Production
 Process of planning the production in advance
 Setting the exact route of each item
 Fixing the starting and finishing dates for each item
 First plan your work, then work on your plan
 Coordination of the series of functions according to a plan
 Economically utilize the plant facilities
 Regulate the orderly movement of goods during the entire mfg. cycle.
Functions of PPC
Planning
 Complete details and requirements of the product to be manufactured
 Planning the design of product going to be manufactured.
 quality and quantity of materials which are to be consumed
 sequence of operations
 capacity of equipment
 Order is placed
 Most economical process is selected depending upon
 Current production commitments
 Delivery date
 Quantity to be produced & Quality standards.
 Availability of equipment’s, tools, and manpower with period
 Sequence of operations to be performed
 Standard time for each operation
Routing
 Selection of path which will be followed by each part of the product while being
transformed from raw materials to finished products
Routing in Industries:
 Assembly Industry
 Job Order Industry
 Batching Industry
 Project based Industry
 Continuous Industry
Scheduling
 Order of sequence
 Starting and finishing time for each step
Dispatching
 Physical transfer of order from Planning Dept. to Production Dept.
 Send to actual production line
 Send Time Cards
 Inspection tickets – What quality should be maintained
Follow-Up
 Daily progress report
 Material at productions
 Shortage and delay of material
 On time or not
 Job progress
 Particular sequence is followed or not
 Assembly Line
 Components are on time for assembly
Inspection
 Confirming predetermined quality
 Defectives are rejected
 Reduce defective products
Objectives of PPC
 Estimate cost
 Make proper sequence
 Optimal usage of resources and capacity
 Coordinate different departments
 Fewer rush order and less overtime
 Better inventory management for raw materials and finished goods
 Reduction in wastage of time
 Deliver product on time
Application of PPC for Electronic Manufacturing Company

More Related Content

What's hot

MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMohammed Kaleemuddin
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndy Taylor
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planningVenu Yadav
 
SAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalSAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalAndrew Si
 
Supply chain imporvement
Supply chain imporvementSupply chain imporvement
Supply chain imporvementRohit Gothwal
 
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...Kevin Perry
 
Using Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM WorkUsing Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM WorkJacquie (Keith) Chischillie
 
KITARON Finite Capacity Production Planning system
KITARON Finite Capacity Production Planning systemKITARON Finite Capacity Production Planning system
KITARON Finite Capacity Production Planning systemGeosoft Systems
 

What's hot (18)

CV - K. Raja Narender Reddy
CV - K. Raja Narender ReddyCV - K. Raja Narender Reddy
CV - K. Raja Narender Reddy
 
Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
 
Annette Siverling Resume
Annette Siverling ResumeAnnette Siverling Resume
Annette Siverling Resume
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year Experience
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.doc
 
Work of a chemical engineer
Work of a chemical engineerWork of a chemical engineer
Work of a chemical engineer
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planning
 
T. Keith Bishop 18
T. Keith Bishop 18T. Keith Bishop 18
T. Keith Bishop 18
 
SAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalSAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-External
 
Supply chain imporvement
Supply chain imporvementSupply chain imporvement
Supply chain imporvement
 
Jai kishore Tiwari resume
Jai kishore Tiwari resume Jai kishore Tiwari resume
Jai kishore Tiwari resume
 
MY JOB DESCRIPTION
MY JOB DESCRIPTIONMY JOB DESCRIPTION
MY JOB DESCRIPTION
 
Ajay_CV_SQA
Ajay_CV_SQAAjay_CV_SQA
Ajay_CV_SQA
 
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
 
Tyler Bloodworth Resume
Tyler Bloodworth ResumeTyler Bloodworth Resume
Tyler Bloodworth Resume
 
Using Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM WorkUsing Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM Work
 
KITARON Finite Capacity Production Planning system
KITARON Finite Capacity Production Planning systemKITARON Finite Capacity Production Planning system
KITARON Finite Capacity Production Planning system
 
Crow 2017
Crow 2017Crow 2017
Crow 2017
 

Similar to Application of PPC for Electronic Manufacturing Company

Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesvideoaakash15
 
Ppc 07.06.2011
Ppc 07.06.2011Ppc 07.06.2011
Ppc 07.06.2011honeysethi
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & ControlKunalJagtap5
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlAijaz Aryan
 
