1. Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
CERTIFICATES & LICENCES
S.S.C.P. (Safe Supervisor Competency Programme)
H.U.E.T
M.S.I.C. (Maritime Security Identification Card).
2006 Certificate IV in Project Management (TAFEWA).
2005 Certificate IV in Electro-Technology Explosion-Protection (3CM).
1999 Certificate IV in Engineering (Instrument / Electrical) (CCI).
1980 Certificate in Electrical Installation Course “C”. (Full Technological Certificate in Electrical
Installation, City &Guilds of London).
REGISTRATIONS / AFFILIATIONS
Electrical Workers Licence “A” grade. (Electrical Licensing board of W.A.) EW 109603 expires 27-
05-2018.
SUMMARY
My current role is with Kentz Construction as a QA/QC Electrical Inspector role, where my primary
responsibility is to ensure all client QA/QC requirements for the inspection of all Electrical
Installation requirements are achieved. for the LNG plant, Power production, control and
distribution, Instrumentation and Hazardous Area Inspection and reports, completion of I.T.R’s and
document control ready for handover to Commissioning and Completions.
My preceding role was with Worley Parsons was as Construction Engineer for offshore facilities,
where my primary responsibility was to assist with all client Project Engineers from FEED to
Implementation and Completion handover.
Establish Schedules and identify any possible project Risk Factors.
Manage project design deliverables from Conception to Installation.
Communicate and liaise with All Discipline Implementation Teams throughout all stages of the
work-scopes from initial start-up/development of workpacks to project completion.
Although based in Perth, I was expected to visit any offshore asset when required.
I was also involved in a project deployment to Woodsides’ Ngujima-Yin to assist in the Initial
Assessment of replacing the Main Engine room switchboard whilst on station.
PROFESSIONAL EXPERIENCE
002-00-CPF-016 (007848) HRF-0033 Page 1
Rev 1 (13-Dec-10)
2. Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
002-00-CPF-016 (007848) HRF-0033 Page 2
Rev 1 (13-Dec-10)
Mar 2016 –
Present
QA/QC Inspector, Kentz Construction
ICHTYUS LNG Project, Bladin Point Darwin
My current role as a QA/QC Electrical Inspector, is to ensure all client QA/QC requirements to
AS3000 and Client Specifications for the Project Electrical Installation are achieved. These
include the following: -
• HV/LV Power Generators and Transformers, control and distribution
• Instrumentation Inspection
• Hazardous Area Inspection to AS 60079
• Completion of Inspection Test Records (I.T.R’s)
• Complete Documentation ready for handover to Commissioning
North West Shelf Offshore Facilities
Responsible for the implementation of Brownfield PPG Projects on offshore facilities in line with the HSE
requirements and Implementation Scope Development Process.
In Conjunction with Asset Superintendent, Project Supervision and Workforce Personnel, direct and co-
ordinate all asset specific implementation requirements aligned to planning milestones within the Asset
schedule.
Drive and coordinate in conjunction with the Asset Superintendent, process and performance improvements of
the Asset Implementation Team.
Support implementation activities of Brownfield projects within 120 day plan to end of execution ensuring,
deliverables and execution of work scopes are completed safely and to schedule.
Assist Offshore Implementation Manager with employee / industrial relations for Offshore trades personnel for
specific asset of responsibility.
Assist with development of implementation processes to enable accurate estimates, monitoring reporting of
analysis of implementation activities in relation to their specific asset.
Liaise with Implementation Manager and support the lead project engineering to ensure that best practice and
innovations to optimise delivery against KPI’s and milestones are being achieved.
Participate in reviews and recommendations regarding engagement of contractors
Mar 2015 –
October 2015
Construction Engineer, Worley Parsons
Jan2015 – Apr
2015
Offshore Superintendent, Worley Parsons
3. Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
North West Shelf Offshore Facilities
Prepare construction documentation & oversee and coordinate the construction and completions effort for
all works at any location assigned
Manage assigned construction projects and the implementation contractors involved to ensure that the
projects were completed safely, met the quality requirements, were on schedule, within budget and
delivered to project requirements
Provide supervision, direction, productivity reports, together with promoting a proactive work environment
Participate in reviews and recommendations regarding engagement of contractors
Positively promote Worley Parsons (WP) by demonstrating professionalism and efficiency, establishing
credible customer and contractor working relationships.
Mar 2010 – Dec
2014
Senior Implementation Coordinator NRA (Inlec), Transfield-Worley
Perth
Establish early identification of resources required for the various projects, input and liaising with
engineering focal points, together with the client and their stakeholders, into planning, the
preparation of estimates for major projects, together with liaising on a daily basis with TW Project
and Design Engineers, Estimators, Planners, Offshore Supervisors, HSE, Materials, Commissioning
and Discipline Focal Points.
Liaising and providing client documentation, standards and specifications, together with workscope
philosophies to all clients preferred vendor / contractors.
Carried out documentation for all vendor FAT’s (Factory Acceptance Testing), for all, equipment
and systems designed to be installed offshore.
Ensure offshore Implementation team were focused on the demands of any Project under their
care.
