1. CURRICULAR VITAE
NAME : JAMILATUL ADAWIAH BINTI MOHD AMINUDIN
AGE : 36 YEARS
DATE OF BIRTH : 21st
MARCH, 1980
MARITAL STATUS : MARRIED
ADDRESS : LOT 1544, JALAN 1D/3,
BANDAR BARU SG. BULOH,
47000 SG. BULOH,
SELANGOR DARUL EHSAN
NATIONALITY : MALAYSIAN
QUALIFICATIONS : DIP. OF ELECTRONIC (INDUSTRY)
COMPUTER LITERACY : MICROSOFT OFFICE
DESIGNATION : SENIOR ESTIMATOR
CONTACT NUMBER : 012-6323395
EMAIL ADDRESS : jzed0611@gmail.com
AVAILIBILITY : AS SOON AS POSSIBLE
EXPECTED SALARY : RM 8,000
2. Jamilatul Adawiah Binti Mohd Aminudin
Page 2 of 13
WORKING EXPERIENCE
Feb 2014 – Present : SAPURAKENCANA HL SDN BHD
(Formerly known as KENCANA HL SDN BHD)
Senior Estimator
Responsibility:
• Preparing tender briefing for the bid
preparation/tender for internal presentation by
superior.
• Preparing Request for Quotation (RFQ) to
Sub-Contractors i.e. Detailed Design
Engineering, Marine Warranty Surveyor, Third
Party Verification, Insulation, Electrical &
Instrumentation Works, Bolt Tensioning &
Leak Test, Architectural etc.
• Provide softcopy and fill-in rate for Unit Rates
(general submission)
• Preparing cost estimation work for Topside,
Jacket etc.
• Compilation of submission Commercial / Un-
priced Proposal.
• Preparing all the documents for hand over to
Project Management Team (PMT) for the
succeed project.
• Preparing costing and budgetary for project.
• To conduct, execute, perform any other task
as assigned or instructed by the Management
or other company senior representative i.e.
screening / preparation for Exco Meeting
Ongoing Tender
• Provision of Engineering, Procurement,
Construction, Installation & Commissioning
(EPCCI) for Central Processing Platform
(CPP) for Bokor Phase 3 Redevelopment
Project , EOR Delivery Centre
• Provision of Front End Engineeirng Design
(FEED) and Engineeirng, Procurement,
Construction, Installaton & Commissioning
(EPCIC) of Wellhead Platforms (WHP) for
Bokor Phase 3 Re-development Project, EOR
Delivery Centre
• Provision Of Engineering, Procurement,
Construction, Installation And Commissioning
(EPCIC) For The BNCPP-B Topsides, Jacket
Substructure And Bridge
• Engineering, Procurement & Construction
(EPC) For Bunga Pakma A Wellhead Riser
Platform (BP-A WHRP)
3. Jamilatul Adawiah Binti Mohd Aminudin
Page 3 of 13
• Procurement, Construction And
Commissioning (PCC) Of KNPG-B Topside
PH II, Kinabalu Non Associated Gas (Nag)
Development Project For Petronas Carigali
Sdn Bhd
• Provision Of Engineering, Procurement,
Construction And Commissioning (EPCC) Of
Belum Topsides For SK309/311 Phase II
Sarawak Gas Development Project
• Engineering, Procurement, Construction,
Transportation, Installation And
Commissioning (EPCIC) And Time Charter Of
A Mobile Offshore Production Unit (MOPU)
And Floatting Storage Offloading (FSO) For
Ham Rong Field In Blocks 102&106, Offshore
Northern Vietnam
• Fabrication Of Wellhead Platform (WHP) For
Block PM307 Bertam Field Development
Project
• Provision Of Front End Engineering Design
(FEED) And Engineering, Procurement,
Construction, Installation, And Commissioning
(EPCIC) Of Sepat Gas Development Project
• Supply Of A Mobile Offshore Production Unit
(MOPU) Facility For Wassana Development
Project
• Provision Of Fabrication Quantities And
Associated Services For Kinabalu Re-
Development Project
• Fabrication – Champion 7 Compression
Upgrade Project
• Provision Of Engineering, Procurement,
Fabrication, Installation And Hook-Up &
Commissioning (EPCIC) Of Wellhead
Platforms, Associated Pipelines And Tie-Ins
For Zawtika Project Phase 1B Development
• Fabrication Of E6DP-A Substructure And
Topside
• Procurement, Construction And
Commissioning (PCC) Of Besar-A Welhead
Platform (WHP), Besar Development Project
Successfully Tender
• Package 1 – Provision for Procurement and
Construction (PC) of Topside Package for
SK310 B15 Development
• Package 2 – Provision for Procurement and
Construction (PC) of Jacket Package for
SK310 B15 Development
4. Jamilatul Adawiah Binti Mohd Aminudin
Page 4 of 13
