SlideShare a Scribd company logo
1 of 7
MOHAMMAD ASIF HUSSAIN
Mobile: - +91 7544855841/+919934705795
Email: - mdasif4u87@yahoo.com
POST APPLIED FOR THE INSTRUMENT SUPERVISOR
Career Summary
To inspire a challenging in various technologies, prove my technical competency
Domain expertise, which will help me to achieve a synergy between my individual
Career inspiration and those of my organization I would like to contribute more and
More in my career in the field and hope to achieve the maximum standard
TOTAL EXEPRIENCE ---- (14 YEARS )
(14 yrs. in Abroad)
Technical Qualification
3 Years Diploma Engineering in Instrumentation
Drawings Knowledge :
Typical drawings, P & ID, Layout of instrument installation & Air line, Layout of
instrument cable tray, Layout of cable lying, Layout of conduit, Hookup, Vender
drawing, Termination details, Logic diagram, loop diagram And Piping plan, etc
Professional Experience
1Project CBDC Project Takreer (Abu Dhabi Ruwais)
Employer Samsung Engineering Co.Ltd
Designation Instrument Supervisor
Duration 22Apr, 2014 to 23July,2016
2. Project West Qurna II Phase Basra (Iraq)
Employer Samsung Engineering Co.Ltd
Designation Instrument Supervisor
Duration 25May, 2012 to 30Feb, 2014
3. Project Saudi Aramco total refinery Project (Jubail2 Satorp KSA)
Employer SK Engineering Company
Designation E&I Supervisor
Duration 1July, 2011 to 18April, 2012
4. Project National Chevron Project (Jubail KSA)
Employer Daelim Engineering
Designation Instrument Supervisor
Duration 15June, 2010 to 2May, 2011
5. Project RGX2 Project Raslaffan (Doha Qatar)
Employer Dodsal Company
Designation Instrument Supervisor
Duration 14February, 2009 to 18April, 2010
6. Project Ruwais Gas Project (Abu Dhabi)
Employer CCC Company
Designation Instrument Supervisor
Duration 27Dec, 2006 to 21Feb, 2008
7. Project Jubail chevron Phillips Project (KSA)
Employer CCC Company
Designation Instrument Supervisor
Duration 10June, 2005 to 18Oct, 2006
8. Project Qatif Gas Project (KSA)
Employer S A Kent Company
Designation Instrument Foreman
Duration 8July, 2002 to 16Dec, 2004
Responsibilities :
 Working as an instrument Supervisor Prepare all inspection documents & getting
the material inspected.
 Conduct regular meeting with area in-charge, E & I construction manager and
consultants, and problem solving for technical/quality aspect, materials, schedule
and others related project problems.
 All documentation work required in construction work.
 Follow the installation works as per client’s standard and approved technical
drawings and work programs.
 All testing, pre-commissioning works follow the standard procedures and getting
the test certificates till handling over.
 Supervision, monitoring for lab calibration field calibration underground above
ground cable pulling, main ladder tray installation, instrument stanchion
installation, secondary tray installation, secondary cable pulling, instrument
installation, tubing installation & leak test airline installation & pneumatic leak
test loop checking & commissioning.
 Calibration of field instrument.
 Checking of Instrument & Control Loop.
 Supervision of various Instrument as per loop diagram, wiring inter connection
diagram. Cable trench location lay out, cable schedule.
 Checking of solenoid valves, temp Elements RTD & Thermocouple.
 Installation of new panel, junction box, proximeters and sensors.
 Inst cable Glanding & Termination.
 Continuity check, loop check and then system check.
 Assigning the work to manpower and guiding the technicians according to design
and specification.
 Prepare bar schedule of projects.
 Scheduling the various activities as per the time schedule.
 Performing daily, weekly and monthly progress reports.
 Involved daily preventive, breakdown maintenance and calibration work of
mentioned plants systems and instruments.
 Troubleshooting of all type instruments all type valves. And line up the
instruments.
 Supervision of erection and commissioning such as instrument calibration
installation, cable tray routes & erection, junction box installation, cable room
meggering continuity checks, Glanding and termination as per drawings control
room panel erection and control panel wiring and process Hook up and P & ID
diagram knowledge Control system involved Emerson process managements
 Delta V system, version.632 Bentley Nevada’s vibration monitoring system
version 3800 and ICS triplex’s ESD system.
 Ensuring that work is completed on schedule and in conformity with instrument
data sheets and specification.
 Supervise the group of technicians in installation, commissioning and
troubleshooting process.
 Supervision during loop-checking activities, function testing of instruments with
safety procedures.
 Responsible for calibration sheet or certificate shall be submitted to the company
for review and approval.
 Responsible for all Test equipment are to be certified and calibrated by recognized
institute regularity period.
 Responsible for overall instrumentation system, field instruments & attend
breakdowns works.
 Commissioning & Maintenance of all Instruments like control valve, Transmitter,
Switches, Flow meters, Emergency Shutdown Valves, MOV- motor operated
valves etc.
 Documentation & implementation of departmental work according toISO-9001:
2000, HSE standards.
 Understanding & Solve the Loop Diagrams, Logic Diagram, Interlock Drawing,
