CURRICULUM VITAE
RANDY A. LAPUHAPU
Soligao, Poblacion 2 Villanueva
Misamis Oriental,Philippines
Email add: ranz_alps @ yahoo.com
Contact no:00639193536795
00639163633186
POSITION SOUGHT:
PIPING SUPERVISOR
SECONDARY DESIRED:
Construction Piping Engineer
Piping Line checker / Controller
BASIC INFORMATION:
Date Of Birth: 08 March 1974
Place Of Birth: Buug, Zamboanga del Sur
Age: 41 Years old
Citizenship: Filipino
Status: Married
Height: 165 cm
Weight: 140 lbs.
Passport No: EB4239680
Issue At: Port Moresby
Others: Computer skills
Hobbies: Sports, singing
EDUCATIONAL BACKGROUND:
Secondary Level:
Graduated HS
Villanueva National High School
Villanueva Misamis Oriental
Colleague/Course Level:
Bachelor of Science in Mechanical Engineering
Technology (BSMET)
Mindanao Polytechnic State College ( MPSC )
Lapasan Cagayan de Oro
TRAINING BACKGROUND:
IIF-SUPERVISORY SKILLS TRAINING AND WORKSHOP
LNG,New Papua Guinea (2012)/MLNG,Bintulo Malaysia(2015)
LEADERSHIP SKILLS AND FUNDAMENTAL DEVELOPMENT TRAINING
LNG,New Papua Guinea (2011)
HSE & LEADERSHIP EDUCATIONAL TRAINING AND SEMINARS
Jubail, KSA(2007)
ARAMCO BASIC ASSESSMENT STANDARD COURSE AND SEMINARS
Ras Tanura, KSA(1998)
CALTEX FIRE FIGTHING PROCEDURE AND EXECUTION TRAINING
Batangas, PHILS.(1995)
MARINE SAFETY COURSE AND ORIENTATION PROCEDURE
Batangas, PHILS.(1994)
SUMMARY OF WORK EXPERIENCED:
Engaged for construction more than 19 years through educational training in extensive and judicious
new technique of work in the field ( onshore/offshore) of piping, mechanical, and structural installation.
Supervision of piping fabrication, installation and erection, mechanical equipment installation and
assembly, materials control and handling preparation. Has current experienced in implementing
advanced work scheduling, piping and welding inspection, progress evaluation and status, proactive
planning, engineering basic operation, safety and health annual program based according on the
project values and literal basic computer encoding assessment program.
PREFERRED EXPERIENCES IN MAJOR PROJECT INDUSTRIES AND COMPANY:
1.Liquidfied Natural Gas Plant (LNG) Petronas/Exxon Mobile Company
2.Pearl Gas to Liquid Refinery Plant (GTL) Shell Company
2.Ethelyn/Glycol Refinery Plant (Petrochemical) SABIC Company
3.Linear Alpha Olefins Refinery Plant (Petrochemical) SABIC Company
4.Urea/Ammonia Refinery Plant (Petrochemical) SAFCO Company
5.Oil and Natural Gas Refinery Plant (Oil and Gas) ARAMCO Company
6.Sulfur/High Propane Process Plant (Oil and Gas) ARAMCO Company
7.Module&Utilities Process Plant (Oil and Gas) ARAMCO Company
8.Cement Process and Refinery Plant(Petrochemical) Company
9.Others.
CURRENT JOB IN FIELD REFERENCES:
a.)3-bay fabrication shop for carbon steel and stainless steel (small/large bore)
b.)Installation of piping and strategy plan for Main Cryogenic Heat Exchanger Unit own by Air Products
(APCI).
c.)Underground and above piping installation for Main/Sub Pipe rack, Column, Flush Drum, Vessels,
exchangers and expander/compander for cold and hot section area.
d.)Piping stress review, Engineering plan and support, mechanical completion, and piping packages
e.)Turbines, pumps and motor, compressor, and pressure safety valve alignment and inspection.
f.)Smart Plan Review (SPR), NAVIS, and Material engineering code operation.
JOB DESCRIPTION: Summary of Duties and Responsibilities
●Supervision and monitoring progress, implementation of all specific jobs for piping activities such
as fabrication, installation, assemble and erection, piping material control function and data
reporting for various type of requirements for above and underground piping system.
