SlideShare a Scribd company logo
1 of 3
MUHAMMAD ZEESHAN KK
E-Mail: kk.redco@gmail.com / Mobile: 00968 96157692 (OMAN), 0092 333 9411159(Pakistan)
QA/ QC Engineer / Civil Inspector
Objective: To be a part of professional organization where my skills could be best utilized so as to achieve the company
goals as well as enhance my career development.
PROFESSIONAL ABRIDGEMENT
A competent Civil Inspector & QA/QC Engineer and Site Engineer with more than 11 years of experience in the areas of
construction, site supervision and management. Proven track record of working on turnkey and EPC projects with
multinational British companies and within Public Sector on multimillion dollar construction developments of world high
ranking and prestigious projects in the Middle East and Asia.
CAREER CONTOUR
March 2015 to till date Ibn Khaldun Almadaen Engineering Consultants Civil Inspector
(OMAN)
Current Project : Oman Convention & Exhibition Centre Package #07 H #02
Key Deliverables:
 Prepared simplefeasibility study (within my scope) for the projects tobe undertaken as well as on the other hand,
Responsible in themonitoringand supervision upon implementation.
 Directly involved on site inspection.Involve full range of construction monitoring.
 Directly involved on site Quality Control of civil works.
 Coordinate with surveyor regardingtechnical survey report.
 Coordinate with MEP Department regarding technical Issue on Site.
 Conduct weekly coordination meeting to all site staff and Contractors ensuring to achieve the ultimate target of
delivering the project with the desired quality at forecasted budget and scheduled time.
April 2011 to Fab 2015 Redco International W.L.L QA/QC Engineer
(Qatar)
Project Handled : Burj Al Marina 3B+G+6P+36 Lusail (PM WEB)
: Ashghal 5 School Project North Khalifa (PRIMAVERA)
: Qatar Airways Crew Accommodation 2B+G+9 (4 Building) (AXONEX)
Key Deliverables:
 Responsible for the Quality Control Inspections at Site For all Civil Works and Steel Structures.
 Review of Submittal for Material Approval, Construction Procedures and Method of Statements & ITPs Submitted by
Consultant. Review of IFC Drawing Revisions Related to Civil, Building and Structural Works.
 Closed NCR in the event of the work done by Site, reviewed of corrective action, and monitor site implementation.
 Maintained qa/qc operations by following policies and procedures, reporting needed changes, witnessed tests, and
verified their adequacy in full compliance with approved quality standard, and certified appropriate documentations
that formed part of quality records.
 Monitor/Witness concreting works to ensure that concrete is placed in accordance with concreting procedure.
 Monitor/Supervised construction activities toensurethat theworks progresses in a manner that will result in
compliance with theproject specifications and approved drawings,and that thework is completed within specified.
Review inspection records and approved the results.
 Ensure that all the construction activities aresystematicallycontrolled and executed so that only conforming materials
equipment, approved methods and procedure use for construction purposes.
 Maintain site progress reports & manpower report, machinery report.
10 March 2010 to 28 March 2011 Izhar Banu Mukhtar Pvt ltd QA/QC Supervisor
(Pakistan)
Project Handled : KIS Suparco PGES Building
Key Deliverables:
 Responsible for the quality Control Inspections at Site For all Civil Works.
 Issued Site observation, reviewed and recommend approval of corrective action, and monitor site implementation.
 Maintained QA/QC operations by following policies and procedures, reporting needed changes, witnessed tests, and
verified their adequacy in full compliance with approved quality standard, and certified appropriate documentations
that formed part of quality records.
 Monitor concreting works to ensure that concrete is placed in accordance with concreting procedure.
 Supervised construction activities toensurethat theworks progresses in a manner that will result in compliance with
the project specifications and approved drawings,and that theworkis completed within specified. Review inspection
records and approved the results.
 Ensure that all the construction activities aresystematicallycontrolled and executed so that only conforming materials
equipment, approved methods and procedure use for construction purposes.
10 Jan 2009 to 08 March 2010 Taha Enterprises Pvt ltd Site Engineer (Civil)
(Pakistan)
Project Handled : SU Houses Malir Cantonment
Key Deliverables:
 Coordination of subcontractors drawings,witness field and laboratory tests..
 Preparesite sketches as required, coordinatewith subcontractor regardingon site surveys,location and elevations,
