The document provides details about the Capital Gate building project in Abu Dhabi. It describes the building as having a record lean of 18 degrees and being 160 meters tall. Unconventional construction methods were used, including pre-cambering and post-tensioning of the core and custom steel diagrids. The building achieved several awards and set new benchmarks in civil engineering.
9953330565 Low Rate Call Girls In Rohini Delhi NCR
Capital Gate Case Study
1. Capital Gate
Case Study
Presented By:
Jeesmon Babu
S7 CE B
Roll no. -35
Guided By:
Mr. Lins Paul Kuriakose
Assistant Professor
Dept. Of Civil Engg
2. Capital Gate- Case Study
VISWAJYOTHI COLLEGE OF ENGINEERING
AND TECHNOLOGY, VAZHAKULAM
VISION
“Moulding Engineers par Excellence with Integrity, Fairness and Human Value”
MISSION
We commit to develop the institution into a Center of Excellence of
International Standards.
We guide and mould our students in the attainment of intellectual and
professional competence for successfully coping with the rapid and challenging
advancements in technologies and the ever changing world of business,
industry and services.
3. Capital Gate- Case Study
We help and support our students in their personal growth shaping them
into mature and responsible individuals.
We strive to cultivate a sense of social and civic responsibility in our
students, empowering them to serve the humanity.
We promise to ensure a free environment where quest for the truth is
encouraged.
4. Capital Gate- Case Study
CIVIL ENGINEERING
DEPARTMENT
VISION
“Building Professionally Competent and Motivated Engineers in the Arena of
Civil Engineering with High Professional Ethics.”
MISSION
To promote a better teaching learning process through academically
proficient faculties, full fledged laboratories and excellent infrastructure
facilities.
To equip the graduates with knowledge, research and practical skills in
modern construction practices and techniques.
To inculcate knowledge of sustainability in various domains of Civil
Engineering.
To nurture Civil Engineers into ethically strong and responsible leaders to
address global challenges through quality education.
5. Capital Gate- Case Study
PROGRAM EDUCATIONAL OBJECTIVES
Our Graduates
Shall tackle the multiple responsibilities of analysis, design and
construction of traditional and modern systems in compliance with various
codes of practices and to meet the current technical challenges.
Shall be proficient in the use of relevant software packages for planning,
designing, scheduling, executing and controlling of civil engineering
projects, with an urge for life-long learning.
Shall function effectively with individual capabilities as well as with a
collective strength as a professional team with good communication skills.
6. Capital Gate- Case Study
PROGRAMME SPECIFIC
OUTCOMES
CIVIL ENGINEERING DEPARTMENT
Ability to utilize civil engineering principles and software that are appropriate
to solve technical problems, prepare design and construction documents ,create
structural systems; produce drawings, reports and quantity estimates related to
the Civil Engineering domain.
Ability to utilize modern surveying methods for land measurement and/or
construction layout and to conduct standardized field /laboratory tests related to
Civil Engineering.
7. Capital Gate- Case Study
Overview
Introduction
Design and Aesthetics
Achievements and awards
Foundation
Core
Diagrids
Façade
Splash
Atrium
Amenities
Project Data
Project Timeline
conclusion
6
9. Capital Gate- Case Study
Introduction
Located in Abu Dhabi Capital Centre
Record lean of 18 degree west
Centerpiece of ADNEC Complements
the national grandstand
35 storeys
160 m tall
Built up area of 53100 square meter
8
10. Capital Gate- Case Study
Design and Aesthetics
Something unique never achieved before
Inspired from sand dunes of the desert and
waves of the sea
Dynamic and Fluidic design
Every element is unique
No two sections or floor plan are same
9
Courtesy: google
Courtesy: google
14. Capital Gate- Case Study
Achievements and awards
Best Commercial High-rise Development at International Property Awards
2015
"Farthest manmade leaning building“ by Guinness World Records 2010
Commercial/Mixed-Use Built and Overall Project of the Year Award 2011-
Cityscape Global Awards
First building to use Pre Cambered Core
First building to use vertical tensioning in core
13
15. Capital Gate- Case Study
Foundation
RRC Raft foundation on top
6000 cubic meter sand was
removed
490 piles
