Page 1 of 15
CURRICULUM VITAE
PERSONAL DATA
Full Name : Ho Xuan Minh Huu
Date of Birth : 21st Sep, 1986
Nationality : Vietnamese
Gender : Male
CONTACT INFORMATION
Email : hominhhuu1986@gmail.com
Mobile : 084 124 219 1986
Address : 508 B4 5th Floor Complex – Ward 7 – Vung Tau City - Vietnam
SUMARY OF EXPERIENCE AND SKILLS
I’m a working hard and self-motivated person , always try my best in my jobs , try to get the
most satisfactory from clients.
05 years of experience in Oil & Gas as many role : E&I Supervisor, E&I Inspector , E&I
Engineer, E&I precom and commissioning Engineer.
Have involved many Oil & Gas projects .(please see attached CV ,updated 11/11/2016).
Have experience working on Electrical system such as : Motor Control Center LV MCC; LV
switchboard; UPS; LV Variable Frequency Drives; Lightning protection system; Cathodic
Monitoring & Protection system; Earthing & Grounding system ,Lighting system , have a bit
experience on HVAC system.
Have a bit experience working on DCS system .
Have experience working with many kind of field instrumentation: Pressure transmitter; Flow
transmitter; Level transmitter; Temperature transmitter; Fire&Gas detectors; Valves (Control
valve, On/off valve, Shutdown valve) and telecommunication system: PAGA , voice and data ,
NDB , .. .Familiar with control and safety system : Fire Water & Deluge; Fusible Loop; Wellhead
system; Flare system,Sea water pump.
Have experience with petroleum regulations, Ex classification, IP ratings, hazardous
classification.
Have much experience in take-off materials and estimate man-hour/man-power for jobs;
prepare and set-up tools/equipments/materials for projects and build method statement for
implementation of E&IT activities at site; make man-loading schedule & detailed E&I activities
schedule .Command E&I tech to carry out E&IT activities at site ,make sure safety and the best
quality.
Have experience to make final documentation,as built.
Have experience to engineering some packages ( valve ,Pressure transmitter ,instrument for
tank..)
PERSONAL SKILLS
Fluent in Vietnamese and English
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 2 of 15
Good computer skills (MS Word, Excel, PowerPoint, Navisworks)
Good manpower managing
High responsibility, well adaptability
Friendly and working hard
WORK EXPERIENCE
Company PTSC Offshore Services JSC
Duration Sep, 2014 – present (2 year 2 month)
Responsibilities:
• Prepare bidding documentation and support for procument team for technical issue.
• Take off manhour and manpower for the project, prepare list of tools,equipments and
materials for projects to carry out E&IT activities at site.
• Build work plan and manpower loading schedule in accordance with the overall project
schedule for E&I discipline.
• Research specifications, procedures, ITP, vendor data, drawings of project to develop
work pack, job card, task sheet dossier and method statement.
• Prepare Job Risk Assessment (JRA), Permit to Work (PTW) for E&IT activities.
• Interview and recruit E&I technician and E&I Supervisor for project.
• Develop E&IT detailed daily, weekly and 4 week look ahead plans base on status of
materials manpower and weather forecast report.
• Responsible in supervision all E&IT activities at site: equipment/support/tray-ladder
installation; cable pulling/gland/termination; tubing run/hook-up; perform cable loop
check, tubing leak test; equipment function check; complete Inspection & Testing report
(ITR); complete Sub-System Acceptance Certificate (SSAC); complete System
Acceptance Certificate (SAC); complete Discipline Acceptance Certificate (DAC), Ready
for Commissioning Certificate (RFC) and ensuring to adhere strictly to the latest
Approved for Construction (AFC) project drawings, Specifications, ITP’s, Procedures
and Site Instructions; complete construction works in accordance with the project
schedule.
• After construction works completed ,carry out precom and commisioning for some
systems.
• Redline mark-up on drawings and complete As-built dossier.
• Responsible for the HSES, and quality aspects of the work within assigned areas
• Control the crew change schedule of E&I team base on marine/logistic schedule,
mobilization plan.
