PERALATAN TAMBANG
EQUIPMENT SELECTION
KELOMPOK 1:
1. CHRISTY NANLOHY ( 073.15.028 )
2. ANDRE MEYRO RITONGA (073.15.014)
Dosen Pembimbing :
MINE PLAN OPTIONS
 Mine planning is complex because its
very site spesific nature.
 The equipment selection process begin
with the initial conception of mine
development
Deposit characteristics
Site characteristics
Mine parameters
Type of mining
Mining system
Unit operations
Equipment selection
BASIC INPUT DATA
KONDISI LOKASI
 ketinggian dari permukaan laut
 Suhu
 Curah hujan
 Ketersediaan listrik
 Akses ke lokasi
 Tenaga kerja
 Fasilitas yang mendukung
DEPOSIT CHARACTERISTICS
 Overburden:
 Depth
 Nature and degree of consolidation
 Highwall stability
 Spoil angle of repose
 Coal/ ore: thickness, pitch, physical properties
 Partings: thickness, nature and degree of
consolidation, underclays
 Hydrology
 Material properties: abrasiveness, stickness, unit
weights, swell
MINE PARAMETERS
 Batas lahan
 Tingkat produksi
 Kualitas produksi
 Umur tambang
 Reklamasi
 Mengembalikan modal investasi
 dana
METODE PENAMBANGAN
 Pit/quarry
 Area mining
 Strip mining
 Contour mining
 Mountain top removal
 placer
AREA MINING
 Sistem ini pada umumnya diterapkan untuk
endapan batubara yang letaknya kurang lebih
horizontal (mendatar) serta daerahnya juga
merupakan dataran.
STRIP MINING
Strip mining merupakan pertambangan kupas atau
pertambangan baris yang secara khusus merupakan
sistem tambang terbuka atau tambang permukaan
untuk batubara. Sistem penambangan ini pada
dasarnya terbagi dua, yaitu tambang area dan
tambang kontur. Pertambangan kupas adalah
merupakan operasi pengupasan tanah atau batuan
penutup lapisan batu bara dengan bentuk
pengupasan baris-baris serjajar.
COUNTOUR MINING
Sistem penambangan ini biasanya diterapkan untuk
cadangan batubara yang tersingkap di lereng
pegunungan atau bukit. Kegiatan penambangan
diawali dengan pengupasan tanah penutup di daerah
singkapan (outcrap) di sepanjang lereng mengikuti
garis kontur, kemudian diikuti dengan penggalian
endapan batubaranya.
MOUNTAIN TOP REMOVAL
Metode mountaintop removal method ini
(Gambar 6) dikenal dan berkembang cepat,
khususnya di Kentucky Timur (Amerika
Serikat). Dengan metode ini lapisan tanah
penutup dapat terkupas seluruhnya,
sehingga memungkinkan perolehan
batubara 100%.
SATUAN OPERASI
Site Preparations
(Cut timber)
Top Soil Removal
Cleaning & Grubbing
Transport for
Direct
Replacement
Transport to
Storage
Prepare Drill
Bench
Drilling
Blasting
Ripping
SATUAN OPERASI
Transport
to Storage
Transport
to Backfill
Coal/Ore Surface Cleaning
Coal/Ore
Drilling
Blasting
Coal/Ore
Ripping
Coal Augering
Overburden RomovalOverburden
Revomal
(Direct Spoiling)
Coal/Ore
Excavating/Loading
Coal/Ore
(to storage or
Processing)
Parting Removal
Backfilling
(from Storage)
Topsoil Replacement
Spoil Regrading
Monitoring
Revegetation Final Grading
Support Activities
:
•Drainage
•Containment
•Access Roads
•Monitoring
TYPES OF MOBILE SURFACE EQUIPMENT
Standar
crawler draglines
walking dragline
bucket wheel excavators
(medium size)
Crawler rotary blast
Hole drills
Truck mounted rotary
Blast hole drills
Variasi khusus
Stripping BWE
Surface miner type wheel
Excavators
Horizontal drills
jet piercing machines
Pneumatic drill
Lanjutan…
Standar
Track dozers
Wheel dozers
Standard sorapers
Standard tandem scraper
Elevating scrapers
Elevating tandem scrapers
Rear dump truck
Bottom dump trucks
Front-End Loaders
Hydraulic snovels
Hydraulic hoes
Electric loading shovels
Variasi khusus
Pared units
Push-pull combination
Electric stripping shovels
Diesel mechanical shovels
EQUIPMENT SIZE
jenis peralatan ukuran Bobot
(1000Ibs)
Tenaga total
HP
Dozers (crawler) - 30-190 140-700
Scrapers (
tandem)
24-52 yardᶾ 60-140 288-950
Front-end loader 3.5-30 yardᶾ 33-389 180-1.2750
Hydraulic
excavator (shovel)
4-30 yardᶾ 114-930 300-2.350
Dragline
(walking)
9-180 yardᶾ 900-17,500 1.080-18.000
Wheel excavator Dari 3,500 yardᶾ - -
Truck 50-350 tons 58-520 420-3.000
Rotary drill (
crawler)
3,0-17,5
diameter lubang
40-282 -
BUCKET SIZE
0
16000
14000
12000
10000
8000
6000
4000
2000
18000
0 30 60 90 150120
Walking
Dragline
Electric
Shovel
Hydraulic
Machines
BobotOperasi(1000Lb)
Bucket Size (Cu.Yd)
Units Power Primary drive
system
Type propel Powered Function
Design
Dozers diesel Torque converter/
transmition
Crawler or
wheel
Silinder
hydraulic/linkages
Scrapers diesel Torque converter/
transmition
wheel Silinder
hydraulic/linkages
Front-end
Loaders
diesel Converter or electric
motor
wheel Silinder
hydraulic/linkages
Hydraulic
Excavators
diesel hydraulic crawler Silinder hydraulic &
gears
Electric
shovel
diesel electric crawler Cable & drums gears
Draglines Diesel/e
lectric
electric Crwaler or
shoes
Cable & drums gears
Wheel
excavator
diesel Hydraulic and/or
electric
crawler Silinder hydraulic &
gears
Trucks diesel conventer/ electric
motor
wheel Converter or motors &
gears
Rotary Drill Diesel/e
lecric
Hydraulic/electric Crawler or Chain & gears
jenis peralatan ukuran Bobot
(1000Ibs)
Tenaga total
HP
Dozers (crawler) - 30-190 140-700
Scrapers (
tandem)
24-52 yardᶾ 60-140 288-950
Front-end loader 3.5-30 yardᶾ 33-389 180-1.2750
Hydraulic
excavator (shovel)
4-30 yardᶾ 114-930 300-2.350
Dragline
(walking)
9-180 yardᶾ 900-17,500 1.080-18.000
Wheel excavator Dari 3,500 yardᶾ - -
Truck 50-350 tons 58-520 420-3.000
Rotary drill (
crawler)
3,0-17,5
diameter lubang
40-282 -
COMPARATIVE MACHINE RATIOS
Faktor Kinerja peralatan
Bank preparation Drill excavation/Loader
Transport Units Trucks
Ukuran lubang kapasitas mangkuk payload
Laju pemboran: kapasitas penggalian: Gross weight
- Down pressure - cutting forces
- Rotary torque -cutting speeds power
- Rotary speed -Cutting path/action
- Compressor size -cycle time
…………………………….. ……………………………… Gradeability
Mast eight Digging height Speed ranges Acceleration
Max, Drilling Depth dumping height
Cyle time : Reach Retardation/breaking
- Pipe changes
- Machine relocation …………………………. ………………………………………
………………………………….. Ground pressures Traction
Maneuverability swing speeds/ Turning radius
Travel speeds turning radius Dump speed
Gradebility
Degree of automation Tractive effort Reability
……………………………….. ………………………..
Reability Reability
DESIGN FACTOR
 Total power
 Service life
 Weight
 Physical size
 Stability
 Ground clearance
 Basic configuration:
geometry and linkages,
coplexity, modular
construction
 Componentry: proven
components,
interchangability unit,
critical component life
 Appearance
 Serviceability
 Maintainbility
 Transportability
 Ruggedness
 Altitude limitations
 Temperature limitations
 Nosie levels
 Crew size