●Promotes technical assistance, planning and site coordination, inspection through to good evaluation
to acquired the smooth completion of work schedule, reviewing method of statement and job hazard
analysis (MS/JHA) to ensure proper execution of work in site will according to safety rule and
company procedure.
●Manage and responsible for indirect manpower distribution, work scheduling, preparation of
materials, preservation and inspection, materials tracking/tracing ability as flowed assurance
procedure.
●Coordinate with contractor, sub-contractor and client to prioritized spools installation and punch
list closure for priority sub-systems and pre-mechanical completion.
●Attending and discuss completion in construction meeting for the progress of piping activities,
materials status, punched list status and some comments clarification to the contractor, sub-
contractor and clients.
●Monitor and responsible for production output by given information, awareness or trained
subordinates on new technique of quality works and procedure for mechanical and piping
activities.
●Promotes and implementing the project quality plans, control initial work through and total
awareness on advanced program for health and safety environmental procedure and code of
practices.
●Perform basic engineering works for mechanical piping such as weld mapping, technical query,
as-built, site instruction, quantity take-off, and materials take-off as per requirement of the project
basis.
●Expedite and reviewed all materials required on site according compliance to the project standard
code and specification of the project.
●Test packages preparation by compiling all its contents as well as checking its limits in the isometric
drawing and piping diagram. Reviewed and expedite test packages related by documents before to
submitted to quality control or client for approval based on ready for inspection (RFI) issuance.
●Monitors and witness hydrostatic and pneumatic testing, bolt torquing, and re-instatement
activities.
●In charge of all punch list clearing for piping, company comments and pre-mechanical completion.
●Daily inspection together with contractor and company for acceptance punched list cleared by
Contractor and sub-contractor.
●Monitor and fit-up inspection, checking its orientation, material tracking assurance used for spool
fabrication piping activities.
●Line checking for piping progress and support as per engaged in drawing required on quality
verifying documents accordance to the project procedure, standard code and specification based on
ITP.
●Responsible for NDE report and schedule to ensure adherence the complete compliance of specify
test as per project requirements.
● Inspection the final installation of various piping and support on site in exact location and
alignment.
●Verifying and reviewed the welding works and reports in accordance with approved WPS and WIR.
●Manage and responsible the alignment of static and rotating equipment such as pump and motors
exchanger, vessel, and turbines.
DETAILS OF WORK EXPERIENCED:
Employer: JGC CONSTRUCTION (MALAYSIA) SDN.BHD.
Duration: 2015 - 2014
Position: Piping Supervisor
Project: MLNG TR-9 Project
Client: Petronas
Location: Bintulo Sarawak Malaysia
Employer: CHIYODA – JGC JOINT VENTURE COMPANY (CJJV)
Duration: 2013 - 2011
Position: Piping Supervisor/Coordinator
Project: PNG-LNG EPC3 Project
Client: Exxon-Mobile,EHL
Location: Papua New Guinea
Employer: CHIYODA – HYUNDAI CONSORTIUM COMPANY (CHC)
Duration: 2010 - 2009
Position: Construction Piping Engineer/Supervisor
Project: PEARL GTL – FGP C4 Project, Phase 1-2
Client: SHELL
Location: Ras Laffan,State of Qatar
Employer: CHIYODA – TECHNIP JOINT VENTURE COMPANY (CTJV)
Duration: 2009 – 2007
Position: Piping Supervisor
Project: RGX-LNG TRAIN 6 & 7 / AKG-2 Expansion Project
Client: RAS GAS ( Exxon Mobile)
Location: Ras Laffan,State of Qatar
Employer: MOHAMMAD AL-MOJIL GROUP COMPANY
Duration: 2007 - 2006
Position: Piping supervisor / Utilized Eng’g IV ( Piping Take-off )
Project: EASTERN PETROCHEMICAL COMPANY (SHARQ)
EthyleneGlycol 3rd
Expansion Project
Client: FOSTER WHEELER-SAMSUNG, Ltd.
Location: Jubail KSA
Employer: MOHAMMAD AL-MOJIL GROUP COMPANY
Duration: 2006 - 2005
Position: Piping Supervisor / Asst. QC Coordinator
Project: JUBAIL PETROCHEMICAL COMPANY (SABIC) JUPC
Linear Alpha Olefins Project, LAO
Client: LINARCO (Linde) Ltd.