Project:
1. Topaz LPS PROJECT.
- Position: Electrical and Instrument Supervisor
- Responsibility: Offshore hook-up for Topaz Wellhead platform
 Prepared tools,equipments,materials ,manpower .
 Prepared plan for offshore activities.
 Installed new instruments and F&G Detector for new compressor and tank
 Installed new lighting system for extension deck
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 3 of 15
 Installed 2 new pumps and 1 VFD cabinet.
 Precom and Commissioning for all system.
 Completed final documentation.
- Client: PCVL.
2. PQP-HT1 FLOWLINE PROJECT.
- Position: Electrical and Instrument Supervisor
- Responsibility: Offshore hook-up for 1 new well at HT1 Platform.
 Prepared tools,equipments,materials ,manpower .
 Prepared plan for offshore activities.
 Installed new instruments for new well.
 Installed heat tracing cable for production pipe.
 Installed new tubing line.
 Tubing leak test ,precom and commissioning system.
 Completed final documentation.
- Client: BIEN DONG POC
3. FLARE TIP MODIFICATION PROJECT
- Position: Electrical and Instrument Supervisor
- Responsibility: Offshore hook-up for STT-CPP Platform
 Prepared tools,equipments,materials ,manpower .
 Prepared plan for offshore activities.
 Installed new iginition junction box and new flare tip.
 Installed new conduct support and conduct.
 Reroute ignition cable and control cable.
 Precom and commissioning system.
 Completed final documentation.
- Client: CUU LONG JOC
4. DAI HUNG 2 FLOWLINE PROJECT
- Position: Electrical and Instrument Supervisor
- Responsibility: Offshore hook-up for Dai Hung 2 Wellhead Platform
 Prepared tools,equipments,materials ,manpower .
 Prepared plan for offshore activities.
 Installed new instruments for 3 new wells.
 Modified wellhead control panel
 Installed tubing line and leak test.
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 4 of 15
 Precom and Commissioning 3 new wells
 Completed final documentation.
- Client: DAI HUNG POC.
5. MLJ1 & MLJ2 MODIFICATION PROJECT
- Position: Electrical and Instrument Supervisor
- Responsibility: Perform modification for Telecomunication System at offshore Brunei
 Prepared tools,equipments,materials ,manpower .
 Prepared plan for offshore activities.
 Installed new antenna for MLJ1 and MLJ2 Platform.
 Installed new telecom cabinet .
 Pulled cable and loop check.
 Completed checksheet for installation.
- Client: TOTAL BRUNEI.
6. MLJ3 PROJECT
- Position: Electrical and Instrument Supervisor
- Responsibility: Offshore hook-up for MLJ3 Wellhead Platform
 Prepared tools,equipments,materials ,manpower .
 Prepared plan for offshore activities.
 Installed E&IT support/cable tray-ladder/equipments
 Pulled ,glanded and terminated cables for equipments
 Precom systems.
- Client: TOTAL BRUNEI.
7. BADAMYAR MODIFICATION PROJECT
- Position: Electrical and Instrument Supervisor
- Responsibility: Offshore hook-up for YADANA Field offshore Myanmar.
 Prepared tools,equipments,materials ,manpower .
 Prepared daily and 4 week look ahead plan for offshore activities.
 Installed many E&IT supports/cable tray-
ladder/instruments/lightings/pumps/PAGA/Antenna.
 Pulled glanded and terminated many cables for equiments.
 Precom cables and completed checksheet.
- Contractor: HUYNDAI HEAVY INDUSTRY (HHI)
- Client: TOTAL MYANMAR
8. SU TU TRANG FULL-FIELD HOOK-UP AND COMMISSIONING PROJECT
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 5 of 15
- Position: Electrical and Instrument Supervisor
- Responsibility: Offshore hook-up for PIP platform, LQ platform, 02 Link Bridge
 Prepared tools,equipments,materials ,manpower .
 Prepared plan for offshore activities.
 Installed many E&IT supports/cable tray-
ladder/instruments/lightings/pumps/PAGA/Antenna.
 Pulled glanded and terminated many cables for equiments.
 Loop check cables and completed checksheet.
