1. MARK P BOUVIER
Cell: 434-981-2134 - mark_p_bouvier@yahoo.com
Summary
Highly skilled Instrumentation, Automation and ControlsManager with over 25 years ofexperience including
instrumentation and electrical project management, inspection, installation, commissioning and start-up of equipmentfor
the power,nuclear power and oil and gasindustries.Proven ability to lead personnelin a multi-cultural environmentand
possess the skill set, knowledge and experience to efficiently install variouselectronic, digital and pneumatic systems
which includesbutnot limited to SCADA, RTU's,ac variable frequency drives, SCR drives,generator controls,and
programmable logic controllers. In addition, have proven proficiency at troubleshooting process field instruments,
PLC's, distributive control systems, analog and digital, microwave systems,two-wayradios,LAW/WAN, CAT-5 and fiber
optic communication cables.
Experience
Field Service Manager
March 2015toPresent
Trident Maritime Systems - Metairie,LA
Ensures appropriate manpower and equipmentare available to customersin a timelymanner by managing a team
of skilled service technicians while providing superior customer service
Ensuresallcustomer issues have been addressed in a timelymanner and all issues have been resolved by
conducting thorough research to understand the exactneeds of customers and ensures workis delegated
properlyso that efficient services are being rendered to customers
Supervise the overall servicing functioning while proposing and negotiating service contracts
Ensures technicians have proper training by providing training as needed
Design and manager strategiesto ensure that all the day to day services have been controlled and thatall
customers’ needshave been tackled successfully
Make recommendationsand design policies and rules that will reduce the costsand improve the efficiencyof
services
Actively involved in hiring and training of newemployees and schedule training sessions accordingly
Evaluate service technicians performance and manage their work schedules to ensure customers’ needsare
covered atall times
Senior I/C Consultant
May 2013 to March 2015
HESS Oil - Tioga, ND
Responsible for various well sites throughout Western North Dakota from construction, commissioning, flow
backs and first oil in downstream pipeline.
Responsible for various contractors including scheduling,costs and estimated completion of each well site.
Provide oversight and troubleshooting to the ICT Group and the DSIProgramming Team when needed to resolve
any relevant issuespertaining to various componentsand instrumentation including DCS and PLCissues.
Attend site walk downswith QA/QC and various contractor representatives to identifyany issues with components
or equipment that would compromise or delaystartup ofthe site.
Test Engineer
June 2012 to February 2013
Turkey Point Nuclear Power Plant.
Port St. Lucie Nuclear Power Plant
Perform complexPre-Op tasksi.e., Site Acceptance testing ofdigital controlsystems,
pre-operational tests of digital controlsystems,and control system tuning.
Write, review, and approve I&C system testprocedures,and test reports.
Provide oversight of I&C troubleshooting team.
Resolve I&C testing problems and deficiencies and non-conformances.
Issue field change documentsto resolve both hardware and software testing problems.
Lead team of I&C Pre-op test engineers at site.
Resolve interface issueswith equipment vendors.
2. Able to perform system field walk downs.
Assist and oversee Verification and Validation ofsoftware during Factory Acceptance Testing.
Oversee and maintain configuration controlof digital system software and maintain control of overlap testing
status and requirements.
Supportand defend digital test strategy and philosophy to customers and regulators.
Develop and implement complexschedules to successfullycoordinate multiple activities associated with I&C
testing.
Electrical Field Engineer
June 2011 to March 2012
Turkey Point Nuclear Power Plant
Reviewof technical proposals, inspection/verification of installed workand communication with design
engineering as required to resolve issues.
Assists Turnover Coordinator by performing finalP&ID checks.
Assist the DCS and I&C system leadsin the preparation of system turnover packagesin accordance with project
proceduresby assembling and reviewing all system I&C and DCStest documentation for adequacy and
completeness.