• Mumbai High South Redevelopment Phase III
Project
• Provision Of Engineering, Procurement,
Construction And Commissioning (EPCC) For
BNJT-K And TTJT-A Wellhead Platforms
(WHP)
• Provision Of Detail Engineering, Procurement,
Construction/Fabrication And Commissioning
(EPCC) For Layang Development (Facilities)
Project
• Provision Of Engineering, Procurement,
Construction, Onshore Pre-Commissioning,
Offshore Transportation, Installation And
Offshore Hook-Up And Commissioning
(EPCIC) Of Four (4) Wellhead Platforms,
Associated Subsea Pipelines Brownfield
Works For JDA Block B-17 And B-17-01 Field
Phase 3 Development Project
• Engineering, Procurement, Construction,
Installation & Commissioning (EPCIC)
Contract For Remote Wellhead Platforms
(WHPs) For Full Field Development (FFD)
Project, North Malay Basin Development
• Engineering, Procurement, Construction,
Installation and Commissioning (EPCIC) for
Sea Base Project Phase 1 – Static - MOPU
• Procurement, Construction And
Commissioning (PCC) Of Angsi Compression
Module, Angsi Facilities Upgrading Project
June 2008 – Jan 2014 : KENCANA HL SDN BHD
Estimator
Responsibility:
• Liaise with GM, Tender & Commercial / Senior
Estimator day-to-day related to ongoing
Bidding.
• Helping Senior Estimator for the tendering
• Preparing Costing Summary sheet
• Preparing all unit rate as per instruction in ITB
• Send all to supplier and subcontractor for
getting quotation.
• Prepare and Compile Commercial Proposal
• Prepare Handover document Bidding to
Project Team
• Uploading proposal in E-portal (for ONGC
Tender)
Ongoing Tender
5. Jamilatul Adawiah Binti Mohd Aminudin
Page 5 of 13
• The Provision Of Engineering, Procurement,
Construction And Commissioning Of Topsides
Facilitates For Floating Chemical Enhanced
Oil Recovery (FCEOR) Facility For Angsi
Field Development For Petronas Carigali Sdn
Bhd
• Engineering, Procurement, Construction,
Installation And Commissioning (EPCIC) Of
Yetagun Phase V Development (Yetagun
North Development Project)
• Engineering, Procurement, Construction,
Installation And Commissioning (EPCIC) Of
JDA Gas Balancing Evacuation Project (Eva
Projects)
• Engineering, Procurement, Construction,
Transportation and Installation and Offshore
Hookup and Commissioning (EPCIC) of MDE
Wellhead Platform, Subsea Pipeline (MDE
and JKB) and Receiving Facilities (At JKA and
MDPP)
• Provision Of Fabrication, Hook-Up &
Commissioning Services For Bulan-B
Wellhead Platform
• Fabrication of F14D-A Topside and F14/F29
Process Module
• Fabrication Of D12DR-A AND LADR-A
Substructures
• Fabrication Of D12DR-A AND LADR-A
Topsides
• Fabrication of F14D-A Substructure
• Engineering, Procurement And Construction
(EPC) of Serendah-PA (SN-PA) and
Serendah Accommodation (SN-AA)
Substructures for Muprhy’s Sarawak
SK309/SK311 SPSA Development Project
• Procurement, Fabrication, Testing, Load-out
and Tie-down of Tapis-R Jacket, Piles and
Appurtenances
• Engineering, Procurement, Construction And
Commissioning (EPCC) Of Patricia Satellite
(PT-SA) Topsides Facilities For MURPHY’s
Sarawak SK309/311 SPSA Development
Project
• Detailed Engineering, Procurement,
Fabrication, Installation, And Hook-up &
Commissioning (EPCIC) Of The Booster
Compression Project In The Malaysia-
Thailand Joint Development Area
• Engineering, Procurement, Construction And
Commissioning (EPCC) Of Serendah
Accommodation (SN-AA) Topsides Facilities
6. Jamilatul Adawiah Binti Mohd Aminudin
Page 6 of 13
For Murphy’s Sarawak SK309 / 311 SPSA
Development Project
• Provision Of Engineering, Procurement,
Construction And Commissioning Of Kamelia-
A Wellhead Platform (Whp) Development
(IGD), North Malay Basin Field ("Work")
• 06 Well Head Platform for MHN
Redevelopment Plan, Phase II Project (Larsen
& Toubro Limited) – Fabrication Only
• 05 Well Head Platform for B-193 Process
Platform Project (Larsen & Toubro Limited) –
Fabrication Only
• 06 Well head Platform for MHN
Redevelopment Plan, Phase II Project (OIL
AND NATURAL GAS CORPORATION LTD.)
