SlideShare a Scribd company logo

Cv ardiansyah t.a cswip 3.1

CV of Ardiansyah T.A

1 of 10
Download to read offline
PERSONAL DETAIL
Name : Ardiansyah Teuku Agam
Title : Welding Inspector CSWIP 3.1 plus NDT ASNT Level 2
for MT/PT, UT, RI
Sex : Male
Place /date of birth : Cilacap, 05 April 1979
Address : Komplek Taman Puspa Indah, Jl. Puspa Utara I No. 11, Bandung, West of Java,
Indonesia - 40286
Phone : +62 813 2053 9038/ +62 815 73167407
Passport No. : A 1624075
Marital status : Married
Email address : zahrainbow@yahoo.co.id
PROFILE
Qualified and experienced as Welding and NDT Inspection such as structural, piping, fabrication and
installation of pressure vessel, storage tanks, repair/replacement of piping system such as Main Oil Line, Main
Gas Line; pressure vessel such as gas lift separator, production separator, test separator; structure of platform
such as bracing, grating, and deck. Familiar with codes such as AWS D1.1, ASME (sec. 1, sec. 2, sec. 5,
sec. 8 div. 1 and div. 2, and sec. 9), ASME B31.1, ASME B31.3, ASME B31.8, API 1104, API 650, API 5L.
Qualified and experienced for working as Welding and NDT Inspection at Onshore (fabrication and site) and
Offshore.
EDUCATION BACKGROUND
Bachelor degree (S1) : Pasundan University, Bandung – Indonesia
Mechanical Engineering, Grade Point Average : 3.17 of scale 4
COURSE / TRAINING
 CSWIP 3.1 Welding Inspector Level 2 – Cert. No. 59937 (expiry : 24 October 2016), certified by TWI
Certification Ltd, Granta Park, Great Abington, Cambridge CB21 6AL, UK
 Basic Offshore Safety Induction & emergency Training (BOSIET) & Travel Safely by Boat (TSbB) –
Cert. No. 939257071708132493 (expiry : 16 August 2017), certified by OPITO
 Welding Inspector / Welding Inspection Personnel with minimum requirement 559 hours training
attendance – WI Cert. No. 0411.12.73 2056, conducted by Ministry of Industrial Affair at Industrial Policy,
Climate, and Quality Research Agency Center for Material and Technical Product (B4T) Bandung -
Indonesia
 Radiographic Film Interpretation and Evaluation (RI) ASNT Level 2 – Cert. No. 0412.23 1223
(expiry : September 2017) conducted by Ministry of Industrial Affair at Industrial Policy, Climate, and
Quality Research Agency Center for Material and Technical Product (B4T) Bandung - Indonesia
 Non Destructive Testing (NDT) Ultrasonic Testing (UT) ASNT Level 2 – Cert. No. 0313.22 1189
(expiry : March 2018) conducted by Ministry of Industrial Affair at Industrial Policy, Climate, and Quality
Research Agency Center for Material and Technical Product (B4T) Bandung - Indonesia
 Non Destructive Testing (NDT) Magnetic Testing & Penetrant Testing (MT & PT) ASNT Level 2 –
Cert. No. 0413.24.25 1210 (expiry : April 2018) conducted by Ministry of Industrial Affair at Industrial
Policy, Climate, and Quality Research Agency Center for Material and Technical Product (B4T)
Bandung - Indonesia
 Confined Space Entry Training, conducted by PT. Sucofindo, Jakarta – Indonesia
COMPUTER’S SKILL
 MS Office (MS Word, MS Excel, MS Power Point)
 AutoCad 2010
 MATLAB 6.1 (toolbox : Simulink 4)
 Inventor 5.3
 ANSYS 5.4
WORK EXPERIENCES AS WELDING INSPECTOR (QA/QC INSPECTOR)
1. 29 July 2015 – 31 Oct 2015
 Company : PT. Tripatra-Samsung Concortium (TSC)
 Agent : PT. Air Energi Indonesia
 Address : Alamanda Tower 18th Floor, Unit B-C, Jl. TB Simatupang Kav. 23-24, Cilandak
Barat, Jakarta 12430
 Project : EPC-1 Banyu Urip Project
 Client : EXXON MOBIL INDONESIA
 Position : Piping / Welding Inspector
 Responsibilities :
a. Reports to the QC Coordinator regarding construction quality activities such as checking, inspecting,
examining and controlling to make sure the constructed items meet project requirements.
b. Coordinating all site inspections with the subcontractor.
c. Ensuring all inspections are held correctly and have an inspection report
d. Reviewing construction documents and inspection documents.
e. Issuance of inspection report activity on daily basis.
f. Initiating NCR for any discrepancy that fails to meet the project requirement or acceptance criteria.
g. Advising subcontractors on quality issues and activity.
h. Any other activities required for achieving the desired level of quality.
i. Witnessing PWHT activities; ensure that the thermocouple configuration meets the procedure.
j. Review report of PWHT that submitted by subcontractor; including its chart and configuration’s
thermocouple sketch.
2. 24 June 2015 – 24 July 2015
 Company : PT. Mulia Tehnik Toolsindo
 Address : Jl. Teuku Umar No. 11 Cibitung – Bekasi
 Project : Onshore Pipeline Package “Installation and Operation KALIJA I Transmission Project
(Kepodang – Tambak Lorok)”
Onshore Pipeline Package “Proyek Pembangunan dan Pengoperasian Ruas Transmisi
KALIJA I (Kepodang – Tambak Lorok)”
 Client : PT.Kalimantan Jawa Gas
 Position : QC Welding Inspector
 Responsibilities :
a. Review project documents such as client documents (client’s spec, procedures, Term Of
References, etc), drawing, Quality plan/Inspection Test Plan, WPS, PQR, Welder Performance
Qualification certificate, NDT Personnel certificate, Mill Certificates (Carbon Steel API 5L X65
PSL2), etc.
b. Monitoring stringing, welding, trenching, lowering, tie-in, and backfilling activities.
c. Assure that joint preparation is accordance to client specification, such as joint bevel 30°, joint bevel
is free from scale, rust, dirt, and other foreign matter.
d. Assure that Line-Up clamp is installed properly and carried out the straightness of line pipe.
e. Witnessing and monitoring the welding execution and joint repair have appropriated with
specification project (WPS).
f. Monitoring preheat temperature, minimum 50°C, and interpass temperature, about 182°C on
welding.
g. Visual Inspection performing.
h. Witness and reviewing NDT activities (DPT, MPI, UT and RT).
i. Witnessing and monitoring hydrotest performing for pipeline.
3. 08 April 2015 – 04 June 2015
 Company : British Petroleum (BP) Berau Ltd
 Agent : PT. Bureau Veritas Indonesia
 Address : Wisma Bakrie, 1st Floor. Jl. Rasuna Said, Kav. B-1 Jakarta
 Project : Turn Around (TAR) Project BP Tangguh LNG
 Client : British Petroleum (BP)Berau Ltd
 Position : Mechanical Inspector Joint Integrity (JI) for TAR 6th Project
 Responsibilities :
a. Review BP’s Guidance of Certificates (GOC) as based of project performing object.
b. Assure that the joint worked is appropriate with PID and others BP’s documents.
c. Assure flange management systems which were conducted have appropriate with specification.
