SlideShare a Scribd company logo
1 of 10
PERSONAL DETAIL
Name : Ardiansyah Teuku Agam
Title : Welding Inspector CSWIP 3.1 plus NDT ASNT Level 2
for MT/PT, UT, RI
Sex : Male
Place /date of birth : Cilacap, 05 April 1979
Address : Komplek Taman Puspa Indah, Jl. Puspa Utara I No. 11, Bandung, West of Java,
Indonesia - 40286
Phone : +62 813 2053 9038/ +62 815 73167407
Passport No. : A 1624075
Marital status : Married
Email address : zahrainbow@yahoo.co.id
PROFILE
Qualified and experienced as Welding and NDT Inspection such as structural, piping, fabrication and
installation of pressure vessel, storage tanks, repair/replacement of piping system such as Main Oil Line, Main
Gas Line; pressure vessel such as gas lift separator, production separator, test separator; structure of platform
such as bracing, grating, and deck. Familiar with codes such as AWS D1.1, ASME (sec. 1, sec. 2, sec. 5,
sec. 8 div. 1 and div. 2, and sec. 9), ASME B31.1, ASME B31.3, ASME B31.8, API 1104, API 650, API 5L.
Qualified and experienced for working as Welding and NDT Inspection at Onshore (fabrication and site) and
Offshore.
EDUCATION BACKGROUND
Bachelor degree (S1) : Pasundan University, Bandung – Indonesia
Mechanical Engineering, Grade Point Average : 3.17 of scale 4
COURSE / TRAINING
 CSWIP 3.1 Welding Inspector Level 2 – Cert. No. 59937 (expiry : 24 October 2016), certified by TWI
Certification Ltd, Granta Park, Great Abington, Cambridge CB21 6AL, UK
 Basic Offshore Safety Induction & emergency Training (BOSIET) & Travel Safely by Boat (TSbB) –
Cert. No. 939257071708132493 (expiry : 16 August 2017), certified by OPITO
 Welding Inspector / Welding Inspection Personnel with minimum requirement 559 hours training
attendance – WI Cert. No. 0411.12.73 2056, conducted by Ministry of Industrial Affair at Industrial Policy,
Climate, and Quality Research Agency Center for Material and Technical Product (B4T) Bandung -
Indonesia
 Radiographic Film Interpretation and Evaluation (RI) ASNT Level 2 – Cert. No. 0412.23 1223
(expiry : September 2017) conducted by Ministry of Industrial Affair at Industrial Policy, Climate, and
Quality Research Agency Center for Material and Technical Product (B4T) Bandung - Indonesia
 Non Destructive Testing (NDT) Ultrasonic Testing (UT) ASNT Level 2 – Cert. No. 0313.22 1189
(expiry : March 2018) conducted by Ministry of Industrial Affair at Industrial Policy, Climate, and Quality
Research Agency Center for Material and Technical Product (B4T) Bandung - Indonesia
 Non Destructive Testing (NDT) Magnetic Testing & Penetrant Testing (MT & PT) ASNT Level 2 –
Cert. No. 0413.24.25 1210 (expiry : April 2018) conducted by Ministry of Industrial Affair at Industrial
Policy, Climate, and Quality Research Agency Center for Material and Technical Product (B4T)
Bandung - Indonesia
 Confined Space Entry Training, conducted by PT. Sucofindo, Jakarta – Indonesia
COMPUTER’S SKILL
 MS Office (MS Word, MS Excel, MS Power Point)
 AutoCad 2010
 MATLAB 6.1 (toolbox : Simulink 4)
 Inventor 5.3
 ANSYS 5.4
WORK EXPERIENCES AS WELDING INSPECTOR (QA/QC INSPECTOR)
1. 29 July 2015 – 31 Oct 2015
 Company : PT. Tripatra-Samsung Concortium (TSC)
 Agent : PT. Air Energi Indonesia
 Address : Alamanda Tower 18th Floor, Unit B-C, Jl. TB Simatupang Kav. 23-24, Cilandak
Barat, Jakarta 12430
 Project : EPC-1 Banyu Urip Project
 Client : EXXON MOBIL INDONESIA
 Position : Piping / Welding Inspector
 Responsibilities :
a. Reports to the QC Coordinator regarding construction quality activities such as checking, inspecting,
examining and controlling to make sure the constructed items meet project requirements.
b. Coordinating all site inspections with the subcontractor.
c. Ensuring all inspections are held correctly and have an inspection report
d. Reviewing construction documents and inspection documents.
e. Issuance of inspection report activity on daily basis.
f. Initiating NCR for any discrepancy that fails to meet the project requirement or acceptance criteria.
g. Advising subcontractors on quality issues and activity.
h. Any other activities required for achieving the desired level of quality.
i. Witnessing PWHT activities; ensure that the thermocouple configuration meets the procedure.
j. Review report of PWHT that submitted by subcontractor; including its chart and configuration’s
thermocouple sketch.
2. 24 June 2015 – 24 July 2015
 Company : PT. Mulia Tehnik Toolsindo
 Address : Jl. Teuku Umar No. 11 Cibitung – Bekasi
 Project : Onshore Pipeline Package “Installation and Operation KALIJA I Transmission Project
(Kepodang – Tambak Lorok)”
Onshore Pipeline Package “Proyek Pembangunan dan Pengoperasian Ruas Transmisi
KALIJA I (Kepodang – Tambak Lorok)”
 Client : PT.Kalimantan Jawa Gas
 Position : QC Welding Inspector
 Responsibilities :
a. Review project documents such as client documents (client’s spec, procedures, Term Of
References, etc), drawing, Quality plan/Inspection Test Plan, WPS, PQR, Welder Performance
Qualification certificate, NDT Personnel certificate, Mill Certificates (Carbon Steel API 5L X65
PSL2), etc.
b. Monitoring stringing, welding, trenching, lowering, tie-in, and backfilling activities.
c. Assure that joint preparation is accordance to client specification, such as joint bevel 30°, joint bevel
is free from scale, rust, dirt, and other foreign matter.