 Dust generation
DESIGN FACCTOR
Operator skill required
Operator effort required
Operator safety
Operator visibility
Control response
Power rating and
characteristic
Hydraulic vs electric vs
mechanical drive system
Disesl vs electric power
 On-board diagnostic and
ettsing devices
 Overload protection
devices
 Fire suppression
equipment
 Accesory option
 Optimal spesification
Faktor Support & biaya
Support biaya
 Auxiliary machines required owner coast:
 Frequency of servicing required - depreciation
 Shop vs field maintanance -interest
 Maintenance skill required -insurance
 Maintenance facilities required -taxes
 Portion maintenable in-house initial investment
include:
 Power distribution system requirements - basic machine
 Component standarization -accessories and option
 Manufactures support available -spesial features
 Manufacturing quality -freight
 Parts availability -ballast
-field assembly
operating coast
-labor
-supplies
-fuel/power
-lubricants
-repairs, maintenance
optional
-general supervision
-storage and warehousing
KEANDALAN MESIN
Keputusan pada keandalan masing-masing peralatan
penting untuk input proses seleksi peralatan . Hal-hal
tersebut secara signifikan berdampak pada satuan dan
sistem produktivitas . Selanjutnya mungkin sama
pentingnya, bagaimanapun, adalah pengetahuan
mereka memberikan kualitas desain mesin. Seperti
desain dasar yang ada semakin disempurnakan
dengan teknologi baru, ini juga bisa menjadi salah satu
penentu utama pemilihan peralatan untuk masa
mendatang .
Keandalan sebagai tolak ukur evaluasi yang semakin
penting , yaitu :
1. Menambah kompleksitas mesin
2. Menambah syarat kemampuan dalam perbaikan berkala
3. Peralatan dengan biaya yang mahal
4. Biaya yang mahal saat unit sedang siaga
5. Kinerja tidak sesuai perkiraan
Produsen peralatan telah menyadari peran memperluas ini
dan telah mengambil beberapa langkah dalam menanggapi
penekanan ini, yaitu :
1. Meningkatkan diagnosa peralatan
2. Memaksimalkan aksesibilitas pelayanan
3. Menyediakan pemeriksaan dan penggantian yang segera
/ cepat
Unit Operation Mining System
Equipment Available
Selection Factor
Aplication Alternative
Machine Reliability
Equipment Trends
Unit Production Calculation
Ownership & Operation Costs
Ada banyak pertimbangan penting yang mempengaruhi kinerja masa lalu yang
tidak tercermin dalam data yang paling stastikal. Selanjutnya, catatan mesin
jarang menyertakan informasi cadangan yang memadai untuk memungkinkan
ekstrapolasi kinerja yang ditunjukkan ke masa mendatang. Beberapa nilai
informasi yang tersedia dapat diperoleh dengan mencoba untuk menjawab
pertanyaan-pertanyaan seperti berikut
• Apakah itu akurat ?
• Apakah itu menutupi kesamaan mesin yang berada di bawah pertimbangan ?
• Bagaimana cara mengenali kerusakan akibat alat yang tua / lama ?
• Bagaimana mengenali kerusakan teknis ?
• Bagaimana cara mengidentifikasi sifat sifat penyalahgunaan ?
• Bagaimana mengindentifikasi kekurangan pada desain ?
• Bagaimana cara mengidentifikasi penundaan yang disebabkan oleh “Operator
in Training” ?
Peralatan memerlukan substansial dalam konfigurasi. Sejauh apakah ini dapat
ditampilkan sebagai contoh fungsi bertenaga pada semua mesin .
• Dozer – Propel , Memposisikan mata tajam pengeruk
• Truck – Propel , Bak , Pengemudian
• Scrapper – Propel , Memposisikan mangkuk , Pelepasan , Pengemudian
• Front End Loader – Propel , Memposisikan mangkuk , Kerekan
• Dragline – Propel ,Ayunan, Penyeret
• Excavator Hidrolik – Propel , Ayunan
• Wheel Excavator – Propel , Ayunan, Roda pengemudi , Conveyor , Charge
Conveyor , Discharge Swing , Discharge boom position
• Drill – Propel , Mast Positioning , Bailing , Dust Control , Wipe Handling
Kompleksitas mesin menyediakan indeks untuk
membandingkan kehandalan desain dasar. Elemen
Elemen untuk mempertimbangkan untuk aplikasi
Peringkat keparahan diuraikan pada tabel 1.1 . Poin
poin tugas ini akan bervariasi tergantung pada
berbagai kondisi di lokasi tambang .
Lingkungan
Hidup
Rentang Suhu Kondisi
Hujan dan
Bersalju
Ketinggian Kecepatan
Angin
Lantai &
Jalan
Pengangkut
an
Persiapan Abrasitas Tingkatan Ketahanan
Daya tarik
Face
Condition
Derajat
Fragmentasi
Abrasifikasi Kebesaran
Persenan
Frekuensi
Pergerakan
- Jarak
Jadwal
Operasi
Perawatan
berkala
Jadwal Kualitas Fasilitas Personil
Operasi Supervisi Operator
Tabel 1.1
Aplikasi Pengambilan
Keputusan
• Diesel (Tinggi)
• Listrik (Tinggi)Sumber Daya
• Tabung Hidrolik , Pompa Tekanan Rendah (Rendah)
• Tabung Hidrolik , Pompa Tekanan Tinggi (Sedang)
• Transmisi (Tinggi)
• D.C Motor (Tinggi)
• A.C Motor (Tinggi)
• Hidrolik dan Motor Eletrik (Tinggi)
Distribusi
Utama Listrik
• Kurang dari tiga (Rendah)
• Empat (Sedang)
• Lebih dari 4 (Tinggi)
Jumlah Tenaga
Berfungsi
• Hubungan mekanis (Rendah)
• Eletrik Statis (Medium)
• Bangsal Leonard Eletrik (Tinggi)
• Perpindahan Variabel Unit (Tinggi)
Sistem Kontrol
Tabel 1.2
Urutan
Kekompleksitas
• Satuan Tunggal (Rendah)
• Unit Kedua Diartikulasikan (Rendah)
• Unit Kedua Diputar (Sedang)
• Unit Ketiga Diputar (Tinggi)
• Unit Keempat Diputar (Tinggi)
Kerangka
Dasar
• Kabel dan Drum (Rendah)
• Tabung dan Lengan (Sedang)
• Rak Pinion (Tinggi)
• Penggalian (Tinggi)
Sistem
Penggalian
• Mata Tajam (Rendah)
• Keranjang (Rendah)
• Gayungan Tetap (Rendah)
• Gayungan Bebas (Sedang)
• Bucket Wheel (Tinggi)
Alat – Alat
Menggali
• Roda (Rendah)
• Peralatan Berjalan (Rendah)
• Crawler Kecepatan Tinggi (Sedang)
• Alat Navigasi Mandiri (Tinggi)
Mekanisme
Propel
TREN PERALATAN
TREN PERALATAN
Memilih peralatan untuk tambang pada dua sampai
lima tahun kemudian, dan dengan service perbaikan
diantisipasi sampai 5 sampai 25 tahun ke depan ,
membutuhkan penilaian yang cermat yang mungkin
berdampak pada konsep-konsep baru dan teknologi.
biaya penambangan harus tetap kompetitif sepanjang
umur peralatan tersebut. ini diterjemahkan ke dalam
kebutuhan produktivitas mesin yang kompetitif dan
biaya kepemilikan dan pengoperasian selama periode
yang sama.
+ Spesifikasi Kinerja
-Ukuran
- Jarak
- Waktu Perputaran
- Mobilitas
- Berat
- Sumber Daya
- Ukuran Pekerja
- Lingkuran Operasi
+ Inovasi
+ Memaksimalkan Teknologi
Terbaru
+ Realibilitas Tinggi
+ Memaksimalkan Produksi
+ Memenuhi Kode dan Standar
+ Menghindari Pelanggaran Paten
+ Kendali Antar Muka Efektif
+ Operasi yang Aman
+ Dapat di Perbaiki
+ Dapat di Perbaiki Berkala
+ Adanya Perangkat Terbaru
+ Produk Bertahan Lama
+ Biaya Mesin yang Rendah
+ Biaya Pengantaran yang Rendah
+ Penggunaan Sumber Daya yang
Rendah
+ Cocok Untuk Fasilitas Manufaktur
+ Cocok Untuk Syarat Distribusi
Tabel 2.1
Kriteria Dasar Model
Mesin
TERIMA KASIH