d. Assure that flange used is clean, free from defect, and in the right alignment.
e. Assure that gasket used is appropriate with specification and position.
f. Assure that bolt and nut used are correct material, number, size, and cleaned condition.
g. Monitoring and assure that anti seize compound applied.
h. Monitoring and assure that bolt tightening is performed by right sequence.
i. Monitoring and assure that torque value is appropriate with specification (based on its NPS and pipe
rating).
j. Assure that only torque wrench calibrated which being used.
k. Apply the Joint Integrity (JI) tag to each joint which has done.
l. Sign on Joint Integrity 1 (JI 1) Certificates that issued by GOC Officer.
 Inspection Objects :
a. Flange management system of joint of pipes; including on piping system, steam turbine compressor
(PR and MR), and structure (fin fan cooler).
b. Bolt and plug tightening, including at flange and structure.
4. 26 August 2014 – 18 January 2015
 Company : Saipem Singapore Pte Ltd
 Agent : Oilfield Technical Inspection (OTI) SDN BHD
 Address : 142 Jl. Kapar 27/89 Section 27, 40400 Shah Alam, Selangor - Malaysia
 Project : ICHTHYS LNG INPEX Project – barge repairing project
 Client : INPEX Corporate
 Position : QC / Welding Inspector
 Responsibilities :
a. Review project documents such as client documents (client’s spec, procedures), drawing, Quality
plan/Inspection Test Plan, WPS, PQR, Welder Performance Qualification certificate, NDT Personnel
certificate, etc.
b. Monitoring work execution to make sure that works have appropriated with specification project.
c. Monitoring/witnessing fit up, welding process, and welding repair.
d. Monitoring preheat temperature on welding (≥ 30°C).
e. Visual inspection performing and NDT (MPI and/or UT) application witnessing for CS A/SA 36.
f. As a final decision maker for retire products acceptance based on project specification; if necessary
punch list issued and close out.
g. Visual Inspection Report performing as closing reporting for each project completed of barges.
h. Reviewing NDT Report (MPI and UT).
 Inspection Objects :
a. Stanchion repairing : stiffeners, spacers, strip plate for dunnage installation
b. Bollard repairing.
c. Hot work performing on stanchion, strip plates for dunnage, spacers, bollards installation; using AWS
D1.1 – 2010.
d. Visual inspection for all welds; groove and fillet welds.
e. Size of welds as per client requirements.
f. Poles of navigation light and black diamond repairing of barges.
5. 27 November 2013 – 25 August 2014
 Company : Pertamina – Medco
 Agent : PT. TRA / TSI Consortium
 Business : Inspection and technical services company
 Address : One Building, Wolter Place Building, 4th Floor, Jl. Wolter Mongonsidi No.63B,
Kebayoran Baru, Jakarta Selatan
 Project : LNG Senoro Sulawesi Project – Spools fabrication for Stainless Steel A/SA 312 Gr. TP
316L and Duplex SA 790 S31803, installation of piping system, tanks, and vessel.
 Position : Client Representative – Quality Management Inspection Supervision Service of JOB
Pertamina Medco LNG – Welding/Piping/Tank/Pressure Vessel Inspector
 Responsibilities :
a. Review project documents such as client documents (client’s spec, procedures, etc), drawing,
Quality plan/Inspection Test Plan, WPS, PQR, welding map, Welder Performance Qualification
certificate, NDT Personnel certificate, etc.
b. Monitoring work execution to make sure that works have appropriated with specification project.
c. Monitoring/witnessing fit up, welding process, welding repair, storage, and packing for Stainless
Steel A/SA 312 A/SA 312 Gr. TP 316L and Duplex SA 790 S31803 pipes/spools.
d. Monitoring status of quality and construction progress of Stainless Steel A/SA 312 A/SA 312 Gr. TP
316L and Duplex SA 790 S31803 spools fabrication.
e. Monitoring preheat and interpass temperature on hot work (random/spot check).
f. Witnessing PMI and Ferrite Content Test application for Stainless Steel A/SA 312 A/SA 312 Gr. TP
316L and/or Duplex SA 790 S31803 spools.
g. As a final decision maker for retire products acceptance based on project specification; if necessary
punch list issued and close out.
h. Witnessing, reviewing, and final decision maker for welder test for Stainless Steel A/SA 312 A/SA
312 Gr. TP 316L and/or Duplex SA 790 S31803 spools.
i. Witnessing, reviewing, and as final decision maker for WPS and PQR test processes (including
WPQT/preliminary WPS and the mechanical tests) for Stainless Steel A/SA 312 A/SA 312 Gr. TP
316L and/or Duplex SA 790 S31803 spools.
j. Witnessing, monitoring, and inspecting for floating roof tanks installation.
k. Witnessing and inspecting the vessel’s installation.
l. As final decision maker of acceptance for film radiography Interpretation result.
m. Flash report and Shop Inspection Report performing as daily reporting.
n. Final linecheck before hydrotest and pre-commissioning.
o. Witness and review hydrotest for line piping.
 Inspection Objects :
a. Test coupons of Welding Procedure Qualification Test (WPQT) for Welding Procedure Specification
and Procedure Qualification Record (visual inspection), it’s Radiography Tests result (films
interpretation), and mechanical tests results; using ASME BPVC IX – 2010.
b. Test coupons of welder test (visual inspection) and its Radiography Test’s result (films
interpretation); using ASME BPVC sec. IX – 2010.
c. Straightness and flatness for fit up and weldment of spools fabrication (including raw materials and
fittings).
d. Hot work on spools fabrication (Stainless Steel and Duplex); using ASME B31.3 – 2002.
e. Positive Material Identification (PMI) test for Stainless Steel and Duplex; using ASME BPVC sec. II
part A; using ASME BPVC sec. II – 2010.
f. Ferrite Content Examination for Duplex; using ASME BPVC sec. II part A – 2010.
g. Color indication of Stainless Steel and Duplex during and after hot work.
h. Contamination possibility on Stainless Steel and Duplex’s surface.
i. Interpretation of films Radiography test of mass production.
6. 15 July 2013 – 25 November 2013
 Company : PT. Adhi Karya (persero) Tbk
 Business : Construction; Engineering, Procurement, and Construction; Property; and Real Estate
Development Businesses
 Address : Jl. Raya Pasar Minggu Km 18, Jakarta 12510
 Project : Resid Fluid Catalytic Cracking (RFCC) Project
 Client : Pertamina RU IV Cilacap
 Position : Mechanical Inspector – Spherical Tank (Pressure Vessel), Atmospheric Tank, Piping
System, Flare Pipe Support
Ad