maintain and update quality records.
 Implement safe system of works in accordance with approved safety procedures and manage multi-disciplinesite
activities toachieve timeand cost targets.
 Over all siteconstruction management and provide effective direction and control of siteconstruction activities ahead
of schedule and supervise/inspection fireproofing for equipment and steel structures.
 Qa/Qc operations by following policies and procedures, reportingneeded changes, witnessed tests,and verified their
adequacy in full compliancewith approved quality standard,and certified appropriatedocumentations that formed
part of quality records.
09 Sep 2008 to 05 Jan 2009 G5 Construction UK Ltd / Al-Naboodha Contracting Site Supervisor (Civil)
(United Arab Emirates)
Project Handled : Emal Aluminium D.C.A Complex AL-Taweela
Key Deliverables:
 Keep on preparingrequest for inspection thru theproject engineer whenever somethingnot clear or else discrepancy
in the approved drawingprior to submit to theclient or main contractor for clarification and action
 Submit internal inspection request to the designated QC inspector, coordinatewith them during inspection as well as
initiatedrastic action whatever comments or else rectifications.
 Kept constant coordination with the surveyor,checked and follow their layout as per drawingas well as collect any
survey report for RFI attachment.
 Keep on preparingweekly reports for a forecast volume of concreteto be poured in succeeding weekly with
coordination of the project engineer.
07 Sep 2007 to 05 Sep 2008 Engineering Consultant International Limited Site Inspector
(Pakistan) .
Project Handled : M.D.A Housing Scheme Infrastructure
Key Deliverables:
 Prepared simplefeasibility study (within my scope) for the projects tobe undertaken as well as on the other hand,
Responsible in themonitoringand supervision upon implementation.
 Directly involved on site inspection.Involve full range of construction monitoring.
 Directly involved on site inspection of civil works.
 Coordinate with surveyor regardingtechnical survey report.
 Conduct weekly coordination meeting to all site staff and Contractors ensuring to achieve the ultimate target of
delivering the project with the desired quality at forecasted budget and scheduled time.
17 Jun 2005 to 27 May 2007 Ecowest International Pvt ltd Associate Engineer (Civil)
(Pakistan)
Project Handled : Sundar Industrial Estate Scheme Infrastructure
Key Deliverables:
 Jointly worked with several key staff personnel at site in supervisingand double checking all civil works
Infrastructure activities and strictlyimposed the daily required manpower schedule in accordance/compliance with
the client quality control specifications and safety standards procedures for all the projects
 Kept constant coordination with thesurveyor,checked and follow their layout as per drawingas well as collect any
survey report for RFI attachment.
 Keep on preparingweekly reports for a forecast volume of concreteto be poured in succeeding weekly with
coordination of the project engineer.
 Responsible for the quality Control Inspections at Site For all Civil Works.
 Implement safe system of works in accordance with approved safety procedures and manage multi-disciplinesite
activities toachieve timeand cost targets.
18 Jan 2004 to 24 may 2005 Kamran Construction Associates Site Supervisor
(Pakistan)
 Project Handled : Schools & Residential buildings
Key Deliverables:
 Keep on preparingrequest for inspection thru theproject engineer whenever somethingnot clear or else discrepancy
in the approved drawingprior to submit to theclient or main contractor for clarification and action
 Submit internal inspection request to the designated QC inspector, coordinatewith them during inspection as well as
initiatedrastic action whatever comments or else rectifications.
 Kept constant coordination with thesurveyor,checked and follow their layout as per drawingas well as collect any
survey report for RFI attachment.
 Keep on preparingweekly reports for a forecast volume of concreteto be poured in succeeding weekly with
coordination of the project engineer.
EDUCATIONAL & PERSONAL DETAILS
Education : 3 years Diploma of Associate Engineer (Civil) from PTI Mirpurkhas Pakistan 2003.
: Bachelor Of Commerce Form University Of Sind Pakistan 2010.
Nationality : Pakistan
Marital Status : Married
Religion : Islam
Driving License : Pakistan
Passport No : AM4959642
Issue Date : 18 July 2008
Expire Date : 17 July 2017
Visa Status : Employment Visa
Languages Known : English, Hindi, Urdu
References : Available on request
I hereby declare that theabove provided information is correct to the best of my knowledge.
(MUHAMMAD ZEESHAN)