- Client: CUU LONG JOC
_____________________________________________________________________________________________________________
Company PVC-MS
Position E&I Supervisor/E&I Inspector/E&I Engineer
Duration Aug, 2011 – Sep,2014 (3 year 1 month)
Responsibilities:
• Prepare bidding documentation and support for procument team for technical issue.
• Take off manhour and manpower for the project, prepare list of tools,equipments and
materials for projects to carry out E&IT activities at site.
• Build work plan and schedule in accordance with the overall project schedule for E&I
discipline.
• Research specifications, procedures, ITP, vendor data, drawings of project to develop
method statement at onshore and jobcard at offshore.
• Responsible in supervision all E&IT activities at site: equipment/support/tray-ladder
installation; cable pulling/gland/termination; tubing run/hook-up; perform cable loop
check, tubing leak test; equipment function check; complete Inspection & Testing report
(ITR); complete Sub-System Acceptance Certificate (SSAC); complete System
Acceptance Certificate (SAC); complete Discipline Acceptance Certificate (DAC), Ready
for Commissioning Certificate (RFC) and ensuring to adhere strictly to the latest
Approved for Construction (AFC) project drawings, Specifications, ITP’s, Procedures
and Site Instructions; complete construction works in accordance with the project
schedule.
• Responsible in inspection the quality of E&IT activities in accordance with project
specification.
• After construction works completed ,carry out precom and commisioning for some
systems.
• Redline mark-up on drawings and complete As-built dossier.
• Responsible for the HSES, and quality aspects of the work within assigned areas
Project:
1. H4 PROJECT
- Position: Electrical and Instrument Supervisor/E&I Commisioning Engineer
- Responsibility: Offshore hook-up and commissioning for H4 Wellhead Platform
 Prepared tools,equipments,materials ,manpower ,job card.
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 6 of 15
 Prepared plan for offshore activities.
 Installed many E&IT supports/cable tray-
ladder/instruments/lightings/pumps/PAGA/Antenna/Voice and data .
 Pulled glanded and terminated many cables for equiments.
 Loop check cables and completed checksheet , SSAC , SAC , DAC , RFC.
 Commissioning all telecommunication systems.
- Client : HOANG LONG JOC.
2. H1 MODIFICATION PROJECT
- Position: Electrical and Instrument Supervisor/E&I Inspector.
- Responsibility: Offshore modification and commissioning for H1 Wellhead Platform
 Prepared tools,equipments,materials ,manpower ,job card.
 Prepared plan for offshore activities.
 Installed E&IT supports/cable tray-ladder/instruments/valve/heat tracing
cable.
 Pulled glanded and terminated many cables for equiments.
 Loop check cables and completed checksheet , SSAC , SAC , DAC , RFC.
 Commissioning systems.
- Client : HOANG LONG JOC.
3. H1/H4/CNV FLOWLINE PROJECT
- Position: Electrical and Instrument Supervisor/E&I Inspector/E&I Engineer
- Responsibility: Offshore hook up and commissioning for new wells at H1/H4/CNV
Wellhead Platform
 Prepared tools,equipments,materials ,manpower ,job card.
 Prepared plan for offshore activities.
 Engineering for transmitter and instruments for new well and modified wellhead
control panel.
 Installed E&IT supports/cable tray-ladder/instruments/valve/heat tracing cable
for new wells
 Installed new wellhead control panel module.
 Pulled glanded and terminated many cables for equiments.
 Loop check cables and completed checksheet , SSAC , SAC , DAC , RFC.
 Commissioning systems.
- Client : HOANG LONG JOC.
4. STV 5X EHOUSE PROJECT ( the first E-House at VIETNAM )
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 7 of 15
- Position: Project Control Manager
- Responsibility: Coordinator/E&I Supervisor/E&I Inspector
 Prepared tools,equipments,materials ,manpower
 Prepared plan for construction activities.
 Coordinated with client for the schedule , drawing , material status.
 Control the progress of project and sub contractor.
 Fabricated and installed all supports/tray-ladder/equipments for E-House.
 Installed all cabinets ,distribution panels inside E house.
 Installed transformer ,HVAC system inside E house.
 Pulled glanded and terminated many cables for equiments.