Performs inspections and documentation of allinstrumentwork in progress on a continuing basis to ensure
quality and conformance to project specifications, codes and contract (customer) requirementsare met.
Instruments, Impulse Lines, Sample Lines, etc.,) Verifies materials, equipmentand workmanship to ensure all
installation meetsall contract, design and code requirements.
March 2011toApril 2011
New Hampshire
InstrumentSuperintendent during outage atFlorida Power and Light Seabrook Nuclear Power Station in
Seabrook, NewHampshire.
Responsible for all instrumentation throughoutfacilityincluding ContainmentArea.
FIN team member responsible for all criticalpath instrumentation and controls during outage.
DP/ICMS Engineer
November 2009 to March 2011
Moduspec USA- Yantai, China
Responsible for the commissioning of the Kongsberg Simrad Dynamic Positioning and InstrumentControl
Management System, which monitorsand controlsmanyofthe vessel's operations,such as Power Management,
HVAC, Fire and Gas, Ballast/De-ballast, and the vessel's Dynamic Positioning system.(11,000 IO points).
Instrument Inspector
April 2009 to November 2009
EDG Inc - Metairie,Louisiana
Responsible for instrumentation and electrical inspections, panelcheckouts, FAT tests,equipmentinstallations
and calibrations.
Oil shipping modifications project for ANKOR Energy at Ship Shoal 229, responsible for all personnel,
equipment, all relevant paperwork and necessarypartsfor the installation and completion ofthe project.
Liaison between the Client and the Customer for allnecessary activitiesfrom start up to completion.
Deputy Instrument Superintendent
January 2008 to April 2009
YEMGAS LNG Project
Responsible for Instrumentation Commissioning departmentconsisting of forty-five multi-cultural workers of
Various disciplines and skill levels.
Commissioning of instrumentation throughout LNG facility,walk down systems,verify & clear punch list items,
witness loop checks, verifyand produce redlinesand troubleshootI/E faults.
Liaising with document control departmentand completing allrelevant paperwork.
Permit to work authority for the Instrumentation department.
Instrument Supervisor
November 2007 to January 2008
Freeport LNG Project - Freeport, Texas
Pre-commissioning, commissioning and startup ofinstrumentation throughout LNG storage facility for
3. Regasification of liquefied natural gas.
Walk down systems, verify& clear punch listitems,witness loop checks, verify & produce redline drawings,
troubleshoot I/E faults.
Liaising with document control departmentand completing allrelevant paperwork.
Cause and Effects Supervisor
November 2006 to November 2007
Tengiz, Kazakstan
Second Generation Project and Sour Gas Injection ProjectPre-commissioning, commissioning and startup of
two GE frame 9 gas turbine/generators with HRSG units.
Walk down systems, verify& clear punch listitems,witness loop checks, verify & produce redline drawings,
troubleshoot I/E faults.
Liaising with document control departmentand completing allrelevant paperwork.
Fire & Gas System Construction Engineer.
Effectivelyled team of 24 multi-culturaland multi craft workers:Electricians, InstrumentTechs, InstrumentFitters
and Hydro-Test Team.
Senior PLC Technician
April 2005 to November 2006
Beier Radio - Harvey,La.
Design, Installation, maintenance and troubleshooting ofDynamic Positioning Systems utilizing Siemens
Redundant Programmable LogicControllers,Global Maritime Distress Safety System Consolesand various
electronic devicesfor TLP's, Jack-Ups, FPSO'sand Drill ships in the Oil and GasIndustry.
Working knowledge of AC Variable FrequencyDrives,SCR drives, generator controls, and programmable logic
controllers.
Instrument Supervisor
December 2004 to April 2005
Con Edison Power Plant - Manhattan, NY
Performed loop checks, function checkout and startup/commissioning on a combined power plant.
2 GE frame 7'swith HRSG'sand on GE steam turbine MarkVIcontrol system.
Walk down of systems, verify and clear punch listitems,witnessloop checksand troubleshoot I/E faults
throughout the East River Plant.