More Related Content

What's hot

Istilah istilah underground mining
Istilah istilah underground miningIstilah istilah underground mining
Istilah istilah underground miningalam_budiman
 
Sistem penambangan
Sistem penambanganSistem penambangan
Sistem penambanganIpung Noor
 
Pengantar perencanaan tambang
Pengantar perencanaan tambangPengantar perencanaan tambang
Pengantar perencanaan tambangIpung Noor
 
ppt tambang bawah tanah
ppt tambang bawah tanahppt tambang bawah tanah
ppt tambang bawah tanahAndrian M
 
Menentukan lokasi pemboran dan peledakan
Menentukan lokasi pemboran dan peledakanMenentukan lokasi pemboran dan peledakan
Menentukan lokasi pemboran dan peledakanseed3d
 
Kuliah 10-bab-ix-kadar-batas-n-ekivalen
Kuliah 10-bab-ix-kadar-batas-n-ekivalenKuliah 10-bab-ix-kadar-batas-n-ekivalen
Kuliah 10-bab-ix-kadar-batas-n-ekivalenSylvester Saragih
 
Room and pillar_dan_longwall_batubara
Room and pillar_dan_longwall_batubaraRoom and pillar_dan_longwall_batubara
Room and pillar_dan_longwall_batubaraSyahwil Ackbar
 
Terminologi Pertambangan
Terminologi PertambanganTerminologi Pertambangan
Terminologi PertambanganReski Aprilia
 
Tugas makalah teknik eksplorasi tambang peralatan yang digunakan alam eksplor...
Tugas makalah teknik eksplorasi tambang peralatan yang digunakan alam eksplor...Tugas makalah teknik eksplorasi tambang peralatan yang digunakan alam eksplor...
Tugas makalah teknik eksplorasi tambang peralatan yang digunakan alam eksplor...Sylvester Saragih
 
Metode sampling pada jenis – jenis endapan
Metode sampling pada jenis – jenis endapanMetode sampling pada jenis – jenis endapan
Metode sampling pada jenis – jenis endapankusyanto Anto
 
pola peledakan tamka dan tamda
pola peledakan tamka dan tamdapola peledakan tamka dan tamda
pola peledakan tamka dan tamdaUDIN MUHRUDIN
 
Metode Penambangan Cut and Fill
Metode Penambangan Cut and FillMetode Penambangan Cut and Fill
Metode Penambangan Cut and FillSastra Diharlan
 
Perencanaan tambang
Perencanaan tambangPerencanaan tambang
Perencanaan tambangramaldini
 
estimasi bucket fill factor berdasarkan volume angkut DumpTruck
estimasi bucket fill factor berdasarkan volume angkut DumpTruckestimasi bucket fill factor berdasarkan volume angkut DumpTruck
estimasi bucket fill factor berdasarkan volume angkut DumpTruckevamanroe
 

What's hot (20)

Metoda Penambangan
Metoda PenambanganMetoda Penambangan
Metoda Penambangan
 
Istilah istilah underground mining
Istilah istilah underground miningIstilah istilah underground mining
Istilah istilah underground mining
 
Sistem penambangan
Sistem penambanganSistem penambangan
Sistem penambangan
 
Pengantar perencanaan tambang
Pengantar perencanaan tambangPengantar perencanaan tambang
Pengantar perencanaan tambang
 
ppt tambang bawah tanah
ppt tambang bawah tanahppt tambang bawah tanah
ppt tambang bawah tanah
 
Menentukan lokasi pemboran dan peledakan
Menentukan lokasi pemboran dan peledakanMenentukan lokasi pemboran dan peledakan
Menentukan lokasi pemboran dan peledakan
 
Kuliah 10-bab-ix-kadar-batas-n-ekivalen
Kuliah 10-bab-ix-kadar-batas-n-ekivalenKuliah 10-bab-ix-kadar-batas-n-ekivalen
Kuliah 10-bab-ix-kadar-batas-n-ekivalen
 
Room and pillar_dan_longwall_batubara
Room and pillar_dan_longwall_batubaraRoom and pillar_dan_longwall_batubara
Room and pillar_dan_longwall_batubara
 
Pengolahan Bahan Galian
Pengolahan Bahan GalianPengolahan Bahan Galian
Pengolahan Bahan Galian
 
Jalan Angkut Tambang
Jalan Angkut TambangJalan Angkut Tambang
Jalan Angkut Tambang
 
Terminologi Pertambangan
Terminologi PertambanganTerminologi Pertambangan
Terminologi Pertambangan
 
Longwall mining
Longwall miningLongwall mining
Longwall mining
 
Tugas makalah teknik eksplorasi tambang peralatan yang digunakan alam eksplor...
Tugas makalah teknik eksplorasi tambang peralatan yang digunakan alam eksplor...Tugas makalah teknik eksplorasi tambang peralatan yang digunakan alam eksplor...
Tugas makalah teknik eksplorasi tambang peralatan yang digunakan alam eksplor...
 