Inst Hook-up and all Panel & Vender Wiring Details.
WORKED ON FIELD INSTRUMENTS:
 HART AND FF, (Foundation field bus), field mate.
 Temperature Measurements- Gauges, Digital Indicators, Temperature Scanners,
Transmitters, RTD PT100, Thermocouples- Multiplexers & Demultiplexers.
 Pressure Measurements- Gauge, transmitters, Differential Pressure Transmitters.
 Level Measurements- DP type, Remote seal type Level Transmitters Switches-
Temperature, Level, Limit & Magnetic type Level switches.
 Flow Measurements- Mass flow type, Magnetic flow meters, Rota meters,
 FF Control Valves with Positioners, Solenoid valves, Actuators, I/P converters,
Air filter regulators. Valve Positioners, PID controller’s single loop & multi loop
etc.
 Calibration of various smart and non-smart transmitters like- (Forbes
Marshall,ABB, Rosemount, Foxboro,Yokogawa,- Honeywell, Siemens)
 Calibration Equipments used: Dead Weight Tester, Ducked Calibrator, and HART
Multimeter etc.
Ensured Electrical & Instrument works complied with project specifications,
company procedures, method statements and quality assurance and controls
documentation.
Liaising with Contractor personnel in resolving construction and commissioning related
issues and punch points.
Plan and schedule Projects, Estimate time and materials
Supervise and monitor the Installation of High Voltage, Medium Voltage & Low Voltage
Electrical System Assigned and monitor all Forman Ledmen, Technician and Electrician
Supervise and monitor Installation, testing and commissioning of Power, Distribution
Transformers, and Dry Type Transformers &NER.
Installation, testing and commissioning of 230kV GIS & 69kV GIS
Installation, testing and commissioning of Air Insulated Switchgears of 13.8kV, 6.6kV and
415V LV Switchgears Installation, Termination, Jointing, testing and Energization of 220kV,
33kV, 6.6kV and LV Cables.
Arrange the Materials receiving inspection of vendor packages or bulk items with complete
certificates/ documents (P.O., packing list, Test certificate, compliance certificates etc.)
Supervise of cable drums for their physical appearance, Meggering and continuity testing,
cable laying, glanding & termination, loop Checking etc.
Installation of Marshalling cabinets, DCS/ESD/F&G/VMS, UCP, Panel board, Switchgears,
Transformers, Lighting fixtures, bus duct and their internal wiring details and inspection of
all interfaces system with field instruments
Arrange the inspection and witness of loop Test, Functional test and SAT activities during
commissioning with approved documents.
Perform of all “RED LINE” drawing properly in order to arrangement for Find “AS-BUILT”
drawing to hand over to the client.
To attend punch list activities and sign off by client Electrical Power Facility like Power
Transformers, HV Switchgears, LV Switchboard, Bus Bar Assembly, Switching unit, HV
switchgear protection relays, static supply units, battery discharge test, UPS inspection,
Battery cell test.
Plant Earth System like Earthing Electrodes, Equipment earthing.
Lighting & Small Power Facilities – Inspection of installations, IR Test Lighting Circuit,
On/Off check, Light intensity & luminosity test Communication facilities – Telephone
system function test, paging system function test, cable pulling, Fiber optic termination, IR
& continuity test Fire Alarm System Cable Installation – Test Cable Drum, cable pulling IR
Test Electrical Motor – Installation check, IR Test, Solo Run Test Cathodic Protection
Inspection installation of CP System, Inspection potential pipe to soil, Anode and Conductor
System
Test package documentation.
Instrument installation & cable termination
Electrical and Instrument cable pulling & tray work
Main cable & Secondary cable termination & Glanding
Main cable & Secondary cable continuity test.
Marshalling cabinet & local panel Installation
Instrument impulse line & valve tubing installation
Instrument airline leak test & impulse line leak test
Junction box installation & cable termination
Instrument & Equipment earthing work
Power distribution cabinet & transformer installation
HT & LT panel erection & cable lying
FRP & GI tray installation
Motor cable glanding and termination.
Light fitting glanding and termination.
Light pole fabrication and erection
Transformer bus duct Erection Meggering for Instrument & electrical cable Meggering and
Hipot testing of cables.
Meggering for Motors
Checking and inspecting Motor Control Centre and Power Control centre.
Checking and inspecting control and relay panels of power transformers and distribution
transformers.
No load testing of HT and LT motors.
Preparation of various test reports
COMPUTER SKILL:
• EXPERT IN MS OFFICE, EXCEL, NET AND POWER POINT
Safety
I am well conversant with safety rules and regulation needed in heavy Industries.
 H2S Trained
 Confined Space Trained
 Incident Injury Free (IIF) Trained
 Work at Height Trained
Passport Details
Passport No M 7104852 (ECNR)
Date of Expiry 03.03.2025
Place of Issue Patna
Date of birth 10-03-1982
Old passport No F 6965765
Declaration
I declare the above information is true to the best of my knowledge and belief. I look
forward to a favorable reply.
Date:
(Mohammad Asif Hussain)
Place: INDIA
Declaration
I declare the above information is true to the best of my knowledge and belief. I look
forward to a favorable reply.
Date:
(Mohammad Asif Hussain)
Place: INDIA

