SlideShare a Scribd company logo
1 of 7
Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
CERTIFICATES & LICENCES
 S.S.C.P. (Safe Supervisor Competency Programme)
 H.U.E.T
 M.S.I.C. (Maritime Security Identification Card).
 2006 Certificate IV in Project Management (TAFEWA).
 2005 Certificate IV in Electro-Technology Explosion-Protection (3CM).
 1999 Certificate IV in Engineering (Instrument / Electrical) (CCI).
 1980 Certificate in Electrical Installation Course “C”. (Full Technological Certificate in Electrical
Installation, City &Guilds of London).
REGISTRATIONS / AFFILIATIONS
 Electrical Workers Licence “A” grade. (Electrical Licensing board of W.A.) EW 109603 expires 27-
05-2018.
SUMMARY
 My current role is with Kentz Construction as a QA/QC Electrical Inspector role, where my primary
responsibility is to ensure all client QA/QC requirements for the inspection of all Electrical
Installation requirements are achieved. for the LNG plant, Power production, control and
distribution, Instrumentation and Hazardous Area Inspection and reports, completion of I.T.R’s and
document control ready for handover to Commissioning and Completions.

 My preceding role was with Worley Parsons was as Construction Engineer for offshore facilities,
where my primary responsibility was to assist with all client Project Engineers from FEED to
Implementation and Completion handover.
 Establish Schedules and identify any possible project Risk Factors.
 Manage project design deliverables from Conception to Installation.
 Communicate and liaise with All Discipline Implementation Teams throughout all stages of the
work-scopes from initial start-up/development of workpacks to project completion.
 Although based in Perth, I was expected to visit any offshore asset when required.
 I was also involved in a project deployment to Woodsides’ Ngujima-Yin to assist in the Initial
Assessment of replacing the Main Engine room switchboard whilst on station.
PROFESSIONAL EXPERIENCE
002-00-CPF-016 (007848) HRF-0033 Page 1
Rev 1 (13-Dec-10)
Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
002-00-CPF-016 (007848) HRF-0033 Page 2
Rev 1 (13-Dec-10)
Mar 2016 –
Present
QA/QC Inspector, Kentz Construction
ICHTYUS LNG Project, Bladin Point Darwin
 My current role as a QA/QC Electrical Inspector, is to ensure all client QA/QC requirements to
AS3000 and Client Specifications for the Project Electrical Installation are achieved. These
include the following: -
• HV/LV Power Generators and Transformers, control and distribution
• Instrumentation Inspection
• Hazardous Area Inspection to AS 60079
• Completion of Inspection Test Records (I.T.R’s)
• Complete Documentation ready for handover to Commissioning
North West Shelf Offshore Facilities
 Responsible for the implementation of Brownfield PPG Projects on offshore facilities in line with the HSE
requirements and Implementation Scope Development Process.
 In Conjunction with Asset Superintendent, Project Supervision and Workforce Personnel, direct and co-
ordinate all asset specific implementation requirements aligned to planning milestones within the Asset
schedule.
 Drive and coordinate in conjunction with the Asset Superintendent, process and performance improvements of
the Asset Implementation Team.
 Support implementation activities of Brownfield projects within 120 day plan to end of execution ensuring,
deliverables and execution of work scopes are completed safely and to schedule.
 Assist Offshore Implementation Manager with employee / industrial relations for Offshore trades personnel for
specific asset of responsibility.
 Assist with development of implementation processes to enable accurate estimates, monitoring reporting of
analysis of implementation activities in relation to their specific asset.
 Liaise with Implementation Manager and support the lead project engineering to ensure that best practice and
innovations to optimise delivery against KPI’s and milestones are being achieved.
 Participate in reviews and recommendations regarding engagement of contractors
Mar 2015 –
October 2015
Construction Engineer, Worley Parsons
Jan2015 – Apr
2015
Offshore Superintendent, Worley Parsons
Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
North West Shelf Offshore Facilities
 Prepare construction documentation & oversee and coordinate the construction and completions effort for
all works at any location assigned
 Manage assigned construction projects and the implementation contractors involved to ensure that the
projects were completed safely, met the quality requirements, were on schedule, within budget and
delivered to project requirements
 Provide supervision, direction, productivity reports, together with promoting a proactive work environment
 Participate in reviews and recommendations regarding engagement of contractors
 Positively promote Worley Parsons (WP) by demonstrating professionalism and efficiency, establishing
credible customer and contractor working relationships.
Mar 2010 – Dec
2014
Senior Implementation Coordinator NRA (Inlec), Transfield-Worley
Perth
Establish early identification of resources required for the various projects, input and liaising with
engineering focal points, together with the client and their stakeholders, into planning, the
preparation of estimates for major projects, together with liaising on a daily basis with TW Project
and Design Engineers, Estimators, Planners, Offshore Supervisors, HSE, Materials, Commissioning
and Discipline Focal Points.