Depth of 20 m –Compression side
600mm dia
Depth 30 m – Tension side
1000mm dia
14
16. Capital Gate- Case Study
Core
Used to transfer building
load to ground
Pre cambered
Post tensioned
Jump forming
Houses stairways , lifts
and other amenities
15
17. Capital Gate- Case Study
Pre cambered
Core is built with a tilt as floors are
stacked its pulled to become straight
Rebars were set during day and
concrete was placed at night
Reinforced with 10,000 tons of steel
Concrete of 250mm slump
15,000 cubic meters of concrete
16
18. Capital Gate- Case Study
Post Tensioned
Usually used in bridge decks
Vertical ducts are used
146 steel tendons 20m long spliced
at 5 m
120 tons of tendons
17
19. Capital Gate- Case Study
Jump forming
The formwork is prepared for
the core and that section is
concreted
The whole form work is lifted
using hydraulic jacks and
above processes is repeated
18
20. Capital Gate- Case Study
Diagrids
Each one custom fabricated in
Sharjah
external shell to transfer loads to
the ground and core
Egg shell
More space
19
21. Capital Gate- Case Study
External Diagrid
Transfers external load to
ground
Hollow Square sections
600mmx600mm
Built of welded steel plates
80mm to 40mm
RCC ring beam at ground takes
load
20
Courtesy: capitalgate.ae
22. Capital Gate- Case Study
Internal Diagrid
In place to transfer load of the atrium
Transfers loads to the core
8 m high steel plates connected to core
Hollow round steel 400mm diameter
Mirrors the external diagrid
21
Courtesy: Jeff Schofield
23. Capital Gate- Case Study
Outriggers
Experiences moderate winds
Resisted by curved shape
Used to counter act lateral forces
Horizontal trusses in the mechanical floor
Transfers lateral forces from external
structure to the core
22
24. Capital Gate- Case Study
Façade
Diamond shaped panels each
custom made
8mx8m
12500 Triangular glass panes
20mm shifts experienced
Waterproof
23
25. Capital Gate- Case Study
The glazing system, called
Cardinal C240, is made of two
silver coatings which are
transparent, increasing its light
transmission.
Double skin façade
24
Courtesy: capitalgate.ae
26. Capital Gate- Case Study
Splash
Built to protect the office sections from direct sunlight
Serves an aesthetic purpose
25
Courtesy: Jeff Schofield
Courtesy: Jeff Schofield
27. Capital Gate- Case Study
Atrium
Funnel shaped opening in hotel section
To reduce weight on the top floors
Allows sunlight through a skylight in the roof
26
Courtesy: Jeff Schofield
28. Capital Gate- Case Study
Amenities
Infinity pools
Restaurants
Helipad
27
Courtesy: capitalgate.ae
Courtesy: capitalgate.ae
29. Capital Gate- Case Study
30 meeting rooms
Conference facilities for 1,200
people
District cooling system
Business center on the ground
floor
28
Courtesy: capitalgate.ae
Courtesy: google
Courtesy: google
30. Capital Gate- Case Study
Project Data
Cost of the project was $233 million
600 people labor force from different countries
400 sub contractors
Height to Architectural Top: 165 meters
Total built up Area: 53,100 square meters
Project Developer: ADNEC Group
Architect , Structural Engineer, MEP Engineer: RMJM
Façade Consultant: Hyder Consulting
Landscape Consultant: Al Khatib Cracknell
Main Contractor: Al Habtoor Engineering
Steel Contractor: Eversendai Façade Contractor: Waagner Biro
Project Manager: Mace
29
31. Capital Gate- Case Study
Project Timeline
September 2007 – work commence
November 2007 – Pile driving starts
April 2008 – Core wall construction starts
February 2009 – Façade commences
May 2009 – Reaches 100 m in height
June 2009 – Incline starts to take shape
October 2009 – Attains final height of 160 m
December 2009 – Completion of exterior core structure
January 2010 – First phase of splash completed
February 2010 – Interior fit-out commences
March 2010 – Commencement of link bridge to Abu Dhabi
National Exhibition Centre
April 2010 – Commencement of atrium roof
2011 – Completed construction
Opening date 21 Dec 2011
30
32. Capital Gate- Case Study
Conclusion
An engineering marvel that sets an example for upcoming engineers that
nothing is too big to be achieved. It also shows the advanced technologies
used to erect this gravity defying structure.
Use of unconventional methods to get the work done in most efficient and
economic ways set new benchmarks for civil engineering
31
33. Capital Gate- Case Study
References
https://www.designbuild-network.com/projects/capital-gate/
http://www.capitalgate.ae/building.html
All video courtesy National Geographic Channel –”The Leaning Tower of
Abu Dhabi”
32