Alexandria University 1984, most of my life was in the field of oil and gas constructions,
for 20 years as a piping supervisor, then site engineer, then senior piping field engineer
solving the site problems regarding the project specifications, and a hydro test section
head. I had the chance to get the experiences in working at the gulf area, Algeria and
Egypt.
Working with multi national companies like Technip, ABB, Bechtel, Archirodon and
construction consolidating international company(CCIC) had gave me the ability to work
with the deferent nationalities and cultures, also I did worked in both the new projects and
the construction in the life plants respecting the safety procedures and precation.
***********************************************************
AREA OF EXPERIENCE
~~~~~~~~~~~~~~
# A decisive team player with organizational, technical skills works well to find
innovative ways to perform tasks and achieve objectives.
Pipe fabrication, erection, piping Engineering &technical office, Piping Hydro test,
Pre-commissioning & Commissioning, Maintenance of the piping & static
equipments
And Rotating equipment’s installation as well.
1|P a g e
As a Mech. Construction Section Head, Mech. field Engineer and start the
profession as a Mech. Construction Supervisor. Respecting the codes
projects specs and HSE.
************************************************************************
PROFISSIONAL HISTORY
FROM 9/2012 TILL 11/2014
company name : Combined Group CGC
Position : lead of the piping and mechanical section: .
Project name : Bulk handling facilities For Production Chemicals in SEK,WK
& NK areas.
Duties & Responsibilities as a head of the piping section:
To manage projects within budget, guidelines, statutory requirements and company procedures ensuring
compliance with HSE policies and customer satisfaction
1-To represent the organization and enhance relationships in deal with client, consultants and
regulatory authorities to ensure all agreements are implemented.
2- To maintain records of any extra works undertaken to ensure company billing covers any
additional costs to client
3- To supervise work teams for effective delivery of daily objectives including the control of work
hours, overtime and incentive schemes to improve efficiency
4- To manage resources and equipment’s to achieve contract completion within budget and
time.
5- To liaise with HSE and/or Quality department for the support for project safety and or quality
to ensure company HSE and Quality policies and procedures are covered to client satisfactory.
6- To respond to emergencies and take remedial action as required to ensure HSE are
protected.
7-Toidentify and ensure skills of assigned manpower are aligned to project requirements to
ensure technically competent personnel for the project.
8- To participate in regular meeting to identify problems, target dates, issues, delays execution
of work to ensure timely project completion.
9-- Punching out the test package systems.
10- Chick the punch list clearing and release the package for testing.
11- Clearing and signing the acceptance of the reinstating of the packages.
12-Provide on-site piping engineering consultation during construction, pre-commissioning &
commissioning stage and start up .
FROM 12/2009 TILL 2/2011
Company name : Gulf piping company
Position : Sr. Project Engineer.
2|P a g e
Project name : Gas production platform (client ENCANA(
Duties & Responsibilities as a head of the piping section:
1-Monitoring the construction works to control the material and construction quality regarding
project specifications for each system and class.
2- Controlling and reporting the contractor’s construction activities
3- Preparing and Raising the TQR’s regarding any technical or piping clash problems 4-
Supervising the preparation of test packs.
5- Monitoring the progress respecting the planning wise and reporting to the project manager.
FROM 3/2007 TILL 26/05/2009
Company name : CCIC
Position : Mechnical section Engineer.(piping)
Project Name : HGCE & Borouge Projects(UAE(
Duties & Responsibilities as a head of the Test center:
1) planning and monitoring the construction activities reporting to the construction manager.