Metode sampling pada jenis – jenis endapan
Metode sampling pada jenis – jenis endapanMetode sampling pada jenis – jenis endapan
Metode sampling pada jenis – jenis endapan
 
Pola peledakan
Pola peledakanPola peledakan
Pola peledakan
 
1.geoteknik tambang
1.geoteknik tambang1.geoteknik tambang
1.geoteknik tambang
 
pola peledakan tamka dan tamda
pola peledakan tamka dan tamdapola peledakan tamka dan tamda
pola peledakan tamka dan tamda
 
Metode Penambangan Cut and Fill
Metode Penambangan Cut and FillMetode Penambangan Cut and Fill
Metode Penambangan Cut and Fill
 
Perencanaan tambang
Perencanaan tambangPerencanaan tambang
Perencanaan tambang
 
estimasi bucket fill factor berdasarkan volume angkut DumpTruck
estimasi bucket fill factor berdasarkan volume angkut DumpTruckestimasi bucket fill factor berdasarkan volume angkut DumpTruck
estimasi bucket fill factor berdasarkan volume angkut DumpTruck
 

Viewers also liked

Power point tgl 16 12-2014 (2)
Power point tgl 16 12-2014 (2)Power point tgl 16 12-2014 (2)
Power point tgl 16 12-2014 (2)Reski Aprilia
 
Laporan geoteknik-gerakan-tanah
Laporan geoteknik-gerakan-tanahLaporan geoteknik-gerakan-tanah
Laporan geoteknik-gerakan-tanahChairulHuda03
 
Mekanika Tanah - Aliran Air dalam Tanah
Mekanika Tanah - Aliran Air dalam TanahMekanika Tanah - Aliran Air dalam Tanah
Mekanika Tanah - Aliran Air dalam TanahReski Aprilia
 
Kbg nikel {ika nurcahyaningsih (1205025100)}
Kbg nikel {ika nurcahyaningsih (1205025100)}Kbg nikel {ika nurcahyaningsih (1205025100)}
Kbg nikel {ika nurcahyaningsih (1205025100)}085753889956
 
Material Teknik - Nikel
Material Teknik - NikelMaterial Teknik - Nikel
Material Teknik - NikelZhafran Anas
 
Pengantar perencanaan tambang
Pengantar perencanaan tambangPengantar perencanaan tambang
Pengantar perencanaan tambangUVRI - UKDM
 
Dampak lingkungan industri akibat pertambangan
Dampak lingkungan industri akibat pertambanganDampak lingkungan industri akibat pertambangan
Dampak lingkungan industri akibat pertambanganyahyakurnia23
 
Potensi dan Pengelompokan SDA (sumber daya alam)
Potensi dan Pengelompokan SDA (sumber daya alam)Potensi dan Pengelompokan SDA (sumber daya alam)
Potensi dan Pengelompokan SDA (sumber daya alam)ahmad arif
 
Company profile gonwana
Company profile gonwanaCompany profile gonwana
Company profile gonwanaQFat Han
 
Struktur organisasi dan tenaga kerja di pertambangan
Struktur organisasi dan tenaga kerja di pertambanganStruktur organisasi dan tenaga kerja di pertambangan
Struktur organisasi dan tenaga kerja di pertambanganAdhitya Henrika
 
40084299 analisis-investasi-tambang
40084299 analisis-investasi-tambang40084299 analisis-investasi-tambang
40084299 analisis-investasi-tambangNurfirman Halwan
 
Penyusunan Rencana Pastambang
Penyusunan Rencana PastambangPenyusunan Rencana Pastambang
Penyusunan Rencana PastambangYusufRiyandi
 
Tata cara perhitungan jaminan reklamasi (final) danang
Tata cara perhitungan jaminan reklamasi (final) danang Tata cara perhitungan jaminan reklamasi (final) danang
Tata cara perhitungan jaminan reklamasi (final) danang MetaKonten Media Monitoring
 
Cashflow tambang
Cashflow tambangCashflow tambang
Cashflow tambangyannick99
 
EL CINE Y LA GUERRA CIVIL EN BENIFAIRÓ DE LES VALLS - Mª Vicenta Pérez
EL CINE Y LA GUERRA CIVIL EN BENIFAIRÓ DE LES VALLS - Mª Vicenta PérezEL CINE Y LA GUERRA CIVIL EN BENIFAIRÓ DE LES VALLS - Mª Vicenta Pérez
EL CINE Y LA GUERRA CIVIL EN BENIFAIRÓ DE LES VALLS - Mª Vicenta PérezLa Finestra del Rey
 

Viewers also liked (20)

Power point tgl 16 12-2014 (2)
Power point tgl 16 12-2014 (2)Power point tgl 16 12-2014 (2)
Power point tgl 16 12-2014 (2)
 
Pentuan Kadar Ni (Nikel)
Pentuan Kadar Ni (Nikel)Pentuan Kadar Ni (Nikel)
Pentuan Kadar Ni (Nikel)
 
Laporan geoteknik-gerakan-tanah
Laporan geoteknik-gerakan-tanahLaporan geoteknik-gerakan-tanah
Laporan geoteknik-gerakan-tanah
 
Mekanika Tanah - Aliran Air dalam Tanah
Mekanika Tanah - Aliran Air dalam TanahMekanika Tanah - Aliran Air dalam Tanah
Mekanika Tanah - Aliran Air dalam Tanah
 
Kbg nikel {ika nurcahyaningsih (1205025100)}
Kbg nikel {ika nurcahyaningsih (1205025100)}Kbg nikel {ika nurcahyaningsih (1205025100)}
Kbg nikel {ika nurcahyaningsih (1205025100)}
 
Material Teknik - Nikel
Material Teknik - NikelMaterial Teknik - Nikel
Material Teknik - Nikel
 
Pengantar perencanaan tambang
Pengantar perencanaan tambangPengantar perencanaan tambang
Pengantar perencanaan tambang
 
Dampak lingkungan industri akibat pertambangan
Dampak lingkungan industri akibat pertambanganDampak lingkungan industri akibat pertambangan
Dampak lingkungan industri akibat pertambangan
 