d. Assure that Line-Up clamp is installed properly and carried out the straightness of line pipe.
e. Witnessing and monitoring the welding execution and joint repair have appropriated with
specification project (WPS).
f. Monitoring preheat temperature, minimum 50°C, and interpass temperature, about 182°C on
welding.
g. Visual Inspection performing.
h. Witness and reviewing NDT activities (DPT, MPI, UT and RT).
i. Witnessing and monitoring hydrotest performing for pipeline.
3. 08 April 2015 – 04 June 2015
 Company : British Petroleum (BP) Berau Ltd
 Agent : PT. Bureau Veritas Indonesia
 Address : Wisma Bakrie, 1st Floor. Jl. Rasuna Said, Kav. B-1 Jakarta
 Project : Turn Around (TAR) Project BP Tangguh LNG
 Client : British Petroleum (BP)Berau Ltd
 Position : Mechanical Inspector Joint Integrity (JI) for TAR 6th Project
 Responsibilities :
a. Review BP’s Guidance of Certificates (GOC) as based of project performing object.
b. Assure that the joint worked is appropriate with PID and others BP’s documents.
c. Assure flange management systems which were conducted have appropriate with specification.
d. Assure that flange used is clean, free from defect, and in the right alignment.
e. Assure that gasket used is appropriate with specification and position.
f. Assure that bolt and nut used are correct material, number, size, and cleaned condition.
g. Monitoring and assure that anti seize compound applied.
h. Monitoring and assure that bolt tightening is performed by right sequence.
i. Monitoring and assure that torque value is appropriate with specification (based on its NPS and pipe
rating).
j. Assure that only torque wrench calibrated which being used.
k. Apply the Joint Integrity (JI) tag to each joint which has done.
l. Sign on Joint Integrity 1 (JI 1) Certificates that issued by GOC Officer.
 Inspection Objects :
a. Flange management system of joint of pipes; including on piping system, steam turbine compressor
(PR and MR), and structure (fin fan cooler).
b. Bolt and plug tightening, including at flange and structure.
4. 26 August 2014 – 18 January 2015
 Company : Saipem Singapore Pte Ltd
 Agent : Oilfield Technical Inspection (OTI) SDN BHD
 Address : 142 Jl. Kapar 27/89 Section 27, 40400 Shah Alam, Selangor - Malaysia
 Project : ICHTHYS LNG INPEX Project – barge repairing project
 Client : INPEX Corporate
 Position : QC / Welding Inspector
 Responsibilities :
a. Review project documents such as client documents (client’s spec, procedures), drawing, Quality
plan/Inspection Test Plan, WPS, PQR, Welder Performance Qualification certificate, NDT Personnel
certificate, etc.
b. Monitoring work execution to make sure that works have appropriated with specification project.
c. Monitoring/witnessing fit up, welding process, and welding repair.
d. Monitoring preheat temperature on welding (≥ 30°C).
e. Visual inspection performing and NDT (MPI and/or UT) application witnessing for CS A/SA 36.
f. As a final decision maker for retire products acceptance based on project specification; if necessary
punch list issued and close out.
g. Visual Inspection Report performing as closing reporting for each project completed of barges.
h. Reviewing NDT Report (MPI and UT).
 Inspection Objects :
a. Stanchion repairing : stiffeners, spacers, strip plate for dunnage installation
b. Bollard repairing.
c. Hot work performing on stanchion, strip plates for dunnage, spacers, bollards installation; using AWS
D1.1 – 2010.
d. Visual inspection for all welds; groove and fillet welds.
e. Size of welds as per client requirements.
f. Poles of navigation light and black diamond repairing of barges.
5. 27 November 2013 – 25 August 2014
 Company : Pertamina – Medco
 Agent : PT. TRA / TSI Consortium
 Business : Inspection and technical services company
 Address : One Building, Wolter Place Building, 4th Floor, Jl. Wolter Mongonsidi No.63B,
Kebayoran Baru, Jakarta Selatan
 Project : LNG Senoro Sulawesi Project – Spools fabrication for Stainless Steel A/SA 312 Gr. TP
316L and Duplex SA 790 S31803, installation of piping system, tanks, and vessel.
 Position : Client Representative – Quality Management Inspection Supervision Service of JOB
Pertamina Medco LNG – Welding/Piping/Tank/Pressure Vessel Inspector
 Responsibilities :
a. Review project documents such as client documents (client’s spec, procedures, etc), drawing,
Quality plan/Inspection Test Plan, WPS, PQR, welding map, Welder Performance Qualification
certificate, NDT Personnel certificate, etc.
b. Monitoring work execution to make sure that works have appropriated with specification project.
c. Monitoring/witnessing fit up, welding process, welding repair, storage, and packing for Stainless
Steel A/SA 312 A/SA 312 Gr. TP 316L and Duplex SA 790 S31803 pipes/spools.
d. Monitoring status of quality and construction progress of Stainless Steel A/SA 312 A/SA 312 Gr. TP
316L and Duplex SA 790 S31803 spools fabrication.
e. Monitoring preheat and interpass temperature on hot work (random/spot check).
f. Witnessing PMI and Ferrite Content Test application for Stainless Steel A/SA 312 A/SA 312 Gr. TP
316L and/or Duplex SA 790 S31803 spools.
g. As a final decision maker for retire products acceptance based on project specification; if necessary
punch list issued and close out.
