SlideShare a Scribd company logo
1 of 41
Download to read offline
CAPITAL GATE, ABU DHABI
PRESENTED BY: SMIT PANCHAL
● The Capital Gate building is located in Abu Dhabi, which is
the second largest city in the United Arab Emirates. This is a
t-shaped island which juts into the Persian Gulf.
● The building is an icon in the city, and helps establish the
status of Abu Dhabi as a global megacity. The coordinates of
the building are 24.4187° N, 54.4347° E.
● skyscraper is located next to the Grandstand, a monument
of national importance. This is done to link the future of Abu
Dhabi with its past.
LOCATION
● The climate of Abu Dhabi is subtropical and arid with high temperature and sunny blue skies.
● The average rainfall is 12cms per year mainly falling during winter season from november to march.
The summer’s from the month october to may the temperature will be typically above 40°C and during
winter the temperature ranges from 13°C to 24°C.
● Air conditioning is considered as a much needed and import necessity for all vehicles and buildings such
as hotels, conference and exhibition halls and shopping malls.
● We see that the climate plays a role in the construction of the building as well. When the concrete was
poured, it cracked due to the heat. Therefore, to work around this, the concrete had to be poured at
night.
CONT…
IN COMPLIANCE WITH CODE REQUIREMENTS
● Building height: 160M (high rise)
● Occupancy type : Group A(institutional/public), R1(hotel)
● Occupancy category : (iii) (more than 800 people)
● Reinforced concrete grade : Deflection does not exceed ACI
318
● Steel grade : Deflection does not exceed AISC 360
● Seismic consideration : site class “E’ - values determined in
accordance to ASCE 7
● Fire safety : SFRM minimum bond strength - 48 Kpa
● wind consideration : 80 percent of design base overturning
moments determined in accordance to ASCE 7
● Soil consideration : Lateral soil load (active pressure) - 7.05
PROJECT TIMELINE
• September 2007 – Enabling works commence
• November 2007 – Pile driving starts
• April 2008 – Core wall construction starts
• February 2009 – Façade commences
• May 2009 – Reaches 100 m in height
• June 2009 – Incline starts to take shape
• October 2009 – Attains final height of 160 m
• December 2009 – Completion of exterior core
• January 2010 – First phase of splash complete
• February 2010 – Interior fit-out commences
• April 2010 – Commencement of atrium roof
• 2011 – Expected completion of construction
• Capital Gate is the 35 storey focal point of Abu
Dhabi’s capital centre.
• Certified by the Guinness book of records as the
farthest leaning tower.
• Constructed with steel diagrid technology and
prestressed precambered elliptical core.
• The tower is 160 meters high with a lean of 18
degrees i.e. 35 meters overhang and has a massive
eccentric dead weight.
INTRODUCTION
INTRODUCTION
• Also known as leaning tower of Abu Dhabi.
• Floors 2 to 16 accommodate commercial and office
space and the top floors accommodate the Hyatt
hotel.
• The tower has a organic shape which was inspired
by the wind shaped sand structures in the desert.
● Ever since the building was constructed in the year 2011, it has become
the pride of Abu dhabi. A structure, truly one of a kind and the best in its
class, it has helped Abu Dhabi retain its name and stature as a global
megacity.
● It forms the focal Point of the Abu Dhabi National Exhibition Center
Complex and the the Capital Center Master Redevelopment , along with
other 23 towers, that include branded hotels, commercial buildings,
residential, service apartment complexes and developments for mixed
use.
● Its location plays a vital role is one of the many reasons why it is
considered iconic. It dominates the waterfront area, overlooking an
urban highway and rising above other developments in its immediate
vicinity.
● It is the only tower in the world that has this degree of inclination. It
inclines at an astounding 18 degrees and holds the Guinness World record
for the furthest leaning manmade tower in the world.
INTRODUCTION
ARCHITECTS: RMJM Architects
LOCATION: Abu Dhabi, United Arab Emirates
COORDINATES: 24.4187° N, 54.4347° E
COMPLETION DATE: 2011
BUILDING USE: Hyatt Hotel, Commercial spaces and
mixed use.
HEIGHT: 164 M
FLOORS: 35
BUILT UP AREA: 53,100 SQM
OFFICE AREA: 14,396 SQM HOTEL
AREA: 25,050 SQM
FOOTPRINT: 1,390 SQM
INCLINATION: 18 DEGREES PROJECT
MANAGER: Mace Group
CONTRACTOR: AL Habtoor Leighton Group
OWNER: ADNEC (Abu Dhabi Exhibitions Company)
COST: $231 million
INTRODUCTION
PROJECT DATA
“It is the first building in the world to use a
pre-cambered core with a built-in lean of 350
millimeters that has been engineered to
straighten with the addition of the upper
floors. It is also the first building in the world
to use vertical post-tensioning of the core to
counter movement and support stresses
created by the building’s overhang.”
PROJECT DATA
● The Capital Gate is an iconic structure on the skyline ofthe
Emirate of Abu Dhabi.
● The tower’s curvaceous shape is inspired strongly from two main
geological elements, one being the sea and the other, the desert.
These two elements resonate strongly with the essence of Abu
Dhabi.
● The main building’s form is meant to symbolize a swirling spiral of
sand, while the curved canopy, known as the “splash,” is meant to
represent the waves in the sea. Itcreates a wave-like effect,
reflecting the building’s proximity to the water and the city’s
seafaring heritage.
● The imposing mass, the organic fluidity of its twist, and the
idiosyncratic lean of the funnel -shaped tower, combine to
embody a specific time, a particular space and a specific volume,
reflecting the geography and culture of ABuDhabi.
GROUND FLOOR PLAN MEZZANINE FLOOR PLAN
SECOND FLOOR -OFFICES 16TH FLOOR -OFFICES
FLOOR PLAN
FLOOR PLAN
18TH FLOOR-RESTAURANT 19TH FLOORAMENITIES
20TH FLOOR -HOTEL 30TH FLOOR-HOTEL
SECTIONAL ELEVATION
SECTIONAL ELEVATION
MAIN STRUCTURE
● The structure consists of a post tensioned concrete core
surrounded by two steel truss systems (diagrid system).
● External and Internal diagrid system (lateral load resisting
system).
● Steel beams support concrete floor & run
throughout the diagrid system horizontally at the