 Loop check cables and completed checksheet , SSAC , SAC , DAC , RFC.
 Commissioning HVAC systems.
- Client : CUU LONG JOC.
5. DIAMOND PROJECT
- Position: E&I Engineer
- Responsibility: Technical support and assessment ,prepare bidding documentation ,FAT
for package.
 Prepared bidding documentation for some E&I package.
 Approved vendor data/drawing.
 Coordinated with vendor for equipments status and documentation.
 FAT packages.
 Instruct construction team to install equipments at site.
 Complete E&IT As built drawings.
- Client : PCVL.
6. SU TU NAU E HOUSE PROJECT
- Position: E&I Commissioning Engineer
- Responsibility: Precom and commissioning for HVAC system.
 Coordinated with foreign expert to commissioning HVAC system for both Ehouse
of Su Tu Nau Project.
Client : CUU LONG JOC.
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 8 of 15
EDUCATION
Bachelor of Engineering
Ho Chi Minh city University of Technology
Electrical and Electronic Faculty
Major: Automation
TRAINING COURSES
Hand tube bending and fitting safety seminar.
IECEx CoPC Unit #001 Training ( EX -001)
Work Superintendent Training course
LV/HV level 2 Training course ( APAVE France )
Tropical – Basic Offshore Safety Induction and Emergency training
Tropical Further Offshore Safety and Emergency training
PROFESSIONAL REFERENCE LIST
Mr. Nguyen Cong Hien
Deputy Manager of Mechanical & Maintenance Workshop
PTSC Offshore services JSC
Email: hiencongnguyen@ptsc.com.vn
Mobile: +84 918023292
Mr. Le Van Du
Project & Marine Department
Offshore Hook-up & Commissioning Manager
PTSC Offshore services JSC
Email: dule@ptsc.com.vn
Mobile: +84 983336369
Mr. Truong Ngoc Quy
Project & Marine Department
Offshore Hook-up & Commissioning Manager
PTSC Offshore services JSC
Email: quytruong@ptsc.com.vn
Mobile: +84 907176117
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 9 of 15
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 10 of 15
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 11 of 15
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 12 of 15
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 13 of 15
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 14 of 15
CURRICULUM VITA E : Ho Xuan Minh Huu
Page 15 of 15

CV- Ho Xuan Minh Huu

  • 1.
    Page 1 of15 CURRICULUM VITAE PERSONAL DATA Full Name : Ho Xuan Minh Huu Date of Birth : 21st Sep, 1986 Nationality : Vietnamese Gender : Male CONTACT INFORMATION Email : hominhhuu1986@gmail.com Mobile : 084 124 219 1986 Address : 508 B4 5th Floor Complex – Ward 7 – Vung Tau City - Vietnam SUMARY OF EXPERIENCE AND SKILLS I’m a working hard and self-motivated person , always try my best in my jobs , try to get the most satisfactory from clients. 05 years of experience in Oil & Gas as many role : E&I Supervisor, E&I Inspector , E&I Engineer, E&I precom and commissioning Engineer. Have involved many Oil & Gas projects .(please see attached CV ,updated 11/11/2016). Have experience working on Electrical system such as : Motor Control Center LV MCC; LV switchboard; UPS; LV Variable Frequency Drives; Lightning protection system; Cathodic Monitoring & Protection system; Earthing & Grounding system ,Lighting system , have a bit experience on HVAC system. Have a bit experience working on DCS system . Have experience working with many kind of field instrumentation: Pressure transmitter; Flow transmitter; Level transmitter; Temperature transmitter; Fire&Gas detectors; Valves (Control valve, On/off valve, Shutdown valve) and telecommunication system: PAGA , voice and data , NDB , .. .Familiar with control and safety system : Fire Water & Deluge; Fusible Loop; Wellhead system; Flare system,Sea water pump. Have experience with petroleum regulations, Ex classification, IP ratings, hazardous classification. Have much experience in take-off materials and estimate man-hour/man-power for jobs; prepare and set-up tools/equipments/materials for projects and build method statement for implementation of E&IT activities at site; make man-loading schedule & detailed E&I activities schedule .Command E&I tech to carry out E&IT activities at site ,make sure safety and the best quality. Have experience to make final documentation,as built. Have experience to engineering some packages ( valve ,Pressure transmitter ,instrument for tank..) PERSONAL SKILLS Fluent in Vietnamese and English
