NISBAH KUPAS
COG – BECOG - ICOG
DEFINISI – RUMUS - APLIKASI
CUTOFF GRADE , CUT-OFF GRADE
(KADAR BATAS)
STRIPPING RATIO
(NISBAH KUPAS)
KADAR EKIVALEN
BREAK EVEN CUTOFF GRADE (BECOG)
I...
CUTOFF GRADE
 1. KADAR RATA-RATATERENDAH
YANG MASIH BISA DITAMBANG BERDSRK
KONDISI EKONOMI DANTEKNOLOGI SAAT
ITU
 2. KAD...
STRIPPING RATIO - SR
(NISBAH KUPAS)
 SR = NISBAH ANTARA JUMLAH MATERIAL
PENUTUP DAN JUMLAH MATERIAL BIJIH
 SR FUNGSI KAD...
STRIP RATIO
NORTH-SOUTH SECTION
Original Topography
2005 Surface
Ultimate Pit Surface
-540mLR
-90mLR
Phase 4
Phase 5
Phase 6
Ultimate ...
BENTUK PIT – STRI P RATIO
RL-90
EAST
DUMP
RL245
TONGOLOKA
NEWTS
KATALA
 2005
BREAK EVEN STRIPPING RATIO
 NISBAH KUPAS PULANG POKOK
 APABILA KADAR BIJIH DIKETAHUI
SEMUA KEUNTUNGAN BERSIH DIPAKAI
UNT...
BESR
BESR = (PENDAPATAN-ONGKOSTAMBANG&OLAH) PERTON BIJIH DIBAGI
(ONGKOS KUPAS) PERTONWASTE
NILAI BESR = 0 PADATITIK BECOG
...
BESR VS SR
Phase 4
Phase 5
Phase 6
Ultimate Pit
NORTH-SOUTH SECTION
-180mLR
-300mLR
-390mLR
-540mLR
BREAK EVEN CUTOFF GRADE
 BERAPA “KADAR BIJIH”YANG MENGHASILKAN
ANGKAYANG SAMA ANTARA PENDAPATAN
DAN BIAYA UNTUK MENAMBANG...
INTERNAL CUTOFF GRADE (ICOG)
 RUMUS SAMA DENGAN BECOGTETAPI
ONGKOS PENAMBANGAN (MINE) = 0
 FAKTOR KOREKSI
% ke POUND (LB...
PENGHASILAN = BIAYA
(TITIK PULANG POKOK UNTUK 1TON BIJIH)
HARGA x KADAR x MILL REC x SMELT REC x 20 =
ONGKOS (MINE+MILL+G&...
PERHITUNGAN KADAR BATAS Cu
ONGKOS PENAMBANGAN PERTON MATERIAL $0.750
ONGKOS PENGOLAHAN PERTON BIJIH $3.250
ONGKOS G&A PERT...
TUGAS CUTOFF CALCULATION
 COSTS:
mining : $1.00/ton materl
processing : $4.00/ton ore
G$A : $0.75/ton ore
Refining & Frei...
KADAR EKIVALEN
 DALAM CEBAKAN BIJIHTERDAPAT LEBIH DARI
SATU MINERAL
 ADA MINERAL UTAMA DAN IKUTAN
 DALAM KADAR EKIVALEN...
TAHAPAN PERHITUNGAN KADAR EKIVALEN
MISAL Cu EKIVALEN (CuEq)
1. HITUNG NSR 1TON mineral utama (TEMBAGA) DG KADAR BIJIH 1%
2...
PERHITUNGAN KADAR EKIVALEN
 APABILA DIKETAHUI:
TEMBAGA MOLY
HARGA KOMODITAS $ 0.900 $ 3.000
PEROLEHAN PABRIK 88% 70%
PERO...
PROSEDUR PERHITUNGAN
1. HITUNG NSR 1TON BIJIH DGN KADAR 1%Cu:
($0.90/lb-$0.324/lb)(1%)(0.88)(0.961)(20lb/%) = $ 9.74
2. HI...
Upcoming SlideShare
Loading in …5
×