2) Reviewing all the DWG’s against the ics.
3) Controlling the Test packs tracking
4) Hydro test Progress planning and reporting to both of the construction manager and project
manager.
5(Following the construct of the test loops completion and following the A items until clear it
from all departments (construction, QC and engineering) until getting release for test by the
client.
6(follow the B items till cleared
7(follow the signatures and the correction completion in the test packs till issue it to
certification.
8(Provide on-site piping engineering consultation during pre-commissioning stage.
FROM 15/2/2006 TILL 20/12/2006
Company name : ABB Italy/SARBY
Position : lead Mechanical engineer
Project Name : Wuargla gas transportation station 3(Algeria(
Duties & Responsibilities :
1-Reviewing all the DWG’s, modification and approve for construction
2- Supervise the construction activities(piping, steel structure )and coordinate to the installation
of the turbine and compressor.
3-supervise the preparation of the test packages and the hydro testing.
4-PrepairAs built DWG’s and the marketed P&ID
3|P a g e
5-Provide on-site piping engineering consultation during construction, pre-commissioning
stage.
6-Reporting to the project manager.
7-- Punching out the test package systems.
8-- Chick the punch list clearing and release the package for testing.
9- Clearing and signing the acceptance of the reinstating of the package
FROM 15/06/05 TILL 28/08/05
Company name : Technip Italy
Position : Piping engineer (Engineering Dep .) .
Project Name : AMOC Sulfur removal unit modification project
Duties & Responsibilities :
1-Reviewing all the DWG’s, modification and approve for construction
2-Controling and reporting the subcontractor’s construction activities
3-supervise the preparation of the test packages and revise.
4-Reply for the RFI's (Request For Information's). Also responsible for the FCN's (Field Chang
Note's). .
5- Provide on-site piping engineering consultation during construction, pre-commissioning &
commissioning stage
6-PrepairAs built DWG’s and the marketed P&I D
7-Reporting all the modifications activities to the project manager
8- Punching out the test package systems.
9- Chick the punch list clearing and release the package for testing.
10-Clearing and signing the acceptance of the reinstating of the package.
FROM 1/09/04 TILL 28/05/05
Company name : Bechte
l
Position : Piping field engineer (Engineering Dep .) .
Project Name : ELNG project (Idku site(
Duties & Responsibilities :
1-Monitoring the construction works to control the material and construction quality regarding
project specifications for each system and class.
2- Controlling and reporting the subcontractor’s construction activities
3-Reply for the RFI's (Request For Information's). Also responsible for the FCN's (Field Chang
Note's) to solve the piping& support's problems which obstructs construction works according to
the project specification and the design criteria, this including" the new revisions and as built"
drawings work.
4-Provide on-site piping engineering consultation during construction, pre-commissioning &
commissioning stage.
5- Punching out the test package systems.
6- Chick the punch list clearing and release the package for testing.
7- Clearing and signing the acceptance of the reinstating of the package.
4|P a g e
FROM 15/6/04 TILL 25/8/04
Company name : Archirodon Construction (Over seas) Co.S.A.
Position : Mechanical section Head.
Project Name : (Toshka Project )Shaikh Zaid Canal, branch three pumping stations.
Duties & Responsibilities :
1- Supervising and coordinating piping construction works.
2- Supervising and coordinating pre-commissioning works for (17 pumps each 8.6 M3/sec
capacity).
FROM 22/2/2004 UNTILL 11/6/04
Company name : Archirodon Construction (Over seas) Co.S.A.
Position : Senior Mechanical Eng.
Project Name : QP (Qatar Petroleum Co.) Multi Product Berth at Mesaieed Industrial City.
Duties & Responsibilities:
1-Hydro Testing works (preparing the marketed P&I.D and Preparing the test packages)
2- Supervising the punch list clearing
3- Pre commissioning Engineer for the piping works.
All the previous activities were done in compliance with QP HSE life plant standards.