  • 2.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 2 of 15 Good computer skills (MS Word, Excel, PowerPoint, Navisworks) Good manpower managing High responsibility, well adaptability Friendly and working hard WORK EXPERIENCE Company PTSC Offshore Services JSC Duration Sep, 2014 – present (2 year 2 month) Responsibilities: • Prepare bidding documentation and support for procument team for technical issue. • Take off manhour and manpower for the project, prepare list of tools,equipments and materials for projects to carry out E&IT activities at site. • Build work plan and manpower loading schedule in accordance with the overall project schedule for E&I discipline. • Research specifications, procedures, ITP, vendor data, drawings of project to develop work pack, job card, task sheet dossier and method statement. • Prepare Job Risk Assessment (JRA), Permit to Work (PTW) for E&IT activities. • Interview and recruit E&I technician and E&I Supervisor for project. • Develop E&IT detailed daily, weekly and 4 week look ahead plans base on status of materials manpower and weather forecast report. • Responsible in supervision all E&IT activities at site: equipment/support/tray-ladder installation; cable pulling/gland/termination; tubing run/hook-up; perform cable loop check, tubing leak test; equipment function check; complete Inspection & Testing report (ITR); complete Sub-System Acceptance Certificate (SSAC); complete System Acceptance Certificate (SAC); complete Discipline Acceptance Certificate (DAC), Ready for Commissioning Certificate (RFC) and ensuring to adhere strictly to the latest Approved for Construction (AFC) project drawings, Specifications, ITP’s, Procedures and Site Instructions; complete construction works in accordance with the project schedule. • After construction works completed ,carry out precom and commisioning for some systems. • Redline mark-up on drawings and complete As-built dossier. • Responsible for the HSES, and quality aspects of the work within assigned areas • Control the crew change schedule of E&I team base on marine/logistic schedule, mobilization plan. Project: 1. Topaz LPS PROJECT. - Position: Electrical and Instrument Supervisor - Responsibility: Offshore hook-up for Topaz Wellhead platform  Prepared tools,equipments,materials ,manpower .  Prepared plan for offshore activities.  Installed new instruments and F&G Detector for new compressor and tank  Installed new lighting system for extension deck
  • 3.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 3 of 15  Installed 2 new pumps and 1 VFD cabinet.  Precom and Commissioning for all system.  Completed final documentation. - Client: PCVL. 2. PQP-HT1 FLOWLINE PROJECT. - Position: Electrical and Instrument Supervisor - Responsibility: Offshore hook-up for 1 new well at HT1 Platform.  Prepared tools,equipments,materials ,manpower .  Prepared plan for offshore activities.  Installed new instruments for new well.  Installed heat tracing cable for production pipe.  Installed new tubing line.  Tubing leak test ,precom and commissioning system.  Completed final documentation. - Client: BIEN DONG POC 3. FLARE TIP MODIFICATION PROJECT - Position: Electrical and Instrument Supervisor - Responsibility: Offshore hook-up for STT-CPP Platform  Prepared tools,equipments,materials ,manpower .  Prepared plan for offshore activities.  Installed new iginition junction box and new flare tip.  Installed new conduct support and conduct.  Reroute ignition cable and control cable.  Precom and commissioning system.  Completed final documentation. - Client: CUU LONG JOC 4. DAI HUNG 2 FLOWLINE PROJECT - Position: Electrical and Instrument Supervisor - Responsibility: Offshore hook-up for Dai Hung 2 Wellhead Platform  Prepared tools,equipments,materials ,manpower .  Prepared plan for offshore activities.  Installed new instruments for 3 new wells.  Modified wellhead control panel  Installed tubing line and leak test.