Kuliah 10-bab-ix-kadar-batas-n-ekivalen

958 views

Published on

Published in: Engineering
  • Be the first to comment

  • Be the first to like this

Kuliah 10-bab-ix-kadar-batas-n-ekivalen

  1. 1. NISBAH KUPAS COG – BECOG - ICOG DEFINISI – RUMUS - APLIKASI
  2. 2. CUTOFF GRADE , CUT-OFF GRADE (KADAR BATAS) STRIPPING RATIO (NISBAH KUPAS) KADAR EKIVALEN BREAK EVEN CUTOFF GRADE (BECOG) INTERNAL CUTOFF GRADE (ICOG)
  3. 3. CUTOFF GRADE  1. KADAR RATA-RATATERENDAH YANG MASIH BISA DITAMBANG BERDSRK KONDISI EKONOMI DANTEKNOLOGI SAAT ITU  2. KADARTERENDAH YANG MASIH BISA DITAMBANG BERDSRK KONDISI EKONOMI DAN TEKNOLOGI SAAT ITU
  4. 4. STRIPPING RATIO - SR (NISBAH KUPAS)  SR = NISBAH ANTARA JUMLAH MATERIAL PENUTUP DAN JUMLAH MATERIAL BIJIH  SR FUNGSI KADAR BATAS (COG)  TAMBANG BIJIH: SR =TON WASTE PERTON ORE SR = BCM WASTE PERTON ORE SR = (TONTOTAL/TON ORE)-1  TAMBANG BATUBARA: BCM OVERBURDEN PERTON COAL MISAL SR 8:1 tidak 1:8!!!
  5. 5. STRIP RATIO
  6. 6. NORTH-SOUTH SECTION Original Topography 2005 Surface Ultimate Pit Surface -540mLR -90mLR Phase 4 Phase 5 Phase 6 Ultimate Pit NORTH-SOUTH SECTION -180mLR -300mLR -390mLR -540mLR APAKAH HUBUNGAN ANTARA KADAR BATAS (COG) – HARGA KOMODITI – SR - CADANGAN
  7. 7. BENTUK PIT – STRI P RATIO RL-90 EAST DUMP RL245 TONGOLOKA NEWTS KATALA  2005
  8. 8. BREAK EVEN STRIPPING RATIO  NISBAH KUPAS PULANG POKOK  APABILA KADAR BIJIH DIKETAHUI SEMUA KEUNTUNGAN BERSIH DIPAKAI UNTUK MENGUPAS MATERIAL PENUTUP BERAPAKAH JUMLAH MATERIAL PENUTUP DAPAT DIKUPAS?
  9. 9. BESR BESR = (PENDAPATAN-ONGKOSTAMBANG&OLAH) PERTON BIJIH DIBAGI (ONGKOS KUPAS) PERTONWASTE NILAI BESR = 0 PADATITIK BECOG REVENUETIDAK DAPAT MENDUKUNG STRIPPING
  10. 10. BESR VS SR Phase 4 Phase 5 Phase 6 Ultimate Pit NORTH-SOUTH SECTION -180mLR -300mLR -390mLR -540mLR
  11. 11. BREAK EVEN CUTOFF GRADE  BERAPA “KADAR BIJIH”YANG MENGHASILKAN ANGKAYANG SAMA ANTARA PENDAPATAN DAN BIAYA UNTUK MENAMBANG DAN MEMPROSES  PENDAPATAN = BIAYA (TITIK PULANG POKOK) DISEBUT KADAR BATAS PULANG POKOK (BECOG)  BECOG = ONGKOS (MINE+MILL+G&A) / (HARGA JUAL-SRF)(MILL REC)(SMELREC)(FAC)
  12. 12. INTERNAL CUTOFF GRADE (ICOG)  RUMUS SAMA DENGAN BECOGTETAPI ONGKOS PENAMBANGAN (MINE) = 0  FAKTOR KOREKSI % ke POUND (LB) = 20 UNTUK SATUAN METRIK, FAKTOR = 22.046 LOGAM MULIA (Au)TIDAK DIPERLUKAN FAKTOR: oz/ton, g/t