Potensi dan Pengelompokan SDA (sumber daya alam)
Potensi dan Pengelompokan SDA (sumber daya alam)Potensi dan Pengelompokan SDA (sumber daya alam)
Potensi dan Pengelompokan SDA (sumber daya alam)
 
Company profile gonwana
Company profile gonwanaCompany profile gonwana
Company profile gonwana
 
9 pemantauan lereng
9 pemantauan lereng9 pemantauan lereng
9 pemantauan lereng
 
Struktur organisasi dan tenaga kerja di pertambangan
Struktur organisasi dan tenaga kerja di pertambanganStruktur organisasi dan tenaga kerja di pertambangan
Struktur organisasi dan tenaga kerja di pertambangan
 
40084299 analisis-investasi-tambang
40084299 analisis-investasi-tambang40084299 analisis-investasi-tambang
40084299 analisis-investasi-tambang
 
Penyusunan Rencana Pastambang
Penyusunan Rencana PastambangPenyusunan Rencana Pastambang
Penyusunan Rencana Pastambang
 
Tata cara perhitungan jaminan reklamasi (final) danang
Tata cara perhitungan jaminan reklamasi (final) danang Tata cara perhitungan jaminan reklamasi (final) danang
Tata cara perhitungan jaminan reklamasi (final) danang
 
Contoh rencana reklamasi
Contoh rencana reklamasiContoh rencana reklamasi
Contoh rencana reklamasi
 
Cashflow tambang
Cashflow tambangCashflow tambang
Cashflow tambang
 
Studi Kelayakan Tambang: Pengantar
Studi Kelayakan Tambang: PengantarStudi Kelayakan Tambang: Pengantar
Studi Kelayakan Tambang: Pengantar
 
EL CINE Y LA GUERRA CIVIL EN BENIFAIRÓ DE LES VALLS - Mª Vicenta Pérez
EL CINE Y LA GUERRA CIVIL EN BENIFAIRÓ DE LES VALLS - Mª Vicenta PérezEL CINE Y LA GUERRA CIVIL EN BENIFAIRÓ DE LES VALLS - Mª Vicenta Pérez
EL CINE Y LA GUERRA CIVIL EN BENIFAIRÓ DE LES VALLS - Mª Vicenta Pérez
 
ISOBAGS-About It
ISOBAGS-About ItISOBAGS-About It
ISOBAGS-About It
 

Similar to OPTIMASI SELEKSI PERALATAN TAMBANG

PERSENTASE_(alat dan kapasitas produksi alat).ppt
PERSENTASE_(alat dan kapasitas produksi alat).pptPERSENTASE_(alat dan kapasitas produksi alat).ppt
PERSENTASE_(alat dan kapasitas produksi alat).pptnail40
 
TEKNIK PENAMBANGAN.pptx
TEKNIK PENAMBANGAN.pptxTEKNIK PENAMBANGAN.pptx
TEKNIK PENAMBANGAN.pptxAkilaZaalan
 
Pengenalan Alat Berat Pekerjaan Konstruksi.pptx
Pengenalan Alat Berat Pekerjaan Konstruksi.pptxPengenalan Alat Berat Pekerjaan Konstruksi.pptx
Pengenalan Alat Berat Pekerjaan Konstruksi.pptxAgusGede3
 
NHK__TAMKA-04_Persiapan Penambangan.pdf
NHK__TAMKA-04_Persiapan Penambangan.pdfNHK__TAMKA-04_Persiapan Penambangan.pdf
NHK__TAMKA-04_Persiapan Penambangan.pdfrahmawatipebrianata
 
Pengawas operasional.pptx
Pengawas operasional.pptxPengawas operasional.pptx
Pengawas operasional.pptxDedy468271
 
Perhitungan biaya konstruksi jalan dan jbt
Perhitungan biaya konstruksi jalan dan jbtPerhitungan biaya konstruksi jalan dan jbt
Perhitungan biaya konstruksi jalan dan jbtIam Iam
 
PERENCANAAN_SUMUR_BOR_PNPM.pptx
PERENCANAAN_SUMUR_BOR_PNPM.pptxPERENCANAAN_SUMUR_BOR_PNPM.pptx
PERENCANAAN_SUMUR_BOR_PNPM.pptxClanaOne
 
Pengantar Alat Berat PTM
Pengantar Alat Berat PTMPengantar Alat Berat PTM
Pengantar Alat Berat PTMNidal27
 
Hand out mp hpji 2008 ok
Hand out mp hpji 2008 okHand out mp hpji 2008 ok
Hand out mp hpji 2008 okKetut Swandana
 
Persentasi_QCC_Muhammad Amin Abimayu_Final.pdf
Persentasi_QCC_Muhammad Amin Abimayu_Final.pdfPersentasi_QCC_Muhammad Amin Abimayu_Final.pdf
Persentasi_QCC_Muhammad Amin Abimayu_Final.pdfTralianorMp
 
Bab 2 m nkst prinsip umum mnj konst 240807
Bab 2  m nkst  prinsip umum mnj konst 240807Bab 2  m nkst  prinsip umum mnj konst 240807
Bab 2 m nkst prinsip umum mnj konst 240807Ketut Swandana
 
PPT SKK PELAKSANA JALAN - rev.pptx_1677900456.pdf
PPT SKK PELAKSANA JALAN - rev.pptx_1677900456.pdfPPT SKK PELAKSANA JALAN - rev.pptx_1677900456.pdf
PPT SKK PELAKSANA JALAN - rev.pptx_1677900456.pdfTaufikkurrahman Upik Teler
 
Inspeksi_dan_Pemeliharaan_Drainase (1).pptx
Inspeksi_dan_Pemeliharaan_Drainase (1).pptxInspeksi_dan_Pemeliharaan_Drainase (1).pptx
Inspeksi_dan_Pemeliharaan_Drainase (1).pptxArieMahardikaPageno
 
Grinding and sizing
Grinding and sizingGrinding and sizing
Grinding and sizingIffa M.Nisa
 
dalam ppt ini untuk menghitung PPT MDP 2013.pptx
dalam ppt ini untuk menghitung PPT MDP 2013.pptxdalam ppt ini untuk menghitung PPT MDP 2013.pptx
dalam ppt ini untuk menghitung PPT MDP 2013.pptxprodiftsp2023
 
Metode pelaksanaan jalan
Metode pelaksanaan jalanMetode pelaksanaan jalan
Metode pelaksanaan jalanTri Hidayat
 

Similar to OPTIMASI SELEKSI PERALATAN TAMBANG (20)

PERSENTASE_(alat dan kapasitas produksi alat).ppt
PERSENTASE_(alat dan kapasitas produksi alat).pptPERSENTASE_(alat dan kapasitas produksi alat).ppt
PERSENTASE_(alat dan kapasitas produksi alat).ppt
 