More Related Content

What's hot

Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance newNoel Roque
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Rahman
 
pandi resume Instrument Technician
pandi resume Instrument Technicianpandi resume Instrument Technician
pandi resume Instrument TechnicianPANDI MUTHU
 
Sr Commi Instrument Technician
Sr Commi Instrument TechnicianSr Commi Instrument Technician
Sr Commi Instrument Technicianchandrabhushan rao
 
Instrument Technician (1)
Instrument  Technician  (1)Instrument  Technician  (1)
Instrument Technician (1)Amit More
 
Bryan Enon Cledoro - Inst. Maint. Tech. CV
Bryan Enon Cledoro - Inst. Maint. Tech. CVBryan Enon Cledoro - Inst. Maint. Tech. CV
Bryan Enon Cledoro - Inst. Maint. Tech. CVBryan Cledoro
 
RAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument TechnicianRAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument TechnicianRavi D
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC Firoz Mohammad
 
NESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGANESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGAnestor alega
 
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION  INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION umesh patel
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years expParthsarathy vijayan
 
Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Jr. Vacaro
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years expParthsarathy vijayan
 

What's hot (20)

Fahad CV
Fahad CVFahad CV
Fahad CV
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance new
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017
 
CV
CVCV
CV
 
JAFAR CV
JAFAR CVJAFAR CV
JAFAR CV
 
pandi resume Instrument Technician
pandi resume Instrument Technicianpandi resume Instrument Technician
pandi resume Instrument Technician
 
