SlideShare a Scribd company logo
1 of 4
Page 1 of 4
OBJECTIVE:
To find a progressive, challenging & responsible position in the field of Preventive
maintenance and Internal Inspection activities of Static Equipments Fabrication / Erection
Work of Piping / maintenance of static equipments / that would use my skills & capabilities
and helpto developmycareer and Company’sgrowth.
Current location:
Client: GASCO, Ruwais , Abu Dhabi
Company: STORK TECHNICALSERVICES
Department: plant services
Duration: 01-06-2013 to till date
Position: Supervisor (Static Equipments)
RESPOSIBILITIES:
 Supervising the Preventive maintenance and Internal Inspection activities of Static Equipments
like,boilers, refractory, heat exchangers, vessels, tanks, furnaces, air coolers, fin fan coolers,
filters, columns. Familiar to perform activities all maintenance & construction activities as per
plan & schedule.
 To monitor, review and, where required, approve the mechanical activities of EPC contractors,
shutdowns and running plant routine maintenance to ensure that all mechanical construction
activities are carried out safely and fully in accordance with company's HSE and technical
requirements.
 Site visit & fully aware scope of work.
 Ensure the workis progressing within the project scope.
 Familiar to perform activities all maintenance & constructionactivities as per plan & schedule.
 Heat exchangers identification of tube leak and plugging of leaking tube.
 leading a team of 30 persons (Technicians, Fitters, Riggers, Helpers)
 coordination with Gasco personnel to arrange required material, spare parts on site.
 Close coordination with QA/QC personnel to perform internal inspection NDT, hydro testing,
leak testing of pressure vessels, boilers, heat exchangers Process Filters, storage tanks, and pipe
lines.
 Attending meetings with management to report daily status according to schedule.
 Follow up with the supporting departments for the execution of projects on time including
arrangement of PTW(Permit to Work)
AZHAR ZAHOOR
MECHANICAL SUPERVISOR
STATIC EQUIP/PIPING
STORK TECHNICAL SERVICES
Abu Dhabi, UAE.
EXPERIENCE:(10YEARS)
Valid U.A.E driving license
Email: zahoor.azhar@yahoo.com
Skype id: azhar.zahoor76
Cell No: +971 56 291 6526
Page 2 of 4
PREVIOUS LOCATION
Client: ADGAS
Contractor: HHI (Hyundai Heavy Industries)
Company: STORKTECHNICALSERVICES
Department: Plant Services
Duration: 13-Oct-2012 to 15-May-2013
Position: Supervisor
RESPOSIBILITIES
 Supervising Fabrication & Installation of piping work, leading a team of 60 persons
(Fabricators, Fitters, Riggers, Helpers)
 Coordination withMaterial Engineer to arrange required material on site
 Close coordination with QA/QC personnel to rectify quality control issues / punch list as per
project specifications prior to hydro test and reinstatement
 Attending meetings with management to report daily status according to schedule
 Coordination withNDE crew for inspection of static equipments and pipe lines.
MAINTENANCE OF STATIC EQUIPMENTS FABRICATION & ERECTION
Company: AL BARAKIndustrial Services (Saudi Arabia)
Department: Plant Services
Duration: 13-Apr-2010 to 12-Sep-2012
Position: Supervisor (Static Equipment)
Worked with Sabic, Aramco and other Petrochemical Plants for the Preventive maintenance and
Internal Inspection activities of Static Equipments Fabrication / Erection Work of Piping of
Refineries, Chemical Plants & Gas plants. Detail summary is as follows:
1. SAUDIARAMCO: SamrafOil RefineryYanbu
2. SAUDIARAMCO: RastanuraOil Refinery
3. Petro Rabigh: Petrochemical Plant
4. SABIC: Petrochemya,Petrochemical Plant
5. SABIC: SharqPetrochemical Plant
RESPOSIBILITIES:
 Maintenance of all type heat exchanger, cooler, reboiler, pre heater
 Heat exchanger cleaning(High pressure jetting, mechanical cleaning, chemical cleaning, hydro
testing, leak testing & air blowing)
 Installation & box up clamp & fermanyic injection of emergency leaking on live lines.
 Installation of high &low pressure valves.(gate, globe, butterfly, NRV, PSV)
 Supervising the Fabrication team during various Projects and Shutdown jobs of different Plants
maintenance including workshop.