Location: Jubail KSA
Employer: MOHAMMAD AL-MOJIL GROUP COMPANY
Duration: 2005 - 2004
Position: Mechanical- Piping Foreman
Project: SAUDI FERTILIZER COMPANY (SAFCO)
UreaAmmonia Expansion Project
Client: U H D E Ltd.
Location: Jubail KSA.
Employer: MOHAMMAD AL-MOJIL GROUP COMPANY
Duration: 2004 - 2003
Position: Piping Foreman / (QC Line Checker)
Project: JUBAIL PETROCHEMICAL COMPANY (SABIC) JUPC
Ethylene/Glycol Expansion Project, JUEG
Client: SATEC-Toyo Engineering Company Ltd.
Location: Jubail KSA
Employer: MOHAMMAD AL-MOJIL GROUP COMPANY
Duration: 2003 - 2002
Position: Mechanical Piping Foreman
Project: Ras Tanura Refinery Plant Project ( RTRUP )
Client: ARAMCO-FLOURDANIEL Ltd.
Location: Ras Tanura, KSA.
Employer: MOHAMMAD AL-MOJIL GROUP COMPANY
Duration: 2002 (6 mo.)
Position: Piping Cost Field Tracker/Line checker
Project: Riyadh Refinery Plant Project (Shutdown )
Client: ARAMCO
Location: Riyadh KSA
Employer: JURONG-PHILS ENGINEERING LTD.
Duration: 2002 - 2001
Position: Piping/Hydrotest Supervisor
Project: NAIA, Int’l Airport Phil’s  IPT
Centennial Expansion Port Project
Client: SIEMEN-NIGATA Ltd.
Location: Pasay, Manila Philippines
Employer: JURONG-PHILS ENGINEERING LTD.
Duration: 2001 - 2000
Position: Piping / Mechanical Foreman
Project: PILIPINAS KAO INCORPORATED, PKI
Tertiary II Expansion Project
Client: Ishikawajima Heavy Industries Ltd. IHI
Location: Misamis Oriental, Philippines
Employer: MOHAMMAD AL-MOJIL GROUP COMPANY
Duration: 2000 - 1998
Position: Piping / Mechanical Leadman
Project: BERRI GAS PLANT
Sulfur / Hp Process Expansion Project
Client: J G C Ltd.-Japan
Location: Jubail KSA.
Employer: MOHAMMAD AL-MOJIL GROUP COMPANY
Duration: 1998 - 1997
Position: Piping / Mechanical Leadman
Project: JUAYMAH NATURAL GAS LINE PLANT
Module & Utilities Expansion Phase 2 Project
Client: J G C Ltd.-Japan
Location: Juaymah Ras Tanura KSA.
Employer: MOHAMMAD AL-MOJIL GROUP COMPANY
Duration: 1997 - 1996
Position: Piping / Mechanical Leadman
Project: YANBU CEMENT PLANT EXPANSION PROJECT
Client: K H D Ltd.
Location: Yanbu KSA
Employer: ATLANTIC GULP AND PACIFIC COMPANY, AG&P
Duration: 1996 - 1995
Position: Mechanical fitter
Project: OIL AND NATURAL GAS COMPRESSION OFFSHORE PROJECT
Client: DHI-Daewoo Heavy Industries Ltd.
Location: Southeast Bombay High, India (Offshore)
Employer: ATLANTIC GULP AND PACIFIC COMPANY, AG&P
Duration: 1995 - 1994
Position: Mechanical fitter
Project: BATANGAS MARINE AND FABRICATION YARD
Fabrication and Hook-up (ONGC) Project
Client: Kawasaki Heavy Industries Ltd. KHI
Location: Bauan Batangas Philippines
I do hereby to pursue that the written statement above is sworn by my will and knowledge are based in
my truly experienced in the field and site.
APPLICANT:
MR. RANDY A. LAPUHAPU
Employer: ATLANTIC GULP AND PACIFIC COMPANY, AG&P
Duration: 1995 - 1994
Position: Mechanical fitter
Project: BATANGAS MARINE AND FABRICATION YARD
Fabrication and Hook-up (ONGC) Project
Client: Kawasaki Heavy Industries Ltd. KHI
Location: Bauan Batangas Philippines
I do hereby to pursue that the written statement above is sworn by my will and knowledge are based in
my truly experienced in the field and site.
