1. MOHAMMAD ASIF HUSSAIN
Mobile: - +91 7544855841/+919934705795
Email: - mdasif4u87@yahoo.com
POST APPLIED FOR THE INSTRUMENT SUPERVISOR
Career Summary
To inspire a challenging in various technologies, prove my technical competency
Domain expertise, which will help me to achieve a synergy between my individual
Career inspiration and those of my organization I would like to contribute more and
More in my career in the field and hope to achieve the maximum standard
TOTAL EXEPRIENCE ---- (14 YEARS )
(14 yrs. in Abroad)
Technical Qualification
3 Years Diploma Engineering in Instrumentation
Drawings Knowledge :
Typical drawings, P & ID, Layout of instrument installation & Air line, Layout of
instrument cable tray, Layout of cable lying, Layout of conduit, Hookup, Vender
drawing, Termination details, Logic diagram, loop diagram And Piping plan, etc
Professional Experience
1Project CBDC Project Takreer (Abu Dhabi Ruwais)
Employer Samsung Engineering Co.Ltd
Designation Instrument Supervisor
Duration 22Apr, 2014 to 23July,2016
2. Project West Qurna II Phase Basra (Iraq)
Employer Samsung Engineering Co.Ltd
Designation Instrument Supervisor
Duration 25May, 2012 to 30Feb, 2014
2. 3. Project Saudi Aramco total refinery Project (Jubail2 Satorp KSA)
Employer SK Engineering Company
Designation E&I Supervisor
Duration 1July, 2011 to 18April, 2012
4. Project National Chevron Project (Jubail KSA)
Employer Daelim Engineering
Designation Instrument Supervisor
Duration 15June, 2010 to 2May, 2011
5. Project RGX2 Project Raslaffan (Doha Qatar)
Employer Dodsal Company
Designation Instrument Supervisor
Duration 14February, 2009 to 18April, 2010
6. Project Ruwais Gas Project (Abu Dhabi)
Employer CCC Company
Designation Instrument Supervisor
Duration 27Dec, 2006 to 21Feb, 2008
7. Project Jubail chevron Phillips Project (KSA)
Employer CCC Company
Designation Instrument Supervisor
Duration 10June, 2005 to 18Oct, 2006
8. Project Qatif Gas Project (KSA)
Employer S A Kent Company
Designation Instrument Foreman
Duration 8July, 2002 to 16Dec, 2004
Responsibilities :
Working as an instrument Supervisor Prepare all inspection documents & getting
the material inspected.
Conduct regular meeting with area in-charge, E & I construction manager and
consultants, and problem solving for technical/quality aspect, materials, schedule
and others related project problems.
All documentation work required in construction work.
Follow the installation works as per client’s standard and approved technical
drawings and work programs.
All testing, pre-commissioning works follow the standard procedures and getting
the test certificates till handling over.
Supervision, monitoring for lab calibration field calibration underground above
ground cable pulling, main ladder tray installation, instrument stanchion
installation, secondary tray installation, secondary cable pulling, instrument
installation, tubing installation & leak test airline installation & pneumatic leak
test loop checking & commissioning.
Calibration of field instrument.
3. Checking of Instrument & Control Loop.
Supervision of various Instrument as per loop diagram, wiring inter connection
diagram. Cable trench location lay out, cable schedule.
Checking of solenoid valves, temp Elements RTD & Thermocouple.
Installation of new panel, junction box, proximeters and sensors.
Inst cable Glanding & Termination.
Continuity check, loop check and then system check.
Assigning the work to manpower and guiding the technicians according to design
and specification.
Prepare bar schedule of projects.
Scheduling the various activities as per the time schedule.
Performing daily, weekly and monthly progress reports.
Involved daily preventive, breakdown maintenance and calibration work of
mentioned plants systems and instruments.
Troubleshooting of all type instruments all type valves. And line up the
instruments.
Supervision of erection and commissioning such as instrument calibration
installation, cable tray routes & erection, junction box installation, cable room
meggering continuity checks, Glanding and termination as per drawings control
room panel erection and control panel wiring and process Hook up and P & ID
diagram knowledge Control system involved Emerson process managements
Delta V system, version.632 Bentley Nevada’s vibration monitoring system
version 3800 and ICS triplex’s ESD system.
Ensuring that work is completed on schedule and in conformity with instrument
data sheets and specification.
Supervise the group of technicians in installation, commissioning and
troubleshooting process.
Supervision during loop-checking activities, function testing of instruments with
safety procedures.
Responsible for calibration sheet or certificate shall be submitted to the company
for review and approval.
Responsible for all Test equipment are to be certified and calibrated by recognized
institute regularity period.
Responsible for overall instrumentation system, field instruments & attend
breakdowns works.
Commissioning & Maintenance of all Instruments like control valve, Transmitter,
Switches, Flow meters, Emergency Shutdown Valves, MOV- motor operated
valves etc.
Documentation & implementation of departmental work according toISO-9001:
2000, HSE standards.
Understanding & Solve the Loop Diagrams, Logic Diagram, Interlock Drawing,
Inst Hook-up and all Panel & Vender Wiring Details.