• B-193 Well Platform (ESSAR OFFSHORE
SUBSEA LTD) – Fabrication Only
• ONGC RS-12 Platform Fabrication (Jacket &
Topside) (ESSAR OFFSHORE SUBSEA LTD)
– Fabrication Only
• Fabrication of Deck for ONGC RS-12 (Jacket
– Fabrication Only) (AFCONS –
INFRASTRUCTURE LIMITED)- Fabrication
Only
• Engineering, Procurement, Construction and
Commissioing for Yetagun Phase 4
Development (Yetagun Booster Compression
Project) (PC Myanmar (Hong Kong) Limited)
Successfully Tender
• Provision of Engineering, Procurment,
Construction and Commissioning (EPCC) of
Kamelia-A Wellhead Platform (WHP) for Early
Production Scheme (EPS), Integrated Gas
Development (IGD), North Malay Basin Field
for Hess Exploration and Production Malaysia
B.V.
• Engineering, Procurement, Construction and
Commissioning (EPCC) of Patricia Satellite
(PT-SA) Topsides Facilities for Murphy’s
Sarawak SK309 / 311 SPSA Development
Project
• Engineering, Procurement, Construction and
Commissioning (EPCC) of Serendah-PA (SN-
PA) Topside for Murphy’s Sarawak SK309 /
311 SPSA Development Project
• Engineering, Procurement, Construction,
Installation & Commissioning (EPCIC) for JDA
Gas Balancing Evacuation Project (EVA
Project)
7. Jamilatul Adawiah Binti Mohd Aminudin
Page 7 of 13
• Procurement, Fabrication, Testing, Load-out
and Tie-Down of Tapis-R Jacket, Piles and
Appurtenances for Exxonmobil Exploration
Production Malaysia Inc.
• Engineering, Procurement, Construction and
Commissioning (EPCC) of Serendah
Accommodation (SN-AA) Topside Facilities
for Murphy’s Sarawak SK309 / 311 SPSA
Development Project
• Engineering, Procurement and Construction
(EPC) of Serendah-PA (SN-PA) and
Serendah Accommodation (SN-AA)
Substructures for Murphy’s Sarawak SK309 /
311 SPSA Development Project
• ICP-R Well Platform Project – MHS (Jacket &
Tripod – Fabrication Only) (AFCONS –
GUNANUSA JOINT VENTURE) – Fabrication
Only
• Provision of Procurement, Construction and
Commissioning (PCC) of Jacket and Topside
for West Belumut Wellhead Platform
(Newfield Peninsula Malaysia Inc.)
• Fabrication of Serampang-A (SEPA)
Production Topside Facilities for SK-309/SK-
311 Phase 1 Gas Development Project
(MURPHY SARAWAK OIL CO., LTD)
• Fabrication of D30 & DANA Wellhead Support
Frame (WHSF), D35 Deck Extension and
Pipeline End Manifold (PLEM) for D1 Cluster
Development Project (PCPP Operating
Company Sdn Bhd)
• Procurement and Construction (PC) of
Tangga Barat Drilling Riser Platform (TBDR-
A) Topside and Jacket for Tangga Barat
Cluster Development Project (Phase 1)
(Petronas Carigali Sdn Bhd)
• Procurement and Construction (PC) of
Kinabalu Drilling Jacket Platform C (KNJT-C)
Topside and Jacket for Kinabalu Non-
Associated Gas (NAG) Development Project
(Petronas Carigali Sdn Bhd)
• Fabrication Package for Dulang Field
Compressed Gas Capacity Enhancement
Project (Petronas Carigali Sdn Bhd)
• Fabrication of CPDR-A Topside (Sarawak
Shell Berhad)
• Fabrication of F28DR-A Topside (Sarawak
Shell Berhad)
May 2006 – June 2008 : KENCANA HL SDN BHD (FORMERLY KNOWN
8. Jamilatul Adawiah Binti Mohd Aminudin
Page 8 of 13
AS HL ENGINEERING (M) SDN. BHD.)
Assistant Estimator/Technical Assistant
(Technical Proposal)
Responsibility:
• Liaise with Project Manager / Estimator day-
to-day related to ongoing Bidding.
• Helping Project Manager / Estimator for the
tendering
• Preparing Costing Summary sheet
• Preparing all unit rate as per instruction in ITB
• Send all to supplier and subcontractor for
getting quotation.