Liaise on a daily basis with all offshore trade discipline supervisors, ensuring all HSE&Q
requirements were being carried out, thereby effectively managing all my projects.
Provide support and advice to produce and maintain quality during Workpack production.
Liaise with all stakeholders offshore and onshore to monitor and report progress of projects
throughout the implementation phase.
Perth
002-00-CPF-016 (007848) HRF-0033 Page 3
Rev 1 (13-Dec-10)
2009 -2010 Implementation Coordinator NRA (Inlec), Transfield-Worley
4. Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
Attend and input into Project “start-up” meetings, organize and assist in the development of projects
Construction and Design reviews and presentations with team focal points.
Assist with the organizing of “Constructability Reviews” prior to workpack completion, to ensure all
stakeholders were adequately aware of their individual rolls and responsibilities for their specific projects.
Risk and Safety reviews for N.R.A. projects.
Produce Work-packs for use by N.R.A. Offshore Installation Team.
Attend regular Project reviews to identify areas where increased productivity and reduced work
scope may be identified.
Respond to any Offshore “Site Technical Queries” promptly.
2008 - 2010 Shutdown Coordinator NRA (Inlec), Transfield-Worley
Perth / NRA Platform
Duties include:
Be on onsite during Shutdown and attend all permit, concurrent activities, and ongoing day to
day planning meetings.
Any special vendors requirements, re-transport and information, were correctly processed ready
for the implementation stage.
Ensure necessary materials were correct to specification at fabrication and delivered on site, on
time.
2008 - 2008 Implementation Coordinator GWA (Inlec), Transfield-Worley
Perth
Duties include:
Organise constructability reviews, input into Project “start-up” meetings, organise Construction,
Design, Risk and Safety reviews for GWA.
Produce Workpacks for use by G.W.A. Offshore Installation Team.
Attend regular Project reviews to identify areas where increased productivity and reduced work
scope may be identified.
Respond to any Offshore “Site Technical Queries” promptly.
002-00-CPF-016 (007848) HRF-0033 Page 4
Rev 1 (13-Dec-10)
2006 - 2008 Angel Offshore Technical Supervisor, Transfield Worley
5. Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
NRA Platform
Duties include:
Oversee the implementation of the ANGEL project during production “Live” situation. This involved
the relocation of the Central Control Room, Installation of a 22kV Transformer, sub-sea cable and
all upgrades to Switchrooms as required.
Attend and input to Platform planning, Permit and Safety meetings with Platform Departmental
Managers, and relate relevant information to Project Engineer and TW Offshore Discipline
Supervisors & Co-coordinators.
Ensure that the project requirements were met with respect to Productivity, Schedule, Budget
and all HSE initiatives were maintained.
Produce Weekly Report for Project Manager.
2006 - 2006 Implementation Coordinator NRA (Inlec), Transfield-Worley
Perth
Duties include:
Attend and input into Project “start-up” meetings, organise and attend Construction, Design,
Risk and Safety reviews for NRA.
Produce Workpacks for use by Offshore Installation Team (NRA).
Attend regular Project reviews to identify areas where increased productivity and reduced work
scope may be identified.
Respond to any Offshore “Site Technical Queries” promptly.
1997 - 2006 Electrical/Instrument Fitter, Transfield-Worley NRA
NRA Platform
Duties include:
General Installation of electrical plant & equipment as directed.
Leading hand (2005-2006).
Secondment to WEL maintenance department (2002-2005).
H.S.E. Rep (2000-2002).
002-00-CPF-016 (007848) HRF-0033 Page 5
Rev 1 (13-Dec-10)
6. Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
EDUCATION & QUALIFICATIONS
James Watt College Greenock. (City & Guilds of London Electrical Installation Certificates B1,
B2, B3, C1, C2 & C3).
Greenock High School. (S.C.E “O” levels, Technical Drawing, Metalwork, English, Mathematics,
Arithmetic, & Geography).
Referees
Ronald Coleman. Construction Manager with Transfield Services.
Mobile 0419-098-811
Robert Rogers. Asset Superintendent with WorleyParsons.
Mobile 0424-791-997
Ian Kidd. Lead Project Manager with Worley Parsons
Tel. 0404-837-835
Personal Contact
Mobile: 0405-955-188
hugh.mckellar@bigpond.com
002-00-CPF-016 (007848) HRF-0033 Page 6
Rev 1 (13-Dec-10)
7. Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
EDUCATION & QUALIFICATIONS
James Watt College Greenock. (City & Guilds of London Electrical Installation Certificates B1,
B2, B3, C1, C2 & C3).
Greenock High School. (S.C.E “O” levels, Technical Drawing, Metalwork, English, Mathematics,
Arithmetic, & Geography).
Referees
Ronald Coleman. Construction Manager with Transfield Services.
Mobile 0419-098-811
Robert Rogers. Asset Superintendent with WorleyParsons.
Mobile 0424-791-997
Ian Kidd. Lead Project Manager with Worley Parsons
Tel. 0404-837-835
Personal Contact
Mobile: 0405-955-188
hugh.mckellar@bigpond.com
002-00-CPF-016 (007848) HRF-0033 Page 6