1. SHERIF ABDELMAGID
1290 Prestonwood Crest.
Mississauga – ON – L5V 2Z2 sh_lotfy63@hotmail.com Cell: 416-835-4573
PROJECT MANAGER
Residential complexes / High rise buildings / Buildings ICI
Profile
• Qualified Project manager with 8+ years of experience
• Civil engineer with 14+ years of experience
• Bachelor degree in Civil Engineering , PMP certified
• Managed the construction of 54 storey high rise residential tower with complex structure comprise of steel structure skeleton ,
post tension podium , precast façade with decorative GRC ornaments and luxury finishes apartments and high quality
landscape around. The owner was able to sell all apartments long time before completion.
• In-depth working experience with different types of contract forms
• Experienced in Design management and the application of a wide range of professional skills to co-ordinate and optimize the
design process, with the aim of ensuring that the delivery of the project as per the client and stakeholders expectations
• Experience in conducting value engineering studies and cost control
• Sound exposure to various building engineering disciplines and ability to carry the necessary coordination works
• Advanced computer skills in using Primavera, MS Project, AutoCAD ,Windows, MS Words, MS Excel, MS PowerPoint
• Leadership , Problem solving , Team player , self motivated and Good communication skills
• Fluent in English and Arabic.
Work Experience
Senior Project manager 2002- 2010
Architectural & Engineering Consultant (Artec) - Dubai U.A.E
Artec is a full service consulting firm in Dubai , Bulgaria , Algeria and Bahrain providing urban planning , Architectural , Civil
engineering and construction supervision services , as well as related surveying and consultation .Website http://artecint.com
Here below some of the important projects / achievements:
• Dubai Lagoon (Dubai U.A.E) Still under construction
o Roles and responsibilities: leading the team to manage and control project activities, Review and evaluate contractor’s
claims and submittals of shop drawings /technical method statements and material submittals , chair the regular progress
meeting , evaluate the contractor’s performance with respect to the contract and manage all client’s relation issues.
o The project: Residential Community designed around a large man-made lagoon and a rich landscaped core. The complex is
designed in a contemporary architectural style. Comprise of 38 buildings in different heights (6 to 8 floors) and 2 levels
basements
o Prospective Cost of 544 million US dollars
• Expo Complex (Constantine - Algeria) Design completed 2009
o Roles and responsibilities: Managed the design stage from initiation and collecting client’s requirements and make the
necessary coordination between all disciplines till obtaining the building permit from all relevant authorities
o The project: Commercial and Residential Complex that consists of three phases with total built up area 285,000 m². The
project included: Expo center, Hotel, office building, shopping center and 6 residential buildings
o Prospective Cost of 148 million US dollars
• Marina Crown (Dubai U.A.E) Completed 2007
o Roles and responsibilities: mange and executes the scope of works contracted, monitor & control the project base line
plans
o The project: Residential Tower comprise of (2 basement +M+ 50 floors) this high rise building has a steel structure,
precast façade and luxury finishes
o Final cost 54.3 million US dollars
Resident Engineer 1998- 2002
Arenco Architectural & Engineering Consultant (Arenco) - Dubai U.A.E
Founded in 1971Arenco is international consultancy firm having head office in Dubai and Branches in London and Huston
Providing full design and supervision services for many of prestigious projects. Website http://www.arencoar.com
Here below some of the important projects / achievements:
Sherif Abdelmagid sh_lotfy63@hotmail.com Page 1 of 3
2. • Internet City (Dubai U.A.E) Completed 2002
o Roles and responsibilities: mange and executes the scope of works contracted, monitor & control the project base line
plans. Coordinate with IT consultant , infrastructure designer and the Master Developer
o The project: group of 5 Office Buildings (Basement + Ground +5) including large landscaping and retail area
o Cost of 28.6 million US dollars
• Emirates Airlines Staff Accommodation (Dubai U.A.E) Completed 2001
o Roles and responsibilities: mange and executes the scope of works contracted, monitor & control the project base line
plans
o The project: Four Buildings (Basement + Ground +3) containing 980 units.
o Cost of 27.5 million US dollars
• 84 Villas Complex (Dubai U.A.E) Completed 1999
o Roles and responsibilities: mange and executes the scope of works contracted, monitor & control the project base line
plans
o The project : Group of 84 commercial villas (G+1)
o Cost of 12.5 million US dollars
Resident Engineer 1995- 1998
Architectural & Engineering Consultant (Artec) - Dubai U.A.E
Here below some of the important projects / achievements:
• Al Manarah Tower (Sharjah U.A.E) Completed 1998
o Roles and responsibilities: representing the consultant design team and provide technical back up to the contractor and
ensure that work execution as per the intended design.
o The project : Residential tower (2 Basement +G+M+22)
o Cost of 10.5 million US dollars
• Al Abbar Villas Complex (Dubai U.A.E) Completed 1997
o Roles and responsibilities: representing the consultant design team and provide technical back up to the contractor and
ensure that work execution as per the intended design
o The project : group of 12 commercial villas (G+1)
o Cost of 12.5 million US dollars
• Sarah Shopping Center and Offices (Sharjah U.A.E) Completed 1996
o Roles and responsibilities: representing the consultant design team and provide technical back up to the contractor and
ensure that work execution as per the intended design
o The project: shopping mall that has a basement car park (B+ G + M + 9 Floors) 4 levels shopping mall and 7 levels offices
10 million US dollars
Building Inspector 1991- 1995
Dubai Municipality - Dubai U.A.E
Working as Building Inspector in the Building control department – Dubai Municipality –
Visiting the sites under construction and make sure that works in progress is according to the building permit obtained and
with respect to the common practice, DM safety manual and specifications.
During such I was obliged to report violation to the above if any and also make technical evaluation / reports in case of
disputes between Owners / Consultants / Contractors.
Site Engineer 1988- 1990
Atlas General Contracting – Cairo - Egypt
Working as Site Engineer in the following project :
• Badr City (Cairo - Egypt) Completed 1990
o Roles and responsibilities: Site Engineer (contractor) Executing the work contracted and ensuring its adherence to
regulations, contract drawings and specifications, conducting the progress & technical meetings , carrying all
correspondences with all engaged parties
o The project : Fifteen residential buildings (G +5 Floors)
o Construction finished in 1990
Site Engineer 1987- 1988
Cairo waste water consortium – Cairo - Egypt
Sherif Abdelmagid sh_lotfy63@hotmail.com Page 2 of 3
3. Working as Site Engineer in the following project :
• Cairo Waste Water Tunnel Network (Cairo - Egypt) Completed 1988
o Roles and responsibilities: Site Engineer (contractor) Executing the work contracted and ensuring its adherence to
regulations, contract drawings & specifications
o The project : 20 meter underground, 5 km long tunnels. Including grouting around the tunnel and brick cladding inside
the tunnel
EDUCATION AND TRAINING COURSE
• B. Sc. Civil Engineering (Ain Shams University –Cairo – Egypt -1987)
• Completed Course in M.S project May 1996
• Completed Course in Primavera project planning October 2003
• Completed PMP Exam preparation course May 2008
• PMP Certified- December 2009
References shall be given upon request
Sherif Abdelmagid sh_lotfy63@hotmail.com Page 3 of 3