FROM 17/7/2003 TILL 22/2/2004
Company name : Archirodon Construction (Over seas) Co.S.A.
Position : Mechanical section Head.
Project Name : (Toshka Project )Shaikh Zaid Canal, branch three pumping stations.
Duties & Responsibilities :
1- Supervising and coordinating piping construction works.
2- Supervising and coordinating mechanical construction works (17 pumps each 8.6 M3
/sec
capacity).
FROM 06/2002 TILL 7/2003
Company name : Lead construction &Trading subcontractor to ABB PETOFAC
Position : Senior Mechanical Eng and Hydro test Supervisor.
Project Name : Ohanet Development Gas Project “ ALGEREA”Client BHP&Sonatrac.
Duties & Responsibilities :
1-Revioing the Equipments& Piping systems test Package.
2- Supervising and witnessing the hydro test with man contract “ABB Petofac”
and the “BHP”.
3- Pre commissioning supervisor Engineer.
FROM 1/09/2000 TILL 30/4/2001
Company name : Archirodon Construction (Over seas) Co.S.A.
Position : Senior Mechanical Eng.
5|P a g e
Project Name : Midtap petroleum products & coke loading facilities
Duties & Responsibilities :
1- Reviewing the isometric DWG.
2- Plotting the isometric bill of material according to the project specs. And standards.
3-Preparing the master P. & I.D. into loops for the hydro test.
4-Preparing the test packages.
5-Supervising the hydro test.
6-Commissioning of pumps & Mech. Equipment’s.
FROM11/03/2000 UNTIL 31/08/2000
Company name : TECHNIP-TTIL-SNC
Position : PIPING Engineer& PWHT supervisor
Project Name : midor refinery plant
Duties & Responsibilities :
1- Piping Supervisor checking ,Reviewing and clearing the punch list before Hydro .
testing for EPC 2 [ Unit 1 Vacuum and topping]
2- PWHT Supervisor for Monitoring the subcontractors TR & DAELEM sites
3Rreporting and controlling the progress of the sub contractors
AUG. 8-1999
Company name : My own contract.
Position : Mech. Sub Contractor
Project Name : National Vegetable Oil co. in Burg El-Arab
Duties & Responsibilities :
1-Erection of two cells cooling tower(1650 M 3 /hr ea.)
2-Commissioning of the pumps.
3-Fabrication & Erection of silo fan ducts
FROM 1-1999 UNTIL 7-1999
Company name : (ESACO. Co) FUT Project.
Position : Mech. SUPERVISOR ENG.
Project Name : Alex . National Steel DK
Duties & Responsibilities :
1- Fabrication & Erection for all the pipes at the Scale pit and air compressor station 2 (120
Tons of pips )
2- Fabrication & Erection Pipe rack piping and laminar cooling plant with (FMC) DSD.(92 Tons
of pips)
FROM 2/1995 UNTIL 31-12-1998
SUPERVISOR ENG. with (Continental Trading &Shipping)
6|P a g e
1- a)Fabrication & Erection of piping and ships vessel plats at Alex . , Damitta , Kuwait
ports (Repair works) .
b) Pumps, valves (Repair works) .
2- Fabrication & erection of carbon steel and st.st. piping in carbon black manufactory.
FROM 1993 UNTILL 1994
Company name : Cimmontubi
Position : SITE ENG.
Project Name : Mahmoudia Damanhour power plant
Duties & Responsibilities :
Fabrication & painting steel structure (about 2000 tons of steel structure)
FROM 1991 UNTILL 1992
Company name : Techmiptrol (T.P.L).
Position : Mech. SITE ENG .
Project Name : Alex . Petro. chemical co.
Duties & Responsibilities :
1- Fabrication & erection of piping.
2-Fabrication, erection & painting of supports and steel structure.
For the fire fitting and water treatment area.
FROM 1989 UNTILL 1991
Company name : Sae Sadelmi
Position : Mech. SITE ENG .
Project Name : ( Damanhour Power Plant) Site. 300 MW.
Duties & Responsibilities :
1-Fabrication & Erection of piping.
2-Fabrication, erection & painting steel structure Insulation work for boiler, duct, and
piping.
FROM 1987 UNTILL 1988
MAINTENANCE ENG. Gasoline cars workshop at Saudi Arabia
FROM 1985 UNTILL 1987
MILITARY SERVICE
Education
~~~~~~~~
7|P a g e
B.Sc.- Faculty of engineering Alexandria University 1984, Dept. of Mechanical Eng.
************************************************************************
COMPUTER SKILS
~~~~~~~~~~~~~~~
MICROSOFT EXCEL
MICROSOFT Word
AUOTO CAD 2000
Knowledge Languages
ARABIC : Native language.
ENGLISH : very good.
Personal
~~~~~~~
Born Alex. AR Of EGYPT 13/8/59
Driving license
1) UAE D. License, EXP 9 / 2017
2) Egypt D. License, EXP 5 / 2021
3) Kuwait D. License, EXP 2/ 2023
8|P a g e

More Related Content

What's hot

CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
Aminul Haque
 
CV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateCV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.update
Eslam Elsnosy
 
MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)
Midel Dalangin
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher
 

What's hot (18)

Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Cris' Updated resume
Cris' Updated resumeCris' Updated resume
Cris' Updated resume
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
 
Poornesha Shetty-QA QC
Poornesha Shetty-QA QCPoornesha Shetty-QA QC
Poornesha Shetty-QA QC
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 
CV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateCV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.update
 
Tom Paterson-resume
Tom Paterson-resumeTom Paterson-resume
Tom Paterson-resume
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Updated Moh. C.V.
Updated Moh. C.V.Updated Moh. C.V.
Updated Moh. C.V.
 
Ashraf-cv
Ashraf-cvAshraf-cv
Ashraf-cv
 
MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)
 
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
 
aditi
aditiaditi
aditi
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 

Viewers also liked

Viewers also liked (11)

Evaluation Q7
Evaluation Q7Evaluation Q7
Evaluation Q7
 
REMIT& Markttransparenzstelle
REMIT& MarkttransparenzstelleREMIT& Markttransparenzstelle
REMIT& Markttransparenzstelle
 
DOTNET 2013 IEEE CLOUDCOMPUTING PROJECT Cloud mov cloud based mobile social tv
DOTNET 2013 IEEE CLOUDCOMPUTING PROJECT Cloud mov cloud based mobile social tvDOTNET 2013 IEEE CLOUDCOMPUTING PROJECT Cloud mov cloud based mobile social tv
DOTNET 2013 IEEE CLOUDCOMPUTING PROJECT Cloud mov cloud based mobile social tv
 
Cuento Los Dos Grandeas Amigos
Cuento Los Dos Grandeas AmigosCuento Los Dos Grandeas Amigos
Cuento Los Dos Grandeas Amigos
 
set C physics
set C  physicsset C  physics
set C physics
 
المصدقة 2
المصدقة 2المصدقة 2
المصدقة 2
 
Vol 1 issue 3 esp definitivo
Vol 1 issue 3 esp definitivoVol 1 issue 3 esp definitivo
Vol 1 issue 3 esp definitivo
 
descriptive paragraph
descriptive paragraphdescriptive paragraph
descriptive paragraph
 
AUTOMATION PROJECT
AUTOMATION PROJECTAUTOMATION PROJECT
AUTOMATION PROJECT
 
Arte y tecnología
Arte y tecnologíaArte y tecnología
Arte y tecnología
 
Arpan Talukder
Arpan TalukderArpan Talukder
Arpan Talukder
 

Similar to A.youssef_c.v.2014.doc-2(3)

Similar to A.youssef_c.v.2014.doc-2(3) (20)

Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
Cv.eslam elsnosy.update
Cv.eslam elsnosy.updateCv.eslam elsnosy.update
Cv.eslam elsnosy.update
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Khaled CV
Khaled CVKhaled CV
Khaled CV
 
HUSSIEN CV 24-12-2012
HUSSIEN CV 24-12-2012HUSSIEN CV 24-12-2012
HUSSIEN CV 24-12-2012
 
Khaled HSE
Khaled HSEKhaled HSE
Khaled HSE
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
bio data 1
bio data 1bio data 1
bio data 1
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
Resume
ResumeResume
Resume
 
Mohamed kamal cv2018
Mohamed kamal cv2018Mohamed kamal cv2018
Mohamed kamal cv2018
 

A.youssef_c.v.2014.doc-2(3)

  • 1. c. v. ENG.AHMED MOHAMED YOUSSEF Ali AGAMY_BITASH MAIL ADD.[50 SHOOTS STREET RAML ALEXANDREA-ALEX ] Tel .+203/3087352 Mobile Tel. 00201005645574 E-Mail: amyael1@yahoo.com PROFESSION PROFILE ~~~~~~~~~~~~~~~~ A brief about me Alexandria University 1984, most of my life was in the field of oil and gas constructions, for 20 years as a piping supervisor, then site engineer, then senior piping field engineer solving the site problems regarding the project specifications, and a hydro test section head. I had the chance to get the experiences in working at the gulf area, Algeria and Egypt. Working with multi national companies like Technip, ABB, Bechtel, Archirodon and construction consolidating international company(CCIC) had gave me the ability to work with the deferent nationalities and cultures, also I did worked in both the new projects and the construction in the life plants respecting the safety procedures and precation. *********************************************************** AREA OF EXPERIENCE ~~~~~~~~~~~~~~ # A decisive team player with organizational, technical skills works well to find innovative ways to perform tasks and achieve objectives. Pipe fabrication, erection, piping Engineering &technical office, Piping Hydro test, Pre-commissioning & Commissioning, Maintenance of the piping & static equipments And Rotating equipment’s installation as well. 1|P a g e
  • 2. As a Mech. Construction Section Head, Mech. field Engineer and start the profession as a Mech. Construction Supervisor. Respecting the codes projects specs and HSE. ************************************************************************ PROFISSIONAL HISTORY FROM 9/2012 TILL 11/2014 company name : Combined Group CGC Position : lead of the piping and mechanical section: . Project name : Bulk handling facilities For Production Chemicals in SEK,WK & NK areas. Duties & Responsibilities as a head of the piping section: To manage projects within budget, guidelines, statutory requirements and company procedures ensuring compliance with HSE policies and customer satisfaction 1-To represent the organization and enhance relationships in deal with client, consultants and regulatory authorities to ensure all agreements are implemented. 2- To maintain records of any extra works undertaken to ensure company billing covers any additional costs to client 3- To supervise work teams for effective delivery of daily objectives including the control of work hours, overtime and incentive schemes to improve efficiency 4- To manage resources and equipment’s to achieve contract completion within budget and time. 5- To liaise with HSE and/or Quality department for the support for project safety and or quality to ensure company HSE and Quality policies and procedures are covered to client satisfactory. 6- To respond to emergencies and take remedial action as required to ensure HSE are protected. 7-Toidentify and ensure skills of assigned manpower are aligned to project requirements to ensure technically competent personnel for the project. 8- To participate in regular meeting to identify problems, target dates, issues, delays execution of work to ensure timely project completion. 9-- Punching out the test package systems. 10- Chick the punch list clearing and release the package for testing. 11- Clearing and signing the acceptance of the reinstating of the packages. 12-Provide on-site piping engineering consultation during construction, pre-commissioning & commissioning stage and start up . FROM 12/2009 TILL 2/2011 Company name : Gulf piping company Position : Sr. Project Engineer. 2|P a g e
  • 3. Project name : Gas production platform (client ENCANA( Duties & Responsibilities as a head of the piping section: 1-Monitoring the construction works to control the material and construction quality regarding project specifications for each system and class. 2- Controlling and reporting the contractor’s construction activities 3- Preparing and Raising the TQR’s regarding any technical or piping clash problems 4- Supervising the preparation of test packs. 5- Monitoring the progress respecting the planning wise and reporting to the project manager. FROM 3/2007 TILL 26/05/2009 Company name : CCIC Position : Mechnical section Engineer.