Recommended

QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updatedSantosh Gurajada
 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorAsad Ahsan
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFChandra Battu
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 

More Related Content

What's hot

Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expVijay Raghavan
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspectorLatchanna Akula
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & GasResume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gasjaison varkey
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
AKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalAKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalMohammad Akram Mian
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipelineUDAYAKUMAR P C PANICKER
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingjaison varkey
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher
 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyAjith Puthoor
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerMujeebuddin Mohammad
 
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)Rajeev Kumar
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERMOHAMMED ZUBAIR
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 

What's hot (20)

Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of exp
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspector
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
Sujit TPI CV
Sujit TPI CVSujit TPI CV
Sujit TPI CV
 
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & GasResume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
AKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalAKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor Mechanical
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coating
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - Copy
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
QC. CV
QC. CVQC. CV
QC. CV
 
Pradeep s (resume)
Pradeep s (resume)Pradeep s (resume)
Pradeep s (resume)
 

Similar to Cv ardiansyah t.a cswip 3.1 (20)

CV_Sa-nga Last Revision
CV_Sa-nga Last RevisionCV_Sa-nga Last Revision
CV_Sa-nga Last Revision
 
LINGAM
LINGAMLINGAM
LINGAM
 
CV-Alamin2016
CV-Alamin2016CV-Alamin2016
CV-Alamin2016
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
Phairat-CV(2015)
Phairat-CV(2015)Phairat-CV(2015)
Phairat-CV(2015)
 
CV_Thangaraj Raja
CV_Thangaraj RajaCV_Thangaraj Raja
CV_Thangaraj Raja
 
Tin's CV
Tin's CVTin's CV
Tin's CV
 
01. cv qc civil structur & wi
01. cv qc civil structur & wi01. cv qc civil structur & wi
01. cv qc civil structur & wi
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
MURUG NEW
MURUG NEWMURUG NEW
MURUG NEW
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)
 
RESUME 26 JAN
RESUME 26 JANRESUME 26 JAN
RESUME 26 JAN
 
Tin's cv
Tin's cvTin's cv
Tin's cv
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
Cutech
CutechCutech
Cutech
 
CV Herwandi
CV HerwandiCV Herwandi
CV Herwandi
 
CV Hasrul Maswandy
CV Hasrul MaswandyCV Hasrul Maswandy
CV Hasrul Maswandy
 
Achmad soewarso _ CV
Achmad soewarso _ CVAchmad soewarso _ CV
Achmad soewarso _ CV
 

Recently uploaded

Microstrip Bandpass Filter Design using EDA Tolol such as keysight ADS and An...
Microstrip Bandpass Filter Design using EDA Tolol such as keysight ADS and An...Microstrip Bandpass Filter Design using EDA Tolol such as keysight ADS and An...
Microstrip Bandpass Filter Design using EDA Tolol such as keysight ADS and An...GauravBhartie
 
Nexus - Final Day 12th February 2024.pptx
Nexus - Final Day 12th February 2024.pptxNexus - Final Day 12th February 2024.pptx
Nexus - Final Day 12th February 2024.pptxRohanAgarwal340656
 
Introduction and replication to DragonflyDB
Introduction and replication to DragonflyDBIntroduction and replication to DragonflyDB
Introduction and replication to DragonflyDBMarian Marinov
 
Microservices: Benefits, drawbacks and are they for me?
Microservices: Benefits, drawbacks and are they for me?Microservices: Benefits, drawbacks and are they for me?
Microservices: Benefits, drawbacks and are they for me?Marian Marinov
 
21 SCHEME_21EC53_VTU_MODULE-4_COMPUTER COMMUNCATION NETWORK.pdf
21 SCHEME_21EC53_VTU_MODULE-4_COMPUTER COMMUNCATION NETWORK.pdf21 SCHEME_21EC53_VTU_MODULE-4_COMPUTER COMMUNCATION NETWORK.pdf
21 SCHEME_21EC53_VTU_MODULE-4_COMPUTER COMMUNCATION NETWORK.pdfDr. Shivashankar
 