APPLICANT:
MR. RANDY A. LAPUHAPU

curr. vitae

  • 1.
    CURRICULUM VITAE RANDY A.LAPUHAPU Soligao, Poblacion 2 Villanueva Misamis Oriental,Philippines Email add: ranz_alps @ yahoo.com Contact no:00639193536795 00639163633186 POSITION SOUGHT: PIPING SUPERVISOR SECONDARY DESIRED: Construction Piping Engineer Piping Line checker / Controller BASIC INFORMATION: Date Of Birth: 08 March 1974 Place Of Birth: Buug, Zamboanga del Sur Age: 41 Years old Citizenship: Filipino Status: Married Height: 165 cm Weight: 140 lbs. Passport No: EB4239680 Issue At: Port Moresby Others: Computer skills Hobbies: Sports, singing EDUCATIONAL BACKGROUND: Secondary Level: Graduated HS Villanueva National High School Villanueva Misamis Oriental Colleague/Course Level: Bachelor of Science in Mechanical Engineering Technology (BSMET) Mindanao Polytechnic State College ( MPSC ) Lapasan Cagayan de Oro
  • 2.
    TRAINING BACKGROUND: IIF-SUPERVISORY SKILLSTRAINING AND WORKSHOP LNG,New Papua Guinea (2012)/MLNG,Bintulo Malaysia(2015) LEADERSHIP SKILLS AND FUNDAMENTAL DEVELOPMENT TRAINING LNG,New Papua Guinea (2011) HSE & LEADERSHIP EDUCATIONAL TRAINING AND SEMINARS Jubail, KSA(2007) ARAMCO BASIC ASSESSMENT STANDARD COURSE AND SEMINARS Ras Tanura, KSA(1998) CALTEX FIRE FIGTHING PROCEDURE AND EXECUTION TRAINING Batangas, PHILS.(1995) MARINE SAFETY COURSE AND ORIENTATION PROCEDURE Batangas, PHILS.(1994) SUMMARY OF WORK EXPERIENCED: Engaged for construction more than 19 years through educational training in extensive and judicious new technique of work in the field ( onshore/offshore) of piping, mechanical, and structural installation. Supervision of piping fabrication, installation and erection, mechanical equipment installation and assembly, materials control and handling preparation. Has current experienced in implementing advanced work scheduling, piping and welding inspection, progress evaluation and status, proactive planning, engineering basic operation, safety and health annual program based according on the project values and literal basic computer encoding assessment program. PREFERRED EXPERIENCES IN MAJOR PROJECT INDUSTRIES AND COMPANY: 1.Liquidfied Natural Gas Plant (LNG) Petronas/Exxon Mobile Company 2.Pearl Gas to Liquid Refinery Plant (GTL) Shell Company 2.Ethelyn/Glycol Refinery Plant (Petrochemical) SABIC Company 3.Linear Alpha Olefins Refinery Plant (Petrochemical) SABIC Company 4.Urea/Ammonia Refinery Plant (Petrochemical) SAFCO Company 5.Oil and Natural Gas Refinery Plant (Oil and Gas) ARAMCO Company 6.Sulfur/High Propane Process Plant (Oil and Gas) ARAMCO Company 7.Module&Utilities Process Plant (Oil and Gas) ARAMCO Company 8.Cement Process and Refinery Plant(Petrochemical) Company 9.Others. CURRENT JOB IN FIELD REFERENCES: a.)3-bay fabrication shop for carbon steel and stainless steel (small/large bore) b.)Installation of piping and strategy plan for Main Cryogenic Heat Exchanger Unit own by Air Products (APCI). c.)Underground and above piping installation for Main/Sub Pipe rack, Column, Flush Drum, Vessels, exchangers and expander/compander for cold and hot section area. d.)Piping stress review, Engineering plan and support, mechanical completion, and piping packages e.)Turbines, pumps and motor, compressor, and pressure safety valve alignment and inspection. f.)Smart Plan Review (SPR), NAVIS, and Material engineering code operation. JOB DESCRIPTION: Summary of Duties and Responsibilities ●Supervision and monitoring progress, implementation of all specific jobs for piping activities such as fabrication, installation, assemble and erection, piping material control function and data reporting for various type of requirements for above and underground piping system. ●Promotes technical assistance, planning and site coordination, inspection through to good evaluation to acquired the smooth completion of work schedule, reviewing method of statement and job hazard analysis (MS/JHA) to ensure proper execution of work in site will according to safety rule and company procedure.