Liaising and providing client documentation, standards and specifications, together with workscope
philosophies to all clients preferred vendor / contractors.
Carried out documentation for all vendor FAT’s (Factory Acceptance Testing), for all, equipment
and systems designed to be installed offshore.
 Ensure offshore Implementation team were focused on the demands of any Project under their
care.
 Liaise on a daily basis with all offshore trade discipline supervisors, ensuring all HSE&Q
requirements were being carried out, thereby effectively managing all my projects.
 Provide support and advice to produce and maintain quality during Workpack production.
 Liaise with all stakeholders offshore and onshore to monitor and report progress of projects
throughout the implementation phase.
Perth
002-00-CPF-016 (007848) HRF-0033 Page 3
Rev 1 (13-Dec-10)
2009 -2010 Implementation Coordinator NRA (Inlec), Transfield-Worley
Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
Attend and input into Project “start-up” meetings, organize and assist in the development of projects
Construction and Design reviews and presentations with team focal points.
Assist with the organizing of “Constructability Reviews” prior to workpack completion, to ensure all
stakeholders were adequately aware of their individual rolls and responsibilities for their specific projects.
Risk and Safety reviews for N.R.A. projects.
 Produce Work-packs for use by N.R.A. Offshore Installation Team.
 Attend regular Project reviews to identify areas where increased productivity and reduced work
scope may be identified.
 Respond to any Offshore “Site Technical Queries” promptly.
2008 - 2010 Shutdown Coordinator NRA (Inlec), Transfield-Worley
Perth / NRA Platform
Duties include:
 Be on onsite during Shutdown and attend all permit, concurrent activities, and ongoing day to
day planning meetings.
 Any special vendors requirements, re-transport and information, were correctly processed ready
for the implementation stage.
 Ensure necessary materials were correct to specification at fabrication and delivered on site, on
time.
2008 - 2008 Implementation Coordinator GWA (Inlec), Transfield-Worley
Perth
Duties include:
Organise constructability reviews, input into Project “start-up” meetings, organise Construction,
Design, Risk and Safety reviews for GWA.
 Produce Workpacks for use by G.W.A. Offshore Installation Team.
 Attend regular Project reviews to identify areas where increased productivity and reduced work
scope may be identified.
 Respond to any Offshore “Site Technical Queries” promptly.
002-00-CPF-016 (007848) HRF-0033 Page 4
Rev 1 (13-Dec-10)
2006 - 2008 Angel Offshore Technical Supervisor, Transfield Worley
Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
NRA Platform
Duties include:
Oversee the implementation of the ANGEL project during production “Live” situation. This involved
the relocation of the Central Control Room, Installation of a 22kV Transformer, sub-sea cable and
all upgrades to Switchrooms as required.
 Attend and input to Platform planning, Permit and Safety meetings with Platform Departmental
Managers, and relate relevant information to Project Engineer and TW Offshore Discipline
Supervisors & Co-coordinators.
 Ensure that the project requirements were met with respect to Productivity, Schedule, Budget
and all HSE initiatives were maintained.
 Produce Weekly Report for Project Manager.
2006 - 2006 Implementation Coordinator NRA (Inlec), Transfield-Worley
Perth
Duties include:
Attend and input into Project “start-up” meetings, organise and attend Construction, Design,
Risk and Safety reviews for NRA.
 Produce Workpacks for use by Offshore Installation Team (NRA).
 Attend regular Project reviews to identify areas where increased productivity and reduced work
scope may be identified.
 Respond to any Offshore “Site Technical Queries” promptly.
1997 - 2006 Electrical/Instrument Fitter, Transfield-Worley NRA
NRA Platform
Duties include:
General Installation of electrical plant & equipment as directed.
 Leading hand (2005-2006).
 Secondment to WEL maintenance department (2002-2005).
 H.S.E. Rep (2000-2002).
002-00-CPF-016 (007848) HRF-0033 Page 5
Rev 1 (13-Dec-10)
Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
EDUCATION & QUALIFICATIONS
 James Watt College Greenock. (City & Guilds of London Electrical Installation Certificates B1,
B2, B3, C1, C2 & C3).
 Greenock High School. (S.C.E “O” levels, Technical Drawing, Metalwork, English, Mathematics,
Arithmetic, & Geography).
Referees
 Ronald Coleman. Construction Manager with Transfield Services.
Mobile 0419-098-811
 Robert Rogers. Asset Superintendent with WorleyParsons.
Mobile 0424-791-997
 Ian Kidd. Lead Project Manager with Worley Parsons
Tel. 0404-837-835
Personal Contact
Mobile: 0405-955-188
hugh.mckellar@bigpond.com
002-00-CPF-016 (007848) HRF-0033 Page 6
Rev 1 (13-Dec-10)
Hugh McKellar
E & I Supervisor / Manager
Personal C.V.
EDUCATION & QUALIFICATIONS
 James Watt College Greenock. (City & Guilds of London Electrical Installation Certificates B1,
B2, B3, C1, C2 & C3).
 Greenock High School. (S.C.E “O” levels, Technical Drawing, Metalwork, English, Mathematics,
Arithmetic, & Geography).
Referees
 Ronald Coleman. Construction Manager with Transfield Services.
Mobile 0419-098-811
 Robert Rogers. Asset Superintendent with WorleyParsons.
Mobile 0424-791-997
 Ian Kidd. Lead Project Manager with Worley Parsons
Tel. 0404-837-835
Personal Contact
Mobile: 0405-955-188
hugh.mckellar@bigpond.com
002-00-CPF-016 (007848) HRF-0033 Page 6
Rev 1 (13-Dec-10)