CCW332-DIGITAL MARKETING QUESTION BANK WITH ANSWERS
CCW332-DIGITAL MARKETING QUESTION BANK WITH ANSWERSCCW332-DIGITAL MARKETING QUESTION BANK WITH ANSWERS
CCW332-DIGITAL MARKETING QUESTION BANK WITH ANSWERSTamil949112
 
Series of training sessions by our experts for you to provide necessary insig...
Series of training sessions by our experts for you to provide necessary insig...Series of training sessions by our experts for you to provide necessary insig...
Series of training sessions by our experts for you to provide necessary insig...AshishChanchal1
 
Chapter 1 - Drilling Fluid Functions GR.ppt
Chapter 1 - Drilling Fluid Functions GR.pptChapter 1 - Drilling Fluid Functions GR.ppt
Chapter 1 - Drilling Fluid Functions GR.pptzeidali3
 
INTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHI
INTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHIINTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHI
INTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHIKiranKandhro1
 
Introduction to Binary Tree and Conersion of General tree to Binary Tree
Introduction to Binary Tree  and Conersion of General tree to Binary TreeIntroduction to Binary Tree  and Conersion of General tree to Binary Tree
Introduction to Binary Tree and Conersion of General tree to Binary TreeSwarupaDeshpande4
 
Forged Fitting Socket Welding Standard- ASME-B16.11-2001.pdf
Forged Fitting Socket Welding Standard- ASME-B16.11-2001.pdfForged Fitting Socket Welding Standard- ASME-B16.11-2001.pdf
Forged Fitting Socket Welding Standard- ASME-B16.11-2001.pdfVikasKumar11936
 
fat and edible oil processsing.ppt, refining
fat and edible oil processsing.ppt, refiningfat and edible oil processsing.ppt, refining
fat and edible oil processsing.ppt, refiningteddymebratie
 
Checklist to troubleshoot CD moisture profiles.docx
Checklist to troubleshoot CD moisture profiles.docxChecklist to troubleshoot CD moisture profiles.docx
Checklist to troubleshoot CD moisture profiles.docxNomanKhan691800
 
CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf8-koi
 
Architectural Preservation - Heritage, focused on Saudi Arabia
Architectural Preservation - Heritage, focused on Saudi ArabiaArchitectural Preservation - Heritage, focused on Saudi Arabia
Architectural Preservation - Heritage, focused on Saudi ArabiaIgnacio J. Palma, Arch PhD.
 
Microstructure of Hadfield Steels (Robert Hadfield)
Microstructure of Hadfield Steels (Robert Hadfield)Microstructure of Hadfield Steels (Robert Hadfield)
Microstructure of Hadfield Steels (Robert Hadfield)MANICKAVASAHAM G
 
Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...
Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...
Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...C Sai Kiran
 
Center Enamel is the leading fire water tanks manufacturer in China.docx
Center Enamel is the leading fire water tanks manufacturer in China.docxCenter Enamel is the leading fire water tanks manufacturer in China.docx
Center Enamel is the leading fire water tanks manufacturer in China.docxsjzzztc
 
GE8073 - FUNDAMENTALS OF NANOSCIENCE.ppt
GE8073 - FUNDAMENTALS OF NANOSCIENCE.pptGE8073 - FUNDAMENTALS OF NANOSCIENCE.ppt
GE8073 - FUNDAMENTALS OF NANOSCIENCE.pptsrajece
 

Recently uploaded (20)

AC DISTRIBUTION - ELECTRICAL POWER SYSTEM
AC DISTRIBUTION - ELECTRICAL POWER SYSTEMAC DISTRIBUTION - ELECTRICAL POWER SYSTEM
AC DISTRIBUTION - ELECTRICAL POWER SYSTEM
 
Microstrip Bandpass Filter Design using EDA Tolol such as keysight ADS and An...
Microstrip Bandpass Filter Design using EDA Tolol such as keysight ADS and An...Microstrip Bandpass Filter Design using EDA Tolol such as keysight ADS and An...
Microstrip Bandpass Filter Design using EDA Tolol such as keysight ADS and An...
 
Nexus - Final Day 12th February 2024.pptx
Nexus - Final Day 12th February 2024.pptxNexus - Final Day 12th February 2024.pptx
Nexus - Final Day 12th February 2024.pptx
 
Introduction and replication to DragonflyDB
Introduction and replication to DragonflyDBIntroduction and replication to DragonflyDB
Introduction and replication to DragonflyDB
 
Microservices: Benefits, drawbacks and are they for me?
Microservices: Benefits, drawbacks and are they for me?Microservices: Benefits, drawbacks and are they for me?
Microservices: Benefits, drawbacks and are they for me?
 
21 SCHEME_21EC53_VTU_MODULE-4_COMPUTER COMMUNCATION NETWORK.pdf
21 SCHEME_21EC53_VTU_MODULE-4_COMPUTER COMMUNCATION NETWORK.pdf21 SCHEME_21EC53_VTU_MODULE-4_COMPUTER COMMUNCATION NETWORK.pdf
21 SCHEME_21EC53_VTU_MODULE-4_COMPUTER COMMUNCATION NETWORK.pdf
 
CCW332-DIGITAL MARKETING QUESTION BANK WITH ANSWERS
CCW332-DIGITAL MARKETING QUESTION BANK WITH ANSWERSCCW332-DIGITAL MARKETING QUESTION BANK WITH ANSWERS
CCW332-DIGITAL MARKETING QUESTION BANK WITH ANSWERS
 
Series of training sessions by our experts for you to provide necessary insig...
Series of training sessions by our experts for you to provide necessary insig...Series of training sessions by our experts for you to provide necessary insig...
Series of training sessions by our experts for you to provide necessary insig...
 