• Prepare and Compile Commercial Proposal
Successfully Tender
• Fabrication, Pre-commissioning and Loadout
of the Cliff Head ‘A’ Platform. [ROC OIL]
• Fabrication of F13E- (SC) DR-A [Sarawak
Shell Berhad]
• Provision of detailed Engineering Design,
Procurement, Fabrication, Transportation,
Hook-up & Commissioning Services EPIC for
Bumi, Bulan & Suriya Gas Field Development.
[Carigali-Triton Operating Company]
• Fabrication of SCDR-A Substructure [Sarawak
Shell Berhad]
May 2005 – Mar 2006 : Cost Estimator cum Project Administrator
Responsibility:
• Liaise with Project Manager’s / Engineer’s day-
to-day problems related to Project /
Administration.
• Prepare Progress Payment, Change Order
Proposal, Field Instruction Request and
Invoice for the project.
• Monitoring invoice status, procedure status,
change order status and field inspection status.
• Monitoring incoming and outgoing
correspondence for the tender.
• Prepared Enquiry & get Quotation from vendor
or supplier for submission.
• Prepared Unit Rate for MTO
• Prepared write-type & Compilation for
Technical Proposal
Tender Involved:
9. Jamilatul Adawiah Binti Mohd Aminudin
Page 9 of 13
• EPC for BO-B, BO-C and BO-D WHRP
Topsides for Bunga Orkid Development
Project. [Talisman Malaysia Limited]
• Fabrication of SFJT-E Topsides &
Substructure. [Sabah Shell Petroleum CO.
LTD.]
• Fabrication of F13E (SC) DR-A. [Sarawak
Sheel Berhad]
• EPCC of the ABU “A” Minimal Relocatable
Integrated Production Platform (MiRIPP), Abu
Clusher Development Project. [Petronas
Cargali Sdn Bhd]
Sept 2003 – Apr 2005 : Project Administrator cum
Document Controller
Responsibility:
• Liaise with Project Manager’s / Engineer’s day-
to-day related to Project / Administration.
• Preparing procedure for the project
• Receive, control, monitor and Filing of project
documentation such as ITB, Technical and
Commercial Proposal, Technical Clarification,
Construction Procedure, AFC & IFC Drawings,
Vendor Documentation and Project
Correspondence.
• Engaged in preparation and submittal of
handover documentation to the Client
• Documentation Administration
• Project Documentation control & filing system
• Monitoring incoming Project corresponding and
distributed network
Project Involved:
• Supply of BAKP-B Integrated Compression
Module for Baram South Development Project.
[Kawasaki Heavy Industries (KHI-PCSB)]
• Fabrication of Baram Wellhead Platform BAJT-
H for Baram South Development Project.
[Petronas Carigali Sdn Bhd]
• Fabrication of E11V-B Platform. [Sarawak
Shell Berhad]
• Fabrication, Hook-up and Commissioning of
Gas Compression Module and Associated
Modification Works for West Natuna Project
(Phase II) [Petronas Carigali Sdn Bhd]
Sept 2002 – Sept 2003 : Assistant Administrator
10. Jamilatul Adawiah Binti Mohd Aminudin
Page 10 of 13
Responsibility:
• Liaise with Project Manager’s / Engineer’s day-
to-day related to Project & Administration.
• Preparing procedure for the project.
• Preparing Unit rate and Compile Commercial
Proposal
• Get Quotation from vendor or supplier for
submission
• Compile Technical Proposal
• Receive, control, monitor and Filing of project
documentation such as ITB, Technical and
Commercial Proposal, Technical Clarification,
Construction Procedure, AFC & IFC Drawings
Vendor Documentation and Project
Correspondence.
• Engaged in preparation and submittal of
handover documentation to the Client.
• Documentation Administration.
• Project Documentation control & filing system
• Monitoring incoming Project/tender
corresponding and distributed network.
• Developed Database system on Microsoft
Access to enable traceability of data
information.
Project Involved:
• EPCC for GMSB City Gate Station
Rejuvenation at Gebeng Industrial Area
Kuantan, Pahang Darul Makmur [Petronas Gas
Berhad]
• EPCC for Gas Metering System for Lundin
PM3-CAA Ohase 2 & 3 Development
[Instromet Asia Pacific]
Tender Involved:
ExxonMobil Exploration And Production
Malaysia Inc.