Sr Commi Instrument Technician
Sr Commi Instrument TechnicianSr Commi Instrument Technician
Sr Commi Instrument Technician
 
Instrument Technician (1)
Instrument  Technician  (1)Instrument  Technician  (1)
Instrument Technician (1)
 
Bryan Enon Cledoro - Inst. Maint. Tech. CV
Bryan Enon Cledoro - Inst. Maint. Tech. CVBryan Enon Cledoro - Inst. Maint. Tech. CV
Bryan Enon Cledoro - Inst. Maint. Tech. CV
 
RAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument TechnicianRAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument Technician
 
Instrument Technician
Instrument  TechnicianInstrument  Technician
Instrument Technician
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
NESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGANESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGA
 
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION  INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION
 
Sajjad QC Engineer
Sajjad QC EngineerSajjad QC Engineer
Sajjad QC Engineer
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp
 

Viewers also liked

παρουσίαση βιβλίων δανειστικής βιβλιοθήκης
παρουσίαση βιβλίων δανειστικής βιβλιοθήκηςπαρουσίαση βιβλίων δανειστικής βιβλιοθήκης
παρουσίαση βιβλίων δανειστικής βιβλιοθήκηςmariageorgiou6779
 
Kunden Profitabilitaets Analyse und Steigerung
Kunden Profitabilitaets Analyse und SteigerungKunden Profitabilitaets Analyse und Steigerung
Kunden Profitabilitaets Analyse und SteigerungHans-Gerlach Woudboer
 
Zahlen, Fakten und 10 Tipps für einen erfolgreichen Start auf Instagram
Zahlen, Fakten und 10 Tipps für einen erfolgreichen Start auf InstagramZahlen, Fakten und 10 Tipps für einen erfolgreichen Start auf Instagram
Zahlen, Fakten und 10 Tipps für einen erfolgreichen Start auf InstagramTWT
 
Pros and Cons of Social Media
Pros and Cons of Social MediaPros and Cons of Social Media
Pros and Cons of Social MediaLlycel May Leyso
 
Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)alejandro_lorenzo
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat BoseSaikat Bose
 
HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016Hugh McKellar
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - CopyPerry Anderson
 
Resume Avalo 2015
Resume Avalo 2015Resume Avalo 2015
Resume Avalo 2015Yamil Avalo
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument EngineerMukhtar Ahmad
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 

Viewers also liked (20)

παρουσίαση βιβλίων δανειστικής βιβλιοθήκης
παρουσίαση βιβλίων δανειστικής βιβλιοθήκηςπαρουσίαση βιβλίων δανειστικής βιβλιοθήκης
παρουσίαση βιβλίων δανειστικής βιβλιοθήκης
 
Mapa conceptual gerencia de proyectos
Mapa conceptual gerencia de proyectosMapa conceptual gerencia de proyectos
Mapa conceptual gerencia de proyectos
 
Teorias y tecnologias 2
Teorias y tecnologias 2Teorias y tecnologias 2
Teorias y tecnologias 2
 
Kunden Profitabilitaets Analyse und Steigerung
Kunden Profitabilitaets Analyse und SteigerungKunden Profitabilitaets Analyse und Steigerung
Kunden Profitabilitaets Analyse und Steigerung
 
Mapa conceptual gerencia de proyectos
Mapa conceptual gerencia de proyectosMapa conceptual gerencia de proyectos
Mapa conceptual gerencia de proyectos
 
CURRICULUM VITAE ENG
CURRICULUM VITAE ENGCURRICULUM VITAE ENG
CURRICULUM VITAE ENG
 
Teorias y tecnologias
Teorias y tecnologiasTeorias y tecnologias
Teorias y tecnologias
 
Zahlen, Fakten und 10 Tipps für einen erfolgreichen Start auf Instagram
Zahlen, Fakten und 10 Tipps für einen erfolgreichen Start auf InstagramZahlen, Fakten und 10 Tipps für einen erfolgreichen Start auf Instagram
Zahlen, Fakten und 10 Tipps für einen erfolgreichen Start auf Instagram
 