WORKED ON FIELD INSTRUMENTS:
HART AND FF, (Foundation field bus), field mate.
Temperature Measurements- Gauges, Digital Indicators, Temperature Scanners,
Transmitters, RTD PT100, Thermocouples- Multiplexers & Demultiplexers.
Pressure Measurements- Gauge, transmitters, Differential Pressure Transmitters.
4. Level Measurements- DP type, Remote seal type Level Transmitters Switches-
Temperature, Level, Limit & Magnetic type Level switches.
Flow Measurements- Mass flow type, Magnetic flow meters, Rota meters,
FF Control Valves with Positioners, Solenoid valves, Actuators, I/P converters,
Air filter regulators. Valve Positioners, PID controller’s single loop & multi loop
etc.
Calibration of various smart and non-smart transmitters like- (Forbes
Marshall,ABB, Rosemount, Foxboro,Yokogawa,- Honeywell, Siemens)
Calibration Equipments used: Dead Weight Tester, Ducked Calibrator, and HART
Multimeter etc.
Ensured Electrical & Instrument works complied with project specifications,
company procedures, method statements and quality assurance and controls
documentation.
Liaising with Contractor personnel in resolving construction and commissioning related
issues and punch points.
Plan and schedule Projects, Estimate time and materials
Supervise and monitor the Installation of High Voltage, Medium Voltage & Low Voltage
Electrical System Assigned and monitor all Forman Ledmen, Technician and Electrician
Supervise and monitor Installation, testing and commissioning of Power, Distribution
Transformers, and Dry Type Transformers &NER.
Installation, testing and commissioning of 230kV GIS & 69kV GIS
Installation, testing and commissioning of Air Insulated Switchgears of 13.8kV, 6.6kV and
415V LV Switchgears Installation, Termination, Jointing, testing and Energization of 220kV,
33kV, 6.6kV and LV Cables.
Arrange the Materials receiving inspection of vendor packages or bulk items with complete
certificates/ documents (P.O., packing list, Test certificate, compliance certificates etc.)
Supervise of cable drums for their physical appearance, Meggering and continuity testing,
cable laying, glanding & termination, loop Checking etc.
Installation of Marshalling cabinets, DCS/ESD/F&G/VMS, UCP, Panel board, Switchgears,
Transformers, Lighting fixtures, bus duct and their internal wiring details and inspection of
all interfaces system with field instruments
Arrange the inspection and witness of loop Test, Functional test and SAT activities during
commissioning with approved documents.
Perform of all “RED LINE” drawing properly in order to arrangement for Find “AS-BUILT”
drawing to hand over to the client.
To attend punch list activities and sign off by client Electrical Power Facility like Power
Transformers, HV Switchgears, LV Switchboard, Bus Bar Assembly, Switching unit, HV
switchgear protection relays, static supply units, battery discharge test, UPS inspection,
Battery cell test.
Plant Earth System like Earthing Electrodes, Equipment earthing.
Lighting & Small Power Facilities – Inspection of installations, IR Test Lighting Circuit,
On/Off check, Light intensity & luminosity test Communication facilities – Telephone
5. system function test, paging system function test, cable pulling, Fiber optic termination, IR
& continuity test Fire Alarm System Cable Installation – Test Cable Drum, cable pulling IR
Test Electrical Motor – Installation check, IR Test, Solo Run Test Cathodic Protection
Inspection installation of CP System, Inspection potential pipe to soil, Anode and Conductor
System
Test package documentation.
Instrument installation & cable termination
Electrical and Instrument cable pulling & tray work
Main cable & Secondary cable termination & Glanding
Main cable & Secondary cable continuity test.
Marshalling cabinet & local panel Installation
Instrument impulse line & valve tubing installation
Instrument airline leak test & impulse line leak test
Junction box installation & cable termination
Instrument & Equipment earthing work
Power distribution cabinet & transformer installation
HT & LT panel erection & cable lying
FRP & GI tray installation
Motor cable glanding and termination.
Light fitting glanding and termination.
Light pole fabrication and erection
Transformer bus duct Erection Meggering for Instrument & electrical cable Meggering and
Hipot testing of cables.
Meggering for Motors
Checking and inspecting Motor Control Centre and Power Control centre.
Checking and inspecting control and relay panels of power transformers and distribution
transformers.
No load testing of HT and LT motors.
Preparation of various test reports
COMPUTER SKILL:
• EXPERT IN MS OFFICE, EXCEL, NET AND POWER POINT
Safety
I am well conversant with safety rules and regulation needed in heavy Industries.
H2S Trained
Confined Space Trained
Incident Injury Free (IIF) Trained
Work at Height Trained
Passport Details
Passport No M 7104852 (ECNR)
Date of Expiry 03.03.2025
Place of Issue Patna
Date of birth 10-03-1982
Old passport No F 6965765
6. Declaration
I declare the above information is true to the best of my knowledge and belief. I look
forward to a favorable reply.
Date:
(Mohammad Asif Hussain)
Place: INDIA
7. Declaration
I declare the above information is true to the best of my knowledge and belief. I look
forward to a favorable reply.
Date:
(Mohammad Asif Hussain)
Place: INDIA