h. Witnessing, reviewing, and final decision maker for welder test for Stainless Steel A/SA 312 A/SA
312 Gr. TP 316L and/or Duplex SA 790 S31803 spools.
i. Witnessing, reviewing, and as final decision maker for WPS and PQR test processes (including
WPQT/preliminary WPS and the mechanical tests) for Stainless Steel A/SA 312 A/SA 312 Gr. TP
316L and/or Duplex SA 790 S31803 spools.
j. Witnessing, monitoring, and inspecting for floating roof tanks installation.
k. Witnessing and inspecting the vessel’s installation.
l. As final decision maker of acceptance for film radiography Interpretation result.
m. Flash report and Shop Inspection Report performing as daily reporting.
n. Final linecheck before hydrotest and pre-commissioning.
o. Witness and review hydrotest for line piping.
 Inspection Objects :
a. Test coupons of Welding Procedure Qualification Test (WPQT) for Welding Procedure Specification
and Procedure Qualification Record (visual inspection), it’s Radiography Tests result (films
interpretation), and mechanical tests results; using ASME BPVC IX – 2010.
b. Test coupons of welder test (visual inspection) and its Radiography Test’s result (films
interpretation); using ASME BPVC sec. IX – 2010.
c. Straightness and flatness for fit up and weldment of spools fabrication (including raw materials and
fittings).
d. Hot work on spools fabrication (Stainless Steel and Duplex); using ASME B31.3 – 2002.
e. Positive Material Identification (PMI) test for Stainless Steel and Duplex; using ASME BPVC sec. II
part A; using ASME BPVC sec. II – 2010.
f. Ferrite Content Examination for Duplex; using ASME BPVC sec. II part A – 2010.
g. Color indication of Stainless Steel and Duplex during and after hot work.
h. Contamination possibility on Stainless Steel and Duplex’s surface.
i. Interpretation of films Radiography test of mass production.
6. 15 July 2013 – 25 November 2013
 Company : PT. Adhi Karya (persero) Tbk
 Business : Construction; Engineering, Procurement, and Construction; Property; and Real Estate
Development Businesses
 Address : Jl. Raya Pasar Minggu Km 18, Jakarta 12510
 Project : Resid Fluid Catalytic Cracking (RFCC) Project
 Client : Pertamina RU IV Cilacap
 Position : Mechanical Inspector – Spherical Tank (Pressure Vessel), Atmospheric Tank, Piping
System, Flare Pipe Support
 Responsibility :
a. Review project documents such as work pack, drawing, Quality plan/Inspection Test Plan, WPS,
PQR, Welder Performance Qualification, NDT Personnel certificate, NDE map, etc.
b. Monitoring work execution to make sure that work was appropriate with specification project.
c. Monitoring status of quality and progress of structural, piping, atmospheric tank, and pressure vessel
during execution as per project specification.
d. Witnessing for fit up, welding process, and weld repair of structural, piping, tank, and pressure vessel
e. Monitoring preheat and interpass temperature on hot work of spherical tank.
f. Make sure that the dimension of atmospheric and spherical tanks (including roundness and
plumpness) were appropriate with client specification.
g. Witnessing and reviewing test pack for hydrostatic test, Product Test Plate, PWHT.
h. Make a decision for its acceptance based on project specification; if necessary punch list issued and
close out.
 Inspection Objects :
a. Plumpness and roundness of Atmospheric and Spherical Tank.
b. Hot work on Piping System (fire water pipe); using B31.3.
c. Hot work on Structural of Flare Pipe Support; using AWS D1.1 – 2010.
d. Hot work on Spherical Tank of LPG and Propylene tank; using ASME VIII div. 2.
e. Settlement test of Hydro Test of Atmospheric Tank (Fire Water Tank) by using an Auto Level.
f. Leak of coating inspection by using the holidy test.
g. Vacuum test of tank’s bottom.
h. Interpretation of NDE result (MT/PT and Radiography Test).
7. 28 November 2011 – 30 June 2013
 Company : PT. Sucofindo (Persero)
 Business : Inspection, Testing, Audit, Supervision, Certification, and Training services
 Address : Jl. Cumi No. 35, Tanjung Priok, Jakarta - Indonesia
 Project : Maintenance of PHE Offshore North West Java (PHE-ONWJ)
 Client : Pertamina Hulu Energi (PHE)
 Position : Client Representative - QA/QC Topside Repair – Structural/Piping/Pressure Vessel
Inspector
 Responsibility :
a. Review project documents such as work pack, drawing, Quality plan/Inspection Test Plan, WPS,
PQR, Performance Test certificate, NDT Personnel certificate.
b. Attend daily morning meeting (kick off meeting) with contractor/executor.
c. Verify material identification that used.
d. Monitoring work execution to make sure that work is appropriate with specification project.
e. Monitoring status of quality and progress of structural, piping, and pressure vessel during execution
as per project specification.
f. Witnessing for fit up, welding process, and weld repair for structural, piping, and pressure vessel.
g. Witnessing and reviewing for test pack of hydrostatic test.
h. Witnessing internal and external blasting and painting activity and reported.
i. Perform a visual inspection and check dimensional.
j. Perform a joint integrity for piping system.
k. Witnessing leak test, service test, and hydrostatic test for pressure vessel and piping.
l. Make a decision for its acceptance based on project specification; if necessary punch list issued and