• Supply of Gas and Liquid Hydrocarbon
Custody Metering System For Guntong-E
Project
• Fabrication, Procurement, Testing, Loadout,
Tiedown and Offshore and Commissioning of
Topsides for Guntong-E, Irong Barat-C and
East Belumut-A Platforms
• Fabrication, Procurement, Testing, Loadout
and Tiedown of Jackets and Appurtenances for
11. Jamilatul Adawiah Binti Mohd Aminudin
Page 11 of 13
Guntong-E, Irong Barat-C and East Belumut-A
Platforms
Petronas Gas Berhad
• Engineering, Procurement, Construction and
Commissioning of Tangga Batu City Gate at
Tangga Batu, Melaka.
• Engineering, Procurement, Construction and
Commissioning of Plentong City Gate at
Plentong, Johor.
• Engineering, Procurement, Construction and
Commissioning of Batang Berjuntai City Gate
at Batang Berjuntai, Selangor.
• Engineering, Procurement, Construction and
Commissioning of Parit Buntar City Gate
Station at Parit Buntar, Perak.
• Engineering, Procurement, Construction and
Commissioning of Nilai City Gate Station at
Nilai, Negeri Sembilan.
• Engineering, Procurement, Construction and
Commissioning of Perlis City Gate Station at
Kg. Tambun Tulang, Perlis.
• Engineering, Procurement, Construction and
Commissioning of Kulim City Gate Station at
Kulim, Kedah.
Petronas Carigali Sdn Bhd
• Fabriaction, Hook-up and Commissioning of
Duyong Gas Compression Module (DUG-
GCM) and Associated Modification of West
Natuna Project (Phase II)
• Hook-up and Commissioning of ANGSI Phase
III Project for ANGSI Phase III Development
Project
Sarawak Shell Berhad
• Supply of Fiscal Gas metering System for
Serai Project
• Supply of Fiscal Condensate Metering System
for Serai Project
Talisman Malaysia Limited
• Engineering, Procurement and Construction
(EPC) of Bunga Raya E (BR-E) CO2 Removal
Platform Jacket for Block PM-3 CAA Phase 4
Development Project
• Provision of Fabrication of CS Pipe Spool for
Mobile Offshore Application Barge (MOAB)
Other Clients
12. Jamilatul Adawiah Binti Mohd Aminudin
Page 12 of 13
• Fabrication, Installation, Pre-commissioning,
Load-out and Sea-fastening of Molikpaq Tie-In
Project, Russia [Technip Geoproduction (M)
Sdn Bhd]
• Trans Thailand Malaysia (TTM) Project –
Onshore Pipeline System [NACAP Asia Pacific
Sdn Bhd]
• MY0370-Telibong Water Supply Scheme,
Sabah M&E Subcontractors [Vivendi Water
Systems Group]
• Fabrication of Water Injection Platform (WP-IA)
Topsides for West Patricia Development
Project [Murphy Sarawak Oil Co. Ltd]
Mar 2002 – Sept 2002 : Technical Clerk
For Project
Responsibility:
• Liaise with Project Manager’s / Engineer’s /
Project Secretary day-to-day related to Project
& Administration.
• Preparing procedure for the project.
• Preparing unit rate and Compile Commercial
Proposal.
• Get Quotation from vendor or supplier for
submission.
• Compile Technical Proposal.
• Receive, control, monitor and Filing of
project/tender documentation such as
Construction Procedure, Vendor
Documentation, Project Correspondence, ITB
and quotation from vendor.
• Engaged in preparation and submittal of
handover documentation to the Client.
• Documentation Administration
• Project Documentation control & filing system
• Monitoring incoming and outgoing for project /
tender corresponding and distributed network.
Project Involved:
• Port Dickson Lateral Looping Pipeline
[Paremba Construction Sdn Bhd]
• EPCC for GMSB City Gate Station
Rejuvenation at Gebeng Industrial Area
Kuantan, Pahang Darul Makmur [Petronas Gas
Berhad]
• EPCC for Gas Metering System for Lundin
PM3-CAA Phase 2 & 3 Development [Instromet
Asia Pacific]
13. Jamilatul Adawiah Binti Mohd Aminudin
Page 13 of 13
Tender Involved:
• Engineering, Procurement, Construction and
Commissioning of Modification for Optimal and
Gurun Lateral Pipelines [Petronas Gas Berhad]
• Engineering, Procurement, Construction and
Commissioning of Modification for Bintulu
Lateral Pipeline [Petronas Gas Berhad]
• Provision of Supply, Fabricate, Install and
Commissioning of Portable / Fresh Water
Transferring System at Puteri Dulang (FSO)
• Engineering, Procurement, Construction and
Commissioning of Puchong, City Gate Station
[Petronas Gas Berhad]
Microsoft Word
Microsoft Excel
Microsoft Power Point
Computer Skills: