1. CURRICULUM VITAE
NAME : PINAK KANTI BISWAS
NATIONALITY : INDIAN
ADDRESS :L421,SARITA VIHAR,NEW DELHI-110076,INDIA
Tel:+91-11-26941241 , +91-8800964824
1 of 13
E-mail:pinak_biswas@hotmail.com
Pkbiswas47@yahoo.com
ACADEMICS :
-
Master Degree in Mechanical Engineering from U.S.A.
Master Of Business Administration(M.B.A) from USA.
First class Bachelor Degree in Mechanical Engineering. From India
Bachelor Degree in Environmental Health & Safety from U.S.A.(Belford University)
Chartered Engineer from India
Diploma in Quality Assurance & Quality Control & ISO 9000.
PASSPORT DETAILS
Passport No : Z1929940
Date of issue : 27.10.2009
Place of issue Delhi
Validity : 26.10.2019
DRIVING LICENSE
OMANI DRIVING LICENSE NO. 68228045
INDIAN DRIVING LICENSE N0. P-03101998105460
MALAYSIAN DRIVING LICENSE NO. K.P. A2576632
U.A.E DRIVING LICENSE NO.1007492
HIGHLIGHTS & CAPABILITIES :
Responsible for overall fabrication of structural steel, piping , tanks etc.
-Responsible for profit & loss of the department
-Accomplish the job in professional manner undertaken by the company
-Develop & implement cost effective method in operations to increase customer
satisfaction
-Provide job training to subordinates
-Ensure optimum uses of resources
-Perform any other duties assigned by the superiors
-
-
-Business development, coordination with clients & consultants
-Tendering & execution of Hydrocarbon projects, interaction with different clients
-Platform fabrication
-Plan, manage the execution of platform fabrication yard
2. -Plan & manage the the execution of all plat form fabrication i.e.Top sides,
Modules,Jackets,Bridges, flare etc
-Manpower planning, control & manage the resources
--Review, update & revise the construction engineering processes & systems for platform
fabrication
-Monitor, control for the process of the fabrication of platform contractors
-Administer & enforce HSE culture7 lifestyle in all phases of fabrication
-Perform , coordinate with all phases of fabrication with the project team
-Plan for personnel development in technical skills
-Preparation of the best practices, proposal, evaluation the contractors proposal etc.
-
.Construction of LNG terminals, tank & tank farms, piping, loading arms etc.
-Construction of refineries like CDU, VDU, FCC(Fluid Catalytic Cracking), reactor &
regenerator, distillation column, catalysts for FCC and
associated utilities,Aromatics plant etc.
To plan, co-ordinate, manage the design, Procurement, Construction & commissioning
of assigned projects, including taking leadership role in the preparation of proposals.
Construction of oil & gas pipelines, Tank & tank farms, construction jetty & terminals
for LNG, oil & gas,FEED to commissioning
Cross country pipelines for oil & gas, installation of Pig trap launcher & receiver, Hot
2 of 13
tapping etc.
Oil & gas Plant Turnaround & Shutdown maintenance
Very well acquainted with Gas Turbine Power plants, Oil & Gas Industry, Petro-chemical
& chemical industries, LNG plants, handled Large Refinery and Petrochemical & Power
Projects, Cross country pipeline for oil and gas, Sewage Treatment Plants & LNG Plants,
Fertilizer plants independently. Thorough knowledge of various Equipments used in LNG,
Refinery and Petrochemical, Chemical Industries & Power plants, Fertilizer plants. ,
Aromatics plant,Lubricants Blending Plant
Heavy lifts of equipments like Cryogenic tower, columns, vessels, heavy structures, etc
Preparation of rigging studies, JSA etc
Handled large value EPC projects independently.
Managing the full Project Execution cycle from receipt to tender through close out of the
project report, developing wining execution strategies, leading the proposal & estimating
department in developing robust competitive proposals, execution of all projects,
participating in price-fix process & carrying out risk assessments as part of the bidding &
execution phases of the projects.
Extensive experience of proposal management & direct estimating of projects. Hands on
experience in field management of construction works & have strong experience in all
phases of Project execution cycle.
Lead a multidiscipline team in the execution of civil, mechanical, piping, electrical &
instrumentation works from mobilization through to pre commissioning & final hand over,
liaise closely with clients, consultants & other agents on day to day basis, submit weekly
and monthly progress reports including schedule, commercial & financial progress.
Commitment to the health & safety, QA/QC. Have substantial construction experience in
high value capital projects in Oil & Gas projects in Europe, Far East, Middle East, Africa&
India. Worked in offshore & onshore projects .Worked with reputed EPC companies like
BECHTEL, Technip ,Foster wheeler, Chiyoda, JGC etc .Oil & Gas Field Developments
,Refineries & Petrochemicals, Chemicals & Fertilizers, Energy & Desalination, LNG
Plants, Gas Separation Projects, Cross Country Pipelines for Oil & Gas, water Pipelines.
Well acquainted with bolt torqueing & tensioning, Chemical cleaning of pipes &
3. equipments, helium detection system for LNG plants, Power Plants, Gas Pipelines &
compressor stations, Refineries , Fertilizer Plants, etc.
HSE Management ,Customer relationships, scope Management Commercial
Management, Time Management, Cost Control, Quality Management, Team
Management, Communications Management, Risk Management, Design Management,
Procurement/Sub-contracts Management, Construction Management
-Overall management of the multidisciplinary project-Tanks & tank farms, piping &
3 of 13
pipelines.
Preparation & maintenance of program for design review & ensuring its implementation
At present I am engaged as Project Director in Star Construction & Engineering Co, India
(From2nd May,3013) for their oil & Gas division.
Worked as General Manager(Projects) in Western Tanks & Pipes Ind .Co. Ltd, Sharjah, UAE.
From4.1..2011 to 30.4.2014
Nature of duties:
-Business Delopment for Hydrocarbon sectors
-Tendering, execution of Hydrocarbon Projects, coordination & interaction with clients,
consultants
-Fabrication & erection of tanks & tank farms, piping of different materials, structural steel for
Refineries ,LNG Plants, Crude oil terminals etc.
.Shut down & maintenance of tanks, pipes, exchangers etc
Fabrication & erection of tanks & tank farms, cross country pipelines, hot tapping, installation of
pig launcher & receiver, metering skids etc. Fabrication of platforms, modules, skids etc
Worked as a Project Director in Tarun Construction, Indonesia from January,2010 to
December,2010 for their oil & gas pipelines projects.
Worked as a Construction Manager for AMEC, Angola for their onshore & Offshore oil & gas
projects from March2008 to December,2009.
Nature of duties:
-Business Devlopment, tendering, coordination with clients, constructability studies,
exection of Hydrocarbon projects
-fabrication of Topsides, Modules, Flares etc. Manpower planning & control, preparation
of procedures for fabrication of platforms, supervise fabrication contractors.
- Analyze the technical & commercial merits, review schedules & prepare logical
construction methodologies for conceptual designs, new & ongoing projects.To look after
the commissioning & handing over of the projects.
- Responsible for review & preparation of ITT documents, conducting Project Feasibility
reviews and preparing project execution plans
- Review & amend project execution & constructability and review operating philosophy.
- Responsible for preparation of construction scope of works for onshore & offshore
pipelines & facilities to reflect the working environment & local contracting requirements.
- Construction consultant onshore/offshore construction performance, safety, & quality
reviews, constructability reviews, cold eyes reviews for construction & survey
- Installation of cross country pipelines for oil & gas, installation of pig launcher &
receivers, hot tapping etc.
- Preparation of rigging studies for heavy lifts, JSA, method statements, heavy lifts upto
250tons
- Manpower planning, Materials Management, Planning, scheduling, monitoring & control
- Overall management of the project
- Preparation of progress reports
- Oversee the tender & contract award
4. - Appointment of sub consultants & subcontractors, special heavy lifts & arrangement of
cranes, locations of crane studies etc.
- Project Planning, monitoring & control
- Budgeting, cash flow
- Manage the plant Change Process and complete the Project without any delay.
- Coordinate with all relevant departments
- Manage the various Projects with Specification & coordinate with project team both
internally & external subcontractors
- Actively participated in Root Cause Analysis
- Preparation & handing over of dossiers
- Participate Lesson Learned sessions
- Worked according to the company policies & procedures
4 of 13
PAST EXPERIENCE
Construction Manager in Namfat Energy Services, Sudan for their 1200km Pipeline
Project, from June 2005 to December2007
Nature Duties:-
-Business Development, coordination with clients, consultants & other agents,
execution of hydrocarbon projects
-
- Construction Manager for Pumping Station No.4.For the construction & commissioning
of pipelines, pumping stations
- Installation of cross country pipelines, installation of pig launcher & receivers
- Construction & commissioning of power plant of 100MW capacity(gas fired, closed
circuit)
- Fabrication & Erecting of Pipelines, Pipe Supports, Painting & Insulation.
- Installation of Pumps, Generators, Heaters & all other Mechanical works.
- Erection of structural Steel .Fabrication & erection of tanks & tank farms.
- Arranging cranes, heavy lifts upto200tons(Single lift) and other heavy lifts, rigging
studies, JSA, method statements
- All civil works like Building, Foundations for Equipments, Control Building, And
Residential Accommodations.
- E&I Works.
- Site safety, QA/QC.
- Preparation of reports, attending meetings.
- Material take-off, project planning, monitoring & control.
- Chemical Cleaning of pipe lines, Bolt torquing & tensioning of flange joints, structural
steels
- Engineering, Office Engineering, Pre-commissioning & Commissioning
- Organize staff & leads the team to ensure project completion in a safe manner within
budget, on schedule & in accordance with the appropriate standards & specifications.
- To ensure that HSE requirements are documented & understood by all project personnel,
to compliance with HSE procedures.
- Maintain & build healthy customer relationships through out the project
- Manage & control project performance
- Construction of tanks & tank farms
- Budgeting, cash flow
- Preparation of progress report
- Appointment of subcontractors
- Project planning, monitoring, control
5. Worked as a Construction Manager in Bahwan Engineering Co, Oman for their LNG
Project at Sur from Jan 2004 to May 2005.
5 of 13
Nature Duties:-
- Construction of Qalhat, Sur, Oman LNG plants & LNG terminal of capacity
7.3mmtpa. It includes tanks& tank farms, piping, loading arms, main plants etc.
- Fabrication, Erection & Testing of pipes from ½”to 84” of CS, SS, LTCS, (total inch-dia.
500,000). Erection of GRE Pipes
- Installation of pig launcher, receiver, hot tapping
- Fabrication & Erection of Structural Steel, Pipe Supports fabrication & erection of tanks
& tank farms.Farication of offshore structures, platforms etc.
- Erection of Mechanical Equipments, heavy lifts upto 750tons,(Single lift) and other heavy
lifts above 20tons, rigging studies, JSA, methodology, lifting plans etc
- Project Planning, Monitoring & control.
- Preparation of Method Statement, Inspection and Test Plan, WPS, PQR, WQT,
- Quality Control, Site Safety Etc.
- Site Supervision, Co-ordination with Sub-Contractors, Consultants (CFW) Client
(QLNG
- Pre-Commissioning, Commissioning and Handing over of the Project
- 2km offshore Pipeline installation work also.
- Engineering of site related activities, construction drawing
- Preparation of budgets & schedules, monitor progress & initiate actions to assure project
objectives & schedule are met & work is performed within budget.
- Provides direction to key project personnel
- Organize staff & leads the team to ensure the project completion in safe manner within
the budget, on schedule in accordance with the standards & specifications.
- Takes the lead in coordinating the planning & execution of the project
- Promote & practices team building across the project chemical cleaning of pipes &
vessels, tanks, bolt torqueing & tensioning of flange joints, helium detection testing
during testing & commissioning stages.
- Construction of LNG tanks, pipelines & associated works
- Budgeting, cash flow
- Appointment of subcontractors
Construction Manager (Mechanical) in C.C.I.C., Qatar for Raslafan LNG project from
19.06.2002 to 28.11.2003
Nature Duties:-
-Coordination with clients, consultants, interaction with other agents, constructibilty
studies, business development
. Construction of LNG train & LNG terminals for Ras Laffan Gas,Qatar which
includes main process plants & LNG terminals of capacity 15.6mmtpammtpa. It includes
tank & tank farms,piping , loading arms, etc. Fabrication of platforms for offshore,
structures etc.
Fabrication & erection of C.S. Pipes of dia upto 82”, SS Pipes, Galvanised Pipes, FRP
Pipe, PE Pipes & all types of Pipe supports. Erection Of GRE pipes. Precommisioning
& commissioning of all systems
Hot tapping, installation of pig launcher & receiver
6. .Erection of captive power plant of capacity 80MW
Fabrication of offshore Pipelines, Platforms, installation of offshore pipelines
Fabrication & erection of Tanks & Tank Firms, erection of equipments, heavy lifting
arrangement like cryogenic tower upto800tons(Single lift) & other heavy lifts above
20tons, rigging studies, preparation of method statements, JSA
Fabrication & erection of Steel Structure.
Supervision of WPS, PQR, WQT, welding controls
Project Planning, Monitoring & Control
Site QA/QC, Safety, Preparation of Method Statements
Site Supervision, Manpower Planning
Coordination with Consultants CHYODA-SNAPROGETI, Client (RAS GAS)
Sub-contract Administration
Painting & Insulation
Provides direction to key project personnel
Organize staff & leads a team to ensure project completion in safe manner within
budget, on schedule in accordance with the appropriate standards & specifications.
Resolves the problems & coordinates the final turnover of the project to the client.
Promotes & practices team building across the project.
Chemical cleaning of pipes, equipments, bolt torquing & tensioning for flange joints
6 of 13
& structural steels.
Construction of tanks, tank farms, pipelines
SENIOR PROJECT MANAGER (Project Director) in SUMATEC CORPORATION
SDN. BHD., MALAYSIA for 3 years (From 22nd March, 1999 to 21st March, 2002).
Nature Duties :-
-Business Development, tendering, coordination with clients , consultants & other agents
-Constructibility studies, interaction with other agents etc
-Preparation of proposals, execution of hydrocarbon projects
.Construction of Malaysia LNG terminal of capacity 7.8mmtpa. It includes tank &
tank farms, piping , loading arms etc.
-Refineries, FCC, reactor & regenerator, distillation column, catalysts for FCC for
Malaka refinery
Fabrication & erection Pipes of Carbon Steel. Low Temperature C.S., Alloy Steel (P11 &
P22), Stainless Steel (304/304L, 316/316L, 321, 347H), G.I. Pipes, etc. & pipe supports.
Precommissioning & commissioning of all systems.
Eection of power plants in karteh of 650 MW and 150 MW capacity in Bintulu
Fabrication & Erection of GRE Pipes
7. Cross country Pipelines for Gas, Metering Skid, Pig Launcher & Receivers, hot tapping
7 of 13
etc.
Erection of Compressors, Steam Turbines, CO2 Absorber, Process Condensate Seperator,
Ammonia Seperator, Syngas Steam Superheater, Syngas Waste Heat-Boiler, Ammonia
Converter, Cooling Towers, Steam Desuperheaters, Pumps, Tanks, Vessels, Exchanger,
Nitrogen Wash Cold Box, Column Cold Box, PSA Unit, Syngas Flare Stack, Ammonia
Flare Stack, Metering Skid, Solution Regenerator, Process Condensate Stripper, Fin-Fan
Coolers etc.
Fabrication & erection of Tanks, Tank Firms.
Oil & Gas Plant Turnaround & Shutdown maintenance
Heavy lifting upto250tons,(Single lift) & other heavy lifts above 25tons arranging cranes
& subcontractors of heavy lifts, rigging studies, preparation of methodology, JSA etc.
Supervision of civil works, E&I works.
Painting & Insulation works.
Structural Steel Fabrication & Erection
Budgeting, Costing, Cost Control, Project Control, Manpower Planning, Material
Planning, Project Planning, Monitoring and Control, Tendering, Proposal & estimating,
Procurement etc.
Procurement, Tendering, Negotiations, Finalization & execution of contracts
Welding, Preparation of WPS, Welder’s qualification, Preparation of method Statement
etc.
Coordination with Consultants- FOSTER WHEELER, TECHNIP, OGP, clients
PETRONAS & SHELL.
Site Supervision, QA/QC, Site Safety, Billing, Preparation of B.Q.Q. etc
Pre-commissioning, commissioning, handing over of projects, preparation of project close
out report.
Ensures that all client’s contacts, including major correspondences & working
relationships is maintained throughout the projects.
Preparation of the progress & special reports to the client & top management of the
company, Minimize cash flow.
Takes the lead in coordinating the planning & execution of the work with organizations
such as Engineering, Procurement, Projects Control, Construction, HRD & other services.
Assists the team in reviewing the prime contract documents & data, establishes plans,
schedules & budgets.
Represents the principal contact with client management & company management
throughout the project duration.
Supervise the development of budgets & schedules, monitor progress & initiates action to
assure project objectives & schedules are met.
Chemical cleaning of pipes & equipments, bolt torqueing & tensioning for flange joints
&structural steels, helium detection system during testing & commissioning stages of the
plants.
Construction of tanks, tank farms, pipelines
VICE-PRESIDENT (Construction) in Reliance Petroleum Ltd for their world`s largest
grass root refinery project at Jamnagar, Gujarat, India for two years. Project Management
& Consultant: BECHTEL (From January 16, 1997 to February 28, 1999).
In-charge for Civil works, E & I, Mechanical & Piping for Captive Power Plant, Crude
Distillation Unit (CDU), Vacuum Distillation Unit (VDU),FCC under UOP licence,
reactor & regenerator, distillation column, catalysts for FCC and all associated utilities
Precommissioning & commissioning all installed systems, construction of oil
terminals
8. Erection of 300MW captive power plant(gas fired, closed circuit)
Arrangement of heavy lifts, rigging study, methodology, JSA
Fabrication & Erection of Carbon Steel Pipes, Stainless Pipes, Low Temperature
Pipes, Alloy Steel Pipes, Galvanized Pipes of total inch-dia of 6,000,000.
Installation of pig launcher & receiver
Fabrication & Erection of Structural Steel, Pipe Supports, Tanks
Installation of Mechanical Equipments
Preparation of WPS, PQR, WQT Method Statement, welding etc
Painting & Insulation works
Supervision of Civil, Electrical and Instrumentation works.
Project Planning, Monitoring and control
Preparation of Budget, Costing and Cost Control, Project Control & Sub-contract
8 of 13
Administration
Procurement, Site Supervision, Manpower Planning & Control
QA/QC, Safety of site etc.
Coordination with BECHTEL India & U.K. and other agents.
Supervise the development of budgets & schedules, monitor progress & initiates
action to assure—the project objectives & schedules are achieved.
Provides direction to key project personnel, organize staff & leads them to ensure the
project completion in a safe manner, on schedule &within budget in accordance with
the specifications.
Assists the team in reviewing the datas, establishes plans, schedules & budgets.
-Takes the lead in coordinating the planning & execution of the work with
organizations such as Engineering, Procurement ,Projects Control, Construction,
Personnel & other services.
-Reviews & approves bid tabulations for all major purchase orders, contracts & sub-contracts
-Preparation of the progress & special reports for top managements., Monitoring cash
flow, Promes & practices team building across the project.
-Chemical cleaning of pipes & pipelines, equipments like vessels etc, bolt torqueing
& tensioning for flange joints, structural steel.
-Construction of tanks, tank farms, piping & pipelines
Design review & ensuring its implementation
f) Worked as a Project Manager / Construction Manager in C.C.I.C., U.A.E. & Kuwait for
ADGAS 3rd LNG Train Projects, Das Island & Onshore Gas Development Project of
ADNOC at Habshan, Abu Dhabi, U.A.E. & Equate Ethylene Plant Project at Kuwait
(From 01.05.1992 to 31.12.1996)
Nature Duties :-
-Business Development, coordination with clients, consultants, tendering, interaction with
other agents
-Execution of Hydrocarbon Projects, interaction with various agencies
. Construction of ADGAS LNG plants & LNG terminals at Das Island, Abudhabi,UAE
of capacity:5.7mmtpa. It includes process plants, LNG terminals, , tanks & tank farms,
piping, loading arms etc. fabrication yard supervision, fabrication of modules , etc
Fabrication & erection of Carbon Steel Pipes of dia upto 100”, Stainless Pipes (304/304
L, 316/316 L), Low Temp. Pipes (A 333), Low Alloy Steel Pipes (A 333 – P11 & P22),
9. GI Pipes, FRP Pipes, Heavy Wall Pipes of custom made 81 mm wall thickness. Erection
Of GRE Pipes. Precommissioning & commissioning of all installed systems
Installation of pig launcher, receiver, hot tapping etc
Fabrication & Erection of structural steel, pipe supporting structures & Tank, Pipe racks
Installation of Boilers, Compressors, Pressure vessels, Heat exchangers & Pumps,
Chemical injection and flare system, Cryogenic Tower, Water Treatment Plants, Heaters,
Columns etc.
Heavy lifts upto 700 tons of cryogenic tower(Single lift) & other heavy lifts above 20tons,,
rigging studies for all heavy lifts, arranging cranes & other equipments, preparation of
methodology, JSA
Welding, preparation of WPS, PQR, WQT, method statement etc..
Painting & Insulation works
Supervision of Civil, Electrical & Instrumentation works.
Project Planning, Monitoring & Control, sub-contract administration
Site supervision, Man power planning and control.
QA/QC, Safety of site etc..
Preparation of BOQ , Measurement, Billing, Materials Management
Construction of tanks, tank farms, pipelines
Co-ordination with BECHTEL & TECHNIP, ADNOC, CHIYODA, Brown & Root etc.
Pre-commissioning, commissioning, handing over of projects, preparation of project close
9 of 13
out report.
Chemical Cleaning of pipes & pipelines, vessels etc, bolt torqueing & tensioning for flange
joints & structural steels.
Worked as a Sr. PROJECT ENGINEER in ONEC, MUSCAT, OMAN for 1 year.
Nature of duties :-
- -Business Development, proposal preparation, coordination with clients, consultants,
- Other agents, execution of Hydrocarbon Projects
.
Fabrication & Erection of Pipes for onshore .& offshore, fabrication of Platforms
Installation of pig launcher, receiver, hot tapping
Precommissioning & commissioning of all installed systems of the project, preparation of
all documents , manuals etc
Fabrication & Erection of structural steel, pipe racks, pipe supporting structure & Tanks
Installation of Mechanical Equipment Welding, preparation of WPS, method statement
etc.
Supervision, of Painting & Insulation works Procurement, Site supervision, Manpower
planning and control, Contract Administration.
QA/QC, Safety aspects of site etc.
Co-ordination with clients, consultants and other sub-contractors associated.
Chemical cleaning for pipes & vessels, bolt torqueing & tensioning for flange joints &
structural steel.
Arrangement of all heavy lifts, preparation of method statements, rigging studies, JSA
From 02.05.1990 to March, 1991 worked as a CONSTRUCTION MANAGER in Desert
Line Projects, Muscat, Oman for Construction of gathering station at Thuleilat & Nimr,
Marmul of Petroleum Development, Oman.
10. Nature of duties :
-Coordination with client, consultants, preparation of proposals, Execution of
10 of 13
hydrocarbon projects
Fabrication & Erection of pipes of carbon steel, stainless steel, Low temperature
steel, Alloy steel and G.I. Pipes.
Installation of pig launcher & receiver
Precommissioning & commissioning of all installed systems, documentation,
handing over
Fabrication & Erection of structural steel, pipe supports & Tanks
Erection of tanks, tank farms, pipelines
Installation of Equipment, Heat exchangers, Valves, Pressure vessels & Pumps
etc..
Arrangement of all heavy lifts, rigging studies, methodoloogy, JSA
Welding, preparation of WPS, PQR, WQT method statement etc..
Supervision of Civil, Electrical & Instrumentation works.
Project planning, Monitoring & Control, Material take-off, Tendering. Contracts
administration, Materials Planning & Control.
Procurement, Site supervision, Man power planning and control.
QA/QC, Safety aspects of site etc..
Co-ordination with consultants, client & other agents.
Chemical cleaning for pipes & pipelines, vessels, bolt torqueing & tensioning for
flange joints.
PROJECT MANAGER in AL-Hassan Construction Company, Muscat, Oman for
Petroleum Development Oman (PDO) Projects from From January, 1987 to 23.03.1990.
Head of Mechanical Construction, of Yibal Khuff Gas Handling Facilities & Oman
Refinery Extension Construction, Power Station etc..
The Scope includes :
-Business Development, Proposal preparation, Execution of Hydrocarbon Projects,
coordination with clients, consultants, Execution of Hydrocarbon Projects
-Expansion of Oman refinery FCC with reactor & regenerator
75000barrels/day(11900m3/day)
Fabrication & Erection of Pipe work for Carbon Steel, Stainless steel, Alloy Steel,
Installation of pig launcher & receiver, hot tapping
Precommissioning & commissioning of all installed systems, preparation of manuals,
documents, coordination with supplier & contractors
Construction & relocation of generators/ power plants
Valves, Structural steel erection of 2 Nos. of 420,000 m3 / day capacity.
Compressors, Pumps, Drain vessels, Amine steel vessel, Amine heater, Oil separators,
Chemical injection system.
Heavy lifts upto300tons, rigging studies, arrangement of cranes & other equipments,
preparation of method statements, JSA
R.O Plant tank, Heat exchangers, Cooling towers, Cross country pipe line, Orifice meter,
PIG Launchers Skid, PIG receiver skid, Dual filters and Reducing stations.
Fabrication & Erection of structural steel, pipe supports & Tanks. Installation of
Equipment, Heat exchangers Valves, Pressure vessels & Pumps etc. Fabrication &
erection of tanks, tank farms, pipelines. Progress reports.
11. Budgeting, cash flow. Supervision of welding, preparation of WPS, PQR, WQT
preparation of method statement etc.
Supervision of Civil, Electrical & Instrumentation works Planning for above works,
Materials Planning & Control Project planning, Monitoring & Control, scheduling,
contracts administration.
Co-ordination, Material take- off, Tendering negotiations, finalization and execution of
11 of 13
contracts.
QA/QC, Safety aspects of site etc.
Co-ordination with clients, consultants & other departments associated.
Pre-commissioning, commissioning, handing over of projects, preparation of project
close out report.
Chemical cleaning of pipes, vessels, bolt torqueing & tensioning of flange joints
PROJECT ENGINEER in C.C.C MUSCAT, Oman from 06.04.1985 to 07.12.1986.
Nature of duties
-Oman refinery expansion including FCC and associated utilities
Fabrication and Erection of Pipe work, valves, Pumps, compressors, Boilers, Chemical
injection system, Coolers, Towers, Desalination plant, Water treatment plant, Sewage
treatment plant, Ko POT Flare, Pipe supports, Pipe racks, Hydrocarbon recovery unit, flow
line, PIG launcher skid, PIG receiving skid & Dual filter senior orifice meter etc..
Arrangement of all heavy lifts, preparation of method statements,JSA
Precommissioning & commissioning of all installed systems
Fabrication and Erection of Tanks and associated Pipe works
Welding activities, qualification of the welders etc..
Project planning, Monitoring & Control scheduling contracts administration.
Leading a group of Foreman & Craftsman
Site management, Co-ordination, Material take-off, Materials management & tendering.
Chemical cleaning of pipes, vessels, bolt tensioning of flange joints. Construction tanks,
tank farms, pipelines
Sr. PROJECT ENGINEER in Syrikat Migas, Seria, Brunei from 16.12.1979 to 31.03.1985.
