2. โข UNIT I INTRODUCTION TO PROCESS PLANNING
โข UNIT II PROCESS PLANNING ACTIVITIES
โข UNIT III INTRODUCTION TO COST ESTIMATION
โข UNIT IV PRODUCTION COST ESTIMATION
โข UNIT V MACHINING TIME CALCULATION
14. Selection of Process planning system
Major factors to be considered while selecting the
best process planning system are:
i. General Environment
ii. Organisational Structure
iii. Technical Expertise
iv. Needs and Objectives of the company
16. The following information can be obtained from the
interpretation of an engineering drawing:
i. Material of the product
ii. Number of parts to be produced
iii. Weight of the component
iv. Dimensions of the parts
v. Dimensional and geometric tolerances
vi. Size and Accuracy
31. Material Evaluation Method
1. Shape or Geometry Consideration
2. Material Property Requirements
3. Manufacturing Considerations
32. Shape or Geometry Consideration
Some of the important shape or Geometry considerations are:
โข Relative size
โข Complexity
โข Dimensional Tolerance
โข Surface Finish
โข Allowances
โข Design for Assembly
โข Design for Manufacturability
34. Material Property Requirements
i. Mechanical Properties
ii. Physical Properties
iii. Service Environment
Manufacturing Considerations
โข Standard Components
โข Ease of Manufacture
โข Quantity and rate of components
โข Minimum and Maximum
โข Level of Quality
โข QA and Inspection Requirements
โข Ease of Assembly