TEKNIK PENAMBANGAN.pptx
TEKNIK PENAMBANGAN.pptxTEKNIK PENAMBANGAN.pptx
TEKNIK PENAMBANGAN.pptx
 
Pengenalan Alat Berat Pekerjaan Konstruksi.pptx
Pengenalan Alat Berat Pekerjaan Konstruksi.pptxPengenalan Alat Berat Pekerjaan Konstruksi.pptx
Pengenalan Alat Berat Pekerjaan Konstruksi.pptx
 
NHK__TAMKA-04_Persiapan Penambangan.pdf
NHK__TAMKA-04_Persiapan Penambangan.pdfNHK__TAMKA-04_Persiapan Penambangan.pdf
NHK__TAMKA-04_Persiapan Penambangan.pdf
 
operasional tambang.ppt
operasional tambang.pptoperasional tambang.ppt
operasional tambang.ppt
 
Pengawas operasional.pptx
Pengawas operasional.pptxPengawas operasional.pptx
Pengawas operasional.pptx
 
Perhitungan biaya konstruksi jalan dan jbt
Perhitungan biaya konstruksi jalan dan jbtPerhitungan biaya konstruksi jalan dan jbt
Perhitungan biaya konstruksi jalan dan jbt
 
PERENCANAAN_SUMUR_BOR_PNPM.pptx
PERENCANAAN_SUMUR_BOR_PNPM.pptxPERENCANAAN_SUMUR_BOR_PNPM.pptx
PERENCANAAN_SUMUR_BOR_PNPM.pptx
 
Basic Drilling Operation.pptx
Basic Drilling Operation.pptxBasic Drilling Operation.pptx
Basic Drilling Operation.pptx
 
Pengantar Alat Berat PTM
Pengantar Alat Berat PTMPengantar Alat Berat PTM
Pengantar Alat Berat PTM
 
Hand out mp hpji 2008 ok
Hand out mp hpji 2008 okHand out mp hpji 2008 ok
Hand out mp hpji 2008 ok
 
Persentasi_QCC_Muhammad Amin Abimayu_Final.pdf
Persentasi_QCC_Muhammad Amin Abimayu_Final.pdfPersentasi_QCC_Muhammad Amin Abimayu_Final.pdf
Persentasi_QCC_Muhammad Amin Abimayu_Final.pdf
 
Bab 2 m nkst prinsip umum mnj konst 240807
Bab 2  m nkst  prinsip umum mnj konst 240807Bab 2  m nkst  prinsip umum mnj konst 240807
Bab 2 m nkst prinsip umum mnj konst 240807
 
Slide T.A
Slide T.ASlide T.A
Slide T.A
 
PPT SKK PELAKSANA JALAN - rev.pptx_1677900456.pdf
PPT SKK PELAKSANA JALAN - rev.pptx_1677900456.pdfPPT SKK PELAKSANA JALAN - rev.pptx_1677900456.pdf
PPT SKK PELAKSANA JALAN - rev.pptx_1677900456.pdf
 
Pertemuan 1 pesawat angkat
Pertemuan 1 pesawat angkatPertemuan 1 pesawat angkat
Pertemuan 1 pesawat angkat
 
Inspeksi_dan_Pemeliharaan_Drainase (1).pptx
Inspeksi_dan_Pemeliharaan_Drainase (1).pptxInspeksi_dan_Pemeliharaan_Drainase (1).pptx
Inspeksi_dan_Pemeliharaan_Drainase (1).pptx
 
Grinding and sizing
Grinding and sizingGrinding and sizing
Grinding and sizing
 
dalam ppt ini untuk menghitung PPT MDP 2013.pptx
dalam ppt ini untuk menghitung PPT MDP 2013.pptxdalam ppt ini untuk menghitung PPT MDP 2013.pptx
dalam ppt ini untuk menghitung PPT MDP 2013.pptx
 
Metode pelaksanaan jalan
Metode pelaksanaan jalanMetode pelaksanaan jalan
Metode pelaksanaan jalan
 

Recently uploaded

Slide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open StudioSlide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open Studiossuser52d6bf
 
MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++FujiAdam
 
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdfTEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdfYogiCahyoPurnomo
 
materi pengendalian proyek konstruksi.pptx
materi pengendalian proyek konstruksi.pptxmateri pengendalian proyek konstruksi.pptx
materi pengendalian proyek konstruksi.pptxsiswoST
 
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxPembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxmuhammadrizky331164
 
Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaRenaYunita2
 
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptxMuhararAhmad
 
Manual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptxManual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptxRemigius1984
 

Recently uploaded (8)

Slide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open StudioSlide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
 
MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++
 
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdfTEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
 
materi pengendalian proyek konstruksi.pptx
materi pengendalian proyek konstruksi.pptxmateri pengendalian proyek konstruksi.pptx
materi pengendalian proyek konstruksi.pptx
 
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxPembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
 
Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di Indonesia
 
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
 
Manual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptxManual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptx
 