close out.
m. Documentation of before, during, and after work processes.
n. Perform Handover Certification Report, Inspection Test Summary, and Visual Inspection Report.
 Inspection Objects :
a. Refurbishment/repainting on piping system, structural, and pressure vessel.
b. Wrapping/strongback of piping system such as of Main Oil Line, Main Gas Line, Sump Pile, and
Riser.
c. Replacement of stud nuts, bolts, and gasket.
d. Replacement of Piping System (Main Oil Line and Main Gas Line).
e. Hot work preparation (machine, consumables, equipment, environment, etc).
f. Hot work on Piping System on gas lift separator, production separator, test separator, launcher,
receiver, etc; using ANSI B31.1, B31.3, and B31.8, API 1104.
g. Hot work on Structural of braces, ladder, hand rail, walkway, grating, boom burner High Pressure
support; using AWS D1.1.
h. Repair vessel (Cladding); on production separator using WPS Repair.
i. Witness and inspect of Hydro Test, Leak Test, and Service Test that performed; and interpretation of
its result (joint integrity and Barton Chard).
j. Inspect joint integrity of piping system.
k. Final interpretation of NDE result (MT/PT, UT, and RI).
8. 04 July – 04 Oct 2011
 Company : PT. Suprabakti Mandiri
 Business : Fabricator of Conveyor and Rubber Lining, Pressure Vessel, Tanks, Piping
 Address : Jl. Pasar Kemis No. 112 Tangerang, Banten – Indonesia
 Project : Perform and/or repair of Conveyor’s Frame, Vessels, Piping systems, structural
 Client : PT. Newmont Nusa Tenggara, PT. Freeport Indonesia, PT. INCO, PT. Chandra Asih,
PT. Pertamina UP VI Balongan
 Position : QC Welding Inspector
 Responsibilities :
a. Review project documents (drawing, Inspection Test Plan, WPS, PQR, etc).
b. Verify material to its documents (such as hot number, dimension, coating thickness, etc).
c. Inspection of incoming material (surface roughness, thickness of coating, dimension, shape, etc).
d. Review of welding preparation (machine, personnel qualification certificates, consumables,
environment, etc).
e. Monitoring work execution to make sure that work is appropriate with procedure.
f. Inspection of work result (using visual and NDT).
g. Make a decision for its acceptance based on manufacturer specification.
h. Documentation of before, during, and after work processes.
i. Closed out and reporting.
 Inspection Objects :
a. Inspection of fit up of construction.
b. Incoming material condition (dimension, shape, quantity, thickness, roughness, etc).
c. Material/product condition after sand blasting.
d. Hot work preparation (machines, consumables, equipment, environment, etc).
e. Hot work performed on structural and construction; using AWS D1.1, ASME sec. VIII – 2010.
f. Dimension and shape of construction as production’s result.
g. Repair vessel (Cladding); using WPS Repair.
9. 06 June – 01 July 2011
 Company : PT. ZUG Indonesia
 Business : Boiler & Vessel Manufacturer
 Address : Cengkareng, Jakarta – Indonesia
 Project : Structural trusses for roof’s support of generator house
 Client : PLTU Bontang, East of Kalimantan, Indonesia
 Position : QC Welding Inspector – Structural
 Responsibilities :
a. Review project documents (drawing, Inspection Test Plan, WPS, PQR, etc).
b. Inspection of material documents (such as hot number, dimension, coating thickness, etc).
c. Inspection of incoming material (surface roughness, thickness of coating, dimension, shape, etc).
d. Inspection of welding preparation (machine, personnel qualification certificates, consumables, etc).
e. Supervision of work execution to make sure that work is appropriate with procedure.
f. Inspection of work result (using visual and NDT).
g. Make a decision for its acceptance based on standard.
h. Documentation of before, during, and after work processes.
i. Reporting.
 Inspection Objects :
a. Fit up of construction.
b. Dimension and shape compare with drawing.
c. Hot work preparation (machine, consumables, equipment, etc).
d. Hot work on Structural; using AWS D1.1 – 2010.
e. Witness of NDE execution.
f. Final interpret of NDE’s result.
g. Painting on structural (frames/trusses).
10.02 May – 31 May 2011
 Company : CV. ArcMart Indonesia
 Business : Construction / fabrication / Repair / Consultant
 Address : Jl. Bojongsoang, Bandung - Indonesia
 Project : Repair and manufacturing Crane track 25 tons of capacity
 Client : PT. Semen Padang, West of Sumatra
 Position : QC Welding Inspector – Structural
 Responsibilities :
a. Perform WPS’s and WPS.
b. Witness mechanical test.
c. Review project document (drawing, client’s spec, etc).
d. Monitoring of execution to make sure that work is appropriate with procedure.
e. Inspection of work result (using visual and PT and UT).
f. Make a decision for its acceptance based on standard (AWS D1.1 – 2010).
g. Reporting.
 Inspection Objects :
a. Fit up of construction.
b. Hot work on Structural; using AWS D1.1 – 2010.
c. Dimension and shape which compared with drawing.
d. Witness of NDE execution.
e. Final interpret of NDE’s result.
I describe myself as an optimistic person with highly motivation, focus to point, quick learner, good
worker as an individual or team, multi task capability, able to work under pressure, and willing to
travel for job.
I hereby declare the details stated to be true and complete.
Best Regards,
Ardiansyah T.A

