PRODUCTION PLANNING
AND PROCESS
PLANNING
Unit-3
PRODUCT PLANNING
• Product Planning is the ongoing process of
identifying and articulating market
requirements that define a product’s feature
set.
• Product planning serves as the basis for
decisions about price, distribution and
promotion.
EXTENDING ORIGINAL PRODUCT
INFORMATION
VALUE ANALYSIS
• Value, as defined, is the ratio of function
to cost. Value can therefore be increased by
either improving the function or reducing
the cost
LACK OF PRODUCT PLANNING
• Unsatisfied customer
• Durability deteriaration
• Lack of quality
• Loss of brand name., Etc
PROCESS PLANNING
ROUTING
SCHEDULING
DISPATCHING
FOLLOW UP
PROCESS PLANNING – INPUT INFO.
• PRODUCT
• PROCESS
• CAPACITY
• ORDERS
• DUE DATES
• RESOURCES
• ETC.,
STEPS IN PROCESS PLANNING
• Analyzing environment
• Establishing objectives or goals
• Seeking necessary Information
QUANTITY DETERMINATION –
BATCH PRODUCTION
• Economic batch quantity (EBQ), also called "optimal batch
quantity" or economic production quantity, is a measure used
to determine the quantity of units that can be produced at
minimum average costs in a given batch or production run.
• Economic Production Quantity model (also known as the EPQ
model) is an extension of the Economic Order Quantity
model. The Economic Batch Quantity model, or production
lot-size model, is similar to the EOQ model in that an optimum
is to be calculated for the batch quantity to be produced.
EBQ
In working with this EBQ model, principal assumptions are:
• The demand (D) is known and constant within a certain period of time
• The unit cost of the inventory item (U) is constant
• The annual holding-cost per unit (Ch) is constant
• The setup-cost per batch (C) is constant
• The production time (tp) is known and constant
• there is one kind of product
• There is no interaction with other products
• The aspect of time does not play a role, just the setup time does
• The setup cost is constant and does not act upon the batch quantity.
Variables
• K = setup cost
• D = demand rate
• F = holding cost
• T = cycle length
• P = production rate
Formula: Sqrt(2x annual demandx setup costs)/(inventory carrying cost per unit)

More Related Content

Similar to PRODUCTION PLANNING AND CONTROL UNIT3

ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfahirwarrajeev198
 
Ppc unit-1-production planning and control
Ppc   unit-1-production planning and controlPpc   unit-1-production planning and control
Ppc unit-1-production planning and controlkarthi keyan
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.PraveenManickam2
 
capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptxhafidhisaidi
 
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptxPRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptxkshitij808555
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL AttiMurugan
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Controlshrinivas kulkarni
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & ControlKunalJagtap5
 
MG6863 Engineering Economics
MG6863 Engineering EconomicsMG6863 Engineering Economics
MG6863 Engineering EconomicsP Manimaran
 
eMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management aeMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management aRai University
 
Bba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsBba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsStephen Ong
 
Session 8 cost planning and definition (1)
Session 8  cost planning and definition (1)Session 8  cost planning and definition (1)
Session 8 cost planning and definition (1)Marwan AL Hashdei
 
NUS DOS3701 Week 3 PPT Supply Chain Management
NUS DOS3701 Week 3 PPT Supply Chain ManagementNUS DOS3701 Week 3 PPT Supply Chain Management
NUS DOS3701 Week 3 PPT Supply Chain Managementyxiinyu
 

Similar to PRODUCTION PLANNING AND CONTROL UNIT3 (20)

Unit 1 PPC
Unit 1 PPCUnit 1 PPC
Unit 1 PPC
 
ACCA
ACCAACCA
ACCA
 
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
 
Ppc unit-1-production planning and control
Ppc   unit-1-production planning and controlPpc   unit-1-production planning and control
Ppc unit-1-production planning and control
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.
 
capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptx
 
UNIT IV COST ACCOUNTING
UNIT IV COST ACCOUNTINGUNIT IV COST ACCOUNTING
UNIT IV COST ACCOUNTING
 
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptxPRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Standard costing
Standard costingStandard costing
Standard costing
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
MG6863 Engineering Economics
MG6863 Engineering EconomicsMG6863 Engineering Economics
MG6863 Engineering Economics
 
eMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management aeMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management a
 
Inventory mgt
Inventory mgtInventory mgt
Inventory mgt
 
Bba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsBba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory models
 
Session 8 cost planning and definition (1)
Session 8  cost planning and definition (1)Session 8  cost planning and definition (1)
Session 8 cost planning and definition (1)
 
NUS DOS3701 Week 3 PPT Supply Chain Management
NUS DOS3701 Week 3 PPT Supply Chain ManagementNUS DOS3701 Week 3 PPT Supply Chain Management
NUS DOS3701 Week 3 PPT Supply Chain Management
 
15 operations, quality and productivity
15  operations, quality and productivity15  operations, quality and productivity
15 operations, quality and productivity
 

More from SIVASHANKAR N

Artificial Neural Network in recent research
Artificial Neural Network in recent researchArtificial Neural Network in recent research
Artificial Neural Network in recent researchSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESS
MANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESSMANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESS
MANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESSSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINES
MANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINESMANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINES
MANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINESSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
MACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATIONSIVASHANKAR N
 
PRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATIONPRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATIONSIVASHANKAR N
 
INTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONINTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONSIVASHANKAR N
 
PROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIESPROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIESSIVASHANKAR N
 
PROCESS PLANNING AND COST ESTIMATION
PROCESS PLANNING AND COST ESTIMATION PROCESS PLANNING AND COST ESTIMATION
PROCESS PLANNING AND COST ESTIMATION SIVASHANKAR N
 