 Supervising the Fabrication and Erectionof Pipe Lines and steel structure.
 Supervising the Hydrotesting of heat exchangers pipe lines after fabrication.
 Knowledge and experience tie-in and hot tapping procedure, including cold cutting to existing
pipe, demolition work of existing plant and reconstruction while shutdown.
Page 3 of 4
 Coordinating with main stores for the necessary arrangement of material consumables and
Tools through Material Requisition.
 Coordinating with planning teams for Progress monitoring and preparing of BOM & BOQ after
drawing studies and client’s for the materials, approved drawing and work scope related
activities.
 Providing trainings to Pipe Fitters & Fabricator related to fabrication work and how to study
drawing.
 Supervision of fabrication & erection of heavy fuel oil pipe lines 0.5 to 60 dia inches as per work
scope.
 Follow up with the supporting departments for the execution of projects on time including
arrangement of PTW(Permit to Work)
 Cooperating with HSE department during the work to fulfill the safety requirement and to
instruct the Fabrication team to follow the HSE instruction.
 Check the quality of work. Participated in maintenance of mechanical (Boilers, Pressure vessels.
Piping heat exchangers work). Control the safety environment control the labor. Satisfied the
client & our company management.
 Conversant in all piping work, fabrication, erection, support installation, daily weekly progress
reports and monitoring, line checking/punch listing hydro test
SAUDIARAMCO:GasWell Head ProjectHaradh, Hawaya,
Striping out pipe spools, instruments, electrical panels and fans. After rig completion reinstallation
of pipe spools, instruments, electricalpanels and fans.
SAUDIARAMCO:K.G.P ANDK.P.F Projectskharsaynia Jubail (Saudi Arabia)
Duration: 18-May-2006to 21-Apr-2009
Client: Saudi Aramco
Company: CCC (Consolidated Construction Company)
Position Piping Foreman
BABCOCK(KUWAIT) Doha Power& Water Distillation Plant
Duration: Dec-2003to Apr-2004
Client: Doha Power
Company: Babcock
Position: Foreman
EXPERIENCE (PAKISTAN)
Duration: 1-May-2009to 30-Jan-2010
Company: Fauji Fertilizer Bin Qasim (FFBL),Karachi
Position: Mechanical Foreman
RESPONSIBILITIES:
 Maintenance of all type heat exchanger, cooler, reboiler, pre heater.
 Heat exchanger cleaning (high pressure jetting, mechanical cleaning, chemical cleaning, hydro
testing, leak testing & air blowing)
 Installation & box up clamp & fermanyic injection of emergency leaking of live lines.
 Installation of high & low pressure valves ( gate, globe, ball, psv, etc)
Page 4 of 4
 Supervised the Piping work of ammonia plant area, Piping and Heat Exchangers including Pipe
Supports.
 Supervised tie in and hot tapping procedure, including cold cutting to existing pipe, demolition
workof existing plant and reconstruction while shutdown
 Supervised the fabricationworkaccording to HSE percussion and policy.
 Organized and report progress in meetings with client’s and planning team.
 Attend the progress and planning meeting for daily progress and Interact with the client’s
engineers forthe modificationas required at site.
 Monitored the workprogress and given daily progress report to planning department
 Coordination with main stores for the necessary arrangement of material consumables and
Tools through Material Requisition.
PROFESSIONALTRAININGS
Certificationof PermitReceiver(Saudi Aramco)
1. Gas Release Permit
2. Hot WorkPermit
3. Cold Work Permit
4. Confined Space Permit
5. Scaba Training
6. basic fire fighting
TECHANICAL COURCES
NDT LEVEL – II (AMERICAN SOCIETY FOR NON DETRUCTIVE TESTING)
1. Radiographic Testing
2. Magnetic Particle Testing
3. DyePenetrant Testing
H. Software:
Ms Office @ 2003 & 2007
PERSONALDETAILS:
Father's name ZAHOOR AHMED
Date of Birth 05-08-1976
Marital Status Married
Nationality Pakistani
Address House # B-842, Steel Town,Bin Qasim, Karachi, Pakistan
Passport No CU5122712
Passport Validity 09-07-2019
Contact #(UAE) +971 56 291 6526
Contact # (PAK) +923002726543
Email zahoor.azhar@yahoo.com
Religion Islam
Qualification Matriculation (1994) Karachi
HigherSecondaryEducation F. Sc (1996) Karachi