More Related Content

What's hot

Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 
Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)Manish Gupta
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERMOHAMMED ZUBAIR
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...Saleem P.P
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)MUHAMMAD ASIF
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.Madhava Rao V
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICRoy Encallado
 
NDT PCN MULTI WITH ROPEACCESS CV
NDT PCN MULTI WITH ROPEACCESS CVNDT PCN MULTI WITH ROPEACCESS CV
NDT PCN MULTI WITH ROPEACCESS CVBabumani Lalgudi
 

What's hot (20)

Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)
 
Karthik Resume
Karthik Resume Karthik Resume
Karthik Resume
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
 
NDT Resume
NDT ResumeNDT Resume
NDT Resume
 
RAJU CV
RAJU  CVRAJU  CV
RAJU CV
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
NDT PCN MULTI WITH ROPEACCESS CV
NDT PCN MULTI WITH ROPEACCESS CVNDT PCN MULTI WITH ROPEACCESS CV
NDT PCN MULTI WITH ROPEACCESS CV
 

Similar to PERSONAL DETAILS (20)

CV_Sa-nga Last Revision
CV_Sa-nga Last RevisionCV_Sa-nga Last Revision
CV_Sa-nga Last Revision
 
LINGAM
LINGAMLINGAM
LINGAM
 
CV-Alamin2016
CV-Alamin2016CV-Alamin2016
CV-Alamin2016
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspector
 
Phairat-CV(2015)
Phairat-CV(2015)Phairat-CV(2015)
Phairat-CV(2015)
 
CV_Thangaraj Raja
CV_Thangaraj RajaCV_Thangaraj Raja
CV_Thangaraj Raja
 
Tin's CV
Tin's CVTin's CV
Tin's CV
 
01. cv qc civil structur & wi
01. cv qc civil structur & wi01. cv qc civil structur & wi
01. cv qc civil structur & wi
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
MURUG NEW
MURUG NEWMURUG NEW
MURUG NEW
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)
 
RESUME 26 JAN
RESUME 26 JANRESUME 26 JAN
RESUME 26 JAN
 
Tin's cv
Tin's cvTin's cv
Tin's cv
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
Cutech
CutechCutech
Cutech
 
CV Herwandi
CV HerwandiCV Herwandi
CV Herwandi
 
CV Hasrul Maswandy
CV Hasrul MaswandyCV Hasrul Maswandy
CV Hasrul Maswandy
 

Recently uploaded

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Recently uploaded (20)