node intervals.
● Outrigger are horizontal trusses used to connect
the building core to the exterior bracing system.
THE CORE
● The core was pre cambered meaning it was initially tilted away
from the overhang ofthe building and was straightened by the
dead load of the building.
● The core was built using the technique called jump forming.
● The concreting was done at night to avoid the extreme day heat
which may cause the concrete to dry and crack.
THE CORE
● Slump tests were carried out on every batch of concrete.
● The core was post tensioned.
● A total of 146 tendons were incorporated into the
core through ducts.
● Each 20 meters long tendons spans 5 floors and overlaps at
each ends. .
● Pneumatic jack was used to stretch each tendon at a time.
FLOOR SYSTEM
● A composite floor system is used, spanning from the
main core to internal and external diagrids.
● Floor beams are connected to the concrete core via
embedment plates already casted in the core walls.
● From level 1 to level 10, the floor plates are stacked
directly over one another, and then begins to stagger
over each other at 800-1400mm and then back to
900mm in
line with the lean of the building, between level 10
through 27.
● The remaining floors, between levels 27 and 34, shift
between 900mm - 300mm.
LOAD TRACING
LOAD TRACING
BUILDING STRUCTURE IN MULTIFRAMEAUTOCAD WIREFRAME OF THE BUILDING
STRUCTURE
LOAD TRACING
● The exoskeleton of the building is connected to the central core by horizontal steel girders that run from the
nodes of the diagrid modules to the core.
● These beams support composite metal decks and concrete floor slabs.
● Each story is 4 meters in height, corresponding to half of the diagrid diamond.
● In the 17th floor service area, eight hefty steel transfer spurs are attached to the core on which sits the base
of an internal atrium diagrid.
● The weight of this diagrid is transferred to the core and hence down to thefoundation.
● The internal diagrid provides extra internal support for the overhanging upper floors as well as lessening
their weight by creating a funnel like opening inthem.
● The atrium diagrid is connected to the diagrid exoskeleton by girders spanning the distance between nodes.
● Massive outrigger beams connected to the core support the 12m extension out over thefacade.
● These outer cantilever beams are braced back to the nodes of the diagrid of the two floorsbelow.
• The vertical and horizontal cross-sections of the tower
are all unique.
• Every one of the 12,500 panes of glass on the facade is
a different size, although each pane is triangular.
• The cross section of the tower changes from curved
triangular to curved rectangular as the tower
progresses upwards.
• The structure has two diagrid systems i.e. an external
diagrid and an internal diagrid which is linked to the
central core with eight pin jointed structural members.
• The external diagrid comprises of 8250 members
which are of different thickness , length and
orientation.
• The project was completed within two years.
FACTS ABOUT CAPITAL TOWER
FOUNDATION:
• The foundation consists of a rectangular raft
footing supported on 400 concrete piles of 1
meter diameter
• Half of the piles are under compression and run
to a depth of about 20 meters
• The other half of the piles run to a depth of
about 30 meters and anchor tightly to the soil
and are in tension due to the massive eccentric
overhang of the building
STRUCTURAL ELEMENTS
FOUNDATION:
• The 2 meter deep raft footing was made up of
7000 cum of reinforced concrete to distribute
the loads evenly on the piles.
STRUCTURAL ELEMENTS
INTERNAL DIAGRID
● The internal diagrid cruciforms were made with
80 mm diameter hollow circular sections.
● the top 18 floors houses an atrium whichreduces
the eccentric weight of the building.
● The internal diagrid support the weight of the18
floors and is shaped like a funnel.
● The internal diagrid is connected to the core by8
pin jointed structural members on the 18th floor
also known as mechanical floor.
THE CORE:
• The core was pre cambered meaning it was initially tilted
away from the overhang of the building and was
straightened by the dead load of the building
• The core was built using the technique called jump
forming
• The concreting was done at night to avoid the extreme
day heat which may cause the concrete to dry and crack
• Slump tests were carried out on every batch of concrete
• Concreting was done by pumping and 250 mm slump
concrete was used
• The core was post tensioned
STRUCTURAL ELEMENTS
• A total of 146 tendons were incorporated into the core
through ducts
• Each tendon was 20 meters long and splice overlap was
up to 5 meters
• Pneumatic jack was used to stretch each tendon at a
time
STRUCTURAL ELEMENTS
FAÇADE:
• The façade /body was made up of steel cross sections
called cruciform
• The external diagrid consists of 720 of such cruciform
• Each cruciform if having different curvature , length and
thickness
• The external cruciform were made up of 600×600 mm
hollow rectangular sections , the thickness of the sections
ranged from 80 mm at the bottom to 40 mm at the top of
the tower
• The internal diagrid cruciform were made with 80 mm
diameter hollow circular sections
• The dimensional accuracy +/- 1mm The floor height is 4
meters
STRUCTURAL ELEMENTS
THE FACADE
● The facade consists of the steel diagonal framing system(diagrid), and
diamond shaped glass modules.
● The Diagrid was made up of steel cross sections called cruciforms.
● The external diagrid consists of 720 of such cruciforms.
● Each cruciform has different curvature, length and
thickness.
● The interlocking part of the cruciform is called the diagrid node, and an
horizontal tie beam connect all nodes together horizontally through the
circumference of the building, the give a strong bracing system.
● The external cruciforms were made up of 600 ×600 mm hollow sections,
and the thickness of the sections ranged from 80 mm at the bottom to 40
mm at the top of the tower.
THE FACADE
● Each diamond shaped glass modules are made up of 18
triangular panels connected to each other by hinge
joints forming a diamond shaped panel measuring 8×8
meters, spanning 2 floors vertically.
● There are 26,000 triangular glass panels called c240.
● The diamond modules were connected to each other
by a two layer seal which made it waterproof and also
allowed it to move by 20mm causing a change in
shape.
• The exterior is made up of 26000 triangular
glass panes called c240
• The glass panes consist of two silver
coatings
• Each triangular glass pane has a unique
shape
• 18 triangular panes connected to each
other by hinge joints formed a diamond
shaped panel measuring 8×8 meters
• The diamond panels were connected to
each other by a two layer seal which made
it water proof and also allowed it to change
shape
STRUCTURAL ELEMENTS
• The top 18 floors houses an atrium which reduces the
eccentric weight of the building
• The internal diagrid support the weight of the 18 floors and
is funnel shaped
• The internal diagrid is connected to the core by 8 pin
jointed structural members on the 18th floor also known as
mechanical floor
STRUCTURAL ELEMENTS
• There’s a two storey extension cantilevered
12 meters from the tower
• They are braced to the external diagrid with
circular steel members which reach
diagonally down to the mechanical floor
• The extension houses a swimming pool.
STRUCTURAL ELEMENTS
• The sun shading also known as the
‘splash’ starts from the 18th floor and
extends to the Abu Dhabi national
exhibition center grandstand.
• It is made up of steel members
interlocked to form a mesh.
• The splash protects the building form
direct sunlight and reflects up to 30%
of the incident radiation thus
decreasing the air conditioning
required.
• The splash is supported by circular
members which are connected to the
external diagrid.
STRUCTURAL ELEMENTS
• All common area lighting, power, two escape staircases and elevators are fed from
the landlord’s distribution network. One passenger elevator is backed up by
standby generator power, for use in case of emergency. All life safety systems and
essential services are backed up by the standby generator. In addition, some of
the life safety system and essential system outlets are backed up by uninterrupted
power supply (UPS) to ensure availability of power at all times.
• The building is supplied at 11KV from an Abu Dhabi Distribution Company (ADDC)
primary substation and network to basement sub-station.
• Power is transformed to the operating voltage of 415 volts by five, 1,500KVA
transformers installed in the substation. Main distribution boards (MDBs) are fed
from the transformers installed in the basement low voltage (LV) switchgear room,
adjacent to the substation. MDBs distribute power to the development, through
cable routes, rising bus bars, sub-main distribution boards (SMDBs) and
distribution boards (DBs).
ELECTRICAL SERVICES
• Fresh air ventilation, fan coil unit (FCU) systems , fresh air handling units (AHUs),
smoke extract ventilation system, variable volume air-conditioning system, and chilled
water (CW) system are provided.
• The cooling requirement is served by TABREED district chilled water network,
facilitated by an energy transfer station at the basement and Level 1 of the building as
the primary supply of chilled water network consisting of two units of rated heat
exchangers. The resulting or secondary chilled water lines will be metered as being
conveyed by four rated pumps serving AHUs and FCUs mounted at all floors of the
building.
MECHANICAL SERVICES
• Sanitary wares, water tanks, domestic water systems, soil/waste/vent and overflows,
irrigation system and rainwater system have been included.
• The main source of the building’s potable water, from the ADWEA distribution line, is
stored in a tank at the basement floor, which undergoes a filtration system. The
concrete water tank is a double compartment type, allocated for domestic water, fire
protection system, and irrigation source. Aside from preliminary filtration, the
domestic water passes through a proven anti-legionella chemical dosing system. Water
tanks are provided at basement, Level 1 and Level 17, with compliance to ADDC
requirements of minimum 2 days consumption storage.
PLUMBING
• Steel Load=26.4x100 lb
• Glass Load =46,296,900 lb
• Concrete Load=79, 365,600 lb
• Partition Load=(Area Per Floor x 5 lb/cf of Floor Area) x (# of Floors
(11,000 SF x 5 Ib/cf) x (35 Floors) 1.925x10 lb
• Equipment Load=(Area Per Floor x 5 ib/cf of Floor Area) x (# of Floors
W(11.000 SF x 5 B/cf) x (35 Floors) = 1.925x10 lb
• Ceiling Load=(Area Per Floor x 2 ver of Floor Area) x (# of Floors)
(11,000 SF x 2 b/cf) x (35 Floors) » 770,000 lb
• Vertical Structure Area= 1.5% of Area Per Floor) (Floor Area) x (Building
Height
(0.015x11.000 SF) x (524.9n) 86,608.5 sq.ft.
• Total Dead Load= (Steel Load + Glass Load + Concrete Load Partition Load
Load Ceiling Load)
=1.57x10 lb
LOAD CALCULATION
• Live load
=Assumed Load Per SF for Commercial Budding) x (Total SF of Building)
=(80 lb/sf) x (572.000 SF)
=4.576x10 lb
• Foundation Load
=Total Dead Load + Building Live Load) / (Building Footprint)
=(1.57 10^8 lb 4.576x10^7 lb) / (67812 64 sq.ft)
=2.990 lb/sq. ft
• Max Beam Length:
=11m=36 sq. ft
• Horizontal Wind Load
Max Wind Spaced=100mph=25.9 psf
Building Face Surface Area (largest face)=72204.45 sq.ft
Max wind Speed x Building Face area= 1.87 x 10^6 lb
CONT…
CONT…
● "Capital Gate Tower, Abu Dhabi". 2017. Ctbuh.Org.
http://www.ctbuh.org/TallBuildings/FeaturedTallBuildings/CapitalGateTowerAbuDhabi/tabid/3380/language/en-
GB/Default.aspx/.
● "Capital Gate Building: The Leaning Tower Of Abu Dhabi". 2017. Amusing Planet.
http://www.amusingplanet.com/2013/03/capital-gate-building-leaning-tower-of.html.
● "Capital Gate Tower - The Skyscraper Center". 2017. Skyscrapercenter.Com.
https://www.skyscrapercenter.com/building/capital-gate-tower/3172.
● "The Architect’S Perspective: The Capital Gate". 2017. RMJM. https://www.rmjm.com/the-architects-perspective-the-
capital-gate/.
● "Capital Gate" Hyatt Hotel + Offices | RMJM - Arch2o.Com". 2017. Arch2o.Com. https://www.arch2o.com/capital-gate-
hyatt-hotel-offices-rmjm/.
● "Capital Gate" Hyatt Hotel + Offices | RMJM - Arch2o.Com". 2017. Arch2o.Com. https://www.arch2o.com/capital-gate-
hyatt-hotel-offices-rmjm/.
● Dufresne, Pierre Martin, Gerry O'Leary, and Jeff Schofield. n.d. 18 Degrees.

More Related Content

What's hot

Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise BuildingsPrasad Thanthratey
 
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...Anurag Mathur
 
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiDesign, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studiesSoumitra Smart
 
Case study kohinoor square Mumbai
Case study kohinoor square MumbaiCase study kohinoor square Mumbai
Case study kohinoor square MumbaiTapu Taba
 
High-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock CenterHigh-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock CenterNuruzzamanpeash
 
World one (Lodha Tower)
World one (Lodha Tower)World one (Lodha Tower)
World one (Lodha Tower)Nikunj Rathod
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Towermisschand
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate buildingNayan Rao
 
Swiss re building london
Swiss re building londonSwiss re building london
Swiss re building londonAda Darmon
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building ShrushtiAhirrao1
 

What's hot (20)

Highrise structure
Highrise structureHighrise structure
Highrise structure
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
 
Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
 
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
 
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiDesign, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
 
Cayan tower,dubai
Cayan tower,dubaiCayan tower,dubai
Cayan tower,dubai
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
 
high rise buildings case study
high rise buildings case studyhigh rise buildings case study
high rise buildings case study
 
One world trade centre
One world trade centreOne world trade centre
One world trade centre
 
high rise case study
high rise case studyhigh rise case study
high rise case study
 
Case study kohinoor square Mumbai
Case study kohinoor square MumbaiCase study kohinoor square Mumbai
Case study kohinoor square Mumbai
 
High-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock CenterHigh-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock Center
 
World one (Lodha Tower)
World one (Lodha Tower)World one (Lodha Tower)
World one (Lodha Tower)
 
The Shard
The ShardThe Shard
The Shard
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Tower
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
Swiss re building london
Swiss re building londonSwiss re building london
Swiss re building london
 
BURJ AL ARAB
BURJ AL ARABBURJ AL ARAB
BURJ AL ARAB
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building
 

Similar to CAPITAL GATE, ABU DHABI

CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfAlasAlthaher
 
architectural concept
architectural conceptarchitectural concept
architectural conceptHezhaHaydar
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai towerAmnarao3
 
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxAl Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxRaiyyanKhalak
 
High Rise Structures case study - The Gherkin & Shanghai financial center.
High Rise Structures  case study - The Gherkin & Shanghai financial center.High Rise Structures  case study - The Gherkin & Shanghai financial center.
High Rise Structures case study - The Gherkin & Shanghai financial center.Shabarinath R
 
HIGH RISE BUILDINGS.pptx
HIGH RISE BUILDINGS.pptxHIGH RISE BUILDINGS.pptx
HIGH RISE BUILDINGS.pptxgoreshsaini2
 
ANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxAnshuBarmase
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters DubaiNeha Rampuria
 
Futuristic architecture dynamic architecture
Futuristic architecture    dynamic architectureFuturistic architecture    dynamic architecture
Futuristic architecture dynamic architectureSoumitra Smart
 

Similar to CAPITAL GATE, ABU DHABI (20)

CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdf
 
architectural concept
architectural conceptarchitectural concept
architectural concept
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
BurjAlArab.pdf
BurjAlArab.pdfBurjAlArab.pdf
BurjAlArab.pdf
 
Pm burj case
Pm burj casePm burj case
Pm burj case
 
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxAl Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
 
PPT ON BURJ AL ARAB
PPT ON BURJ AL ARABPPT ON BURJ AL ARAB
PPT ON BURJ AL ARAB
 
burjkhalifa-160318164437.pdf
burjkhalifa-160318164437.pdfburjkhalifa-160318164437.pdf
burjkhalifa-160318164437.pdf
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
High Rise Structures case study - The Gherkin & Shanghai financial center.
High Rise Structures  case study - The Gherkin & Shanghai financial center.High Rise Structures  case study - The Gherkin & Shanghai financial center.
High Rise Structures case study - The Gherkin & Shanghai financial center.
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
HIGH RISE BUILDINGS.pptx
HIGH RISE BUILDINGS.pptxHIGH RISE BUILDINGS.pptx
HIGH RISE BUILDINGS.pptx
 
ANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptx
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
 
KINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWERKINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWER
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
 
Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Futuristic architecture dynamic architecture
Futuristic architecture    dynamic architectureFuturistic architecture    dynamic architecture
Futuristic architecture dynamic architecture
 
Al Hamra Firdous Tower, Kuwait
Al Hamra Firdous Tower, KuwaitAl Hamra Firdous Tower, Kuwait
Al Hamra Firdous Tower, Kuwait
 

More from Self employed

Intelligent building
Intelligent buildingIntelligent building
Intelligent buildingSelf employed
 
Aluminium composite panel
Aluminium composite panelAluminium composite panel
Aluminium composite panelSelf employed
 
National building codes
National building codesNational building codes
National building codesSelf employed
 
Philip johnson- history of architecture
Philip johnson- history of architecturePhilip johnson- history of architecture
Philip johnson- history of architectureSelf employed
 
Romanesque architecture
Romanesque architectureRomanesque architecture
Romanesque architectureSelf employed
 
Islamic architecture in india,
Islamic architecture in india,Islamic architecture in india,
Islamic architecture in india,Self employed
 
Byzantine architecture
Byzantine architectureByzantine architecture
Byzantine architectureSelf employed
 
Islamic architecture
Islamic architecture Islamic architecture
Islamic architecture Self employed
 
Gothic architecture,
Gothic architecture,Gothic architecture,
Gothic architecture,Self employed
 
Hindu temple architecture 1,
Hindu temple architecture 1,Hindu temple architecture 1,
Hindu temple architecture 1,Self employed
 
brick as a building material
brick as a building materialbrick as a building material
brick as a building materialSelf employed
 

More from Self employed (17)

Intelligent building
Intelligent buildingIntelligent building
Intelligent building
 
Aluminium composite panel
Aluminium composite panelAluminium composite panel
Aluminium composite panel
 
National building codes
National building codesNational building codes
National building codes
 
Philip johnson- history of architecture
Philip johnson- history of architecturePhilip johnson- history of architecture
Philip johnson- history of architecture
 
HVAC System
HVAC SystemHVAC System
HVAC System
 
Contouring
ContouringContouring
Contouring
 
Surveying i
Surveying iSurveying i
Surveying i
 
Romanesque architecture
Romanesque architectureRomanesque architecture
Romanesque architecture
 
Islamic architecture in india,
Islamic architecture in india,Islamic architecture in india,
Islamic architecture in india,
 
Byzantine architecture
Byzantine architectureByzantine architecture
Byzantine architecture
 
Islamic architecture
Islamic architecture Islamic architecture
Islamic architecture
 
Gothic architecture,
Gothic architecture,Gothic architecture,
Gothic architecture,
 
Hindu temple architecture 1,
Hindu temple architecture 1,Hindu temple architecture 1,
Hindu temple architecture 1,
 
POLAR REGION
POLAR REGIONPOLAR REGION
POLAR REGION
 
Greek architecture
Greek architectureGreek architecture
Greek architecture
 
Wood
WoodWood
Wood
 
brick as a building material
brick as a building materialbrick as a building material
brick as a building material
 

Recently uploaded

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 

Recently uploaded (20)

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 

CAPITAL GATE, ABU DHABI

  • 1. CAPITAL GATE, ABU DHABI PRESENTED BY: SMIT PANCHAL
  • 2. ● The Capital Gate building is located in Abu Dhabi, which is the second largest city in the United Arab Emirates. This is a t-shaped island which juts into the Persian Gulf. ● The building is an icon in the city, and helps establish the status of Abu Dhabi as a global megacity. The coordinates of the building are 24.4187° N, 54.4347° E. ● skyscraper is located next to the Grandstand, a monument of national importance. This is done to link the future of Abu Dhabi with its past. LOCATION
  • 3. ● The climate of Abu Dhabi is subtropical and arid with high temperature and sunny blue skies. ● The average rainfall is 12cms per year mainly falling during winter season from november to march. The summer’s from the month october to may the temperature will be typically above 40°C and during winter the temperature ranges from 13°C to 24°C. ● Air conditioning is considered as a much needed and import necessity for all vehicles and buildings such as hotels, conference and exhibition halls and shopping malls. ● We see that the climate plays a role in the construction of the building as well. When the concrete was poured, it cracked due to the heat. Therefore, to work around this, the concrete had to be poured at night. CONT…
  • 4. IN COMPLIANCE WITH CODE REQUIREMENTS ● Building height: 160M (high rise) ● Occupancy type : Group A(institutional/public), R1(hotel) ● Occupancy category : (iii) (more than 800 people) ● Reinforced concrete grade : Deflection does not exceed ACI 318 ● Steel grade : Deflection does not exceed AISC 360 ● Seismic consideration : site class “E’ - values determined in accordance to ASCE 7 ● Fire safety : SFRM minimum bond strength - 48 Kpa ● wind consideration : 80 percent of design base overturning moments determined in accordance to ASCE 7 ● Soil consideration : Lateral soil load (active pressure) - 7.05
  • 5. PROJECT TIMELINE • September 2007 – Enabling works commence • November 2007 – Pile driving starts • April 2008 – Core wall construction starts • February 2009 – Façade commences • May 2009 – Reaches 100 m in height • June 2009 – Incline starts to take shape • October 2009 – Attains final height of 160 m • December 2009 – Completion of exterior core • January 2010 – First phase of splash complete • February 2010 – Interior fit-out commences • April 2010 – Commencement of atrium roof • 2011 – Expected completion of construction
  • 6. • Capital Gate is the 35 storey focal point of Abu Dhabi’s capital centre. • Certified by the Guinness book of records as the farthest leaning tower. • Constructed with steel diagrid technology and prestressed precambered elliptical core. • The tower is 160 meters high with a lean of 18 degrees i.e. 35 meters overhang and has a massive eccentric dead weight. INTRODUCTION
  • 7. INTRODUCTION • Also known as leaning tower of Abu Dhabi. • Floors 2 to 16 accommodate commercial and office space and the top floors accommodate the Hyatt hotel. • The tower has a organic shape which was inspired by the wind shaped sand structures in the desert.
  • 8. ● Ever since the building was constructed in the year 2011, it has become the pride of Abu dhabi. A structure, truly one of a kind and the best in its class, it has helped Abu Dhabi retain its name and stature as a global megacity. ● It forms the focal Point of the Abu Dhabi National Exhibition Center Complex and the the Capital Center Master Redevelopment , along with other 23 towers, that include branded hotels, commercial buildings, residential, service apartment complexes and developments for mixed use. ● Its location plays a vital role is one of the many reasons why it is considered iconic. It dominates the waterfront area, overlooking an urban highway and rising above other developments in its immediate vicinity. ● It is the only tower in the world that has this degree of inclination. It inclines at an astounding 18 degrees and holds the Guinness World record for the furthest leaning manmade tower in the world. INTRODUCTION
  • 9. ARCHITECTS: RMJM Architects LOCATION: Abu Dhabi, United Arab Emirates COORDINATES: 24.4187° N, 54.4347° E COMPLETION DATE: 2011 BUILDING USE: Hyatt Hotel, Commercial spaces and mixed use. HEIGHT: 164 M FLOORS: 35 BUILT UP AREA: 53,100 SQM OFFICE AREA: 14,396 SQM HOTEL AREA: 25,050 SQM FOOTPRINT: 1,390 SQM INCLINATION: 18 DEGREES PROJECT MANAGER: Mace Group CONTRACTOR: AL Habtoor Leighton Group OWNER: ADNEC (Abu Dhabi Exhibitions Company) COST: $231 million INTRODUCTION
  • 10. PROJECT DATA “It is the first building in the world to use a pre-cambered core with a built-in lean of 350 millimeters that has been engineered to straighten with the addition of the upper floors. It is also the first building in the world to use vertical post-tensioning of the core to counter movement and support stresses created by the building’s overhang.”
  • 11. PROJECT DATA ● The Capital Gate is an iconic structure on the skyline ofthe Emirate of Abu Dhabi. ● The tower’s curvaceous shape is inspired strongly from two main geological elements, one being the sea and the other, the desert. These two elements resonate strongly with the essence of Abu Dhabi. ● The main building’s form is meant to symbolize a swirling spiral of sand, while the curved canopy, known as the “splash,” is meant to represent the waves in the sea. Itcreates a wave-like effect, reflecting the building’s proximity to the water and the city’s seafaring heritage. ● The imposing mass, the organic fluidity of its twist, and the idiosyncratic lean of the funnel -shaped tower, combine to embody a specific time, a particular space and a specific volume, reflecting the geography and culture of ABuDhabi.
  • 12. GROUND FLOOR PLAN MEZZANINE FLOOR PLAN SECOND FLOOR -OFFICES 16TH FLOOR -OFFICES FLOOR PLAN
  • 13. FLOOR PLAN 18TH FLOOR-RESTAURANT 19TH FLOORAMENITIES 20TH FLOOR -HOTEL 30TH FLOOR-HOTEL
  • 16. MAIN STRUCTURE ● The structure consists of a post tensioned concrete core surrounded by two steel truss systems (diagrid system). ● External and Internal diagrid system (lateral load resisting system). ● Steel beams support concrete floor & run throughout the diagrid system horizontally at the node intervals. ● Outrigger are horizontal trusses used to connect the building core to the exterior bracing system.
  • 17. THE CORE ● The core was pre cambered meaning it was initially tilted away from the overhang ofthe building and was straightened by the dead load of the building. ● The core was built using the technique called jump forming. ● The concreting was done at night to avoid the extreme day heat which may cause the concrete to dry and crack.
  • 18. THE CORE ● Slump tests were carried out on every batch of concrete. ● The core was post tensioned. ● A total of 146 tendons were incorporated into the core through ducts. ● Each 20 meters long tendons spans 5 floors and overlaps at each ends. . ● Pneumatic jack was used to stretch each tendon at a time.
  • 19. FLOOR SYSTEM ● A composite floor system is used, spanning from the main core to internal and external diagrids. ● Floor beams are connected to the concrete core via embedment plates already casted in the core walls. ● From level 1 to level 10, the floor plates are stacked directly over one another, and then begins to stagger over each other at 800-1400mm and then back to 900mm in line with the lean of the building, between level 10 through 27. ● The remaining floors, between levels 27 and 34, shift between 900mm - 300mm.
  • 21. LOAD TRACING BUILDING STRUCTURE IN MULTIFRAMEAUTOCAD WIREFRAME OF THE BUILDING STRUCTURE
  • 22. LOAD TRACING ● The exoskeleton of the building is connected to the central core by horizontal steel girders that run from the nodes of the diagrid modules to the core. ● These beams support composite metal decks and concrete floor slabs. ● Each story is 4 meters in height, corresponding to half of the diagrid diamond. ● In the 17th floor service area, eight hefty steel transfer spurs are attached to the core on which sits the base of an internal atrium diagrid. ● The weight of this diagrid is transferred to the core and hence down to thefoundation. ● The internal diagrid provides extra internal support for the overhanging upper floors as well as lessening their weight by creating a funnel like opening inthem. ● The atrium diagrid is connected to the diagrid exoskeleton by girders spanning the distance between nodes. ● Massive outrigger beams connected to the core support the 12m extension out over thefacade. ● These outer cantilever beams are braced back to the nodes of the diagrid of the two floorsbelow.
  • 23. • The vertical and horizontal cross-sections of the tower are all unique. • Every one of the 12,500 panes of glass on the facade is a different size, although each pane is triangular. • The cross section of the tower changes from curved triangular to curved rectangular as the tower progresses upwards. • The structure has two diagrid systems i.e. an external diagrid and an internal diagrid which is linked to the central core with eight pin jointed structural members. • The external diagrid comprises of 8250 members which are of different thickness , length and orientation. • The project was completed within two years. FACTS ABOUT CAPITAL TOWER
  • 24. FOUNDATION: • The foundation consists of a rectangular raft footing supported on 400 concrete piles of 1 meter diameter • Half of the piles are under compression and run to a depth of about 20 meters • The other half of the piles run to a depth of about 30 meters and anchor tightly to the soil and are in tension due to the massive eccentric overhang of the building STRUCTURAL ELEMENTS
  • 25. FOUNDATION: • The 2 meter deep raft footing was made up of 7000 cum of reinforced concrete to distribute the loads evenly on the piles. STRUCTURAL ELEMENTS
  • 26. INTERNAL DIAGRID ● The internal diagrid cruciforms were made with 80 mm diameter hollow circular sections. ● the top 18 floors houses an atrium whichreduces the eccentric weight of the building. ● The internal diagrid support the weight of the18 floors and is shaped like a funnel. ● The internal diagrid is connected to the core by8 pin jointed structural members on the 18th floor also known as mechanical floor.
  • 27. THE CORE: • The core was pre cambered meaning it was initially tilted away from the overhang of the building and was straightened by the dead load of the building • The core was built using the technique called jump forming • The concreting was done at night to avoid the extreme day heat which may cause the concrete to dry and crack • Slump tests were carried out on every batch of concrete • Concreting was done by pumping and 250 mm slump concrete was used • The core was post tensioned STRUCTURAL ELEMENTS
  • 28. • A total of 146 tendons were incorporated into the core through ducts • Each tendon was 20 meters long and splice overlap was up to 5 meters • Pneumatic jack was used to stretch each tendon at a time STRUCTURAL ELEMENTS
  • 29. FAÇADE: • The façade /body was made up of steel cross sections called cruciform • The external diagrid consists of 720 of such cruciform • Each cruciform if having different curvature , length and thickness • The external cruciform were made up of 600×600 mm hollow rectangular sections , the thickness of the sections ranged from 80 mm at the bottom to 40 mm at the top of the tower • The internal diagrid cruciform were made with 80 mm diameter hollow circular sections • The dimensional accuracy +/- 1mm The floor height is 4 meters STRUCTURAL ELEMENTS
  • 30. THE FACADE ● The facade consists of the steel diagonal framing system(diagrid), and diamond shaped glass modules. ● The Diagrid was made up of steel cross sections called cruciforms. ● The external diagrid consists of 720 of such cruciforms. ● Each cruciform has different curvature, length and thickness. ● The interlocking part of the cruciform is called the diagrid node, and an horizontal tie beam connect all nodes together horizontally through the circumference of the building, the give a strong bracing system. ● The external cruciforms were made up of 600 ×600 mm hollow sections, and the thickness of the sections ranged from 80 mm at the bottom to 40 mm at the top of the tower.
  • 31. THE FACADE ● Each diamond shaped glass modules are made up of 18 triangular panels connected to each other by hinge joints forming a diamond shaped panel measuring 8×8 meters, spanning 2 floors vertically. ● There are 26,000 triangular glass panels called c240. ● The diamond modules were connected to each other by a two layer seal which made it waterproof and also allowed it to move by 20mm causing a change in shape.
  • 32. • The exterior is made up of 26000 triangular glass panes called c240 • The glass panes consist of two silver coatings • Each triangular glass pane has a unique shape • 18 triangular panes connected to each other by hinge joints formed a diamond shaped panel measuring 8×8 meters • The diamond panels were connected to each other by a two layer seal which made it water proof and also allowed it to change shape STRUCTURAL ELEMENTS
  • 33. • The top 18 floors houses an atrium which reduces the eccentric weight of the building • The internal diagrid support the weight of the 18 floors and is funnel shaped • The internal diagrid is connected to the core by 8 pin jointed structural members on the 18th floor also known as mechanical floor STRUCTURAL ELEMENTS
  • 34. • There’s a two storey extension cantilevered 12 meters from the tower • They are braced to the external diagrid with circular steel members which reach diagonally down to the mechanical floor • The extension houses a swimming pool. STRUCTURAL ELEMENTS
  • 35. • The sun shading also known as the ‘splash’ starts from the 18th floor and extends to the Abu Dhabi national exhibition center grandstand. • It is made up of steel members interlocked to form a mesh. • The splash protects the building form direct sunlight and reflects up to 30% of the incident radiation thus decreasing the air conditioning required. • The splash is supported by circular members which are connected to the external diagrid. STRUCTURAL ELEMENTS
  • 36. • All common area lighting, power, two escape staircases and elevators are fed from the landlord’s distribution network. One passenger elevator is backed up by standby generator power, for use in case of emergency. All life safety systems and essential services are backed up by the standby generator. In addition, some of the life safety system and essential system outlets are backed up by uninterrupted power supply (UPS) to ensure availability of power at all times. • The building is supplied at 11KV from an Abu Dhabi Distribution Company (ADDC) primary substation and network to basement sub-station. • Power is transformed to the operating voltage of 415 volts by five, 1,500KVA transformers installed in the substation. Main distribution boards (MDBs) are fed from the transformers installed in the basement low voltage (LV) switchgear room, adjacent to the substation. MDBs distribute power to the development, through cable routes, rising bus bars, sub-main distribution boards (SMDBs) and distribution boards (DBs). ELECTRICAL SERVICES
  • 37. • Fresh air ventilation, fan coil unit (FCU) systems , fresh air handling units (AHUs), smoke extract ventilation system, variable volume air-conditioning system, and chilled water (CW) system are provided. • The cooling requirement is served by TABREED district chilled water network, facilitated by an energy transfer station at the basement and Level 1 of the building as the primary supply of chilled water network consisting of two units of rated heat exchangers. The resulting or secondary chilled water lines will be metered as being conveyed by four rated pumps serving AHUs and FCUs mounted at all floors of the building. MECHANICAL SERVICES
  • 38. • Sanitary wares, water tanks, domestic water systems, soil/waste/vent and overflows, irrigation system and rainwater system have been included. • The main source of the building’s potable water, from the ADWEA distribution line, is stored in a tank at the basement floor, which undergoes a filtration system. The concrete water tank is a double compartment type, allocated for domestic water, fire protection system, and irrigation source. Aside from preliminary filtration, the domestic water passes through a proven anti-legionella chemical dosing system. Water tanks are provided at basement, Level 1 and Level 17, with compliance to ADDC requirements of minimum 2 days consumption storage. PLUMBING
  • 39. • Steel Load=26.4x100 lb • Glass Load =46,296,900 lb • Concrete Load=79, 365,600 lb • Partition Load=(Area Per Floor x 5 lb/cf of Floor Area) x (# of Floors (11,000 SF x 5 Ib/cf) x (35 Floors) 1.925x10 lb • Equipment Load=(Area Per Floor x 5 ib/cf of Floor Area) x (# of Floors W(11.000 SF x 5 B/cf) x (35 Floors) = 1.925x10 lb • Ceiling Load=(Area Per Floor x 2 ver of Floor Area) x (# of Floors) (11,000 SF x 2 b/cf) x (35 Floors) » 770,000 lb • Vertical Structure Area= 1.5% of Area Per Floor) (Floor Area) x (Building Height (0.015x11.000 SF) x (524.9n) 86,608.5 sq.ft. • Total Dead Load= (Steel Load + Glass Load + Concrete Load Partition Load Load Ceiling Load) =1.57x10 lb LOAD CALCULATION
  • 40. • Live load =Assumed Load Per SF for Commercial Budding) x (Total SF of Building) =(80 lb/sf) x (572.000 SF) =4.576x10 lb • Foundation Load =Total Dead Load + Building Live Load) / (Building Footprint) =(1.57 10^8 lb 4.576x10^7 lb) / (67812 64 sq.ft) =2.990 lb/sq. ft • Max Beam Length: =11m=36 sq. ft • Horizontal Wind Load Max Wind Spaced=100mph=25.9 psf Building Face Surface Area (largest face)=72204.45 sq.ft Max wind Speed x Building Face area= 1.87 x 10^6 lb CONT…
  • 41. CONT… ● "Capital Gate Tower, Abu Dhabi". 2017. Ctbuh.Org. http://www.ctbuh.org/TallBuildings/FeaturedTallBuildings/CapitalGateTowerAbuDhabi/tabid/3380/language/en- GB/Default.aspx/. ● "Capital Gate Building: The Leaning Tower Of Abu Dhabi". 2017. Amusing Planet. http://www.amusingplanet.com/2013/03/capital-gate-building-leaning-tower-of.html. ● "Capital Gate Tower - The Skyscraper Center". 2017. Skyscrapercenter.Com. https://www.skyscrapercenter.com/building/capital-gate-tower/3172. ● "The Architect’S Perspective: The Capital Gate". 2017. RMJM. https://www.rmjm.com/the-architects-perspective-the- capital-gate/. ● "Capital Gate" Hyatt Hotel + Offices | RMJM - Arch2o.Com". 2017. Arch2o.Com. https://www.arch2o.com/capital-gate- hyatt-hotel-offices-rmjm/. ● "Capital Gate" Hyatt Hotel + Offices | RMJM - Arch2o.Com". 2017. Arch2o.Com. https://www.arch2o.com/capital-gate- hyatt-hotel-offices-rmjm/. ● Dufresne, Pierre Martin, Gerry O'Leary, and Jeff Schofield. n.d. 18 Degrees.