(piping) Project Name : HGCE & Borouge Projects(UAE( Duties & Responsibilities as a head of the Test center: 1) planning and monitoring the construction activities reporting to the construction manager. 2) Reviewing all the DWG’s against the ics. 3) Controlling the Test packs tracking 4) Hydro test Progress planning and reporting to both of the construction manager and project manager. 5(Following the construct of the test loops completion and following the A items until clear it from all departments (construction, QC and engineering) until getting release for test by the client. 6(follow the B items till cleared 7(follow the signatures and the correction completion in the test packs till issue it to certification. 8(Provide on-site piping engineering consultation during pre-commissioning stage. FROM 15/2/2006 TILL 20/12/2006 Company name : ABB Italy/SARBY Position : lead Mechanical engineer Project Name : Wuargla gas transportation station 3(Algeria( Duties & Responsibilities : 1-Reviewing all the DWG’s, modification and approve for construction 2- Supervise the construction activities(piping, steel structure )and coordinate to the installation of the turbine and compressor. 3-supervise the preparation of the test packages and the hydro testing. 4-PrepairAs built DWG’s and the marketed P&ID 3|P a g e
  • 4. 5-Provide on-site piping engineering consultation during construction, pre-commissioning stage. 6-Reporting to the project manager. 7-- Punching out the test package systems. 8-- Chick the punch list clearing and release the package for testing. 9- Clearing and signing the acceptance of the reinstating of the package FROM 15/06/05 TILL 28/08/05 Company name : Technip Italy Position : Piping engineer (Engineering Dep .) . Project Name : AMOC Sulfur removal unit modification project Duties & Responsibilities : 1-Reviewing all the DWG’s, modification and approve for construction 2-Controling and reporting the subcontractor’s construction activities 3-supervise the preparation of the test packages and revise. 4-Reply for the RFI's (Request For Information's). Also responsible for the FCN's (Field Chang Note's). . 5- Provide on-site piping engineering consultation during construction, pre-commissioning & commissioning stage 6-PrepairAs built DWG’s and the marketed P&I D 7-Reporting all the modifications activities to the project manager 8- Punching out the test package systems. 9- Chick the punch list clearing and release the package for testing. 10-Clearing and signing the acceptance of the reinstating of the package. FROM 1/09/04 TILL 28/05/05 Company name : Bechte l Position : Piping field engineer (Engineering Dep .) . Project Name : ELNG project (Idku site( Duties & Responsibilities : 1-Monitoring the construction works to control the material and construction quality regarding project specifications for each system and class. 2- Controlling and reporting the subcontractor’s construction activities 3-Reply for the RFI's (Request For Information's). Also responsible for the FCN's (Field Chang Note's) to solve the piping& support's problems which obstructs construction works according to the project specification and the design criteria, this including" the new revisions and as built" drawings work. 4-Provide on-site piping engineering consultation during construction, pre-commissioning & commissioning stage. 5- Punching out the test package systems. 6- Chick the punch list clearing and release the package for testing. 7- Clearing and signing the acceptance of the reinstating of the package. 4|P a g e
  • 5. FROM 15/6/04 TILL 25/8/04 Company name : Archirodon Construction (Over seas) Co.S.A. Position : Mechanical section Head. Project Name : (Toshka Project )Shaikh Zaid Canal, branch three pumping stations. Duties & Responsibilities : 1- Supervising and coordinating piping construction works. 2- Supervising and coordinating pre-commissioning works for (17 pumps each 8.6 M3/sec capacity). FROM 22/2/2004 UNTILL 11/6/04 Company name : Archirodon Construction (Over seas) Co.S.A. Position : Senior Mechanical Eng. Project Name : QP (Qatar Petroleum Co.) Multi Product Berth at Mesaieed Industrial City. Duties & Responsibilities: 1-Hydro Testing works (preparing the marketed P&I.D and Preparing the test packages) 2- Supervising the punch list clearing 3- Pre commissioning Engineer for the piping works. All the previous activities were done in compliance with QP HSE life plant standards. FROM 17/7/2003 TILL 22/2/2004 Company name : Archirodon Construction (Over seas) Co.S.A. Position : Mechanical section Head. Project Name : (Toshka Project )Shaikh Zaid Canal, branch three pumping stations. Duties & Responsibilities : 1- Supervising and coordinating piping construction works. 