More Related Content

What's hot (20)

Challenor-paul 13-01-16
Challenor-paul 13-01-16Challenor-paul 13-01-16
Challenor-paul 13-01-16
 
CV JMCNAB
CV JMCNABCV JMCNAB
CV JMCNAB
 
Michael D. Rapp Csm, Oshp2
Michael D. Rapp  Csm, Oshp2Michael D. Rapp  Csm, Oshp2
Michael D. Rapp Csm, Oshp2
 
CV-WalterPriotti1-Mar2016
CV-WalterPriotti1-Mar2016CV-WalterPriotti1-Mar2016
CV-WalterPriotti1-Mar2016
 
Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)
 
CV
CVCV
CV
 
Abraham Sanni CV
Abraham Sanni CVAbraham Sanni CV
Abraham Sanni CV
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTIL
 
Hermann Zapletal - Resume 2015
Hermann Zapletal - Resume 2015Hermann Zapletal - Resume 2015
Hermann Zapletal - Resume 2015
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302
 
QC E&I alhassan
QC E&I alhassanQC E&I alhassan
QC E&I alhassan
 
AlbertiResume Updated
AlbertiResume UpdatedAlbertiResume Updated
AlbertiResume Updated
 
Stephen Jones October 2016
Stephen Jones October 2016Stephen Jones October 2016
Stephen Jones October 2016
 
Mostafa Nabil ELBanhawy CV
Mostafa Nabil ELBanhawy CVMostafa Nabil ELBanhawy CV
Mostafa Nabil ELBanhawy CV
 
Structural Engineer
Structural EngineerStructural Engineer
Structural Engineer
 
TONY HERCEGl resume
TONY  HERCEGl resumeTONY  HERCEGl resume
TONY HERCEGl resume
 
P7512-EXT-SQ-0030
P7512-EXT-SQ-0030P7512-EXT-SQ-0030
P7512-EXT-SQ-0030
 
KIM CV jan2015
KIM CV jan2015KIM CV jan2015
KIM CV jan2015
 
CV_E&I QC
CV_E&I QCCV_E&I QC
CV_E&I QC
 
CV Carl Irlam 30-09-2015
CV Carl Irlam 30-09-2015 CV Carl Irlam 30-09-2015
CV Carl Irlam 30-09-2015
 

Viewers also liked

Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat BoseSaikat Bose
 
Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)alejandro_lorenzo
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - CopyPerry Anderson
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument EngineerMukhtar Ahmad
 
Resume Avalo 2015
Resume Avalo 2015Resume Avalo 2015
Resume Avalo 2015Yamil Avalo
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVmohammed zameel zainudheen
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORIKRAM HUSSAIN
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
 
Instrumentation & Electrical Engineer
Instrumentation &  Electrical EngineerInstrumentation &  Electrical Engineer
Instrumentation & Electrical EngineerCHAUHAN HIREN
 
CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -abdallah chamekh
 
Revit mep draftman resume 000
Revit mep draftman resume 000Revit mep draftman resume 000
Revit mep draftman resume 000Mca Faizul Islam
 

Viewers also liked (20)

MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 
Sanjeev Resume (1)
Sanjeev Resume (1)Sanjeev Resume (1)
Sanjeev Resume (1)
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat Bose
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Resume Avalo 2015
Resume Avalo 2015Resume Avalo 2015
Resume Avalo 2015
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CV
 
Muhammad Aminudin Ramli
Muhammad Aminudin RamliMuhammad Aminudin Ramli
Muhammad Aminudin Ramli
 
asif sup new (4)
asif sup new (4)asif sup new (4)
asif sup new (4)
 
Rinku Gemini
Rinku GeminiRinku Gemini
Rinku Gemini
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISOR
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
Instrumentation & Electrical Engineer
Instrumentation &  Electrical EngineerInstrumentation &  Electrical Engineer
Instrumentation & Electrical Engineer
 
CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -
 
Revit mep draftman resume 000
Revit mep draftman resume 000Revit mep draftman resume 000
Revit mep draftman resume 000
 
Autodesk Revit MEP
Autodesk Revit MEPAutodesk Revit MEP
Autodesk Revit MEP
 

Similar to HMcKellar CV 26th Nov 2016

Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar
 
RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1William Crowley
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.TOM VAN WYK
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe
 
Steve Allan Sept2016
Steve Allan Sept2016  Steve Allan Sept2016
Steve Allan Sept2016 Steve Allan
 
Stevan Hicks Short
Stevan Hicks ShortStevan Hicks Short
Stevan Hicks ShortStevan Hicks
 
PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015Peter Bricknell
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 FinalGary Whyte
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CVShane Elcoate
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CVShane Elcoate
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd ResumeNathan Mudd
 

Similar to HMcKellar CV 26th Nov 2016 (20)

Jai Townsend - CV
Jai Townsend - CVJai Townsend - CV
Jai Townsend - CV
 
Colin Officer - Resume
Colin Officer - ResumeColin Officer - Resume
Colin Officer - Resume
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Resume Arnold Angeles
Resume  Arnold AngelesResume  Arnold Angeles
Resume Arnold Angeles
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016
 
Steve Allan Sept2016
Steve Allan Sept2016  Steve Allan Sept2016
Steve Allan Sept2016
 
Stevan Hicks Short
Stevan Hicks ShortStevan Hicks Short
Stevan Hicks Short
 
PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015
 
Bill resume
Bill resumeBill resume
Bill resume
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 Final
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)
 