  • 3.
    ●Manage and responsiblefor indirect manpower distribution, work scheduling, preparation of materials, preservation and inspection, materials tracking/tracing ability as flowed assurance procedure. ●Coordinate with contractor, sub-contractor and client to prioritized spools installation and punch list closure for priority sub-systems and pre-mechanical completion. ●Attending and discuss completion in construction meeting for the progress of piping activities, materials status, punched list status and some comments clarification to the contractor, sub- contractor and clients. ●Monitor and responsible for production output by given information, awareness or trained subordinates on new technique of quality works and procedure for mechanical and piping activities. ●Promotes and implementing the project quality plans, control initial work through and total awareness on advanced program for health and safety environmental procedure and code of practices. ●Perform basic engineering works for mechanical piping such as weld mapping, technical query, as-built, site instruction, quantity take-off, and materials take-off as per requirement of the project basis. ●Expedite and reviewed all materials required on site according compliance to the project standard code and specification of the project. ●Test packages preparation by compiling all its contents as well as checking its limits in the isometric drawing and piping diagram. Reviewed and expedite test packages related by documents before to submitted to quality control or client for approval based on ready for inspection (RFI) issuance. ●Monitors and witness hydrostatic and pneumatic testing, bolt torquing, and re-instatement activities. ●In charge of all punch list clearing for piping, company comments and pre-mechanical completion. ●Daily inspection together with contractor and company for acceptance punched list cleared by Contractor and sub-contractor. ●Monitor and fit-up inspection, checking its orientation, material tracking assurance used for spool fabrication piping activities. ●Line checking for piping progress and support as per engaged in drawing required on quality verifying documents accordance to the project procedure, standard code and specification based on ITP. ●Responsible for NDE report and schedule to ensure adherence the complete compliance of specify test as per project requirements. ● Inspection the final installation of various piping and support on site in exact location and alignment. ●Verifying and reviewed the welding works and reports in accordance with approved WPS and WIR. ●Manage and responsible the alignment of static and rotating equipment such as pump and motors exchanger, vessel, and turbines. DETAILS OF WORK EXPERIENCED: Employer: JGC CONSTRUCTION (MALAYSIA) SDN.BHD. Duration: 2015 - 2014 Position: Piping Supervisor Project: MLNG TR-9 Project Client: Petronas Location: Bintulo Sarawak Malaysia Employer: CHIYODA – JGC JOINT VENTURE COMPANY (CJJV) Duration: 2013 - 2011 Position: Piping Supervisor/Coordinator Project: PNG-LNG EPC3 Project Client: Exxon-Mobile,EHL Location: Papua New Guinea
  • 4.
    Employer: CHIYODA –HYUNDAI CONSORTIUM COMPANY (CHC) Duration: 2010 - 2009 Position: Construction Piping Engineer/Supervisor Project: PEARL GTL – FGP C4 Project, Phase 1-2 Client: SHELL Location: Ras Laffan,State of Qatar Employer: CHIYODA – TECHNIP JOINT VENTURE COMPANY (CTJV) Duration: 2009 – 2007 Position: Piping Supervisor Project: RGX-LNG TRAIN 6 & 7 / AKG-2 Expansion Project Client: RAS GAS ( Exxon Mobile) Location: Ras Laffan,State of Qatar Employer: MOHAMMAD AL-MOJIL GROUP COMPANY Duration: 2007 - 2006 Position: Piping supervisor / Utilized Eng’g IV ( Piping Take-off ) Project: EASTERN PETROCHEMICAL COMPANY (SHARQ) EthyleneGlycol 3rd Expansion Project Client: FOSTER WHEELER-SAMSUNG, Ltd. Location: Jubail KSA Employer: MOHAMMAD AL-MOJIL GROUP COMPANY Duration: 2006 - 2005 Position: Piping Supervisor / Asst. QC Coordinator Project: JUBAIL PETROCHEMICAL COMPANY (SABIC) JUPC Linear Alpha Olefins Project, LAO Client: LINARCO (Linde) Ltd. Location: Jubail KSA Employer: MOHAMMAD AL-MOJIL GROUP COMPANY Duration: 2005 - 2004 Position: Mechanical- Piping Foreman Project: SAUDI FERTILIZER COMPANY (SAFCO) UreaAmmonia Expansion Project Client: U H D E Ltd. Location: Jubail KSA. Employer: MOHAMMAD AL-MOJIL GROUP COMPANY Duration: 2004 - 2003 Position: Piping Foreman / (QC Line Checker) Project: JUBAIL PETROCHEMICAL COMPANY (SABIC) JUPC Ethylene/Glycol Expansion Project, JUEG Client: SATEC-Toyo Engineering Company Ltd. Location: Jubail KSA Employer: MOHAMMAD AL-MOJIL GROUP COMPANY Duration: 2003 - 2002 Position: Mechanical Piping Foreman Project: Ras Tanura Refinery Plant Project ( RTRUP ) Client: ARAMCO-FLOURDANIEL Ltd. Location: Ras Tanura, KSA.