Comprehensive Care Navigation Pathway 2016
Comprehensive Care Navigation Pathway 2016Comprehensive Care Navigation Pathway 2016
Comprehensive Care Navigation Pathway 2016
 
Pros and Cons of Social Media
Pros and Cons of Social MediaPros and Cons of Social Media
Pros and Cons of Social Media
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
Sanjeev Resume (1)
Sanjeev Resume (1)Sanjeev Resume (1)
Sanjeev Resume (1)
 
Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)
 
MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat Bose
 
HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
 
Resume Avalo 2015
Resume Avalo 2015Resume Avalo 2015
Resume Avalo 2015
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 

Similar to asif sup new (4)

Similar to asif sup new (4) (20)

ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISOR
 
E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)
 
vinodh
vinodhvinodh
vinodh
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
 
M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CV
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 
mintu updated cv
mintu updated cvmintu updated cv
mintu updated cv
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
 
E & I QA QC SUPERVISOR
E & I QA QC SUPERVISORE & I QA QC SUPERVISOR
E & I QA QC SUPERVISOR
 
New cv jithesh
New cv jitheshNew cv jithesh
New cv jithesh
 
M Imran
M ImranM Imran
M Imran
 
instrumentation Engineering Cv
instrumentation Engineering Cvinstrumentation Engineering Cv
instrumentation Engineering Cv
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
 
Resume-Instrumentation engineer
Resume-Instrumentation engineerResume-Instrumentation engineer
Resume-Instrumentation engineer
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
 
filip_damian cv poza.docx NEW IUNIE
filip_damian cv poza.docx NEW IUNIEfilip_damian cv poza.docx NEW IUNIE
filip_damian cv poza.docx NEW IUNIE
 
MANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QC
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 

asif sup new (4)