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 

PERSONAL DETAILS

  • 1. PERSONAL DETAIL Name : Ardiansyah Teuku Agam Title : Welding Inspector CSWIP 3.1 plus NDT ASNT Level 2 for MT/PT, UT, RI Sex : Male Place /date of birth : Cilacap, 05 April 1979 Address : Komplek Taman Puspa Indah, Jl. Puspa Utara I No. 11, Bandung, West of Java, Indonesia - 40286 Phone : +62 813 2053 9038/ +62 815 73167407 Passport No. : A 1624075 Marital status : Married Email address : zahrainbow@yahoo.co.id PROFILE Qualified and experienced as Welding and NDT Inspection such as structural, piping, fabrication and installation of pressure vessel, storage tanks, repair/replacement of piping system such as Main Oil Line, Main Gas Line; pressure vessel such as gas lift separator, production separator, test separator; structure of platform such as bracing, grating, and deck. Familiar with codes such as AWS D1.1, ASME (sec. 1, sec. 2, sec. 5, sec. 8 div. 1 and div. 2, and sec. 9), ASME B31.1, ASME B31.3, ASME B31.8, API 1104, API 650, API 5L. Qualified and experienced for working as Welding and NDT Inspection at Onshore (fabrication and site) and Offshore. EDUCATION BACKGROUND Bachelor degree (S1) : Pasundan University, Bandung – Indonesia Mechanical Engineering, Grade Point Average : 3.17 of scale 4 COURSE / TRAINING  CSWIP 3.1 Welding Inspector Level 2 – Cert. No. 59937 (expiry : 24 October 2016), certified by TWI Certification Ltd, Granta Park, Great Abington, Cambridge CB21 6AL, UK  Basic Offshore Safety Induction & emergency Training (BOSIET) & Travel Safely by Boat (TSbB) – Cert. No. 939257071708132493 (expiry : 16 August 2017), certified by OPITO  Welding Inspector / Welding Inspection Personnel with minimum requirement 559 hours training attendance – WI Cert. No. 0411.12.73 2056, conducted by Ministry of Industrial Affair at Industrial Policy,
  • 2. Climate, and Quality Research Agency Center for Material and Technical Product (B4T) Bandung - Indonesia  Radiographic Film Interpretation and Evaluation (RI) ASNT Level 2 – Cert. No. 0412.23 1223 (expiry : September 2017) conducted by Ministry of Industrial Affair at Industrial Policy, Climate, and Quality Research Agency Center for Material and Technical Product (B4T) Bandung - Indonesia  Non Destructive Testing (NDT) Ultrasonic Testing (UT) ASNT Level 2 – Cert. No. 0313.22 1189 (expiry : March 2018) conducted by Ministry of Industrial Affair at Industrial Policy, Climate, and Quality Research Agency Center for Material and Technical Product (B4T) Bandung - Indonesia  Non Destructive Testing (NDT) Magnetic Testing & Penetrant Testing (MT & PT) ASNT Level 2 – Cert. No. 0413.24.25 1210 (expiry : April 2018) conducted by Ministry of Industrial Affair at Industrial Policy, Climate, and Quality Research Agency Center for Material and Technical Product (B4T) Bandung - Indonesia  Confined Space Entry Training, conducted by PT. Sucofindo, Jakarta – Indonesia COMPUTER’S SKILL  MS Office (MS Word, MS Excel, MS Power Point)  AutoCad 2010  MATLAB 6.1 (toolbox : Simulink 4)  Inventor 5.3  ANSYS 5.4 WORK EXPERIENCES AS WELDING INSPECTOR (QA/QC INSPECTOR) 1. 29 July 2015 – 31 Oct 2015  Company : PT. Tripatra-Samsung Concortium (TSC)  Agent : PT. Air Energi Indonesia  Address : Alamanda Tower 18th Floor, Unit B-C, Jl. TB Simatupang Kav. 23-24, Cilandak Barat, Jakarta 12430  Project : EPC-1 Banyu Urip Project  Client : EXXON MOBIL INDONESIA  Position : Piping / Welding Inspector  Responsibilities : a. Reports to the QC Coordinator regarding construction quality activities such as checking, inspecting, examining and controlling to make sure the constructed items meet project requirements. b. Coordinating all site inspections with the subcontractor. c. Ensuring all inspections are held correctly and have an inspection report d. Reviewing construction documents and inspection documents.
  • 3. e. Issuance of inspection report activity on daily basis. f. Initiating NCR for any discrepancy that fails to meet the project requirement or acceptance criteria. g. Advising subcontractors on quality issues and activity. h. Any other activities required for achieving the desired level of quality. i. Witnessing PWHT activities; ensure that the thermocouple configuration meets the procedure. j. Review report of PWHT that submitted by subcontractor; including its chart and configuration’s thermocouple sketch. 2. 24 June 2015 – 24 July 2015  Company : PT. Mulia Tehnik Toolsindo  Address : Jl. Teuku Umar No. 11 Cibitung – Bekasi  Project : Onshore Pipeline Package “Installation and Operation KALIJA I Transmission Project (Kepodang – Tambak Lorok)” Onshore Pipeline Package “Proyek Pembangunan dan Pengoperasian Ruas Transmisi KALIJA I (Kepodang – Tambak Lorok)”  Client : PT.Kalimantan Jawa Gas  Position : QC Welding Inspector  Responsibilities : a. Review project documents such as client documents (client’s spec, procedures, Term Of References, etc), drawing, Quality plan/Inspection Test Plan, WPS, PQR, Welder Performance Qualification certificate, NDT Personnel certificate, Mill Certificates (Carbon Steel API 5L X65 PSL2), etc. b. Monitoring stringing, welding, trenching, lowering, tie-in, and backfilling activities. c. Assure that joint preparation is accordance to client specification, such as joint bevel 30°, joint bevel is free from scale, rust, dirt, and other foreign matter. d. Assure that Line-Up clamp is installed properly and carried out the straightness of line pipe. e. Witnessing and monitoring the welding execution and joint repair have appropriated with specification project (WPS). f. Monitoring preheat temperature, minimum 50°C, and interpass temperature, about 182°C on welding. g. Visual Inspection performing. h. Witness and reviewing NDT activities (DPT, MPI, UT and RT). i. Witnessing and monitoring hydrotest performing for pipeline.
  • 4. 3. 08 April 2015 – 04 June 2015  Company : British Petroleum (BP) Berau Ltd  Agent : PT. Bureau Veritas Indonesia  Address : Wisma Bakrie, 1st Floor. Jl. Rasuna Said, Kav. B-1 Jakarta  Project : Turn Around (TAR) Project BP Tangguh LNG  Client : British Petroleum (BP)Berau Ltd  Position : Mechanical Inspector Joint Integrity (JI) for TAR 6th Project  Responsibilities : a. Review BP’s Guidance of Certificates (GOC) as based of project performing object. b. Assure that the joint worked is appropriate with PID and others BP’s documents. c. Assure flange management systems which were conducted have appropriate with specification. d. Assure that flange used is clean, free from defect, and in the right alignment. e. Assure that gasket used is appropriate with specification and position. f. Assure that bolt and nut used are correct material, number, size, and cleaned condition. g. Monitoring and assure that anti seize compound applied. h. Monitoring and assure that bolt tightening is performed by right sequence. i. Monitoring and assure that torque value is appropriate with specification (based on its NPS and pipe rating). j. Assure that only torque wrench calibrated which being used. k. Apply the Joint Integrity (JI) tag to each joint which has done. l. Sign on Joint Integrity 1 (JI 1) Certificates that issued by GOC Officer.  Inspection Objects : a. Flange management system of joint of pipes; including on piping system, steam turbine compressor (PR and MR), and structure (fin fan cooler). b. Bolt and plug tightening, including at flange and structure. 4. 26 August 2014 – 18 January 2015  Company : Saipem Singapore Pte Ltd  Agent : Oilfield Technical Inspection (OTI) SDN BHD  Address : 142 Jl. Kapar 27/89 Section 27, 40400 Shah Alam, Selangor - Malaysia  Project : ICHTHYS LNG INPEX Project – barge repairing project  Client : INPEX Corporate  Position : QC / Welding Inspector  Responsibilities : a. Review project documents such as client documents (client’s spec, procedures), drawing, Quality plan/Inspection Test Plan, WPS, PQR, Welder Performance Qualification certificate, NDT Personnel certificate, etc. b. Monitoring work execution to make sure that works have appropriated with specification project.
