Identify non productive
items in the use of best
practices and project
management performance.
Identify reasons for lack of
productivity (root causes).
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
Develop an action plan (select best
practices to reduce shortfall);
Integrate best practices into the
project delivery process;
Adopt benchmarking as part of a
continuous improvement program;
Develop a process model;
 Monitor progress.
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
Program- and department-level
input/process measures.
Assess the total resources provided
for all projects within a programme or
department.
Assess the degree to which
programme- and department-wide
goals for projects and their
management are met.
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
From CT must be deducted:
any additional work;
Alterations;
Based on calendar days.
The following three factors are used for
calculating the KPI:
the date of start-up of the construction
phase;
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
the actual handing-over the project to the
client (day);
the alterations that have been agreed with
the client;
or have been caused by external factors
or by the client;
In both cases, the alterations are
expressed in calendar days.
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
If the work takes longer
than anticipated;
the KPI will be greater than
100%;
KPI will be less than 100%
if the work is completed
faster than anticipated.
There are 4 factors for calculating
the KPI:
BENCHMARKING-KPIsBENCHMARKING-KPIs
Actual construction time includes:
Remedy work (defects) in relation to planned
construction time;
this KPI expresses the relationship between the
actual construction time (including defects
liability period), if any;
and the expected construction time;
 For this case KPI for “Actual construction time
in relation to expected construction time”, the
expected construction time includes alterations
expressed in calendar days.
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
The KPI is calculated as a percentage,
where 100% corresponds to the actual
construction time being identical to the
expected construction time;
If the realised construction time is longer
than expected;
Therefore, the KPI will be greater than
100%.
The KPI will be less than 100% if the work
is completed ahead of the anticipated
time.
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
Remedial work to defects during the first
year after handing over
The KPI includes only the defects
remedied in the first year following
handing over, based on man-hour
consumption.
Some clients set the defect liability for
less time such as 6 month.
Other extra works or additional services
after the first year .
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
If it has been agreed that these additional
services may be carried out after handing
over they are not included in the KPI.
The man hours used to remedy defects in
connection with the one-year inspection
are included as an estimated figure.
The KPI is expressed in man hours
worked and measured against the
contract sum.
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
Accident frequency-CDM
 This is accomplished by the calculating of two
rates:
1. Incidence rate;
2. Accident frequency rate.
Incidence Rate
 Give the number of accidents for 1000
employees and is used to take into account
variations in the size of the workforce:
Incidence Rate = Number of Accidents X 1000
Numbers Employed
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
Accident frequency-CDM
The revised detailed guidance notes
which accompany CDM 2007 entitled
'managing health and safety in
construction.
Listed by the Health and Safety
Commission ((the Approved Code of
Practice (ACoP)) was approved in
February 2007.
CDM 2007 and ACoP came into force at
the beginning of April 2007.
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
Contribution ratio
Benchmarking System comprises
selected types of costs incurred by a
contracting company.
Earnings- KPIs are calculated on the
basis of a proportion of the total costs
incurred by a contracting company on
a contract.
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
The contribution ratio (basic package),
It is calculated on the basis of the
contractor’s turnover on the contract.
It corresponds to the sum of the payments
he has received from the client.
To the above figure should be added
payments such as:
extra works
additional services
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
Exclude from above:
income from interest
income from sale of scrap materials
salary cost
small assets
other direct and indirect production costs
and overhead costs.
Some of these costs are included in the
benchmarking system’s optional
packages.
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
Labour productivity
Labour productivity is defined as the value
added on the project.
It is measured against the total number of
man hours worked by contractors and
subcontractors contractors.
This productivity indicator will
subsequently constitute the project’s
labour productivity.
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
The value added on the project are
considered as:
the value added to the raw materials,
building materials and components
used from the time they are
purchased to the time they are ”sold”
in the form of the finished
construction project.
BENCHMARKING-KPI’SBENCHMARKING-KPI’S
The presentation of the
productivity indicators is carried
out at different levels such as:
sector
company
project and contract level.
005 benchmarking-kpi's