Nature of duties :
-Business Development, coordination with clients, consultants, preparation of proposals,
execution of hydrocarbon projects
-SHELL refinery in Seria, Brunei including FCC with reactor & regenerator, distillation column, catalysts
for FCC and associated utilities
Erection of Pipe works, valves, Pumps, Compressors, Boilers, Tanks, Structural steel,
Desalination plants.
Cross country pipelines for oil & gas, installation of pig launcher & receiver, hot tapping
Construction of power plants of capacity upto300MW
Fabrication and erection of Pipeline for transportation of Gas & Oil, Pipes of carbon
steel, stainless steel, alloy steel, low temperature steel, Galvanized and FRP pipe.
12. Fabrication & erection of Tanks & Tank firms. Supervision of Civil, Mechanical,
Electrical and Instrumentation works.
Erection of all heavy equipments & structures, heavy lifts upto500tons, arrangement of
cranes & other equipments, rigging studies, methodology, JSA
Precommissioning & commissioning of all installed systems, documentation
Co-ordination, Material take-off, Purchasing, Tendering, Negotiation, Finalization &
Execution of contracts, Cost Control, Billing and Contract Administration.
Estimation, office engineering.
Leading a group of Foreman & Craftsman.
Project Planning, Monitoring and Control.
Preparation of Method Statement, WPS, PQR, WQT.
QA/QC, Ste Safety, Site Supervision.
Coordination with Consultants, clients & other agents
Project Control, Measurement, Billing etc.
Pre-commissioning, commissioning, handing over of projects, preparation of project
12 of 13
close out report.
Chemical cleaning pipe & pipelines, vessels, bolt torqueing & tensioning for flange
joints , structural steel, helium detection system during testing & commissioning
l) Worked as a CHIEF MECHANICAL ENGINEER in Hobart- Blumauer, Vienna,
Austria from 10.10.1974 to 06.12.1979 for their Refinery, Petrochemical & Power plant
projects in Yugoslavia, Austria, Germany, Finland, Iraq, Romania, Bulgaria.
Nature of duties :
-Business development, preparation of proposals, execution of hydrocarbon projects,
coordination with clients, consultants
-Helsinki, Finland refinery, FCC with reactor & regenerator, distillation column, catalysts
for FCCand associated utilities
Fabrication and Erection of Pipe work of carbon steel, stainless steel, low temp steel,
galvanized, FRP pipes etc.. Pipe supports Pipe racks.
Precommissioning & commissioning of all installed systems
Construction of power plants of capacity upto1100 MW
Cross country pipelines for transportation of Oil & Gas, installation of pig launcher &
receiver, hot tapping etc.
Fabrication and Erection of Tanks & associated pipe works.
Oil & Gas plant turnaround & Shutdown maintenance
Erection of all mechanical equipments for refineries, chemical plants, petrochemical
plants, power plants, heavy lifts of equipments & structures, arrangement of canes &
other equipments, rigging studies, methodology,JSA
Supervision of welding activities, qualification of the welders, Preparation of WPS &
Method statement.
Project planning, Monitoring & Control scheduling contracts administration.
Testing, Commissioning & Maintenance work of Petrochemicals, refinery plants.
Material take-off, tendering, billing etc..
Co-ordination with consultants, clients & other agents.
Pre-commissioning, commissioning, handing over of projects, preparation of project
close out report.
Chemical cleaning, bolt torqueing & tensioning for flange joints
Current salary:USD10000p.m.+perks
Salary expected:USD12000p.m. , however this can be negotiated.
13. Joining time : Within 30 days.
REFERENCES:
1.Mr.Anusorn Sornkajorn, President
Boonyanuch Engineering, Rayong, Thailand
Tel:+66-38687067
E-mail ID:sornkajorna@hydrodyne.co.th
2.Mr.John Baillie,UK
Tel:+44-1862893927
E-mailID:john_baillie9@yahoo.com
13 of 13
3.Mr.Sonny Webster, USA
E-mail ID:sonnywebster@yahoo.com