  • 4.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 4 of 15  Precom and Commissioning 3 new wells  Completed final documentation. - Client: DAI HUNG POC. 5. MLJ1 & MLJ2 MODIFICATION PROJECT - Position: Electrical and Instrument Supervisor - Responsibility: Perform modification for Telecomunication System at offshore Brunei  Prepared tools,equipments,materials ,manpower .  Prepared plan for offshore activities.  Installed new antenna for MLJ1 and MLJ2 Platform.  Installed new telecom cabinet .  Pulled cable and loop check.  Completed checksheet for installation. - Client: TOTAL BRUNEI. 6. MLJ3 PROJECT - Position: Electrical and Instrument Supervisor - Responsibility: Offshore hook-up for MLJ3 Wellhead Platform  Prepared tools,equipments,materials ,manpower .  Prepared plan for offshore activities.  Installed E&IT support/cable tray-ladder/equipments  Pulled ,glanded and terminated cables for equipments  Precom systems. - Client: TOTAL BRUNEI. 7. BADAMYAR MODIFICATION PROJECT - Position: Electrical and Instrument Supervisor - Responsibility: Offshore hook-up for YADANA Field offshore Myanmar.  Prepared tools,equipments,materials ,manpower .  Prepared daily and 4 week look ahead plan for offshore activities.  Installed many E&IT supports/cable tray- ladder/instruments/lightings/pumps/PAGA/Antenna.  Pulled glanded and terminated many cables for equiments.  Precom cables and completed checksheet. - Contractor: HUYNDAI HEAVY INDUSTRY (HHI) - Client: TOTAL MYANMAR 8. SU TU TRANG FULL-FIELD HOOK-UP AND COMMISSIONING PROJECT
  • 5.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 5 of 15 - Position: Electrical and Instrument Supervisor - Responsibility: Offshore hook-up for PIP platform, LQ platform, 02 Link Bridge  Prepared tools,equipments,materials ,manpower .  Prepared plan for offshore activities.  Installed many E&IT supports/cable tray- ladder/instruments/lightings/pumps/PAGA/Antenna.  Pulled glanded and terminated many cables for equiments.  Loop check cables and completed checksheet. - Client: CUU LONG JOC _____________________________________________________________________________________________________________ Company PVC-MS Position E&I Supervisor/E&I Inspector/E&I Engineer Duration Aug, 2011 – Sep,2014 (3 year 1 month) Responsibilities: • Prepare bidding documentation and support for procument team for technical issue. • Take off manhour and manpower for the project, prepare list of tools,equipments and materials for projects to carry out E&IT activities at site. • Build work plan and schedule in accordance with the overall project schedule for E&I discipline. • Research specifications, procedures, ITP, vendor data, drawings of project to develop method statement at onshore and jobcard at offshore. • Responsible in supervision all E&IT activities at site: equipment/support/tray-ladder installation; cable pulling/gland/termination; tubing run/hook-up; perform cable loop check, tubing leak test; equipment function check; complete Inspection & Testing report (ITR); complete Sub-System Acceptance Certificate (SSAC); complete System Acceptance Certificate (SAC); complete Discipline Acceptance Certificate (DAC), Ready for Commissioning Certificate (RFC) and ensuring to adhere strictly to the latest Approved for Construction (AFC) project drawings, Specifications, ITP’s, Procedures and Site Instructions; complete construction works in accordance with the project schedule. • Responsible in inspection the quality of E&IT activities in accordance with project specification. • After construction works completed ,carry out precom and commisioning for some systems. • Redline mark-up on drawings and complete As-built dossier. • Responsible for the HSES, and quality aspects of the work within assigned areas Project: 1. H4 PROJECT - Position: Electrical and Instrument Supervisor/E&I Commisioning Engineer - Responsibility: Offshore hook-up and commissioning for H4 Wellhead Platform  Prepared tools,equipments,materials ,manpower ,job card.