  • 5. c. Monitoring/witnessing fit up, welding process, and welding repair. d. Monitoring preheat temperature on welding (≥ 30°C). e. Visual inspection performing and NDT (MPI and/or UT) application witnessing for CS A/SA 36. f. As a final decision maker for retire products acceptance based on project specification; if necessary punch list issued and close out. g. Visual Inspection Report performing as closing reporting for each project completed of barges. h. Reviewing NDT Report (MPI and UT).  Inspection Objects : a. Stanchion repairing : stiffeners, spacers, strip plate for dunnage installation b. Bollard repairing. c. Hot work performing on stanchion, strip plates for dunnage, spacers, bollards installation; using AWS D1.1 – 2010. d. Visual inspection for all welds; groove and fillet welds. e. Size of welds as per client requirements. f. Poles of navigation light and black diamond repairing of barges. 5. 27 November 2013 – 25 August 2014  Company : Pertamina – Medco  Agent : PT. TRA / TSI Consortium  Business : Inspection and technical services company  Address : One Building, Wolter Place Building, 4th Floor, Jl. Wolter Mongonsidi No.63B, Kebayoran Baru, Jakarta Selatan  Project : LNG Senoro Sulawesi Project – Spools fabrication for Stainless Steel A/SA 312 Gr. TP 316L and Duplex SA 790 S31803, installation of piping system, tanks, and vessel.  Position : Client Representative – Quality Management Inspection Supervision Service of JOB Pertamina Medco LNG – Welding/Piping/Tank/Pressure Vessel Inspector  Responsibilities : a. Review project documents such as client documents (client’s spec, procedures, etc), drawing, Quality plan/Inspection Test Plan, WPS, PQR, welding map, Welder Performance Qualification certificate, NDT Personnel certificate, etc. b. Monitoring work execution to make sure that works have appropriated with specification project. c. Monitoring/witnessing fit up, welding process, welding repair, storage, and packing for Stainless Steel A/SA 312 A/SA 312 Gr. TP 316L and Duplex SA 790 S31803 pipes/spools. d. Monitoring status of quality and construction progress of Stainless Steel A/SA 312 A/SA 312 Gr. TP 316L and Duplex SA 790 S31803 spools fabrication. e. Monitoring preheat and interpass temperature on hot work (random/spot check). f. Witnessing PMI and Ferrite Content Test application for Stainless Steel A/SA 312 A/SA 312 Gr. TP 316L and/or Duplex SA 790 S31803 spools.
  • 6. g. As a final decision maker for retire products acceptance based on project specification; if necessary punch list issued and close out. h. Witnessing, reviewing, and final decision maker for welder test for Stainless Steel A/SA 312 A/SA 312 Gr. TP 316L and/or Duplex SA 790 S31803 spools. i. Witnessing, reviewing, and as final decision maker for WPS and PQR test processes (including WPQT/preliminary WPS and the mechanical tests) for Stainless Steel A/SA 312 A/SA 312 Gr. TP 316L and/or Duplex SA 790 S31803 spools. j. Witnessing, monitoring, and inspecting for floating roof tanks installation. k. Witnessing and inspecting the vessel’s installation. l. As final decision maker of acceptance for film radiography Interpretation result. m. Flash report and Shop Inspection Report performing as daily reporting. n. Final linecheck before hydrotest and pre-commissioning. o. Witness and review hydrotest for line piping.  Inspection Objects : a. Test coupons of Welding Procedure Qualification Test (WPQT) for Welding Procedure Specification and Procedure Qualification Record (visual inspection), it’s Radiography Tests result (films interpretation), and mechanical tests results; using ASME BPVC IX – 2010. b. Test coupons of welder test (visual inspection) and its Radiography Test’s result (films interpretation); using ASME BPVC sec. IX – 2010. c. Straightness and flatness for fit up and weldment of spools fabrication (including raw materials and fittings). d. Hot work on spools fabrication (Stainless Steel and Duplex); using ASME B31.3 – 2002. e. Positive Material Identification (PMI) test for Stainless Steel and Duplex; using ASME BPVC sec. II part A; using ASME BPVC sec. II – 2010. f. Ferrite Content Examination for Duplex; using ASME BPVC sec. II part A – 2010. g. Color indication of Stainless Steel and Duplex during and after hot work. h. Contamination possibility on Stainless Steel and Duplex’s surface. i. Interpretation of films Radiography test of mass production. 6. 15 July 2013 – 25 November 2013  Company : PT. Adhi Karya (persero) Tbk  Business : Construction; Engineering, Procurement, and Construction; Property; and Real Estate Development Businesses  Address : Jl. Raya Pasar Minggu Km 18, Jakarta 12510  Project : Resid Fluid Catalytic Cracking (RFCC) Project  Client : Pertamina RU IV Cilacap  Position : Mechanical Inspector – Spherical Tank (Pressure Vessel), Atmospheric Tank, Piping System, Flare Pipe Support
  • 7.  Responsibility : a. Review project documents such as work pack, drawing, Quality plan/Inspection Test Plan, WPS, PQR, Welder Performance Qualification, NDT Personnel certificate, NDE map, etc. b. Monitoring work execution to make sure that work was appropriate with specification project. c. Monitoring status of quality and progress of structural, piping, atmospheric tank, and pressure vessel during execution as per project specification. d. Witnessing for fit up, welding process, and weld repair of structural, piping, tank, and pressure vessel e. Monitoring preheat and interpass temperature on hot work of spherical tank. f. Make sure that the dimension of atmospheric and spherical tanks (including roundness and plumpness) were appropriate with client specification. g. Witnessing and reviewing test pack for hydrostatic test, Product Test Plate, PWHT. h. Make a decision for its acceptance based on project specification; if necessary punch list issued and close out.  