Anil Kumar CP has over 19 years of experience in oil, gas, refinery and steel plant industries. He is currently a Senior Mechanical Supervisor for Samsung Engineering working on a clean fuel project in Kuwait. Previously, he held roles as a Commissioning Machinery Supervisor for rotating and static equipment. His responsibilities included overseeing equipment erection, pre-commissioning, commissioning, and assisting with plant start-up. He has extensive experience working on projects across multiple countries and industries.
1. Page 1 of 8
CURRICULUM VITAE
OF
Anil Kumar C P
Applied for post:- MECHANICAL SUPERVISOR(Construction/Pre-
Commissioning/Commissioning&Start-Up)
Career Summary,
More than 19+ years of experience in the field of Oil & Gas, Refinery, Steel Plant other related
industries.
Professional competency
Self motivated with a keen eye for details and able to handle multiple tasks simultaneously,
Familiarity in adapting to a new environment, Good manual dexterity and Problem-solving skills,
Good communication skills, Carries out planned (preventive, predictive, routine and breakdown)
maintenance activities on mechanical plant and equipment in assigned field in accordance with set
plans and standard procedures.
This includes Trouble shooting of any Equipment related Mechanical Ability to work independently
as well as with a team.
Carries out preventative maintenance and repairs on plant mechanical equipment by identifying
the cause of faults and rectifying by repair on site or by replacement and/or workshop repair.
Works according to all safety regulations and follows an established pattern of work. Attends a
safety talk in the beginning of the day with assigned Group to discuss HSE planned activities and
plant impact on personal safety & health. Attend weekly department HSE meetings. Attends HSE
monthly meeting and actively contributes to the agenda of every safety meeting. Ensure if all
area work activities are performed safely.
At the end of each maintenance activity, check the area for housekeeping. Ensure that health and
hygiene practices are being followed as per company procedure in area.
Duties and Responsibilities:
Experienced in Installation, Testing, Inspection, Pre-Commissioning, Commissioning &
Start-up of Rotating and Static Equipments In Oil & Gas Projects
Worked in major shut-down & plant start-up.
Worked as Technician in operation & maintenance of Rotating Counter Weight Marine
loading Arm (RCMA).
Fire Water System in Oil Jetty with operation of high pressure fire water jet in Logic
Control System.
Carries out planned (preventive, predictive, routine maintenance and breakdown)
maintenance activities in assigned field in accordance with set plans and standard
procedures.
Troubleshooting of all rotary, static equipment and Condition monitoring techniques
(Boroscope, Inspections, and Condition Monitoring etc.
Carrying out new installations, modification and testing of equipment through
Various stages as per plan and in line with Superior’s instructions and checks.
Adherence to all parameters before handing over the equipment to Operations. And
making reports after completion of job.
Doing Major Overhauling, Carrying out complex repairs doing minor troubleshooting
following the Maintenance plan or in response to failure of equipment.
Participating in area or unit shutdown, and Turnarounds in the Plant.
Identifying and uses appropriate tools based on the job and safety requirements.
Complying with all HSE&Q and fire related rules and regulations and observes all
2. Page 2 of 8
Requirements.
Assisting in complex repairs, critical equipment shutdown and
Helps in maintaining data log generating detailed report of jobs.
Carrying out in-house refurbishment of components and sub assemblies of
Equipments in line with the Superiors instructions and checks adherence to all
Parameters before handing over to warehouse.
Taking initiative to implement continuous improvement programs, proposes
Improvements in all kind of maintenance programs in technical and safety areas,
Is involved in punch listing, commissioning and pre-commissioning activities.
Vessels & Columns, furnaces Removal of Tray, Domestic Pad, Pressure Testing of Vessel
and replacing Charcoal & Catalysts
Witnessing and Inspection of Construction activities as per client approved Procedures
For Erection of Internals in Reactor, Columns and High Pressure Vessel
Reinstatement of piping systems after completion of all hydro testing activities
WORK EXPERIENCE
Present Employer:
Company : Samsung Engineering
Client : KNPC (Kuwait National Oil Company)
Project : Clean Fuel (C F)
Position : SENIOR MECHANICAL SUPERVISOR
Period : 16th
Feb2016 to Till Date
Detailed task assigned:
Construction Supervisor for Rotating & Static Equipments.
Responsibilities:
Prepare erection schedule and work plan.
Review all document related to equipment erection and safe work plan(MS,RS & Rigging
Study)by Sub-Contractor.