Liaising with document control departmentand completing allrelevant paperwork.
Lead Instrument Technician
August 2004 toDecember 2004
Brandy Branch Power Plant - Jacksonville,FL
Performed loop checks, function checkout and startup/commissioning on a combined power plant.
2 GE frame 7'swith HRSG'sand on GE steam turbine MarkVIcontrol system.
Clear I/E faults, produce redlines and clear punch listitems throughout the facility.
Liaising with document control departmentand completing allrelevant paperwork.
Instrument Supervisor
March 2003toAugust 2004
Turner Enterprises LLC - Shell Refinery - Norco,LA
Commissioning, start-up, and maintenance of Instrumentation/Electrical on process equipmentthroughout
refinery & adjacent chemical plant.
Walk down systems and clear I/E faultsthroughout both facilities.
Turnaround Lead responsible for anyand all loop folders and documentation for the unit or unitsshutdown during
turnaround.
Liaising with document control departmentand completing allrelevant paperwork.
Instrument Technician
June 1999 to March 2003
Deepwater Specialists, Inc. - NewOrleans,LA
Commissioning of Instrumentation/Electricaland DCS systems for the Shell Brutus& Nakika Tension Leg
Platforms.
Building ofpackets for Brutusand Nakika Tension Leg Platforms consisting ofevery Loop folder for
4. Instrumentation and Electrical throughout both facilitiesincluding: P&ID, Data Sheets and other associated
drawings for each Loop.
Set up of Allen Bradley Programmable Logic Controllers, Distributive Control System, calibration and
troubleshooting of field instrumentsfor the Platform.
Commissioning of NEXWOS, ADCP and Wave staff Weather Monitoring Systems.
Commissioning of Solar Mars 100 Turbine.
Function test of safety shutdown systems and Punch listfocal point for the commissioning group.
Instrumentation / Electrical Technician
August 1998toJune 1999
C&D Production Inc - LA
Maintain the production of Oil and Gas on the offshore facilities.
Maintenance and upkeep of the electrical and instrumentation systems on the facilities.
Liaising with drillrig electricians and key personnel whenever necessary to maintain SIMOPS of the production
facilities and the integrity of the drilling operations.
Working knowledge of AC Variable FrequencyDrives,SCR drives, generator controls, and programmable logic
controllers.
Maintain and uphold HSE and MMS regulations throughout the field,consisting offour offshore facilities.
Education
Associate of Arts:Electronics Engineering,1998
Southeast College of Technology
Basic, Solid State, Micro, and Digital Electronics
1993
United States Army
MSE Network Switching Systems Operator Certification
New Equipment Training Division Readiness Doctorate
ANSI/ASME N.45.2.6 Level II Test Engineer
Skills
Project Management
Instrumentation and Electrical Management
Leader and manager of highly skilled personnel in multi-cultural environment
Ability to develop and maintain strong internal and external relationships
Ability to develop and deliver customer-centered solutions,while providing exceptional experiences,productsand
services that meet and exceed customer expectations
Utilize appropriate metrics, methods and data to manage by fact and monitor,measure and improve processes
Build talentpools byattracting, developing,managing and retaining criticaltalentby leveraging and developing
people's capabilities, skill sets and strengths.
Effective communicator that is able to consistently prepare, and deliver clear, concise, timely and persuasive
communications.
Actively listensand promotes open exchange ofideas and opinions ofothers
Problem solver and trained negotiator to develop win-win situationsfor both employer and client
Inspection,installation, commissioning and startup ofequipmentfor power,nuclear power and oiland gas
industries
Site acceptance testing of digital control systems
Write, reviewand approve I&C test proceduresand reports
Leader and manager of highly skilled personnel in multi-cultural environments
Installation of variouselectronic, digital and pneumatic systems
Problem solver and trained negotiator to develop win-win situationsfor both employer and client