  • 1. MOHAMMAD ASIF HUSSAIN Mobile: - +91 7544855841/+919934705795 Email: - mdasif4u87@yahoo.com POST APPLIED FOR THE INSTRUMENT SUPERVISOR Career Summary To inspire a challenging in various technologies, prove my technical competency Domain expertise, which will help me to achieve a synergy between my individual Career inspiration and those of my organization I would like to contribute more and More in my career in the field and hope to achieve the maximum standard TOTAL EXEPRIENCE ---- (14 YEARS ) (14 yrs. in Abroad) Technical Qualification 3 Years Diploma Engineering in Instrumentation Drawings Knowledge : Typical drawings, P & ID, Layout of instrument installation & Air line, Layout of instrument cable tray, Layout of cable lying, Layout of conduit, Hookup, Vender drawing, Termination details, Logic diagram, loop diagram And Piping plan, etc Professional Experience 1Project CBDC Project Takreer (Abu Dhabi Ruwais) Employer Samsung Engineering Co.Ltd Designation Instrument Supervisor Duration 22Apr, 2014 to 23July,2016 2. Project West Qurna II Phase Basra (Iraq) Employer Samsung Engineering Co.Ltd Designation Instrument Supervisor Duration 25May, 2012 to 30Feb, 2014
  • 2. 3. Project Saudi Aramco total refinery Project (Jubail2 Satorp KSA) Employer SK Engineering Company Designation E&I Supervisor Duration 1July, 2011 to 18April, 2012 4. Project National Chevron Project (Jubail KSA) Employer Daelim Engineering Designation Instrument Supervisor Duration 15June, 2010 to 2May, 2011 5. Project RGX2 Project Raslaffan (Doha Qatar) Employer Dodsal Company Designation Instrument Supervisor Duration 14February, 2009 to 18April, 2010 6. Project Ruwais Gas Project (Abu Dhabi) Employer CCC Company Designation Instrument Supervisor Duration 27Dec, 2006 to 21Feb, 2008 7. Project Jubail chevron Phillips Project (KSA) Employer CCC Company Designation Instrument Supervisor Duration 10June, 2005 to 18Oct, 2006 8. Project Qatif Gas Project (KSA) Employer S A Kent Company Designation Instrument Foreman Duration 8July, 2002 to 16Dec, 2004 Responsibilities :  Working as an instrument Supervisor Prepare all inspection documents & getting the material inspected.  Conduct regular meeting with area in-charge, E & I construction manager and consultants, and problem solving for technical/quality aspect, materials, schedule and others related project problems.  All documentation work required in construction work.  Follow the installation works as per client’s standard and approved technical drawings and work programs.  All testing, pre-commissioning works follow the standard procedures and getting the test certificates till handling over.  Supervision, monitoring for lab calibration field calibration underground above ground cable pulling, main ladder tray installation, instrument stanchion installation, secondary tray installation, secondary cable pulling, instrument installation, tubing installation & leak test airline installation & pneumatic leak test loop checking & commissioning.  Calibration of field instrument.
  • 3.  Checking of Instrument & Control Loop.  Supervision of various Instrument as per loop diagram, wiring inter connection diagram. Cable trench location lay out, cable schedule.  Checking of solenoid valves, temp Elements RTD & Thermocouple.  Installation of new panel, junction box, proximeters and sensors.  Inst cable Glanding & Termination.  Continuity check, loop check and then system check.  Assigning the work to manpower and guiding the technicians according to design and specification.  Prepare bar schedule of projects.  Scheduling the various activities as per the time schedule.  Performing daily, weekly and monthly progress reports.  Involved daily preventive, breakdown maintenance and calibration work of mentioned plants systems and instruments.  Troubleshooting of all type instruments all type valves. And line up the instruments.  Supervision of erection and commissioning such as instrument calibration installation, cable tray routes & erection, junction box installation, cable room meggering continuity checks, Glanding and termination as per drawings control room panel erection and control panel wiring and process Hook up and P & ID diagram knowledge Control system involved Emerson process managements  Delta V system, version.632 Bentley Nevada’s vibration monitoring system version 3800 and ICS triplex’s ESD system.  Ensuring that work is completed on schedule and in conformity with instrument data sheets and specification.  Supervise the group of technicians in installation, commissioning and troubleshooting process.  Supervision during loop-checking activities, function testing of instruments with safety procedures.  Responsible for calibration sheet or certificate shall be submitted to the company for review and approval.  Responsible for all Test equipment are to be certified and calibrated by recognized institute regularity period.  Responsible for overall instrumentation system, field instruments & attend breakdowns works.  Commissioning & Maintenance of all Instruments like control valve, Transmitter, Switches, Flow meters, Emergency Shutdown Valves, MOV- motor operated valves etc.  Documentation & implementation of departmental work according toISO-9001: 2000, HSE standards.  Understanding & Solve the Loop Diagrams, Logic Diagram, Interlock Drawing, Inst Hook-up and all Panel & Vender Wiring Details. WORKED ON FIELD INSTRUMENTS:  HART AND FF, (Foundation field bus), field mate.  Temperature Measurements- Gauges, Digital Indicators, Temperature Scanners, Transmitters, RTD PT100, Thermocouples- Multiplexers & Demultiplexers.  Pressure Measurements- Gauge, transmitters, Differential Pressure Transmitters.