Chapter 1 - Drilling Fluid Functions GR.ppt
Chapter 1 - Drilling Fluid Functions GR.pptChapter 1 - Drilling Fluid Functions GR.ppt
Chapter 1 - Drilling Fluid Functions GR.ppt
 
INTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHI
INTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHIINTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHI
INTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHI
 
Introduction to Binary Tree and Conersion of General tree to Binary Tree
Introduction to Binary Tree  and Conersion of General tree to Binary TreeIntroduction to Binary Tree  and Conersion of General tree to Binary Tree
Introduction to Binary Tree and Conersion of General tree to Binary Tree
 
Forged Fitting Socket Welding Standard- ASME-B16.11-2001.pdf
Forged Fitting Socket Welding Standard- ASME-B16.11-2001.pdfForged Fitting Socket Welding Standard- ASME-B16.11-2001.pdf
Forged Fitting Socket Welding Standard- ASME-B16.11-2001.pdf
 
fat and edible oil processsing.ppt, refining
fat and edible oil processsing.ppt, refiningfat and edible oil processsing.ppt, refining
fat and edible oil processsing.ppt, refining
 
Checklist to troubleshoot CD moisture profiles.docx
Checklist to troubleshoot CD moisture profiles.docxChecklist to troubleshoot CD moisture profiles.docx
Checklist to troubleshoot CD moisture profiles.docx
 
CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf
 
Architectural Preservation - Heritage, focused on Saudi Arabia
Architectural Preservation - Heritage, focused on Saudi ArabiaArchitectural Preservation - Heritage, focused on Saudi Arabia
Architectural Preservation - Heritage, focused on Saudi Arabia
 
Microstructure of Hadfield Steels (Robert Hadfield)
Microstructure of Hadfield Steels (Robert Hadfield)Microstructure of Hadfield Steels (Robert Hadfield)
Microstructure of Hadfield Steels (Robert Hadfield)
 
Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...
Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...
Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...
 
Center Enamel is the leading fire water tanks manufacturer in China.docx
Center Enamel is the leading fire water tanks manufacturer in China.docxCenter Enamel is the leading fire water tanks manufacturer in China.docx
Center Enamel is the leading fire water tanks manufacturer in China.docx
 
GE8073 - FUNDAMENTALS OF NANOSCIENCE.ppt
GE8073 - FUNDAMENTALS OF NANOSCIENCE.pptGE8073 - FUNDAMENTALS OF NANOSCIENCE.ppt
GE8073 - FUNDAMENTALS OF NANOSCIENCE.ppt
 