OPTIMASI SELEKSI PERALATAN TAMBANG

  • 1. PERALATAN TAMBANG EQUIPMENT SELECTION KELOMPOK 1: 1. CHRISTY NANLOHY ( 073.15.028 ) 2. ANDRE MEYRO RITONGA (073.15.014) Dosen Pembimbing :
  • 2. MINE PLAN OPTIONS  Mine planning is complex because its very site spesific nature.  The equipment selection process begin with the initial conception of mine development
  • 3. Deposit characteristics Site characteristics Mine parameters Type of mining Mining system Unit operations Equipment selection BASIC INPUT DATA
  • 4. KONDISI LOKASI  ketinggian dari permukaan laut  Suhu  Curah hujan  Ketersediaan listrik  Akses ke lokasi  Tenaga kerja  Fasilitas yang mendukung
  • 5. DEPOSIT CHARACTERISTICS  Overburden:  Depth  Nature and degree of consolidation  Highwall stability  Spoil angle of repose  Coal/ ore: thickness, pitch, physical properties  Partings: thickness, nature and degree of consolidation, underclays  Hydrology  Material properties: abrasiveness, stickness, unit weights, swell
  • 6. MINE PARAMETERS  Batas lahan  Tingkat produksi  Kualitas produksi  Umur tambang  Reklamasi  Mengembalikan modal investasi  dana
  • 7. METODE PENAMBANGAN  Pit/quarry  Area mining  Strip mining  Contour mining  Mountain top removal  placer
  • 8. AREA MINING  Sistem ini pada umumnya diterapkan untuk endapan batubara yang letaknya kurang lebih horizontal (mendatar) serta daerahnya juga merupakan dataran.
  • 9. STRIP MINING Strip mining merupakan pertambangan kupas atau pertambangan baris yang secara khusus merupakan sistem tambang terbuka atau tambang permukaan untuk batubara. Sistem penambangan ini pada dasarnya terbagi dua, yaitu tambang area dan tambang kontur. Pertambangan kupas adalah merupakan operasi pengupasan tanah atau batuan penutup lapisan batu bara dengan bentuk pengupasan baris-baris serjajar.
  • 10. COUNTOUR MINING Sistem penambangan ini biasanya diterapkan untuk cadangan batubara yang tersingkap di lereng pegunungan atau bukit. Kegiatan penambangan diawali dengan pengupasan tanah penutup di daerah singkapan (outcrap) di sepanjang lereng mengikuti garis kontur, kemudian diikuti dengan penggalian endapan batubaranya.
  • 11. MOUNTAIN TOP REMOVAL Metode mountaintop removal method ini (Gambar 6) dikenal dan berkembang cepat, khususnya di Kentucky Timur (Amerika Serikat). Dengan metode ini lapisan tanah penutup dapat terkupas seluruhnya, sehingga memungkinkan perolehan batubara 100%.
  • 12. SATUAN OPERASI Site Preparations (Cut timber) Top Soil Removal Cleaning & Grubbing Transport for Direct Replacement Transport to Storage Prepare Drill Bench Drilling Blasting Ripping
  • 13. SATUAN OPERASI Transport to Storage Transport to Backfill Coal/Ore Surface Cleaning Coal/Ore Drilling Blasting Coal/Ore Ripping Coal Augering Overburden RomovalOverburden Revomal (Direct Spoiling)
  • 14. Coal/Ore Excavating/Loading Coal/Ore (to storage or Processing) Parting Removal Backfilling (from Storage) Topsoil Replacement Spoil Regrading Monitoring Revegetation Final Grading Support Activities : •Drainage •Containment •Access Roads •Monitoring
  • 15. TYPES OF MOBILE SURFACE EQUIPMENT Standar crawler draglines walking dragline bucket wheel excavators (medium size) Crawler rotary blast Hole drills Truck mounted rotary Blast hole drills Variasi khusus Stripping BWE Surface miner type wheel Excavators Horizontal drills jet piercing machines Pneumatic drill
  • 16. Lanjutan… Standar Track dozers Wheel dozers Standard sorapers Standard tandem scraper Elevating scrapers Elevating tandem scrapers Rear dump truck Bottom dump trucks Front-End Loaders Hydraulic snovels Hydraulic hoes Electric loading shovels Variasi khusus Pared units Push-pull combination Electric stripping shovels Diesel mechanical shovels
  • 17. EQUIPMENT SIZE jenis peralatan ukuran Bobot (1000Ibs) Tenaga total HP Dozers (crawler) - 30-190 140-700 Scrapers ( tandem) 24-52 yardᶾ 60-140 288-950 Front-end loader 3.5-30 yardᶾ 33-389 180-1.2750 Hydraulic excavator (shovel) 4-30 yardᶾ 114-930 300-2.350 Dragline (walking) 9-180 yardᶾ 900-17,500 1.080-18.000 Wheel excavator Dari 3,500 yardᶾ - - Truck 50-350 tons 58-520 420-3.000 Rotary drill ( crawler) 3,0-17,5 diameter lubang 40-282 -
  • 18. BUCKET SIZE 0 16000 14000 12000 10000 8000 6000 4000 2000 18000 0 30 60 90 150120 Walking Dragline Electric Shovel Hydraulic Machines BobotOperasi(1000Lb) Bucket Size (Cu.Yd)
  • 19. Units Power Primary drive system Type propel Powered Function Design Dozers diesel Torque converter/ transmition Crawler or wheel Silinder hydraulic/linkages Scrapers diesel Torque converter/ transmition wheel Silinder hydraulic/linkages Front-end Loaders diesel Converter or electric motor wheel Silinder hydraulic/linkages Hydraulic Excavators diesel hydraulic crawler Silinder hydraulic & gears Electric shovel diesel electric crawler Cable & drums gears Draglines Diesel/e lectric electric Crwaler or shoes Cable & drums gears Wheel excavator diesel Hydraulic and/or electric crawler Silinder hydraulic & gears Trucks diesel conventer/ electric motor wheel Converter or motors & gears Rotary Drill Diesel/e lecric Hydraulic/electric Crawler or Chain & gears
  • 20. jenis peralatan ukuran Bobot (1000Ibs) Tenaga total HP Dozers (crawler) - 30-190 140-700 Scrapers ( tandem) 24-52 yardᶾ 60-140 288-950 Front-end loader 3.5-30 yardᶾ 33-389 180-1.2750 Hydraulic excavator (shovel) 4-30 yardᶾ 114-930 300-2.350 Dragline (walking) 9-180 yardᶾ 900-17,500 1.080-18.000 Wheel excavator Dari 3,500 yardᶾ - - Truck 50-350 tons 58-520 420-3.000 Rotary drill ( crawler) 3,0-17,5 diameter lubang 40-282 - COMPARATIVE MACHINE RATIOS
  • 21. Faktor Kinerja peralatan Bank preparation Drill excavation/Loader Transport Units Trucks Ukuran lubang kapasitas mangkuk payload Laju pemboran: kapasitas penggalian: Gross weight - Down pressure - cutting forces - Rotary torque -cutting speeds power - Rotary speed -Cutting path/action - Compressor size -cycle time …………………………….. ……………………………… Gradeability Mast eight Digging height Speed ranges Acceleration Max, Drilling Depth dumping height Cyle time : Reach Retardation/breaking - Pipe changes - Machine relocation …………………………. ……………………………………… ………………………………….. Ground pressures Traction Maneuverability swing speeds/ Turning radius Travel speeds turning radius Dump speed Gradebility Degree of automation Tractive effort Reability ……………………………….. ……………………….. Reability Reability
  • 22. DESIGN FACTOR  Total power  Service life  Weight  Physical size  Stability  Ground clearance  Basic configuration: geometry and linkages, coplexity, modular construction  Componentry: proven components, interchangability unit, critical component life  Appearance  Serviceability  Maintainbility  Transportability  Ruggedness  Altitude limitations  Temperature limitations  Nosie levels  Crew size  Dust generation