Inspection Objects : a. Plumpness and roundness of Atmospheric and Spherical Tank. b. Hot work on Piping System (fire water pipe); using B31.3. c. Hot work on Structural of Flare Pipe Support; using AWS D1.1 – 2010. d. Hot work on Spherical Tank of LPG and Propylene tank; using ASME VIII div. 2. e. Settlement test of Hydro Test of Atmospheric Tank (Fire Water Tank) by using an Auto Level. f. Leak of coating inspection by using the holidy test. g. Vacuum test of tank’s bottom. h. Interpretation of NDE result (MT/PT and Radiography Test). 7. 28 November 2011 – 30 June 2013  Company : PT. Sucofindo (Persero)  Business : Inspection, Testing, Audit, Supervision, Certification, and Training services  Address : Jl. Cumi No. 35, Tanjung Priok, Jakarta - Indonesia  Project : Maintenance of PHE Offshore North West Java (PHE-ONWJ)  Client : Pertamina Hulu Energi (PHE)  Position : Client Representative - QA/QC Topside Repair – Structural/Piping/Pressure Vessel Inspector  Responsibility : a. Review project documents such as work pack, drawing, Quality plan/Inspection Test Plan, WPS, PQR, Performance Test certificate, NDT Personnel certificate. b. Attend daily morning meeting (kick off meeting) with contractor/executor. c. Verify material identification that used. d. Monitoring work execution to make sure that work is appropriate with specification project. e. Monitoring status of quality and progress of structural, piping, and pressure vessel during execution as per project specification. f. Witnessing for fit up, welding process, and weld repair for structural, piping, and pressure vessel.
  • 8. g. Witnessing and reviewing for test pack of hydrostatic test. h. Witnessing internal and external blasting and painting activity and reported. i. Perform a visual inspection and check dimensional. j. Perform a joint integrity for piping system. k. Witnessing leak test, service test, and hydrostatic test for pressure vessel and piping. l. Make a decision for its acceptance based on project specification; if necessary punch list issued and close out. m. Documentation of before, during, and after work processes. n. Perform Handover Certification Report, Inspection Test Summary, and Visual Inspection Report.  Inspection Objects : a. Refurbishment/repainting on piping system, structural, and pressure vessel. b. Wrapping/strongback of piping system such as of Main Oil Line, Main Gas Line, Sump Pile, and Riser. c. Replacement of stud nuts, bolts, and gasket. d. Replacement of Piping System (Main Oil Line and Main Gas Line). e. Hot work preparation (machine, consumables, equipment, environment, etc). f. Hot work on Piping System on gas lift separator, production separator, test separator, launcher, receiver, etc; using ANSI B31.1, B31.3, and B31.8, API 1104. g. Hot work on Structural of braces, ladder, hand rail, walkway, grating, boom burner High Pressure support; using AWS D1.1. h. Repair vessel (Cladding); on production separator using WPS Repair. i. Witness and inspect of Hydro Test, Leak Test, and Service Test that performed; and interpretation of its result (joint integrity and Barton Chard). j. Inspect joint integrity of piping system. k. Final interpretation of NDE result (MT/PT, UT, and RI). 8. 04 July – 04 Oct 2011  Company : PT. Suprabakti Mandiri  Business : Fabricator of Conveyor and Rubber Lining, Pressure Vessel, Tanks, Piping  Address : Jl. Pasar Kemis No. 112 Tangerang, Banten – Indonesia  Project : Perform and/or repair of Conveyor’s Frame, Vessels, Piping systems, structural  Client : PT. Newmont Nusa Tenggara, PT. Freeport Indonesia, PT. INCO, PT. Chandra Asih, PT. Pertamina UP VI Balongan  Position : QC Welding Inspector  Responsibilities : a. Review project documents (drawing, Inspection Test Plan, WPS, PQR, etc). b. Verify material to its documents (such as hot number, dimension, coating thickness, etc). c. Inspection of incoming material (surface roughness, thickness of coating, dimension, shape, etc). d. Review of welding preparation (machine, personnel qualification certificates, consumables, environment, etc).
  • 9. e. Monitoring work execution to make sure that work is appropriate with procedure. f. Inspection of work result (using visual and NDT). g. Make a decision for its acceptance based on manufacturer specification. h. Documentation of before, during, and after work processes. i. Closed out and reporting.  Inspection Objects : a. Inspection of fit up of construction. b. Incoming material condition (dimension, shape, quantity, thickness, roughness, etc). c. Material/product condition after sand blasting. d. Hot work preparation (machines, consumables, equipment, environment, etc). e. Hot work performed on structural and construction; using AWS D1.1, ASME sec. VIII – 2010. f. Dimension and shape of construction as production’s result. g. Repair vessel (Cladding); using WPS Repair. 9. 06 June – 01 July 2011  Company : PT. ZUG Indonesia  Business : Boiler & Vessel Manufacturer  Address : Cengkareng, Jakarta – Indonesia  Project : Structural trusses for roof’s support of generator house  Client : PLTU Bontang, East of Kalimantan, Indonesia  Position : QC Welding Inspector – Structural  Responsibilities : a. Review project documents (drawing, Inspection Test Plan, WPS, PQR, etc). b. Inspection of material documents (such as hot number, dimension, coating thickness, etc). c. Inspection of incoming material (surface roughness, thickness of coating, dimension, shape, etc). d. Inspection of welding preparation (machine, personnel qualification certificates, consumables, etc). e. Supervision of work execution to make sure that work is appropriate with procedure. f. Inspection of work result (using visual and NDT). g. Make a decision for its acceptance based on standard. h. Documentation of before, during, and after work processes. i. Reporting.  Inspection Objects : a. Fit up of construction. b. Dimension and shape compare with drawing. c. Hot work preparation (machine, consumables, equipment, etc). d. Hot work on Structural; using AWS D1.1 – 2010. e. Witness of NDE execution. f. Final interpret of NDE’s result. g. Painting on structural (frames/trusses).
  • 10. 10.02 May – 31 May 2011  Company : CV. ArcMart Indonesia  Business : Construction / fabrication / Repair / Consultant  Address : Jl. Bojongsoang, Bandung - Indonesia  Project : Repair and manufacturing Crane track 25 tons of capacity  Client : PT. Semen Padang, West of Sumatra  Position : QC Welding Inspector – Structural  Responsibilities : a. Perform WPS’s and WPS. b. Witness mechanical test. c. Review project document (drawing, client’s spec, etc). d. Monitoring of execution to make sure that work is appropriate with procedure. e. Inspection of work result (using visual and PT and UT). f. Make a decision for its acceptance based on standard (AWS D1.1 – 2010). g. Reporting.  Inspection Objects : a. Fit up of construction. b. Hot work on Structural; using AWS D1.1 – 2010. c. Dimension and shape which compared with drawing. d. Witness of NDE execution. e. Final interpret of NDE’s result. I describe myself as an optimistic person with highly motivation, focus to point, quick learner, good worker as an individual or team, multi task capability, able to work under pressure, and willing to travel for job. I hereby declare the details stated to be true and complete. Best Regards, Ardiansyah T.A