More Related Content

What's hot (20)

QC Civil A. Afzal
QC Civil A. AfzalQC Civil A. Afzal
QC Civil A. Afzal
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
Sami resume new
Sami resume newSami resume new
Sami resume new
 
Glenn updated cv
Glenn updated cvGlenn updated cv
Glenn updated cv
 
RESUME - Rajesh
RESUME - RajeshRESUME - Rajesh
RESUME - Rajesh
 
Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
Challenor-paul 13-01-16
Challenor-paul 13-01-16Challenor-paul 13-01-16
Challenor-paul 13-01-16
 
QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_
 
Curriculum vitae updated as of 01 April,2017
Curriculum vitae updated as of 01 April,2017Curriculum vitae updated as of 01 April,2017
Curriculum vitae updated as of 01 April,2017
 
Hamza qadeer cv
Hamza qadeer cvHamza qadeer cv
Hamza qadeer cv
 
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC Engr
 
Engr. Sikandar_resume
Engr. Sikandar_resumeEngr. Sikandar_resume
Engr. Sikandar_resume
 
James
JamesJames
James
 
Khaled Hubaisheh Resume
Khaled Hubaisheh ResumeKhaled Hubaisheh Resume
Khaled Hubaisheh Resume
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Krishnendu cv
Krishnendu cvKrishnendu cv
Krishnendu cv
 

Viewers also liked

HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016Hugh McKellar
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - CopyPerry Anderson
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat BoseSaikat Bose
 
Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)alejandro_lorenzo
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument EngineerMukhtar Ahmad
 
Resume Avalo 2015
Resume Avalo 2015Resume Avalo 2015
Resume Avalo 2015Yamil Avalo
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVmohammed zameel zainudheen
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORIKRAM HUSSAIN
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
 
Instrumentation & Electrical Engineer
Instrumentation &  Electrical EngineerInstrumentation &  Electrical Engineer
Instrumentation & Electrical EngineerCHAUHAN HIREN
 
CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -abdallah chamekh
 
Revit mep draftman resume 000
Revit mep draftman resume 000Revit mep draftman resume 000
Revit mep draftman resume 000Mca Faizul Islam
 

Viewers also liked (20)

HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat Bose
 
Sanjeev Resume (1)
Sanjeev Resume (1)Sanjeev Resume (1)
Sanjeev Resume (1)
 
Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Resume Avalo 2015
Resume Avalo 2015Resume Avalo 2015
Resume Avalo 2015
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CV
 
Muhammad Aminudin Ramli
Muhammad Aminudin RamliMuhammad Aminudin Ramli
Muhammad Aminudin Ramli
 
asif sup new (4)
asif sup new (4)asif sup new (4)
asif sup new (4)
 
Rinku Gemini
Rinku GeminiRinku Gemini
Rinku Gemini
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISOR
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
Instrumentation & Electrical Engineer
Instrumentation &  Electrical EngineerInstrumentation &  Electrical Engineer
Instrumentation & Electrical Engineer
 
CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -
 
Revit mep draftman resume 000
Revit mep draftman resume 000Revit mep draftman resume 000
Revit mep draftman resume 000
 
Autodesk Revit MEP
Autodesk Revit MEPAutodesk Revit MEP
Autodesk Revit MEP
 

Similar to MUHAMMAD ZEESHAN

Similar to MUHAMMAD ZEESHAN (20)

Kaleemullah. cv
Kaleemullah. cvKaleemullah. cv
Kaleemullah. cv
 
Bilal updated cv
Bilal updated cvBilal updated cv
Bilal updated cv
 
Project Quality Management PPT.pptx
Project Quality Management PPT.pptxProject Quality Management PPT.pptx
Project Quality Management PPT.pptx
 
Updated CV
Updated CVUpdated CV
Updated CV
 
CV Updated 2
CV Updated 2CV Updated 2
CV Updated 2
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc  civil engineer I did civil engineering from University peshawarengr ijaz 1 qc  civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
Sr.civil engineer
Sr.civil engineerSr.civil engineer
Sr.civil engineer
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
Umar
UmarUmar
Umar
 
wilson cv
wilson cvwilson cv
wilson cv
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Cv 2015
Cv 2015Cv 2015
Cv 2015
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 