PRINCIPLES OF MANAGEMENT.pptx
PRINCIPLES OF MANAGEMENT.pptxPRINCIPLES OF MANAGEMENT.pptx
PRINCIPLES OF MANAGEMENT.pptxSIVASHANKAR N
 
PRODUCTION PLANNING AND CONTROL unit 5.ppt
PRODUCTION PLANNING AND CONTROL unit 5.pptPRODUCTION PLANNING AND CONTROL unit 5.ppt
PRODUCTION PLANNING AND CONTROL unit 5.pptSIVASHANKAR N
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLSIVASHANKAR N
 
PRODUCTION PLANNING AND CONTROL UNIT 2
PRODUCTION PLANNING AND CONTROL UNIT 2PRODUCTION PLANNING AND CONTROL UNIT 2
PRODUCTION PLANNING AND CONTROL UNIT 2SIVASHANKAR N
 
Topic-4-Belt-Drives-Pulleys.ppt
Topic-4-Belt-Drives-Pulleys.pptTopic-4-Belt-Drives-Pulleys.ppt
Topic-4-Belt-Drives-Pulleys.pptSIVASHANKAR N
 
ABRASIVE AND BROACHING
ABRASIVE AND BROACHINGABRASIVE AND BROACHING
ABRASIVE AND BROACHINGSIVASHANKAR N
 

More from SIVASHANKAR N (20)

Artificial Neural Network in recent research
Artificial Neural Network in recent researchArtificial Neural Network in recent research
Artificial Neural Network in recent research
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
MANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESS
MANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESSMANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESS
MANUFACTURING PROCESS-II UNIT-4 ABRASIVE PROCESS
 
MANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINES
MANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINESMANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINES
MANUFACTURING PROCESS-II UNIT-3 SHAPER MACHINES
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
MACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATION
 
PRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATIONPRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATION
 
INTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONINTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATION
 
PROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIESPROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIES
 
PROCESS PLANNING AND COST ESTIMATION
PROCESS PLANNING AND COST ESTIMATION PROCESS PLANNING AND COST ESTIMATION
PROCESS PLANNING AND COST ESTIMATION
 
PRINCIPLES OF MANAGEMENT.pptx
PRINCIPLES OF MANAGEMENT.pptxPRINCIPLES OF MANAGEMENT.pptx
PRINCIPLES OF MANAGEMENT.pptx
 
PRODUCTION PLANNING AND CONTROL unit 5.ppt
PRODUCTION PLANNING AND CONTROL unit 5.pptPRODUCTION PLANNING AND CONTROL unit 5.ppt
PRODUCTION PLANNING AND CONTROL unit 5.ppt
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
PRODUCTION PLANNING AND CONTROL UNIT 2
PRODUCTION PLANNING AND CONTROL UNIT 2PRODUCTION PLANNING AND CONTROL UNIT 2
PRODUCTION PLANNING AND CONTROL UNIT 2
 
Topic-4-Belt-Drives-Pulleys.ppt
Topic-4-Belt-Drives-Pulleys.pptTopic-4-Belt-Drives-Pulleys.ppt
Topic-4-Belt-Drives-Pulleys.ppt
 
NC AND CNC
NC AND CNCNC AND CNC
NC AND CNC
 
ABRASIVE AND BROACHING
ABRASIVE AND BROACHINGABRASIVE AND BROACHING
ABRASIVE AND BROACHING
 
SHAPERS
SHAPERSSHAPERS
SHAPERS
 
TURNING MACHINES
TURNING MACHINESTURNING MACHINES
TURNING MACHINES
 

Recently uploaded

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 

Recently uploaded (20)

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 

PRODUCTION PLANNING AND CONTROL UNIT3

  • 2. PRODUCT PLANNING • Product Planning is the ongoing process of identifying and articulating market requirements that define a product’s feature set. • Product planning serves as the basis for decisions about price, distribution and promotion.
  • 3.
  • 5. VALUE ANALYSIS • Value, as defined, is the ratio of function to cost. Value can therefore be increased by either improving the function or reducing the cost
  • 6. LACK OF PRODUCT PLANNING • Unsatisfied customer • Durability deteriaration • Lack of quality • Loss of brand name., Etc
  • 8. PROCESS PLANNING – INPUT INFO. • PRODUCT • PROCESS • CAPACITY • ORDERS • DUE DATES • RESOURCES • ETC.,
  • 9. STEPS IN PROCESS PLANNING • Analyzing environment • Establishing objectives or goals • Seeking necessary Information
  • 10. QUANTITY DETERMINATION – BATCH PRODUCTION • Economic batch quantity (EBQ), also called "optimal batch quantity" or economic production quantity, is a measure used to determine the quantity of units that can be produced at minimum average costs in a given batch or production run. • Economic Production Quantity model (also known as the EPQ model) is an extension of the Economic Order Quantity model. The Economic Batch Quantity model, or production lot-size model, is similar to the EOQ model in that an optimum is to be calculated for the batch quantity to be produced.
  • 11. EBQ In working with this EBQ model, principal assumptions are: • The demand (D) is known and constant within a certain period of time • The unit cost of the inventory item (U) is constant • The annual holding-cost per unit (Ch) is constant • The setup-cost per batch (C) is constant • The production time (tp) is known and constant • there is one kind of product • There is no interaction with other products • The aspect of time does not play a role, just the setup time does • The setup cost is constant and does not act upon the batch quantity. Variables • K = setup cost • D = demand rate • F = holding cost • T = cycle length • P = production rate Formula: Sqrt(2x annual demandx setup costs)/(inventory carrying cost per unit)