More Related Content

What's hot

What's hot (20)

Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
Siddharth_resume_Engg.
Siddharth_resume_Engg.Siddharth_resume_Engg.
Siddharth_resume_Engg.
 
Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)
 
Operation Refinery - Mayur resume
Operation Refinery - Mayur resumeOperation Refinery - Mayur resume
Operation Refinery - Mayur resume
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
CV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorCV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing Supervisor
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
sengu cv
sengu cvsengu cv
sengu cv
 
HARI RESUME 2016
HARI RESUME 2016HARI RESUME 2016
HARI RESUME 2016
 
RESUME 2016
RESUME 2016RESUME 2016
RESUME 2016
 
resume piping
resume pipingresume piping
resume piping
 
RESUME_Chelladurai
RESUME_ChelladuraiRESUME_Chelladurai
RESUME_Chelladurai
 
Resume-Ramasamy Ganapathy
Resume-Ramasamy GanapathyResume-Ramasamy Ganapathy
Resume-Ramasamy Ganapathy
 
Project engineer C.V.
Project engineer C.V.Project engineer C.V.
Project engineer C.V.
 
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs final
 
Ng onga Mazimba CV
Ng onga Mazimba CVNg onga Mazimba CV
Ng onga Mazimba CV
 
Ariel Awayan CV updated
Ariel Awayan CV updatedAriel Awayan CV updated
Ariel Awayan CV updated
 

Viewers also liked

curriculum vitae-KISHAN THAKKAR - Copy (2)
curriculum vitae-KISHAN THAKKAR - Copy (2)curriculum vitae-KISHAN THAKKAR - Copy (2)
curriculum vitae-KISHAN THAKKAR - Copy (2)kishan thakkar
 
srinu resume 1234 - Copy
srinu resume 1234 - Copysrinu resume 1234 - Copy
srinu resume 1234 - CopySrinivas Reddy
 
Mechanical interview questions
Mechanical interview questionsMechanical interview questions
Mechanical interview questionsPrashant Kumar
 
Resume of Marc Richards - Mechanical Supervisor
Resume of Marc Richards - Mechanical SupervisorResume of Marc Richards - Mechanical Supervisor
Resume of Marc Richards - Mechanical SupervisorMarc Richards
 
roshan_Resume_IITKGP_2016
roshan_Resume_IITKGP_2016roshan_Resume_IITKGP_2016
roshan_Resume_IITKGP_2016ROSHAN MESHRAM
 
SITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - CopySITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - Copyyoussef youssef
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007REHAN MUMTAZ
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUMEselva raj
 
AKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalAKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalMohammad Akram Mian
 
Top 10 mechanical supervisor interview questions and answers
Top 10 mechanical supervisor interview questions and answersTop 10 mechanical supervisor interview questions and answers
Top 10 mechanical supervisor interview questions and answersridajom
 

Viewers also liked (20)

Sum CV
Sum CVSum CV
Sum CV
 
CV MECH QC
CV MECH QCCV MECH QC
CV MECH QC
 
my Update cv
my Update cvmy Update cv
my Update cv
 
curriculum vitae-KISHAN THAKKAR - Copy (2)
curriculum vitae-KISHAN THAKKAR - Copy (2)curriculum vitae-KISHAN THAKKAR - Copy (2)
curriculum vitae-KISHAN THAKKAR - Copy (2)
 
Digestive System
Digestive SystemDigestive System
Digestive System
 
Yousef Abu Alwafa Resume
Yousef Abu Alwafa ResumeYousef Abu Alwafa Resume
Yousef Abu Alwafa Resume
 
srinu resume 1234 - Copy
srinu resume 1234 - Copysrinu resume 1234 - Copy
srinu resume 1234 - Copy
 
Mechanical interview questions
Mechanical interview questionsMechanical interview questions
Mechanical interview questions
 
Resume of Marc Richards - Mechanical Supervisor
Resume of Marc Richards - Mechanical SupervisorResume of Marc Richards - Mechanical Supervisor
Resume of Marc Richards - Mechanical Supervisor
 
roshan_Resume_IITKGP_2016
roshan_Resume_IITKGP_2016roshan_Resume_IITKGP_2016
roshan_Resume_IITKGP_2016
 
SITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - CopySITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - Copy
 
CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
 
Cv 15 sep2016
Cv 15 sep2016Cv 15 sep2016
Cv 15 sep2016
 
Ali Hichem Lakhdari C V
Ali Hichem Lakhdari C VAli Hichem Lakhdari C V
Ali Hichem Lakhdari C V
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
 
Cv mm
Cv mmCv mm
Cv mm
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUME
 
AKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalAKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor Mechanical
 
MOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
 
Top 10 mechanical supervisor interview questions and answers
Top 10 mechanical supervisor interview questions and answersTop 10 mechanical supervisor interview questions and answers
Top 10 mechanical supervisor interview questions and answers
 

Similar to AZHAR ZAHOOR mech supervisor

Similar to AZHAR ZAHOOR mech supervisor (20)

CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
my cv
my cvmy cv
my cv
 
Varun Resume
Varun Resume Varun Resume
Varun Resume
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
hatata cv 2015
hatata cv 2015hatata cv 2015
hatata cv 2015
 
C.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif HegaziC.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif Hegazi
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
RAVI CV
RAVI CVRAVI CV
RAVI CV
 
CV_Suhail
CV_SuhailCV_Suhail
CV_Suhail
 
Jayadevan_Pattali
Jayadevan_PattaliJayadevan_Pattali
Jayadevan_Pattali
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
QASIM CV
QASIM CVQASIM CV
QASIM CV
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
PIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docxPIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docx
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 

AZHAR ZAHOOR mech supervisor

  • 1. Page 1 of 4 OBJECTIVE: To find a progressive, challenging & responsible position in the field of Preventive maintenance and Internal Inspection activities of Static Equipments Fabrication / Erection Work of Piping / maintenance of static equipments / that would use my skills & capabilities and helpto developmycareer and Company’sgrowth. Current location: Client: GASCO, Ruwais , Abu Dhabi Company: STORK TECHNICALSERVICES Department: plant services Duration: 01-06-2013 to till date Position: Supervisor (Static Equipments) RESPOSIBILITIES:  Supervising the Preventive maintenance and Internal Inspection activities of Static Equipments like,boilers, refractory, heat exchangers, vessels, tanks, furnaces, air coolers, fin fan coolers, filters, columns. Familiar to perform activities all maintenance & construction activities as per plan & schedule.  To monitor, review and, where required, approve the mechanical activities of EPC contractors, shutdowns and running plant routine maintenance to ensure that all mechanical construction activities are carried out safely and fully in accordance with company's HSE and technical requirements.  Site visit & fully aware scope of work.  Ensure the workis progressing within the project scope.  Familiar to perform activities all maintenance & constructionactivities as per plan & schedule.  Heat exchangers identification of tube leak and plugging of leaking tube.  leading a team of 30 persons (Technicians, Fitters, Riggers, Helpers)  coordination with Gasco personnel to arrange required material, spare parts on site.  Close coordination with QA/QC personnel to perform internal inspection NDT, hydro testing, leak testing of pressure vessels, boilers, heat exchangers Process Filters, storage tanks, and pipe lines.  Attending meetings with management to report daily status according to schedule.  Follow up with the supporting departments for the execution of projects on time including arrangement of PTW(Permit to Work) AZHAR ZAHOOR MECHANICAL SUPERVISOR STATIC EQUIP/PIPING STORK TECHNICAL SERVICES Abu Dhabi, UAE. EXPERIENCE:(10YEARS) Valid U.A.E driving license Email: zahoor.azhar@yahoo.com Skype id: azhar.zahoor76 Cell No: +971 56 291 6526
  • 2. Page 2 of 4 PREVIOUS LOCATION Client: ADGAS Contractor: HHI (Hyundai Heavy Industries) Company: STORKTECHNICALSERVICES Department: Plant Services Duration: 13-Oct-2012 to 15-May-2013 Position: Supervisor RESPOSIBILITIES  Supervising Fabrication & Installation of piping work, leading a team of 60 persons (Fabricators, Fitters, Riggers, Helpers)  Coordination withMaterial Engineer to arrange required material on site  Close coordination with QA/QC personnel to rectify quality control issues / punch list as per project specifications prior to hydro test and reinstatement  Attending meetings with management to report daily status according to schedule  Coordination withNDE crew for inspection of static equipments and pipe lines. MAINTENANCE OF STATIC EQUIPMENTS FABRICATION & ERECTION Company: AL BARAKIndustrial Services (Saudi Arabia) Department: Plant Services Duration: 13-Apr-2010 to 12-Sep-2012 Position: Supervisor (Static Equipment) Worked with Sabic, Aramco and other Petrochemical Plants for the Preventive maintenance and Internal Inspection activities of Static Equipments Fabrication / Erection Work of Piping of Refineries, Chemical Plants & Gas plants. Detail summary is as follows: 1. SAUDIARAMCO: SamrafOil RefineryYanbu 2. SAUDIARAMCO: RastanuraOil Refinery 3. Petro Rabigh: Petrochemical Plant 4. SABIC: Petrochemya,Petrochemical Plant 5. SABIC: SharqPetrochemical Plant RESPOSIBILITIES:  Maintenance of all type heat exchanger, cooler, reboiler, pre heater  Heat exchanger cleaning(High pressure jetting, mechanical cleaning, chemical cleaning, hydro testing, leak testing & air blowing)  Installation & box up clamp & fermanyic injection of emergency leaking on live lines.  