Permit Issuer
Monitor & guide sub-contractor, for site preparation of each equipment pre-activities on
ETA
Equipment erection and preservation
Supervise and monitor erection activities, material handling as per company Quality control
plan.
Unit in-charge for erection of all equipments (Reciprocating Compressor with Steam
Turbine Driven, Fired Heaters,Pumps,Reactors with internal
installation,Columns,Vessals,High Pressure Vessals,Package etc ).
3. Page 3 of 8
Previous Employer
Company : TECNIMONT .IN
Client : OPal (ONGC Petro additions Limited, Dahej, Gujarath, India)
Project : LLDPE/HDPE Swing & PP Unit.
Position : COMMISSIONING MACHINERY SUPERVISOR
Period : July2015 to 25th
January2016
Detailed task assigned:
Commissioning Machinery Supervisor for Rotating & Static Equipments.
Responsibilities:
Supervise & Monitor the Erection activities as per companies Quality Control Plan.
Witnesses for Erection of Static & Rotating Equipments buy Sub-Contractor.
Preparation for Pre-Commissioning and Commissioning activities,(System package blowing
and lube oil Flushing , Seal system flushing and charging with buffer fluid , system
mechanical run test in Compressor , Blower and various type of pumps ).
Preparation for inspection with Client, for plant start-up.
Previous employer:
Company : TECNIMONT S p A
Client : BOROUGE
Project : PO & LDPE BOROUGE 3, RUWAISE, ABU DHABI, UAE.
Position : COMMISSIONING MACHINERY SUPERVISOR
Period : Oct2013 to April2015
Detailed task assigned:
Commissioning Machinery Supervisor for Rotating & Static Equipments.
Responsibilities:
Witnesses for Erection of Static & Rotating Equipments buy Sub-Contractor.
Preparation for Pre-Commissioning and Commissioning activities.
Supervise & Monitor the Erection activities as per companies Quality Control Plan.
Preparation for inspection with Client.
Trouble Shooting in Pumps , compressor and Blowers
Preparation of Mechanical Completion and ready for Plant Start-Up
Maintenance of rotating equipment in running plant
Check seal system , lube oil , pump strainers
Replace of Mechanical Seal
4. Page 4 of 8
Previous employer:
Company : TECNIMONT S p A
Client : GASCO, ABU DHABI, UAE
Position : Commissioning Mechanical Assistance
Period : August2012 to September2013
Detailed task assigned:
Worked as a Commissioning Machinery Assistance for Pre-Commissioning, Commissioning & Start-
Up for Static and Rotating Equipment.
Responsibilities:
Supervise all Erection related activities as per approved inspection & Test plans, Quality
Control Procedures.
Witnessing of all equipment erection by Sub-Contractor.
Preparation for Pre-Commissioning Inspection with TPI and Client for mechanical
completion package.
Commissioning of Rotating Equipment with TPI and Client inspection.
Completion of all ITP , clear all punch point
Preparation of Mechanical Completion and ready for Plant Start-Up
Maintenance of rotating equipment in running plant
Check seal system , lube oil , pump strainers
Replace of Mechanical Seal.
Troubleshooting
Company : Siecs Polska S p A, c/o Tecnimont S p A Italy
Project : PGNiG, Underground Gas Storage Project
Position : Mechanical Supervisor for Construction & Commissioning
Period : January2011 to May2012
Client : PGING Poland
Responsibilities:
Erection of high pressure line , steam drum & Rotating Equipments
Hydro test of line and Re-instatement
Conduct Safety Induction before to start work
Planning of job to be done, and completion before target given.
Work in Boiler for field modification in internal liner & preparation for internal Inspection
Work in HP & LP steam drum and preparation for internal Inspection.
Project : HABSHAN 5-IGD
5. Page 5 of 8
Team lead in pipeline cleaning with water circulation , air blowing & Blasting, Inserting and
Drying
Re-instatement and 100% Leak Test
Material Controller
Company : Sices Polska S p A, c/o Tecnip Italy
Project : Mild Hydrocracker Unit (Programme 10+)
Period : July2009 to November2010
Position : Mechanical Technician/Foreman
Client : LOTOS Refinery, Gdansk, Poland.
Responsibilities:
Erection of Rotating Equipment.
Erection of Internal Accessories (Trays, Demisters, Distributors, Catalyst bed) in Vessel,
column, Reactors, High Pressure Vessel.
Preparation for Inspection with TPI & Client
Pre-Commissioning & Final Box-Up
Support for Manhole closure with bolt Hydraulic Tensioning & Torque
Team lead in Commissioning.