F. CV
F. CVF. CV
F. CV
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd Resume
 

HMcKellar CV 26th Nov 2016

  • 1. Hugh McKellar E & I Supervisor / Manager Personal C.V. CERTIFICATES & LICENCES  S.S.C.P. (Safe Supervisor Competency Programme)  H.U.E.T  M.S.I.C. (Maritime Security Identification Card).  2006 Certificate IV in Project Management (TAFEWA).  2005 Certificate IV in Electro-Technology Explosion-Protection (3CM).  1999 Certificate IV in Engineering (Instrument / Electrical) (CCI).  1980 Certificate in Electrical Installation Course “C”. (Full Technological Certificate in Electrical Installation, City &Guilds of London). REGISTRATIONS / AFFILIATIONS  Electrical Workers Licence “A” grade. (Electrical Licensing board of W.A.) EW 109603 expires 27- 05-2018. SUMMARY  My current role is with Kentz Construction as a QA/QC Electrical Inspector role, where my primary responsibility is to ensure all client QA/QC requirements for the inspection of all Electrical Installation requirements are achieved. for the LNG plant, Power production, control and distribution, Instrumentation and Hazardous Area Inspection and reports, completion of I.T.R’s and document control ready for handover to Commissioning and Completions.   My preceding role was with Worley Parsons was as Construction Engineer for offshore facilities, where my primary responsibility was to assist with all client Project Engineers from FEED to Implementation and Completion handover.  Establish Schedules and identify any possible project Risk Factors.  Manage project design deliverables from Conception to Installation.  Communicate and liaise with All Discipline Implementation Teams throughout all stages of the work-scopes from initial start-up/development of workpacks to project completion.  Although based in Perth, I was expected to visit any offshore asset when required.  I was also involved in a project deployment to Woodsides’ Ngujima-Yin to assist in the Initial Assessment of replacing the Main Engine room switchboard whilst on station. PROFESSIONAL EXPERIENCE 002-00-CPF-016 (007848) HRF-0033 Page 1 Rev 1 (13-Dec-10)
  • 2. Hugh McKellar E & I Supervisor / Manager Personal C.V. 002-00-CPF-016 (007848) HRF-0033 Page 2 Rev 1 (13-Dec-10) Mar 2016 – Present QA/QC Inspector, Kentz Construction ICHTYUS LNG Project, Bladin Point Darwin  My current role as a QA/QC Electrical Inspector, is to ensure all client QA/QC requirements to AS3000 and Client Specifications for the Project Electrical Installation are achieved. These include the following: - • HV/LV Power Generators and Transformers, control and distribution • Instrumentation Inspection • Hazardous Area Inspection to AS 60079 • Completion of Inspection Test Records (I.T.R’s) • Complete Documentation ready for handover to Commissioning North West Shelf Offshore Facilities  Responsible for the implementation of Brownfield PPG Projects on offshore facilities in line with the HSE requirements and Implementation Scope Development Process.  In Conjunction with Asset Superintendent, Project Supervision and Workforce Personnel, direct and co- ordinate all asset specific implementation requirements aligned to planning milestones within the Asset schedule.  Drive and coordinate in conjunction with the Asset Superintendent, process and performance improvements of the Asset Implementation Team.  Support implementation activities of Brownfield projects within 120 day plan to end of execution ensuring, deliverables and execution of work scopes are completed safely and to schedule.  Assist Offshore Implementation Manager with employee / industrial relations for Offshore trades personnel for specific asset of responsibility.  Assist with development of implementation processes to enable accurate estimates, monitoring reporting of analysis of implementation activities in relation to their specific asset.  Liaise with Implementation Manager and support the lead project engineering to ensure that best practice and innovations to optimise delivery against KPI’s and milestones are being achieved.  Participate in reviews and recommendations regarding engagement of contractors Mar 2015 – October 2015 Construction Engineer, Worley Parsons Jan2015 – Apr 2015 Offshore Superintendent, Worley Parsons
  • 3. Hugh McKellar E & I Supervisor / Manager Personal C.V. North West Shelf Offshore Facilities  Prepare construction documentation & oversee and coordinate the construction and completions effort for all works at any location assigned  Manage assigned construction projects and the implementation contractors involved to ensure that the projects were completed safely, met the quality requirements, were on schedule, within budget and delivered to project requirements  Provide supervision, direction, productivity reports, together with promoting a proactive work environment  Participate in reviews and recommendations regarding engagement of contractors  Positively promote Worley Parsons (WP) by demonstrating professionalism and efficiency, establishing credible customer and contractor working relationships. Mar 2010 – Dec 2014 Senior Implementation Coordinator NRA (Inlec), Transfield-Worley Perth Establish early identification of resources required for the various projects, input and liaising with engineering focal points, together with the client and their stakeholders, into planning, the preparation of estimates for major projects, together with liaising on a daily basis with TW Project and Design Engineers, Estimators, Planners, Offshore Supervisors, HSE, Materials, Commissioning and Discipline Focal Points. Liaising and providing client documentation, standards and specifications, together with workscope philosophies to all clients preferred vendor / contractors. Carried out documentation for all vendor FAT’s (Factory Acceptance Testing), for all, equipment and systems designed to be installed offshore.  