MUHAMMAD ZEESHAN

  • 1. MUHAMMAD ZEESHAN KK E-Mail: kk.redco@gmail.com / Mobile: 00968 96157692 (OMAN), 0092 333 9411159(Pakistan) QA/ QC Engineer / Civil Inspector Objective: To be a part of professional organization where my skills could be best utilized so as to achieve the company goals as well as enhance my career development. PROFESSIONAL ABRIDGEMENT A competent Civil Inspector & QA/QC Engineer and Site Engineer with more than 11 years of experience in the areas of construction, site supervision and management. Proven track record of working on turnkey and EPC projects with multinational British companies and within Public Sector on multimillion dollar construction developments of world high ranking and prestigious projects in the Middle East and Asia. CAREER CONTOUR March 2015 to till date Ibn Khaldun Almadaen Engineering Consultants Civil Inspector (OMAN) Current Project : Oman Convention & Exhibition Centre Package #07 H #02 Key Deliverables:  Prepared simplefeasibility study (within my scope) for the projects tobe undertaken as well as on the other hand, Responsible in themonitoringand supervision upon implementation.  Directly involved on site inspection.Involve full range of construction monitoring.  Directly involved on site Quality Control of civil works.  Coordinate with surveyor regardingtechnical survey report.  Coordinate with MEP Department regarding technical Issue on Site.  Conduct weekly coordination meeting to all site staff and Contractors ensuring to achieve the ultimate target of delivering the project with the desired quality at forecasted budget and scheduled time. April 2011 to Fab 2015 Redco International W.L.L QA/QC Engineer (Qatar) Project Handled : Burj Al Marina 3B+G+6P+36 Lusail (PM WEB) : Ashghal 5 School Project North Khalifa (PRIMAVERA) : Qatar Airways Crew Accommodation 2B+G+9 (4 Building) (AXONEX) Key Deliverables:  Responsible for the Quality Control Inspections at Site For all Civil Works and Steel Structures.  Review of Submittal for Material Approval, Construction Procedures and Method of Statements & ITPs Submitted by Consultant. Review of IFC Drawing Revisions Related to Civil, Building and Structural Works.  Closed NCR in the event of the work done by Site, reviewed of corrective action, and monitor site implementation.  Maintained qa/qc operations by following policies and procedures, reporting needed changes, witnessed tests, and verified their adequacy in full compliance with approved quality standard, and certified appropriate documentations that formed part of quality records.  Monitor/Witness concreting works to ensure that concrete is placed in accordance with concreting procedure.  Monitor/Supervised construction activities toensurethat theworks progresses in a manner that will result in compliance with theproject specifications and approved drawings,and that thework is completed within specified. Review inspection records and approved the results.  Ensure that all the construction activities aresystematicallycontrolled and executed so that only conforming materials equipment, approved methods and procedure use for construction purposes.  Maintain site progress reports & manpower report, machinery report. 10 March 2010 to 28 March 2011 Izhar Banu Mukhtar Pvt ltd QA/QC Supervisor (Pakistan) Project Handled : KIS Suparco PGES Building
  • 2. Key Deliverables:  Responsible for the quality Control Inspections at Site For all Civil Works.  Issued Site observation, reviewed and recommend approval of corrective action, and monitor site implementation.  Maintained QA/QC operations by following policies and procedures, reporting needed changes, witnessed tests, and verified their adequacy in full compliance with approved quality standard, and certified appropriate documentations that formed part of quality records.  Monitor concreting works to ensure that concrete is placed in accordance with concreting procedure.  Supervised construction activities toensurethat theworks progresses in a manner that will result in compliance with the project specifications and approved drawings,and that theworkis completed within specified. Review inspection records and approved the results.  Ensure that all the construction activities aresystematicallycontrolled and executed so that only conforming materials equipment, approved methods and procedure use for construction purposes. 10 Jan 2009 to 08 March 2010 Taha Enterprises Pvt ltd Site Engineer (Civil) (Pakistan) Project Handled : SU Houses Malir Cantonment Key Deliverables:  Coordination of subcontractors drawings,witness field and laboratory tests..  Preparesite sketches as required, coordinatewith subcontractor regardingon site surveys,location and elevations, maintain and update quality records.  