1. SIDDHARTH SINGH
Village/Post- Pilkhawan
Distt. - Faizabad (U.P).
Pin- 224001
Mob. No. +91-9785706526
Email ID-siddharth000786@gmail.com
OBJECTIVE
To sincerely, meticulously and continuously learn and absorb from my surrounding work place and
apply the same in order to contribute to the organizational business and the society henceforth
gaining valuable experience.
EXPERIENCE
Brief Description- My 5 years work experience encompasses Thermal Power Project, Oil & gas and
Fire Fighting Piping, Oil Tank Modification Projects which involves Turbuine, Generator and
Auxiliary Equipment, Low Pressure Piping, Critical Pressure Piping, Tank Modification and Hyrdrant
Piping, Maintenance and Erection Job profile. My job profile belongs to technical & Managerial
functions.
I am also open to work in sectors which are new to my work experience to add another dimension
to my career like Renewable Energy Project, Infrastructure Development Project, Manufacturing
and Maintenance.
COMPANY SITE- INCHARGE Thermosystems Pvt.Ltd since Sep'2015 to present
PROJECT Tank Modification Project at Hindustan Petroleum Corporation Limited, Jaipur
(Rajasthan) WORK EXPERIENCE
Preparation of schedule of technical and field activity of project.Ensuring the availability of
material, required tools & tackles and the execution of job as per job specifications and
project schedule.
Maintenance of Tanks and Pipeline of petroleum product conducted when defect observed
at pipe, welded joints, flange connections and various auxilliaries in the pipeline. Also,
consider the life span of pipeline and get it replaced when needed.
Execution and inspection of Hydro-Testing“which is performed to determine the strength of
material, welded joints and leak proofness of joints” and Roof Floating Test of Oil
(Petroleum product) Tanks.
Tank Modification Job involves activities like making a hole in Tank Pontoon then welding a
sleeve pipe with Pontoon.Now, pontoon leakage detection test conducted and a pipe
installed through the sleeve Pipe vertically upto tank height by fixing it from tank shell wall
through supporting structure at top and bottom of tank. There is arrangement of various
nozzle at top of pipe flange on which sensing gauges installed.
Knowledge of analysing and conducting inspection of First Angle Drawing.
Experienced with the preparation cum maintenance of welders performance qualification
record. Familiar with and hands on with most measuring/inspection tools.
Page 1
2. SIDDHARTH SINGH
Record Keeping and inspection of Quality of shot blasting “which is performed to produce
clean and abrasive surface”, painting of pipe, Joint Fit-Up of lap-joint, butt-joint, SMAW
Welding and Dye Penetration Test which is performed at first-run of welding in order to
detect the surface defect of welding as per standard specifications provided.
Preparing & Raising Material Supply & Erection bill Invoice to client and get it approved for
clearance.
Monitoring the activities of contractor for work Progress, worker welfare and Material
availability at Project.
COMPANY SITE- INCHARGE Thermosystems Pvt.Ltd since Aug'2014 to Sep’2015
PROJECT MBLC Fire Fighting Project at Hindustan Petroleum Corporation Limited, Mughalsarai (U.P)
WORK EXPERIENCE
Management of resources for unhindered work progress and execution of technical & field
activities at site as per standard specifications and Project schedule.
Hydrant Piping Job (above ground) involves activities like erection and welding of Pipe on
pedestals which connect the water tank to pupms.To control the flow through pipeline
various valves installed on pipe.
Ensure the fulfilment of duties of contractor as per contractor and work progress as per
project schedule and standard specification.
There is also responsibility of ensuring labour welfare, material availability, record keeping
and preparing & raising material supply & erection bill Invoice to client.
Inspection of Quality of Shot Blasting and Painting of Pipe, Joint Fit-Up Butt- Joint, SMAW
Welding and Dye Penetration Test which is conducted to detect the surface defect of
welding as per specification provided.
Installation & Dismantling of Gate Valves, NRV, Water Monitor Double Hydrant, and Jockey
Pump.
The valve and pipeline connected by flange and welded connection. Prior installation,
properly clean the mating surface of flanges then insert the gasket in order to achieve the
leak proof connection otherwise the possibility of leakage is very high.
HPCL Depot terminal Pipeline Maintenance works performed when defect observed at pipe,
welding joints, flange connection and various auxilliaries in the pipeline.Also, consider the
life of pipeline and get it replaced when needed.
Hydrant Piping (under ground) job involves Holiday Testing of Wrapping of Pipe “which
determine that there is no air gap between wrap material and pipe” and Hydro-Testing of
Pipe “which is executed to determine the strength of material, welded joints and leak
proofness of joints”prior laying it under the ground which is connected to the ends of pipe
above ground.
Casting (Civilwork) of Foundations of pumps, Pedestals of pipeline.
COMPANY Engineer in BHEL (as a outsource through PCPIL) since Aug'2012 to Aug'2014
PROJECT 3X660 MW Lalitpur Super Thermal Power Project of Bajaj Group, Lalitpur (U.P)
WORK EXPERIENCE
Erection of Turbine and Generator, Critical Pressure Piping, Low Pressure Piping, Condenser
and various Auxiliary equipments.
Page 2
3. SIDDHARTH SINGH
Tools and plant (T&P) maintenance and record keeping like 600 MT, 250 MT, 135 MT
Cranes,
Huck Bolting Machine, Induction Heating Machine, Hydro Pumps and Lube Oil Purifying
Machine etc.
Inspection of dimensions and Position of embedments of TG Deck, Condenser foundation
and Auxiliary equipment foundation.
Checking of Erection and Alignment of Auxiliary equipment such as Pumps, H.P heater, L.P
heater, Deareator etc.