Installation of high &low pressure valves.(gate, globe, butterfly, NRV, PSV)  Supervising the Fabrication team during various Projects and Shutdown jobs of different Plants maintenance including workshop.  Supervising the Fabrication and Erectionof Pipe Lines and steel structure.  Supervising the Hydrotesting of heat exchangers pipe lines after fabrication.  Knowledge and experience tie-in and hot tapping procedure, including cold cutting to existing pipe, demolition work of existing plant and reconstruction while shutdown.
  • 3. Page 3 of 4  Coordinating with main stores for the necessary arrangement of material consumables and Tools through Material Requisition.  Coordinating with planning teams for Progress monitoring and preparing of BOM & BOQ after drawing studies and client’s for the materials, approved drawing and work scope related activities.  Providing trainings to Pipe Fitters & Fabricator related to fabrication work and how to study drawing.  Supervision of fabrication & erection of heavy fuel oil pipe lines 0.5 to 60 dia inches as per work scope.  Follow up with the supporting departments for the execution of projects on time including arrangement of PTW(Permit to Work)  Cooperating with HSE department during the work to fulfill the safety requirement and to instruct the Fabrication team to follow the HSE instruction.  Check the quality of work. Participated in maintenance of mechanical (Boilers, Pressure vessels. Piping heat exchangers work). Control the safety environment control the labor. Satisfied the client & our company management.  Conversant in all piping work, fabrication, erection, support installation, daily weekly progress reports and monitoring, line checking/punch listing hydro test SAUDIARAMCO:GasWell Head ProjectHaradh, Hawaya, Striping out pipe spools, instruments, electrical panels and fans. After rig completion reinstallation of pipe spools, instruments, electricalpanels and fans. SAUDIARAMCO:K.G.P ANDK.P.F Projectskharsaynia Jubail (Saudi Arabia) Duration: 18-May-2006to 21-Apr-2009 Client: Saudi Aramco Company: CCC (Consolidated Construction Company) Position Piping Foreman BABCOCK(KUWAIT) Doha Power& Water Distillation Plant Duration: Dec-2003to Apr-2004 Client: Doha Power Company: Babcock Position: Foreman EXPERIENCE (PAKISTAN) Duration: 1-May-2009to 30-Jan-2010 Company: Fauji Fertilizer Bin Qasim (FFBL),Karachi Position: Mechanical Foreman RESPONSIBILITIES:  Maintenance of all type heat exchanger, cooler, reboiler, pre heater.  Heat exchanger cleaning (high pressure jetting, mechanical cleaning, chemical cleaning, hydro testing, leak testing & air blowing)  Installation & box up clamp & fermanyic injection of emergency leaking of live lines.  Installation of high & low pressure valves ( gate, globe, ball, psv, etc)
  • 4. Page 4 of 4  Supervised the Piping work of ammonia plant area, Piping and Heat Exchangers including Pipe Supports.  Supervised tie in and hot tapping procedure, including cold cutting to existing pipe, demolition workof existing plant and reconstruction while shutdown  Supervised the fabricationworkaccording to HSE percussion and policy.  Organized and report progress in meetings with client’s and planning team.  Attend the progress and planning meeting for daily progress and Interact with the client’s engineers forthe modificationas required at site.  Monitored the workprogress and given daily progress report to planning department  Coordination with main stores for the necessary arrangement of material consumables and Tools through Material Requisition. PROFESSIONALTRAININGS Certificationof PermitReceiver(Saudi Aramco) 1. Gas Release Permit 2. Hot WorkPermit 3. Cold Work Permit 4. Confined Space Permit 5. Scaba Training 6. basic fire fighting TECHANICAL COURCES NDT LEVEL – II (AMERICAN SOCIETY FOR NON DETRUCTIVE TESTING) 1. Radiographic Testing 2. Magnetic Particle Testing 3. DyePenetrant Testing H. Software: Ms Office @ 2003 & 2007 PERSONALDETAILS: Father's name ZAHOOR AHMED Date of Birth 05-08-1976 Marital Status Married Nationality Pakistani Address House # B-842, Steel Town,Bin Qasim, Karachi, Pakistan Passport No CU5122712 Passport Validity 09-07-2019 Contact #(UAE) +971 56 291 6526 Contact # (PAK) +923002726543 Email zahoor.azhar@yahoo.com Religion Islam Qualification Matriculation (1994) Karachi HigherSecondaryEducation F. Sc (1996) Karachi