  • 6.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 6 of 15  Prepared plan for offshore activities.  Installed many E&IT supports/cable tray- ladder/instruments/lightings/pumps/PAGA/Antenna/Voice and data .  Pulled glanded and terminated many cables for equiments.  Loop check cables and completed checksheet , SSAC , SAC , DAC , RFC.  Commissioning all telecommunication systems. - Client : HOANG LONG JOC. 2. H1 MODIFICATION PROJECT - Position: Electrical and Instrument Supervisor/E&I Inspector. - Responsibility: Offshore modification and commissioning for H1 Wellhead Platform  Prepared tools,equipments,materials ,manpower ,job card.  Prepared plan for offshore activities.  Installed E&IT supports/cable tray-ladder/instruments/valve/heat tracing cable.  Pulled glanded and terminated many cables for equiments.  Loop check cables and completed checksheet , SSAC , SAC , DAC , RFC.  Commissioning systems. - Client : HOANG LONG JOC. 3. H1/H4/CNV FLOWLINE PROJECT - Position: Electrical and Instrument Supervisor/E&I Inspector/E&I Engineer - Responsibility: Offshore hook up and commissioning for new wells at H1/H4/CNV Wellhead Platform  Prepared tools,equipments,materials ,manpower ,job card.  Prepared plan for offshore activities.  Engineering for transmitter and instruments for new well and modified wellhead control panel.  Installed E&IT supports/cable tray-ladder/instruments/valve/heat tracing cable for new wells  Installed new wellhead control panel module.  Pulled glanded and terminated many cables for equiments.  Loop check cables and completed checksheet , SSAC , SAC , DAC , RFC.  Commissioning systems. - Client : HOANG LONG JOC. 4. STV 5X EHOUSE PROJECT ( the first E-House at VIETNAM )
  • 7.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 7 of 15 - Position: Project Control Manager - Responsibility: Coordinator/E&I Supervisor/E&I Inspector  Prepared tools,equipments,materials ,manpower  Prepared plan for construction activities.  Coordinated with client for the schedule , drawing , material status.  Control the progress of project and sub contractor.  Fabricated and installed all supports/tray-ladder/equipments for E-House.  Installed all cabinets ,distribution panels inside E house.  Installed transformer ,HVAC system inside E house.  Pulled glanded and terminated many cables for equiments.  Loop check cables and completed checksheet , SSAC , SAC , DAC , RFC.  Commissioning HVAC systems. - Client : CUU LONG JOC. 5. DIAMOND PROJECT - Position: E&I Engineer - Responsibility: Technical support and assessment ,prepare bidding documentation ,FAT for package.  Prepared bidding documentation for some E&I package.  Approved vendor data/drawing.  Coordinated with vendor for equipments status and documentation.  FAT packages.  Instruct construction team to install equipments at site.  Complete E&IT As built drawings. - Client : PCVL. 6. SU TU NAU E HOUSE PROJECT - Position: E&I Commissioning Engineer - Responsibility: Precom and commissioning for HVAC system.  Coordinated with foreign expert to commissioning HVAC system for both Ehouse of Su Tu Nau Project. Client : CUU LONG JOC.
  • 8.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 8 of 15 EDUCATION Bachelor of Engineering Ho Chi Minh city University of Technology Electrical and Electronic Faculty Major: Automation TRAINING COURSES Hand tube bending and fitting safety seminar. IECEx CoPC Unit #001 Training ( EX -001) Work Superintendent Training course LV/HV level 2 Training course ( APAVE France ) Tropical – Basic Offshore Safety Induction and Emergency training Tropical Further Offshore Safety and Emergency training PROFESSIONAL REFERENCE LIST Mr. Nguyen Cong Hien Deputy Manager of Mechanical & Maintenance Workshop PTSC Offshore services JSC Email: hiencongnguyen@ptsc.com.vn Mobile: +84 918023292 Mr. Le Van Du Project & Marine Department Offshore Hook-up & Commissioning Manager PTSC Offshore services JSC Email: dule@ptsc.com.vn Mobile: +84 983336369 Mr. Truong Ngoc Quy Project & Marine Department Offshore Hook-up & Commissioning Manager PTSC Offshore services JSC Email: quytruong@ptsc.com.vn Mobile: +84 907176117
  • 9.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 9 of 15
  • 10.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 10 of 15
  • 11.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 11 of 15
  • 12.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 12 of 15
  • 13.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 13 of 15
  • 14.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 14 of 15
  • 15.
    CURRICULUM VITA E: Ho Xuan Minh Huu Page 15 of 15