  • 4.  Level Measurements- DP type, Remote seal type Level Transmitters Switches- Temperature, Level, Limit & Magnetic type Level switches.  Flow Measurements- Mass flow type, Magnetic flow meters, Rota meters,  FF Control Valves with Positioners, Solenoid valves, Actuators, I/P converters, Air filter regulators. Valve Positioners, PID controller’s single loop & multi loop etc.  Calibration of various smart and non-smart transmitters like- (Forbes Marshall,ABB, Rosemount, Foxboro,Yokogawa,- Honeywell, Siemens)  Calibration Equipments used: Dead Weight Tester, Ducked Calibrator, and HART Multimeter etc. Ensured Electrical & Instrument works complied with project specifications, company procedures, method statements and quality assurance and controls documentation. Liaising with Contractor personnel in resolving construction and commissioning related issues and punch points. Plan and schedule Projects, Estimate time and materials Supervise and monitor the Installation of High Voltage, Medium Voltage & Low Voltage Electrical System Assigned and monitor all Forman Ledmen, Technician and Electrician Supervise and monitor Installation, testing and commissioning of Power, Distribution Transformers, and Dry Type Transformers &NER. Installation, testing and commissioning of 230kV GIS & 69kV GIS Installation, testing and commissioning of Air Insulated Switchgears of 13.8kV, 6.6kV and 415V LV Switchgears Installation, Termination, Jointing, testing and Energization of 220kV, 33kV, 6.6kV and LV Cables. Arrange the Materials receiving inspection of vendor packages or bulk items with complete certificates/ documents (P.O., packing list, Test certificate, compliance certificates etc.) Supervise of cable drums for their physical appearance, Meggering and continuity testing, cable laying, glanding & termination, loop Checking etc. Installation of Marshalling cabinets, DCS/ESD/F&G/VMS, UCP, Panel board, Switchgears, Transformers, Lighting fixtures, bus duct and their internal wiring details and inspection of all interfaces system with field instruments Arrange the inspection and witness of loop Test, Functional test and SAT activities during commissioning with approved documents. Perform of all “RED LINE” drawing properly in order to arrangement for Find “AS-BUILT” drawing to hand over to the client. To attend punch list activities and sign off by client Electrical Power Facility like Power Transformers, HV Switchgears, LV Switchboard, Bus Bar Assembly, Switching unit, HV switchgear protection relays, static supply units, battery discharge test, UPS inspection, Battery cell test. Plant Earth System like Earthing Electrodes, Equipment earthing. Lighting & Small Power Facilities – Inspection of installations, IR Test Lighting Circuit, On/Off check, Light intensity & luminosity test Communication facilities – Telephone
  • 5. system function test, paging system function test, cable pulling, Fiber optic termination, IR & continuity test Fire Alarm System Cable Installation – Test Cable Drum, cable pulling IR Test Electrical Motor – Installation check, IR Test, Solo Run Test Cathodic Protection Inspection installation of CP System, Inspection potential pipe to soil, Anode and Conductor System Test package documentation. Instrument installation & cable termination Electrical and Instrument cable pulling & tray work Main cable & Secondary cable termination & Glanding Main cable & Secondary cable continuity test. Marshalling cabinet & local panel Installation Instrument impulse line & valve tubing installation Instrument airline leak test & impulse line leak test Junction box installation & cable termination Instrument & Equipment earthing work Power distribution cabinet & transformer installation HT & LT panel erection & cable lying FRP & GI tray installation Motor cable glanding and termination. Light fitting glanding and termination. Light pole fabrication and erection Transformer bus duct Erection Meggering for Instrument & electrical cable Meggering and Hipot testing of cables. Meggering for Motors Checking and inspecting Motor Control Centre and Power Control centre. Checking and inspecting control and relay panels of power transformers and distribution transformers. No load testing of HT and LT motors. Preparation of various test reports COMPUTER SKILL: • EXPERT IN MS OFFICE, EXCEL, NET AND POWER POINT Safety I am well conversant with safety rules and regulation needed in heavy Industries.  H2S Trained  Confined Space Trained  Incident Injury Free (IIF) Trained  Work at Height Trained Passport Details Passport No M 7104852 (ECNR) Date of Expiry 03.03.2025 Place of Issue Patna Date of birth 10-03-1982 Old passport No F 6965765
  • 6. Declaration I declare the above information is true to the best of my knowledge and belief. I look forward to a favorable reply. Date: (Mohammad Asif Hussain) Place: INDIA
  • 7. Declaration I declare the above information is true to the best of my knowledge and belief. I look forward to a favorable reply. Date: (Mohammad Asif Hussain) Place: INDIA