Cv ardiansyah t.a cswip 3.1

  • 1. PERSONAL DETAIL Name : Ardiansyah Teuku Agam Title : Welding Inspector CSWIP 3.1 plus NDT ASNT Level 2 for MT/PT, UT, RI Sex : Male Place /date of birth : Cilacap, 05 April 1979 Address : Komplek Taman Puspa Indah, Jl. Puspa Utara I No. 11, Bandung, West of Java, Indonesia - 40286 Phone : +62 813 2053 9038/ +62 815 73167407 Passport No. : A 1624075 Marital status : Married Email address : zahrainbow@yahoo.co.id PROFILE Qualified and experienced as Welding and NDT Inspection such as structural, piping, fabrication and installation of pressure vessel, storage tanks, repair/replacement of piping system such as Main Oil Line, Main Gas Line; pressure vessel such as gas lift separator, production separator, test separator; structure of platform such as bracing, grating, and deck. Familiar with codes such as AWS D1.1, ASME (sec. 1, sec. 2, sec. 5, sec. 8 div. 1 and div. 2, and sec. 9), ASME B31.1, ASME B31.3, ASME B31.8, API 1104, API 650, API 5L. Qualified and experienced for working as Welding and NDT Inspection at Onshore (fabrication and site) and Offshore. EDUCATION BACKGROUND Bachelor degree (S1) : Pasundan University, Bandung – Indonesia Mechanical Engineering, Grade Point Average : 3.17 of scale 4 COURSE / TRAINING  CSWIP 3.1 Welding Inspector Level 2 – Cert. No. 59937 (expiry : 24 October 2016), certified by TWI Certification Ltd, Granta Park, Great Abington, Cambridge CB21 6AL, UK  Basic Offshore Safety Induction & emergency Training (BOSIET) & Travel Safely by Boat (TSbB) – Cert. No. 939257071708132493 (expiry : 16 August 2017), certified by OPITO  Welding Inspector / Welding Inspection Personnel with minimum requirement 559 hours training attendance – WI Cert. No. 0411.12.73 2056, conducted by Ministry of Industrial Affair at Industrial Policy,
  • 2. Climate, and Quality Research Agency Center for Material and Technical Product (B4T) Bandung - Indonesia  Radiographic Film Interpretation and Evaluation (RI) ASNT Level 2 – Cert. No. 0412.23 1223 (expiry : September 2017) conducted by Ministry of Industrial Affair at Industrial Policy, Climate, and Quality Research Agency Center for Material and Technical Product (B4T) Bandung - Indonesia  Non Destructive Testing (NDT) Ultrasonic Testing (UT) ASNT Level 2 – Cert. No. 0313.22 1189 (expiry : March 2018) conducted by Ministry of Industrial Affair at Industrial Policy, Climate, and Quality Research Agency Center for Material and Technical Product (B4T) Bandung - Indonesia  Non Destructive Testing (NDT) Magnetic Testing & Penetrant Testing (MT & PT) ASNT Level 2 – Cert. No. 0413.24.25 1210 (expiry : April 2018) conducted by Ministry of Industrial Affair at Industrial Policy, Climate, and Quality Research Agency Center for Material and Technical Product (B4T) Bandung - Indonesia  Confined Space Entry Training, conducted by PT. Sucofindo, Jakarta – Indonesia COMPUTER’S SKILL  MS Office (MS Word, MS Excel, MS Power Point)  AutoCad 2010  MATLAB 6.1 (toolbox : Simulink 4)  Inventor 5.3  ANSYS 5.4 WORK EXPERIENCES AS WELDING INSPECTOR (QA/QC INSPECTOR) 1. 29 July 2015 – 31 Oct 2015  Company : PT. Tripatra-Samsung Concortium (TSC)  Agent : PT. Air Energi Indonesia  Address : Alamanda Tower 18th Floor, Unit B-C, Jl. TB Simatupang Kav. 23-24, Cilandak Barat, Jakarta 12430  Project : EPC-1 Banyu Urip Project  Client : EXXON MOBIL INDONESIA  Position : Piping / Welding Inspector  Responsibilities : a. Reports to the QC Coordinator regarding construction quality activities such as checking, inspecting, examining and controlling to make sure the constructed items meet project requirements. b. Coordinating all site inspections with the subcontractor. c. Ensuring all inspections are held correctly and have an inspection report d. Reviewing construction documents and inspection documents.
  • 3. e. Issuance of inspection report activity on daily basis. f. Initiating NCR for any discrepancy that fails to meet the project requirement or acceptance criteria. g. Advising subcontractors on quality issues and activity. h. Any other activities required for achieving the desired level of quality. i. Witnessing PWHT activities; ensure that the thermocouple configuration meets the procedure. j. Review report of PWHT that submitted by subcontractor; including its chart and configuration’s thermocouple sketch. 2. 24 June 2015 – 24 July 2015  Company : PT. Mulia Tehnik Toolsindo  Address : Jl. Teuku Umar No. 11 Cibitung – Bekasi  Project : Onshore Pipeline Package “Installation and Operation KALIJA I Transmission Project (Kepodang – Tambak Lorok)” Onshore Pipeline Package “Proyek Pembangunan dan Pengoperasian Ruas Transmisi KALIJA I (Kepodang – Tambak Lorok)”  Client : PT.Kalimantan Jawa Gas  Position : QC Welding Inspector  Responsibilities : a. Review project documents such as client documents (client’s spec, procedures, Term Of References, etc), drawing, Quality plan/Inspection Test Plan, WPS, PQR, Welder Performance Qualification certificate, NDT Personnel certificate, Mill Certificates (Carbon Steel API 5L X65 PSL2), etc. b. Monitoring stringing, welding, trenching, lowering, tie-in, and backfilling activities. c. Assure that joint preparation is accordance to client specification, such as joint bevel 30°, joint bevel is free from scale, rust, dirt, and other foreign matter. d. Assure that Line-Up clamp is installed properly and carried out the straightness of line pipe. e. Witnessing and monitoring the welding execution and joint repair have appropriated with specification project (WPS). f. Monitoring preheat temperature, minimum 50°C, and interpass temperature, about 182°C on welding. g. Visual Inspection performing. h. Witness and reviewing NDT activities (DPT, MPI, UT and RT). i. Witnessing and monitoring hydrotest performing for pipeline.
  • 4. 3. 08 April 2015 – 04 June 2015  Company : British Petroleum (BP) Berau Ltd  Agent : PT. Bureau Veritas Indonesia  Address : Wisma Bakrie, 1st Floor. Jl. Rasuna Said, Kav. B-1 Jakarta  Project : Turn Around (TAR) Project BP Tangguh LNG  Client : British Petroleum (BP)Berau Ltd  Position : Mechanical Inspector Joint Integrity (JI) for TAR 6th Project  Responsibilities : a. Review BP’s Guidance of Certificates (GOC) as based of project performing object. b. Assure that the joint worked is appropriate with PID and others BP’s documents. c. Assure flange management systems which were conducted have appropriate with specification. d. Assure that flange used is clean, free from defect, and in the right alignment. e. Assure that gasket used is appropriate with specification and position. f. Assure that bolt and nut used are correct material, number, size, and cleaned condition. g. Monitoring and assure that anti seize compound applied. h. Monitoring and assure that bolt tightening is performed by right sequence. i. Monitoring and assure that torque value is appropriate with specification (based on its NPS and pipe rating). j. Assure that only torque wrench calibrated which being used. k. Apply the Joint Integrity (JI) tag to each joint which has done. l. Sign on Joint Integrity 1 (JI 1) Certificates that issued by GOC Officer.  Inspection Objects : a. Flange management system of joint of pipes; including on piping system, steam turbine compressor (PR and MR), and structure (fin fan cooler). b. Bolt and plug tightening, including at flange and structure. 4. 26 August 2014 – 18 January 2015  Company : Saipem Singapore Pte Ltd  Agent : Oilfield Technical Inspection (OTI) SDN BHD  Address : 142 Jl. Kapar 27/89 Section 27, 40400 Shah Alam, Selangor - Malaysia  Project : ICHTHYS LNG INPEX Project – barge repairing project  Client : INPEX Corporate  Position : QC / Welding Inspector  Responsibilities : a. Review project documents such as client documents (client’s spec, procedures), drawing, Quality plan/Inspection Test Plan, WPS, PQR, Welder Performance Qualification certificate, NDT Personnel certificate, etc. b. Monitoring work execution to make sure that works have appropriated with specification project.