  • 5.
    Employer: MOHAMMAD AL-MOJILGROUP COMPANY Duration: 2002 (6 mo.) Position: Piping Cost Field Tracker/Line checker Project: Riyadh Refinery Plant Project (Shutdown ) Client: ARAMCO Location: Riyadh KSA Employer: JURONG-PHILS ENGINEERING LTD. Duration: 2002 - 2001 Position: Piping/Hydrotest Supervisor Project: NAIA, Int’l Airport Phil’s IPT Centennial Expansion Port Project Client: SIEMEN-NIGATA Ltd. Location: Pasay, Manila Philippines Employer: JURONG-PHILS ENGINEERING LTD. Duration: 2001 - 2000 Position: Piping / Mechanical Foreman Project: PILIPINAS KAO INCORPORATED, PKI Tertiary II Expansion Project Client: Ishikawajima Heavy Industries Ltd. IHI Location: Misamis Oriental, Philippines Employer: MOHAMMAD AL-MOJIL GROUP COMPANY Duration: 2000 - 1998 Position: Piping / Mechanical Leadman Project: BERRI GAS PLANT Sulfur / Hp Process Expansion Project Client: J G C Ltd.-Japan Location: Jubail KSA. Employer: MOHAMMAD AL-MOJIL GROUP COMPANY Duration: 1998 - 1997 Position: Piping / Mechanical Leadman Project: JUAYMAH NATURAL GAS LINE PLANT Module & Utilities Expansion Phase 2 Project Client: J G C Ltd.-Japan Location: Juaymah Ras Tanura KSA. Employer: MOHAMMAD AL-MOJIL GROUP COMPANY Duration: 1997 - 1996 Position: Piping / Mechanical Leadman Project: YANBU CEMENT PLANT EXPANSION PROJECT Client: K H D Ltd. Location: Yanbu KSA Employer: ATLANTIC GULP AND PACIFIC COMPANY, AG&P Duration: 1996 - 1995 Position: Mechanical fitter Project: OIL AND NATURAL GAS COMPRESSION OFFSHORE PROJECT Client: DHI-Daewoo Heavy Industries Ltd. Location: Southeast Bombay High, India (Offshore)
  • 6.
    Employer: ATLANTIC GULPAND PACIFIC COMPANY, AG&P Duration: 1995 - 1994 Position: Mechanical fitter Project: BATANGAS MARINE AND FABRICATION YARD Fabrication and Hook-up (ONGC) Project Client: Kawasaki Heavy Industries Ltd. KHI Location: Bauan Batangas Philippines I do hereby to pursue that the written statement above is sworn by my will and knowledge are based in my truly experienced in the field and site. APPLICANT: MR. RANDY A. LAPUHAPU
  • 7.
    Employer: ATLANTIC GULPAND PACIFIC COMPANY, AG&P Duration: 1995 - 1994 Position: Mechanical fitter Project: BATANGAS MARINE AND FABRICATION YARD Fabrication and Hook-up (ONGC) Project Client: Kawasaki Heavy Industries Ltd. KHI Location: Bauan Batangas Philippines I do hereby to pursue that the written statement above is sworn by my will and knowledge are based in my truly experienced in the field and site. APPLICANT: MR. RANDY A. LAPUHAPU