Installation and inspection of MOVs, SOV and Control Valves. The valve and pipeline
connected by flange and welded connection. Prior installation, properly clean the mating
surface of flanges then insert the gasket in order to achieve the leak proof connection
otherwise the possibility of leakage is very high
Checking of Bearing Pedestal erection and alignment for maintaining catenary of shaft of
Turbine.
Execution and inspection of grouting of Bearing Pedestal and Auxiliaries as per specification
provided by Manufacturer of grout cement and Quality documents.
Inspection of Bottom Plate, TSP, Sidewall, Hot well, Water Chamber, Water box and Dome
wall Erection, Alignment, Fit-Up, and Weld Visual of condensate system.
Preparation of Erection schedule of L.P Piping, H.P Piping, auxilliary equipment, Turbine and
Generator and conducting various inspection of Erection.
Knowledge of analysing and conducting inspection of First Angle Drawing. Familiar with and
hands on with most measuring/inspection tools.
Fit-up Inspection of Joints in-process stage with respect to visual, dimensional and
orientation compliance as per the approved drawings and specifications.
Welding inspection and familiar with most of the Welding Processes like SMAW, GTAW,
GMAW, SAW for CS, SS, Mild steel, Cast iron etc.
Experienced with the preparation cum maintenance of welders performance qualification
record and welders performance rating thro' welders and welding control log.
COMPANY Engineer in Velcrotech since 14th
July' 2011 to
July'2012
PROJECT 2X300 MW Reliance Thermal Power Project, Butibori (M.H)
WORK EXPERIENCE
Management and Execution of Erection of Fire Fighting Pipeline.
Record Keeping and inspection of Joint Fit-Up of butt & lap joint, SMAW (Shield Metal Arc
Welding) Welding and Dye Penetration Test which is executed to detect surface defect of
welding joint.
Installation & Dismantling of Gate Valves and NRV. The valve and pipeline connected by
flange connection. Prior installation, properly clean the mating surface then insert the
gasket in order to achieve the leak proof connection otherwise the possibility of leakage is
very high.
Conducting Hydro-Testing “which is executed to determine the strength of material,welding
joint and leak proof joint” and Holiday Testing “which determine the tightness of wrapping
around the pipe and ensure there is no air gap between wrap material and pipe” of pipeline.
Page 3
4. SIDDHARTH SINGH
Maintenance works executed when leakage observed through pipe, welded joints, flange
connection and various auxilliaries in the pipeline
Preparing Project Schedule, Conducting Field activity and preparing & Raising Erection Bill.
Preparation of welder performance log sheet and job card.
ACADEMIC QUALIFICATIONS
GATE QUALIFIED 2013 - 98.50 Percentile
2012 - 92.93 Percentile
B -TECH. in ‘MECHANICAL ENGINEERING' from JSS ACADEMY OF TECHNICAL
EDUCATION, NOIDA.
Institute Course Year Percentage
JSSATE B.TECH 2007-2011 72%
PROJECTS
MAJOR PROJECT : STEERING CONTROLLED MOVEMENT OF
HEADLIGHT OF A FOUR WHEELED VEHICLE
OBJECTIVE : To compensate the effect of blind angle during steering.
Components used : Optical encoder, microcontroller, stepper motor, gears, control
boards.
Mechanism used : Optical sensors precisely measure the steering wheel rotation and
transfer the same in Micro controller, which process the input data and give output in
accordance with theProgram and actuate the stepper motor which attached with gears and
they turn Head light as per the wheel movement either side of their straight ward position.
TRAINING DETAIL
SUMMER TRAINING : K. M. SUGAR MILLS, FAIZABAD IN JUNE 2010.
PERIODS : Four weeks.
MACHINES : Boiler and Turbine
FAVORITE SUBJECTS
Power Plant Engineering
Applied Thermodynamics
Hydraulic Machinery
Strength Of Material
EXTRA-CURICULAR ACTIVITIES
Member of YANTRASHILP "THE MECHANICAL SOCIETY" of our College.
Head of my college cricket team for the year 2007-2011.
Organised the event for "YOUTH FOR A CAUSE" which is a cultural society of our college.
Page 4
5. SIDDHARTH SINGH
STRENGTH
Perseverance & Analytical Approach
Dedication
Determined Optimism
PERSONAL DETAILS
Name : Siddharth Singh
Father's Name : Shiv Pujan Singh
Date of birth : 11-07-1988
Gender : Male
Marital Status : Single
Nationality : Indian
Religion : Hindu
Language : English, Hindi
Permanent Address : V/P- Pilkhawan,
Distt.- Faizabad,
Pin- 224001
Contact No. : 09785706526
Passport No : N2196473
DECLARATION
I hereby declare that all the details furnished above are true to the best of my knowledge and
belief.
Place: Jaipur SIDDHARTH SINGH
Date: 21-07-2016
Page 5
6. SIDDHARTH SINGH
STRENGTH
Perseverance & Analytical Approach
Dedication
Determined Optimism
PERSONAL DETAILS
Name : Siddharth Singh
Father's Name : Shiv Pujan Singh
Date of birth : 11-07-1988
Gender : Male
Marital Status : Single
Nationality : Indian
Religion : Hindu
Language : English, Hindi
Permanent Address : V/P- Pilkhawan,
Distt.- Faizabad,
Pin- 224001
Contact No. : 09785706526
Passport No : N2196473
DECLARATION
I hereby declare that all the details furnished above are true to the best of my knowledge and
belief.
Place: Jaipur SIDDHARTH SINGH
Date: 21-07-2016
Page 5