  • 5. c. Monitoring/witnessing fit up, welding process, and welding repair. d. Monitoring preheat temperature on welding (≥ 30°C). e. Visual inspection performing and NDT (MPI and/or UT) application witnessing for CS A/SA 36. f. As a final decision maker for retire products acceptance based on project specification; if necessary punch list issued and close out. g. Visual Inspection Report performing as closing reporting for each project completed of barges. h. Reviewing NDT Report (MPI and UT).  Inspection Objects : a. Stanchion repairing : stiffeners, spacers, strip plate for dunnage installation b. Bollard repairing. c. Hot work performing on stanchion, strip plates for dunnage, spacers, bollards installation; using AWS D1.1 – 2010. d. Visual inspection for all welds; groove and fillet welds. e. Size of welds as per client requirements. f. Poles of navigation light and black diamond repairing of barges. 5. 27 November 2013 – 25 August 2014  Company : Pertamina – Medco  Agent : PT. TRA / TSI Consortium  Business : Inspection and technical services company  Address : One Building, Wolter Place Building, 4th Floor, Jl. Wolter Mongonsidi No.63B, Kebayoran Baru, Jakarta Selatan  Project : LNG Senoro Sulawesi Project – Spools fabrication for Stainless Steel A/SA 312 Gr. TP 316L and Duplex SA 790 S31803, installation of piping system, tanks, and vessel.  Position : Client Representative – Quality Management Inspection Supervision Service of JOB Pertamina Medco LNG – Welding/Piping/Tank/Pressure Vessel Inspector  Responsibilities : a. Review project documents such as client documents (client’s spec, procedures, etc), drawing, Quality plan/Inspection Test Plan, WPS, PQR, welding map, Welder Performance Qualification certificate, NDT Personnel certificate, etc. b. Monitoring work execution to make sure that works have appropriated with specification project. c. Monitoring/witnessing fit up, welding process, welding repair, storage, and packing for Stainless Steel A/SA 312 A/SA 312 Gr. TP 316L and Duplex SA 790 S31803 pipes/spools. d. Monitoring status of quality and construction progress of Stainless Steel A/SA 312 A/SA 312 Gr. TP 316L and Duplex SA 790 S31803 spools fabrication. e. Monitoring preheat and interpass temperature on hot work (random/spot check). f. Witnessing PMI and Ferrite Content Test application for Stainless Steel A/SA 312 A/SA 312 Gr. TP 316L and/or Duplex SA 790 S31803 spools.
  • 6. g. As a final decision maker for retire products acceptance based on project specification; if necessary punch list issued and close out. h. Witnessing, reviewing, and final decision maker for welder test for Stainless Steel A/SA 312 A/SA 312 Gr. TP 316L and/or Duplex SA 790 S31803 spools. i. Witnessing, reviewing, and as final decision maker for WPS and PQR test processes (including WPQT/preliminary WPS and the mechanical tests) for Stainless Steel A/SA 312 A/SA 312 Gr. TP 316L and/or Duplex SA 790 S31803 spools. j. Witnessing, monitoring, and inspecting for floating roof tanks installation. k. Witnessing and inspecting the vessel’s installation. l. As final decision maker of acceptance for film radiography Interpretation result. m. Flash report and Shop Inspection Report performing as daily reporting. n. Final linecheck before hydrotest and pre-commissioning. o. Witness and review hydrotest for line piping.  Inspection Objects : a. Test coupons of Welding Procedure Qualification Test (WPQT) for Welding Procedure Specification and Procedure Qualification Record (visual inspection), it’s Radiography Tests result (films interpretation), and mechanical tests results; using ASME BPVC IX – 2010. b. Test coupons of welder test (visual inspection) and its Radiography Test’s result (films interpretation); using ASME BPVC sec. IX – 2010. c. Straightness and flatness for fit up and weldment of spools fabrication (including raw materials and fittings). d. Hot work on spools fabrication (Stainless Steel and Duplex); using ASME B31.3 – 2002. e. Positive Material Identification (PMI) test for Stainless Steel and Duplex; using ASME BPVC sec. II part A; using ASME BPVC sec. II – 2010. f. Ferrite Content Examination for Duplex; using ASME BPVC sec. II part A – 2010. g. Color indication of Stainless Steel and Duplex during and after hot work. h. Contamination possibility on Stainless Steel and Duplex’s surface. i. Interpretation of films Radiography test of mass production. 6. 15 July 2013 – 25 November 2013  Company : PT. Adhi Karya (persero) Tbk  Business : Construction; Engineering, Procurement, and Construction; Property; and Real Estate Development Businesses  Address : Jl. Raya Pasar Minggu Km 18, Jakarta 12510  Project : Resid Fluid Catalytic Cracking (RFCC) Project  Client : Pertamina RU IV Cilacap  Position : Mechanical Inspector – Spherical Tank (Pressure Vessel), Atmospheric Tank, Piping System, Flare Pipe Support
  • 7.  Responsibility : a. Review project documents such as work pack, drawing, Quality plan/Inspection Test Plan, WPS, PQR, Welder Performance Qualification, NDT Personnel certificate, NDE map, etc. b. Monitoring work execution to make sure that work was appropriate with specification project. c. Monitoring status of quality and progress of structural, piping, atmospheric tank, and pressure vessel during execution as per project specification. d. Witnessing for fit up, welding process, and weld repair of structural, piping, tank, and pressure vessel e. Monitoring preheat and interpass temperature on hot work of spherical tank. f. Make sure that the dimension of atmospheric and spherical tanks (including roundness and plumpness) were appropriate with client specification. g. Witnessing and reviewing test pack for hydrostatic test, Product Test Plate, PWHT. h. Make a decision for its acceptance based on project specification; if necessary punch list issued and close out.  Inspection Objects : a. Plumpness and roundness of Atmospheric and Spherical Tank. b. Hot work on Piping System (fire water pipe); using B31.3. c. Hot work on Structural of Flare Pipe Support; using AWS D1.1 – 2010. d. Hot work on Spherical Tank of LPG and Propylene tank; using ASME VIII div. 2. e. Settlement test of Hydro Test of Atmospheric Tank (Fire Water Tank) by using an Auto Level. f. Leak of coating inspection by using the holidy test. g. Vacuum test of tank’s bottom. h. Interpretation of NDE result (MT/PT and Radiography Test). 