  • 23. DESIGN FACCTOR Operator skill required Operator effort required Operator safety Operator visibility Control response Power rating and characteristic Hydraulic vs electric vs mechanical drive system Disesl vs electric power  On-board diagnostic and ettsing devices  Overload protection devices  Fire suppression equipment  Accesory option  Optimal spesification
  • 24. Faktor Support & biaya Support biaya  Auxiliary machines required owner coast:  Frequency of servicing required - depreciation  Shop vs field maintanance -interest  Maintenance skill required -insurance  Maintenance facilities required -taxes  Portion maintenable in-house initial investment include:  Power distribution system requirements - basic machine  Component standarization -accessories and option  Manufactures support available -spesial features  Manufacturing quality -freight  Parts availability -ballast -field assembly operating coast -labor -supplies -fuel/power -lubricants -repairs, maintenance optional -general supervision -storage and warehousing
  • 25. KEANDALAN MESIN Keputusan pada keandalan masing-masing peralatan penting untuk input proses seleksi peralatan . Hal-hal tersebut secara signifikan berdampak pada satuan dan sistem produktivitas . Selanjutnya mungkin sama pentingnya, bagaimanapun, adalah pengetahuan mereka memberikan kualitas desain mesin. Seperti desain dasar yang ada semakin disempurnakan dengan teknologi baru, ini juga bisa menjadi salah satu penentu utama pemilihan peralatan untuk masa mendatang .
  • 26. Keandalan sebagai tolak ukur evaluasi yang semakin penting , yaitu : 1. Menambah kompleksitas mesin 2. Menambah syarat kemampuan dalam perbaikan berkala 3. Peralatan dengan biaya yang mahal 4. Biaya yang mahal saat unit sedang siaga 5. Kinerja tidak sesuai perkiraan Produsen peralatan telah menyadari peran memperluas ini dan telah mengambil beberapa langkah dalam menanggapi penekanan ini, yaitu : 1. Meningkatkan diagnosa peralatan 2. Memaksimalkan aksesibilitas pelayanan 3. Menyediakan pemeriksaan dan penggantian yang segera / cepat
  • 27. Unit Operation Mining System Equipment Available Selection Factor Aplication Alternative Machine Reliability Equipment Trends Unit Production Calculation Ownership & Operation Costs
  • 28. Ada banyak pertimbangan penting yang mempengaruhi kinerja masa lalu yang tidak tercermin dalam data yang paling stastikal. Selanjutnya, catatan mesin jarang menyertakan informasi cadangan yang memadai untuk memungkinkan ekstrapolasi kinerja yang ditunjukkan ke masa mendatang. Beberapa nilai informasi yang tersedia dapat diperoleh dengan mencoba untuk menjawab pertanyaan-pertanyaan seperti berikut • Apakah itu akurat ? • Apakah itu menutupi kesamaan mesin yang berada di bawah pertimbangan ? • Bagaimana cara mengenali kerusakan akibat alat yang tua / lama ? • Bagaimana mengenali kerusakan teknis ? • Bagaimana cara mengidentifikasi sifat sifat penyalahgunaan ? • Bagaimana mengindentifikasi kekurangan pada desain ? • Bagaimana cara mengidentifikasi penundaan yang disebabkan oleh “Operator in Training” ?
  • 29. Peralatan memerlukan substansial dalam konfigurasi. Sejauh apakah ini dapat ditampilkan sebagai contoh fungsi bertenaga pada semua mesin . • Dozer – Propel , Memposisikan mata tajam pengeruk • Truck – Propel , Bak , Pengemudian • Scrapper – Propel , Memposisikan mangkuk , Pelepasan , Pengemudian • Front End Loader – Propel , Memposisikan mangkuk , Kerekan • Dragline – Propel ,Ayunan, Penyeret • Excavator Hidrolik – Propel , Ayunan • Wheel Excavator – Propel , Ayunan, Roda pengemudi , Conveyor , Charge Conveyor , Discharge Swing , Discharge boom position • Drill – Propel , Mast Positioning , Bailing , Dust Control , Wipe Handling
  • 30. Kompleksitas mesin menyediakan indeks untuk membandingkan kehandalan desain dasar. Elemen Elemen untuk mempertimbangkan untuk aplikasi Peringkat keparahan diuraikan pada tabel 1.1 . Poin poin tugas ini akan bervariasi tergantung pada berbagai kondisi di lokasi tambang .
  • 31. Lingkungan Hidup Rentang Suhu Kondisi Hujan dan Bersalju Ketinggian Kecepatan Angin Lantai & Jalan Pengangkut an Persiapan Abrasitas Tingkatan Ketahanan Daya tarik Face Condition Derajat Fragmentasi Abrasifikasi Kebesaran Persenan Frekuensi Pergerakan - Jarak Jadwal Operasi Perawatan berkala Jadwal Kualitas Fasilitas Personil Operasi Supervisi Operator Tabel 1.1 Aplikasi Pengambilan Keputusan
  • 32. • Diesel (Tinggi) • Listrik (Tinggi)Sumber Daya • Tabung Hidrolik , Pompa Tekanan Rendah (Rendah) • Tabung Hidrolik , Pompa Tekanan Tinggi (Sedang) • Transmisi (Tinggi) • D.C Motor (Tinggi) • A.C Motor (Tinggi) • Hidrolik dan Motor Eletrik (Tinggi) Distribusi Utama Listrik • Kurang dari tiga (Rendah) • Empat (Sedang) • Lebih dari 4 (Tinggi) Jumlah Tenaga Berfungsi • Hubungan mekanis (Rendah) • Eletrik Statis (Medium) • Bangsal Leonard Eletrik (Tinggi) • Perpindahan Variabel Unit (Tinggi) Sistem Kontrol Tabel 1.2 Urutan Kekompleksitas
  • 33. • Satuan Tunggal (Rendah) • Unit Kedua Diartikulasikan (Rendah) • Unit Kedua Diputar (Sedang) • Unit Ketiga Diputar (Tinggi) • Unit Keempat Diputar (Tinggi) Kerangka Dasar • Kabel dan Drum (Rendah) • Tabung dan Lengan (Sedang) • Rak Pinion (Tinggi) • Penggalian (Tinggi) Sistem Penggalian • Mata Tajam (Rendah) • Keranjang (Rendah) • Gayungan Tetap (Rendah) • Gayungan Bebas (Sedang) • Bucket Wheel (Tinggi) Alat – Alat Menggali • Roda (Rendah) • Peralatan Berjalan (Rendah) • Crawler Kecepatan Tinggi (Sedang) • Alat Navigasi Mandiri (Tinggi) Mekanisme Propel
  • 35. TREN PERALATAN Memilih peralatan untuk tambang pada dua sampai lima tahun kemudian, dan dengan service perbaikan diantisipasi sampai 5 sampai 25 tahun ke depan , membutuhkan penilaian yang cermat yang mungkin berdampak pada konsep-konsep baru dan teknologi. biaya penambangan harus tetap kompetitif sepanjang umur peralatan tersebut. ini diterjemahkan ke dalam kebutuhan produktivitas mesin yang kompetitif dan biaya kepemilikan dan pengoperasian selama periode yang sama.
  • 36. + Spesifikasi Kinerja -Ukuran - Jarak - Waktu Perputaran - Mobilitas - Berat - Sumber Daya - Ukuran Pekerja - Lingkuran Operasi + Inovasi + Memaksimalkan Teknologi Terbaru + Realibilitas Tinggi + Memaksimalkan Produksi + Memenuhi Kode dan Standar + Menghindari Pelanggaran Paten + Kendali Antar Muka Efektif + Operasi yang Aman + Dapat di Perbaiki + Dapat di Perbaiki Berkala + Adanya Perangkat Terbaru + Produk Bertahan Lama + Biaya Mesin yang Rendah + Biaya Pengantaran yang Rendah + Penggunaan Sumber Daya yang Rendah + Cocok Untuk Fasilitas Manufaktur + Cocok Untuk Syarat Distribusi Tabel 2.1 Kriteria Dasar Model Mesin