Production planning
Production planningProduction planning
Production planningDavid Jaison
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlSimran Kaur
 
Production planing & control
Production planing & controlProduction planing & control
Production planing & controlPRIYABAMBALE
 
production planning and control
production planning and controlproduction planning and control
production planning and controlReshma Babu
 
Production And Planning control.ppt
Production And Planning control.pptProduction And Planning control.ppt
Production And Planning control.pptSrinuKN
 
Productionplanning control power point presentation
Productionplanning control power point presentationProductionplanning control power point presentation
Productionplanning control power point presentationmahadeopg
 
Enterprise resource planning in manufacturing
Enterprise resource planning in manufacturingEnterprise resource planning in manufacturing
Enterprise resource planning in manufacturingGoa App
 

Similar to Application of PPC for Electronic Manufacturing Company (20)

Ppc New
Ppc NewPpc New
Ppc New
 
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
 
Ppc 07.06.2011
Ppc 07.06.2011Ppc 07.06.2011
Ppc 07.06.2011
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Routing and scheduling
Routing and schedulingRouting and scheduling
Routing and scheduling
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production planning
Production planningProduction planning
Production planning
 
Mrp
MrpMrp
Mrp
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Production planing & control
Production planing & controlProduction planing & control
Production planing & control
 
Waleed
WaleedWaleed
Waleed
 
Production planning-and-control
Production planning-and-controlProduction planning-and-control
Production planning-and-control
 
PPC
PPCPPC
PPC
 
James hall ch 7
James hall ch 7James hall ch 7
James hall ch 7
 
production planning and control
production planning and controlproduction planning and control
production planning and control
 
Production And Planning control.ppt
Production And Planning control.pptProduction And Planning control.ppt
Production And Planning control.ppt
 
Productionplanning control power point presentation
Productionplanning control power point presentationProductionplanning control power point presentation
Productionplanning control power point presentation
 
Enterprise resource planning in manufacturing
Enterprise resource planning in manufacturingEnterprise resource planning in manufacturing
Enterprise resource planning in manufacturing
 
PPC
PPCPPC
PPC
 
PPC.pdf
PPC.pdfPPC.pdf
PPC.pdf
 

Recently uploaded

Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsmeharikiros2
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information SystemsAnge Felix NSANZIYERA
 

Recently uploaded (20)

Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

Application of PPC for Electronic Manufacturing Company

  • 1. Application of PPC for Electronics Manufacturing Company
  • 2. Production  Process of planning the production in advance  Setting the exact route of each item  Fixing the starting and finishing dates for each item  First plan your work, then work on your plan  Coordination of the series of functions according to a plan  Economically utilize the plant facilities  Regulate the orderly movement of goods during the entire mfg. cycle.
  • 3. Functions of PPC Planning  Complete details and requirements of the product to be manufactured  Planning the design of product going to be manufactured.  quality and quantity of materials which are to be consumed  sequence of operations  capacity of equipment  Order is placed  Most economical process is selected depending upon  Current production commitments  Delivery date  Quantity to be produced & Quality standards.  Availability of equipment’s, tools, and manpower with period  Sequence of operations to be performed  Standard time for each operation
  • 4. Routing  Selection of path which will be followed by each part of the product while being transformed from raw materials to finished products Routing in Industries:  Assembly Industry  Job Order Industry  Batching Industry  Project based Industry  Continuous Industry
  • 5. Scheduling  Order of sequence  Starting and finishing time for each step Dispatching  Physical transfer of order from Planning Dept. to Production Dept.  Send to actual production line  Send Time Cards  Inspection tickets – What quality should be maintained
  • 6. Follow-Up  Daily progress report  Material at productions  Shortage and delay of material  On time or not  Job progress  Particular sequence is followed or not  Assembly Line  Components are on time for assembly Inspection  Confirming predetermined quality  Defectives are rejected  Reduce defective products
  • 7. Objectives of PPC  Estimate cost  Make proper sequence  Optimal usage of resources and capacity  Coordinate different departments  Fewer rush order and less overtime  Better inventory management for raw materials and finished goods  Reduction in wastage of time  Deliver product on time