Implement safe system of works in accordance with approved safety procedures and manage multi-disciplinesite activities toachieve timeand cost targets.  Over all siteconstruction management and provide effective direction and control of siteconstruction activities ahead of schedule and supervise/inspection fireproofing for equipment and steel structures.  Qa/Qc operations by following policies and procedures, reportingneeded changes, witnessed tests,and verified their adequacy in full compliancewith approved quality standard,and certified appropriatedocumentations that formed part of quality records. 09 Sep 2008 to 05 Jan 2009 G5 Construction UK Ltd / Al-Naboodha Contracting Site Supervisor (Civil) (United Arab Emirates) Project Handled : Emal Aluminium D.C.A Complex AL-Taweela Key Deliverables:  Keep on preparingrequest for inspection thru theproject engineer whenever somethingnot clear or else discrepancy in the approved drawingprior to submit to theclient or main contractor for clarification and action  Submit internal inspection request to the designated QC inspector, coordinatewith them during inspection as well as initiatedrastic action whatever comments or else rectifications.  Kept constant coordination with the surveyor,checked and follow their layout as per drawingas well as collect any survey report for RFI attachment.  Keep on preparingweekly reports for a forecast volume of concreteto be poured in succeeding weekly with coordination of the project engineer. 07 Sep 2007 to 05 Sep 2008 Engineering Consultant International Limited Site Inspector (Pakistan) . Project Handled : M.D.A Housing Scheme Infrastructure Key Deliverables:  Prepared simplefeasibility study (within my scope) for the projects tobe undertaken as well as on the other hand, Responsible in themonitoringand supervision upon implementation.  Directly involved on site inspection.Involve full range of construction monitoring.  Directly involved on site inspection of civil works.  Coordinate with surveyor regardingtechnical survey report.
  • 3.  Conduct weekly coordination meeting to all site staff and Contractors ensuring to achieve the ultimate target of delivering the project with the desired quality at forecasted budget and scheduled time. 17 Jun 2005 to 27 May 2007 Ecowest International Pvt ltd Associate Engineer (Civil) (Pakistan) Project Handled : Sundar Industrial Estate Scheme Infrastructure Key Deliverables:  Jointly worked with several key staff personnel at site in supervisingand double checking all civil works Infrastructure activities and strictlyimposed the daily required manpower schedule in accordance/compliance with the client quality control specifications and safety standards procedures for all the projects  Kept constant coordination with thesurveyor,checked and follow their layout as per drawingas well as collect any survey report for RFI attachment.  Keep on preparingweekly reports for a forecast volume of concreteto be poured in succeeding weekly with coordination of the project engineer.  Responsible for the quality Control Inspections at Site For all Civil Works.  Implement safe system of works in accordance with approved safety procedures and manage multi-disciplinesite activities toachieve timeand cost targets. 18 Jan 2004 to 24 may 2005 Kamran Construction Associates Site Supervisor (Pakistan)  Project Handled : Schools & Residential buildings Key Deliverables:  Keep on preparingrequest for inspection thru theproject engineer whenever somethingnot clear or else discrepancy in the approved drawingprior to submit to theclient or main contractor for clarification and action  Submit internal inspection request to the designated QC inspector, coordinatewith them during inspection as well as initiatedrastic action whatever comments or else rectifications.  Kept constant coordination with thesurveyor,checked and follow their layout as per drawingas well as collect any survey report for RFI attachment.  Keep on preparingweekly reports for a forecast volume of concreteto be poured in succeeding weekly with coordination of the project engineer. EDUCATIONAL & PERSONAL DETAILS Education : 3 years Diploma of Associate Engineer (Civil) from PTI Mirpurkhas Pakistan 2003. : Bachelor Of Commerce Form University Of Sind Pakistan 2010. Nationality : Pakistan Marital Status : Married Religion : Islam Driving License : Pakistan Passport No : AM4959642 Issue Date : 18 July 2008 Expire Date : 17 July 2017 Visa Status : Employment Visa Languages Known : English, Hindi, Urdu References : Available on request I hereby declare that theabove provided information is correct to the best of my knowledge. (MUHAMMAD ZEESHAN)