Company : Al-Jabber Energy Service, c/o Qatar Gas
Project : Common Sulphur Project (Sulphur Granulation)
Period : April2008 to April2009
Position : Mechanical Technician
Responsibilities:
Erection of Rotating Equipment & Alignment (Rim & Face Method)
Erection of 33KV Diesel Generator, Alignment, erection of Accessories, Silencer, Coolers.
Preparation of inspection with Client.
Company : Ratna Enterprises, Industrial Area, Mangalore.
Position : Supervisor
Period : June2006 to March2008.
Responsibilities:
Working as site in-charge for Maintenance in Mechanical & Electrical work in,
Ruchi Palm Oil Refinery, New Mangalore Port & Infosys.
Plant Expansion Project in Ruchi Palm Oil Refinery , with erection of electric panel ,laying
HV & LV Cables , cable termination etc
All Electrical related work (erection of 33Kv transformer , cable laying, sub-station panel
erection & termination etc) done for Infosys Project,
6. Page 6 of 8
Manpower Control, Billing, Material Control etc.
Company : Kharafi National, Kuwait,
Position : Mechanical Technician
Duration : February 2006 May2006
Client : KOCL Kuwait
Responsibilities:
Worked for Major Shutdown in Mina Abdullah & Shoiba Refinery ,
For Heat Exchanger opening and hydro jetting for tube bundle , tube leak test and rectify it
if found leak ,
CDU & VDU Column internal tray , demister replacement ,
Fin Fan Cooler hydro jetting , removal of Fin Tube , Re-instatement of valves and PSV
after calibration ,
Rigging etc.
Company : Nisarga Engineering, Mangalore
Position : Mechanical Technician
Duration : September 2003 to October2005
Client : HPCL (Central Govt/ Enterprises)
Responsibilities:
Erection of Rotating & Counter Weight Marine Loading Arm (RCMA) FMC makes.
Operation and Maintenance of Fire Water system (Logic Control)
Operation and Maintenance in Marine Loading Arm.
Company : Mather + Platt India Ltd
Position : Mechanical Technician
Duration : january2001 to July2003
Client : NMPT (New Mangalore Port trust)
Responsibilities:
Field Assemble , Erection ,Alignment, Pre-Commission & Commissioning of Centrifugal
Vertical Fire Water Pump , With Electric & Diesel Engine Drive with intermediate heavy
right angle gearbox
7. Page 7 of 8
Company : Acufil Machines Coimbatore India
Position : Mechanical Fitter
Duration : December1999 to August2000
Company : Tecnimont ICB
Position : Assistant Store Keeper
Duration : August1998 to September1999
Project : Hydro Cracker Unit,MRPL Phase 2, Mangalore.
Company : Hind Soka Enterprises Baikampady Industrial Area Mangalore
Position : Machinist
Duration : August1995 to September1997
Company : Kanara Engineering Co ltd Baikampady Industrial Area Mangalore
Position : Machinist/Fitter
Duration : August1994 to August1995.
8. Page 8 of 8
BIO-DATA
EDUCATIONAL QUALIFICATIONS
1. SSLC (English Medium), Year of Passing 1992.
2. ITI in Mechanical, Year of Passing 1994.
3. Diploma in Mechanical Engineering, Year of Passing 20th
July2016.
TRANING AND COMPUTER SKILLS
1. Trained in HSE Induction
2. PTW for Construction & Commissioning
3. Confined Space Entry
4. MS word, Ms excel.
PERSONAL DETAILS
DDaattee ooff bbiirrtthh 13th
July 1974
NNaattiioonnaalliittyy Indian
MMaarriittaall ssttaattuuss Married
AAddddrreessss 5/142-2, Sunil Nivas
Chitrapura Temple Street
Post ; Kulai , Mangalore .
Karnataka , India.
Pin Code No. 575019
PPhhoonnee +91-7204285784(Mobile India)
+91-8242407199(Land Line India)
+91-9482521646 (Mobile Home)
EE--mmaaiill anilkumarcp85@yahoo.co.in
anilkumarcp1974@gmail.com
PPaassssppoorrtt DDeettaaiillss
Passport No N4136655
Expiry Date; 8th
November2025
Place of Issue; Bangalore, India
DDrriivviinngg LLiicceennssee LMV (India)
Declaration:
I hereby declare that all the information provided is true to the best of my knowledge and belief
Anil Kumar CP