Ensure offshore Implementation team were focused on the demands of any Project under their care.  Liaise on a daily basis with all offshore trade discipline supervisors, ensuring all HSE&Q requirements were being carried out, thereby effectively managing all my projects.  Provide support and advice to produce and maintain quality during Workpack production.  Liaise with all stakeholders offshore and onshore to monitor and report progress of projects throughout the implementation phase. Perth 002-00-CPF-016 (007848) HRF-0033 Page 3 Rev 1 (13-Dec-10) 2009 -2010 Implementation Coordinator NRA (Inlec), Transfield-Worley
  • 4. Hugh McKellar E & I Supervisor / Manager Personal C.V. Attend and input into Project “start-up” meetings, organize and assist in the development of projects Construction and Design reviews and presentations with team focal points. Assist with the organizing of “Constructability Reviews” prior to workpack completion, to ensure all stakeholders were adequately aware of their individual rolls and responsibilities for their specific projects. Risk and Safety reviews for N.R.A. projects.  Produce Work-packs for use by N.R.A. Offshore Installation Team.  Attend regular Project reviews to identify areas where increased productivity and reduced work scope may be identified.  Respond to any Offshore “Site Technical Queries” promptly. 2008 - 2010 Shutdown Coordinator NRA (Inlec), Transfield-Worley Perth / NRA Platform Duties include:  Be on onsite during Shutdown and attend all permit, concurrent activities, and ongoing day to day planning meetings.  Any special vendors requirements, re-transport and information, were correctly processed ready for the implementation stage.  Ensure necessary materials were correct to specification at fabrication and delivered on site, on time. 2008 - 2008 Implementation Coordinator GWA (Inlec), Transfield-Worley Perth Duties include: Organise constructability reviews, input into Project “start-up” meetings, organise Construction, Design, Risk and Safety reviews for GWA.  Produce Workpacks for use by G.W.A. Offshore Installation Team.  Attend regular Project reviews to identify areas where increased productivity and reduced work scope may be identified.  Respond to any Offshore “Site Technical Queries” promptly. 002-00-CPF-016 (007848) HRF-0033 Page 4 Rev 1 (13-Dec-10) 2006 - 2008 Angel Offshore Technical Supervisor, Transfield Worley
  • 5. Hugh McKellar E & I Supervisor / Manager Personal C.V. NRA Platform Duties include: Oversee the implementation of the ANGEL project during production “Live” situation. This involved the relocation of the Central Control Room, Installation of a 22kV Transformer, sub-sea cable and all upgrades to Switchrooms as required.  Attend and input to Platform planning, Permit and Safety meetings with Platform Departmental Managers, and relate relevant information to Project Engineer and TW Offshore Discipline Supervisors & Co-coordinators.  Ensure that the project requirements were met with respect to Productivity, Schedule, Budget and all HSE initiatives were maintained.  Produce Weekly Report for Project Manager. 2006 - 2006 Implementation Coordinator NRA (Inlec), Transfield-Worley Perth Duties include: Attend and input into Project “start-up” meetings, organise and attend Construction, Design, Risk and Safety reviews for NRA.  Produce Workpacks for use by Offshore Installation Team (NRA).  Attend regular Project reviews to identify areas where increased productivity and reduced work scope may be identified.  Respond to any Offshore “Site Technical Queries” promptly. 1997 - 2006 Electrical/Instrument Fitter, Transfield-Worley NRA NRA Platform Duties include: General Installation of electrical plant & equipment as directed.  Leading hand (2005-2006).  Secondment to WEL maintenance department (2002-2005).  H.S.E. Rep (2000-2002). 002-00-CPF-016 (007848) HRF-0033 Page 5 Rev 1 (13-Dec-10)
  • 6. Hugh McKellar E & I Supervisor / Manager Personal C.V. EDUCATION & QUALIFICATIONS  James Watt College Greenock. (City & Guilds of London Electrical Installation Certificates B1, B2, B3, C1, C2 & C3).  Greenock High School. (S.C.E “O” levels, Technical Drawing, Metalwork, English, Mathematics, Arithmetic, & Geography). Referees  Ronald Coleman. Construction Manager with Transfield Services. Mobile 0419-098-811  Robert Rogers. Asset Superintendent with WorleyParsons. Mobile 0424-791-997  Ian Kidd. Lead Project Manager with Worley Parsons Tel. 0404-837-835 Personal Contact Mobile: 0405-955-188 hugh.mckellar@bigpond.com 002-00-CPF-016 (007848) HRF-0033 Page 6 Rev 1 (13-Dec-10)
  • 7. Hugh McKellar E & I Supervisor / Manager Personal C.V. EDUCATION & QUALIFICATIONS  James Watt College Greenock. (City & Guilds of London Electrical Installation Certificates B1, B2, B3, C1, C2 & C3).  Greenock High School. (S.C.E “O” levels, Technical Drawing, Metalwork, English, Mathematics, Arithmetic, & Geography). Referees  Ronald Coleman. Construction Manager with Transfield Services. Mobile 0419-098-811  Robert Rogers. Asset Superintendent with WorleyParsons. Mobile 0424-791-997  Ian Kidd. Lead Project Manager with Worley Parsons Tel. 0404-837-835 Personal Contact Mobile: 0405-955-188 hugh.mckellar@bigpond.com 002-00-CPF-016 (007848) HRF-0033 Page 6 Rev 1 (13-Dec-10)