2- Supervising and coordinating mechanical construction works (17 pumps each 8.6 M3 /sec capacity). FROM 06/2002 TILL 7/2003 Company name : Lead construction &Trading subcontractor to ABB PETOFAC Position : Senior Mechanical Eng and Hydro test Supervisor. Project Name : Ohanet Development Gas Project “ ALGEREA”Client BHP&Sonatrac. Duties & Responsibilities : 1-Revioing the Equipments& Piping systems test Package. 2- Supervising and witnessing the hydro test with man contract “ABB Petofac” and the “BHP”. 3- Pre commissioning supervisor Engineer. FROM 1/09/2000 TILL 30/4/2001 Company name : Archirodon Construction (Over seas) Co.S.A. Position : Senior Mechanical Eng. 5|P a g e
  • 6. Project Name : Midtap petroleum products & coke loading facilities Duties & Responsibilities : 1- Reviewing the isometric DWG. 2- Plotting the isometric bill of material according to the project specs. And standards. 3-Preparing the master P. & I.D. into loops for the hydro test. 4-Preparing the test packages. 5-Supervising the hydro test. 6-Commissioning of pumps & Mech. Equipment’s. FROM11/03/2000 UNTIL 31/08/2000 Company name : TECHNIP-TTIL-SNC Position : PIPING Engineer& PWHT supervisor Project Name : midor refinery plant Duties & Responsibilities : 1- Piping Supervisor checking ,Reviewing and clearing the punch list before Hydro . testing for EPC 2 [ Unit 1 Vacuum and topping] 2- PWHT Supervisor for Monitoring the subcontractors TR & DAELEM sites 3Rreporting and controlling the progress of the sub contractors AUG. 8-1999 Company name : My own contract. Position : Mech. Sub Contractor Project Name : National Vegetable Oil co. in Burg El-Arab Duties & Responsibilities : 1-Erection of two cells cooling tower(1650 M 3 /hr ea.) 2-Commissioning of the pumps. 3-Fabrication & Erection of silo fan ducts FROM 1-1999 UNTIL 7-1999 Company name : (ESACO. Co) FUT Project. Position : Mech. SUPERVISOR ENG. Project Name : Alex . National Steel DK Duties & Responsibilities : 1- Fabrication & Erection for all the pipes at the Scale pit and air compressor station 2 (120 Tons of pips ) 2- Fabrication & Erection Pipe rack piping and laminar cooling plant with (FMC) DSD.(92 Tons of pips) FROM 2/1995 UNTIL 31-12-1998 SUPERVISOR ENG. with (Continental Trading &Shipping) 6|P a g e
  • 7. 1- a)Fabrication & Erection of piping and ships vessel plats at Alex . , Damitta , Kuwait ports (Repair works) . b) Pumps, valves (Repair works) . 2- Fabrication & erection of carbon steel and st.st. piping in carbon black manufactory. FROM 1993 UNTILL 1994 Company name : Cimmontubi Position : SITE ENG. Project Name : Mahmoudia Damanhour power plant Duties & Responsibilities : Fabrication & painting steel structure (about 2000 tons of steel structure) FROM 1991 UNTILL 1992 Company name : Techmiptrol (T.P.L). Position : Mech. SITE ENG . Project Name : Alex . Petro. chemical co. Duties & Responsibilities : 1- Fabrication & erection of piping. 2-Fabrication, erection & painting of supports and steel structure. For the fire fitting and water treatment area. FROM 1989 UNTILL 1991 Company name : Sae Sadelmi Position : Mech. SITE ENG . Project Name : ( Damanhour Power Plant) Site. 300 MW. Duties & Responsibilities : 1-Fabrication & Erection of piping. 2-Fabrication, erection & painting steel structure Insulation work for boiler, duct, and piping. FROM 1987 UNTILL 1988 MAINTENANCE ENG. Gasoline cars workshop at Saudi Arabia FROM 1985 UNTILL 1987 MILITARY SERVICE Education ~~~~~~~~ 7|P a g e
  • 8. B.Sc.- Faculty of engineering Alexandria University 1984, Dept. of Mechanical Eng. ************************************************************************ COMPUTER SKILS ~~~~~~~~~~~~~~~ MICROSOFT EXCEL MICROSOFT Word AUOTO CAD 2000 Knowledge Languages ARABIC : Native language. ENGLISH : very good. Personal ~~~~~~~ Born Alex. AR Of EGYPT 13/8/59 Driving license 1) UAE D. License, EXP 9 / 2017 2) Egypt D. License, EXP 5 / 2021 3) Kuwait D. License, EXP 2/ 2023 8|P a g e