  13. 13. PENGHASILAN = BIAYA (TITIK PULANG POKOK UNTUK 1TON BIJIH) HARGA x KADAR x MILL REC x SMELT REC x 20 = ONGKOS (MINE+MILL+G&A)+SRF x KADAR x MILL REC x SMELT REC x 20 (HARGA-SRF) x KADAR x MILL REC x SMELT REC x 20 = ONGKOS (MINE+MILL+G&A) BECOG = ONGKOS (MINE+MILL+G&A) (HARGA-SRF) x MILL REC x SMELT REC X 20 PERHITUNGAN KADAR BATAS Cu
  14. 14. PERHITUNGAN KADAR BATAS Cu ONGKOS PENAMBANGAN PERTON MATERIAL $0.750 ONGKOS PENGOLAHAN PERTON BIJIH $3.250 ONGKOS G&A PERTON BIJIH $0.250 PEROLEHAN PABRIK 94% SMELTING REFINING FREIGHT PER lb PRODUK $0.275 PEROLEHAN SMELTER 96.15% HARGATEMBAGA PER lb (POUND) $0.950 BECOG = ONGKOS (MINE+MILL+G&A) (HARGA-SRF) x MILL REC x SMELT REC x 20 BECOG = $0.750 + $3.250 + $0.250 ($0.95-$0.275) x 0.94 x 0.9615 x 20 BECOG= 0.35% TUGAS HITUNGLAH ICOG!
  15. 15. TUGAS CUTOFF CALCULATION  COSTS: mining : $1.00/ton materl processing : $4.00/ton ore G$A : $0.75/ton ore Refining & Freight : $5.00/oz  REVENUE: commodity price : $ 425/oz recovery : 75%  HITUNGLAH: 1. BECOG 2. ICOG! Untuk apa diperlukan ICOG
  16. 16. KADAR EKIVALEN  DALAM CEBAKAN BIJIHTERDAPAT LEBIH DARI SATU MINERAL  ADA MINERAL UTAMA DAN IKUTAN  DALAM KADAR EKIVALEN : ADA ISTILAH NSR DAN SRF  NSR = NET SMELTER RETURN ADALAH NILAI KOTOR DARI SATUTON BIJIH SETELAH DIKURANGI ONGKOS-ONGKOS SRF  SRF =SMELTING – REFIN ING - FREIGHT
  17. 17. TAHAPAN PERHITUNGAN KADAR EKIVALEN MISAL Cu EKIVALEN (CuEq) 1. HITUNG NSR 1TON mineral utama (TEMBAGA) DG KADAR BIJIH 1% 2. HITUNG NSR 1TON MINERAL IKUTAN MISAL: MOLY DG KADAR 1% atau EMAS DG KADAR 1 oz/ton ATAU 1 g/t 3. HITUNG FAKTOR EKIVALENSI = NISBAH NSR MINERAL IKUTAN DAN MINERAL UTAMA 4. KADAR EKIVALEN =TOTAL Cu + FAKTOR x MOLY 5. BILA DALAM BLOK DIKETAHUI KADARTOTAL Cu DAN KADAR MOLY (EMAS, PERAK) MAKA KADAR CuEq DARI BLOKTERSEBUT DAPAT DIHITUNG KADAR EKIVALEN = KADARYG MENGHASILKAN GABUNGAN NILAI NSR DARI SEMUA MINERALYANG ADA
  18. 18. PERHITUNGAN KADAR EKIVALEN  APABILA DIKETAHUI: TEMBAGA MOLY HARGA KOMODITAS $ 0.900 $ 3.000 PEROLEHAN PABRIK 88% 70% PEROLEHAN SMELTER (KONVERTER) 96.1% 99% BIAYA SMELTING KONVERSI KE POUND $ 0.324 $ 0.810 (LB)
  19. 19. PROSEDUR PERHITUNGAN 1. HITUNG NSR 1TON BIJIH DGN KADAR 1%Cu: ($0.90/lb-$0.324/lb)(1%)(0.88)(0.961)(20lb/%) = $ 9.74 2. HITUNG NSR 1TON BIJIH DGN KADAR 1% MOLY ($3.0/lb-$0.81/lb)(1%)(0.70)(0.99)(20lb/%) = $30.35 3. FAKTOR EKIVALEN = NSR MOLY/NSRTEMBAGA $30.35 / $9.74 = 3.1160 4. TEMBAGA EKIVALEN = KADAR Cu + (3.1160 x KADAR MOLY) DALAM MODEL BLOK SERING MEMAKAI NILAI NSR drpd KADAR EKIVALEN PEROLEHAN MILL DAN SMELTER, ONGKOS: SRF, HARGA KOMODITAS SUDAH DIPERHITUNGKAN DALAM NSR

×