7. 28 November 2011 – 30 June 2013  Company : PT. Sucofindo (Persero)  Business : Inspection, Testing, Audit, Supervision, Certification, and Training services  Address : Jl. Cumi No. 35, Tanjung Priok, Jakarta - Indonesia  Project : Maintenance of PHE Offshore North West Java (PHE-ONWJ)  Client : Pertamina Hulu Energi (PHE)  Position : Client Representative - QA/QC Topside Repair – Structural/Piping/Pressure Vessel Inspector  Responsibility : a. Review project documents such as work pack, drawing, Quality plan/Inspection Test Plan, WPS, PQR, Performance Test certificate, NDT Personnel certificate. b. Attend daily morning meeting (kick off meeting) with contractor/executor. c. Verify material identification that used. d. Monitoring work execution to make sure that work is appropriate with specification project. e. Monitoring status of quality and progress of structural, piping, and pressure vessel during execution as per project specification. f. Witnessing for fit up, welding process, and weld repair for structural, piping, and pressure vessel.
  • 8. g. Witnessing and reviewing for test pack of hydrostatic test. h. Witnessing internal and external blasting and painting activity and reported. i. Perform a visual inspection and check dimensional. j. Perform a joint integrity for piping system. k. Witnessing leak test, service test, and hydrostatic test for pressure vessel and piping. l. Make a decision for its acceptance based on project specification; if necessary punch list issued and close out. m. Documentation of before, during, and after work processes. n. Perform Handover Certification Report, Inspection Test Summary, and Visual Inspection Report.  Inspection Objects : a. Refurbishment/repainting on piping system, structural, and pressure vessel. b. Wrapping/strongback of piping system such as of Main Oil Line, Main Gas Line, Sump Pile, and Riser. c. Replacement of stud nuts, bolts, and gasket. d. Replacement of Piping System (Main Oil Line and Main Gas Line). e. Hot work preparation (machine, consumables, equipment, environment, etc). f. Hot work on Piping System on gas lift separator, production separator, test separator, launcher, receiver, etc; using ANSI B31.1, B31.3, and B31.8, API 1104. g. Hot work on Structural of braces, ladder, hand rail, walkway, grating, boom burner High Pressure support; using AWS D1.1. h. Repair vessel (Cladding); on production separator using WPS Repair. i. Witness and inspect of Hydro Test, Leak Test, and Service Test that performed; and interpretation of its result (joint integrity and Barton Chard). j. Inspect joint integrity of piping system. k. Final interpretation of NDE result (MT/PT, UT, and RI). 8. 04 July – 04 Oct 2011  Company : PT. Suprabakti Mandiri  Business : Fabricator of Conveyor and Rubber Lining, Pressure Vessel, Tanks, Piping  Address : Jl. Pasar Kemis No. 112 Tangerang, Banten – Indonesia  Project : Perform and/or repair of Conveyor’s Frame, Vessels, Piping systems, structural  Client : PT. Newmont Nusa Tenggara, PT. Freeport Indonesia, PT. INCO, PT. Chandra Asih, PT. Pertamina UP VI Balongan  Position : QC Welding Inspector  Responsibilities : a. Review project documents (drawing, Inspection Test Plan, WPS, PQR, etc). b. Verify material to its documents (such as hot number, dimension, coating thickness, etc). c. Inspection of incoming material (surface roughness, thickness of coating, dimension, shape, etc). d. Review of welding preparation (machine, personnel qualification certificates, consumables, environment, etc).
  • 9. e. Monitoring work execution to make sure that work is appropriate with procedure. f. Inspection of work result (using visual and NDT). g. Make a decision for its acceptance based on manufacturer specification. h. Documentation of before, during, and after work processes. i. Closed out and reporting.  Inspection Objects : a. Inspection of fit up of construction. b. Incoming material condition (dimension, shape, quantity, thickness, roughness, etc). c. Material/product condition after sand blasting. d. Hot work preparation (machines, consumables, equipment, environment, etc). e. Hot work performed on structural and construction; using AWS D1.1, ASME sec. VIII – 2010. f. Dimension and shape of construction as production’s result. g. Repair vessel (Cladding); using WPS Repair. 9. 06 June – 01 July 2011  Company : PT. ZUG Indonesia  Business : Boiler & Vessel Manufacturer  Address : Cengkareng, Jakarta – Indonesia  Project : Structural trusses for roof’s support of generator house  Client : PLTU Bontang, East of Kalimantan, Indonesia  Position : QC Welding Inspector – Structural  Responsibilities : a. Review project documents (drawing, Inspection Test Plan, WPS, PQR, etc). b. Inspection of material documents (such as hot number, dimension, coating thickness, etc). c. Inspection of incoming material (surface roughness, thickness of coating, dimension, shape, etc). d. Inspection of welding preparation (machine, personnel qualification certificates, consumables, etc). e. Supervision of work execution to make sure that work is appropriate with procedure. f. Inspection of work result (using visual and NDT). g. Make a decision for its acceptance based on standard. h. Documentation of before, during, and after work processes. i. Reporting.  Inspection Objects : a. Fit up of construction. b. Dimension and shape compare with drawing. c. Hot work preparation (machine, consumables, equipment, etc). d. Hot work on Structural; using AWS D1.1 – 2010. e. Witness of NDE execution. f. Final interpret of NDE’s result. g. Painting on structural (frames/trusses).
  • 10. 10.02 May – 31 May 2011  Company : CV. ArcMart Indonesia  Business : Construction / fabrication / Repair / Consultant  Address : Jl. Bojongsoang, Bandung - Indonesia  Project : Repair and manufacturing Crane track 25 tons of capacity  Client : PT. Semen Padang, West of Sumatra  Position : QC Welding Inspector – Structural  Responsibilities : a. Perform WPS’s and WPS. b. Witness mechanical test. c. Review project document (drawing, client’s spec, etc). d. Monitoring of execution to make sure that work is appropriate with procedure. e. Inspection of work result (using visual and PT and UT). f. Make a decision for its acceptance based on standard (AWS D1.1 – 2010). g. Reporting.  Inspection Objects : a. Fit up of construction. b. Hot work on Structural; using AWS D1.1 – 2010. c. Dimension and shape which compared with drawing. d. Witness of NDE execution. e. Final interpret of NDE’s result. I describe myself as an optimistic person with highly motivation, focus to point, quick learner, good worker as an individual or team, multi task capability, able to work under pressure, and willing to travel for job. I hereby declare the details stated to be true and complete. Best Regards, Ardiansyah T.A