SlideShare a Scribd company logo
1 of 4
Download to read offline
Page 1 of 4
N.KARTHIK
Mechanical Engineer
Objective
Seeking a challenging position in your reputable company to work in the mechanical field
Areas of Expertise
∑ Rotating and static equipment installation
∑ Pre-Commissioning, Commissioning and Start up
∑ Running plant maintenance and shutdown
Professional Experience
Total - 12 Years Gulf - 4 Years
April 2014-Till date
Company
ONGC Mangalore Petrochemicals, Subsidiary of Mangalore Refinery
and Petrochemicals (MRPL)
Project Aromatic complex
Job title and description Mechanical Maintenance Sr. Supervisor
March 2012- March 2014
Company Eni Saipem, Abu Dhabi
Project Shah gas development project
Job title and description Mechanical Equipment installation and commissioning supervisor
Qualification
Address
Mobile No.
Date Of Birth
Marital Status
Passport No.
E-Mail
Skype ID
:
:
:
:
:
:
:
:
Diploma in Mechanical Engineering
Bachelor Of Engineering in Mechanical
Flat no - F1, Ramana Park, Lakshmi
Nagar Extension, Selaiyur - Chennai,
Tamil Nadu, India – 600073
91-9480822173
10-07-1986
Married
G-2901534
pnkarthik86@gmail.com
Natarajankarthik
Page 2 of 4
August 2009-July 2011
Company Tecnicas Reunidas Gulf co. Ltd, Saudi Arabia
Project ARAMCO Refinery
Job title and description Mechanical Equipment installation and commissioning supervisor
May2005-July 2009
Company Siemens (Flender Grafenstaden)
Project Power and Energy Division
Job title and description
High speed gear box Assembly, Testing, Maintenance and
commissioning engineer
Key responsibilities handled
1. Installation during construction
¸ Coordinating fabrication, shell course shifting and erection activities for the static
equipments
¸ Monitoring the job as per ITP and required by client
¸ Reviewing the approval documents about Inspection Test Plan of the project to ensure
inspection shall be in accordance with the required quality standard and procedures
¸ Executing and checking documentation works for static and rotating equipments to
assure that the required forms used in testing submitted are approved by client
representative as per ITP such as:-Installation checklist for static/rotating equipment-
levelling/alignment recording forms for horizontal and vertical package type-Axial/radial,
soft foot parallelism forms for pumps and compressors
¸ Regular surveillance checking at site to verify the preservation requirements for
anchor bolts during construction stage
¸ Checking the preservation status of equipments at site
¸ Obtaining complete check list of the assembling equipment and keep a record of same.
¸ Erection of equipments such as pumps, vessels, tanks and compressors and other
equipments as per the approved method statement
¸ Checking equipment orientation and shimming before and after erection
¸ Check the condition of pump alignment (axial/radial) without piping prior for
preparation for piping installation
Page 3 of 4
2. Pre- Commissioning and commissioning
¸ Preparation of document coding system, defining systems/subsystems, mechanical
completion package, setting milestones
¸ Preparation of commissioning package, procedures and check list of plant system and
sub-system divisions
¸ Inspection of static equipments hydro test and leak test
¸ System wise plant delivery, installation, hook-up and Operations readiness assurance,
operations Readiness assurance plans/methodology/management.
¸ Preparation of punch list and follow up of its completion
¸ Preparation of operation procedure according to the vendor recommendations
¸ Conduction of meetings with sub-contractor for pre-commissioning and commissioning
start-up activities
¸ Reviewing the installed equipment and its accessories as per P&ID
¸ Coordination and interface with other disciplines related issues
¸ Final inspection (Alignment and box up ) of rotary and static equipment
¸ Identification and rectification of start- up problems of rotary equipments
3. Maintenance
¸ Maintenance for different types of static and rotating equipment
¸ Rectification of leaks present at heat exchanger tubes, column vessel and reactor trays
¸ Problem fixing with the help of various measuring tools
¸ Conducting a root cause analysis at the time of breakdown of machines
¸ Recommending alternative solution when the execution of the given design becomes
difficult at site
¸ Tracking the maintenance work orders using SAP software
¸ Planning, preparation and execution of yearly and short term shutdown
Machineries handled
∑ Air fin coolers (Forced and induced type )FD and ID fans, Blowers
∑ All types of pumps
∑ Compressors and auxiliaries system
∑ Steam turbines and auxiliaries system
∑ Gearboxes (High speed gear boxes )
Page 4 of 4
Units worked on
∑ Petrochemical Aromatic complex - Mangalore Petrochemicals
∑ Vacuum gas oil Unit ( VGO ) - GGSR refinery
∑ Diesel hydro treated Unit (DHDT) - GGSR refinery / Aram co refinery
∑ Hydro Treated Unit, Hydrogen Unit, Gas storage Unit - Shah gas project Abu Dhabi
∑ Power plant, Cement plant , Sugar plant
Software skills
Mechanical CADD
Training and Certification
1. Training on Operations and Maintenance of Steam Turbine conducted by India Boiler
Dot Com from 10th
to 11th
November 2014.
2. Training on Fire and Safety conducted by ONGC Mangalore Petrochemicals on
29th
November 2014.
3. Training on Scaffolding Erection and Certification conducted by National Safety
Council, Karnataka Chapter on 18th
July 2015.
4. Training on The Proper Use of Selected Crosby Lifting & Rigging Products conducted
by Crosby Communication System on 2nd
December 2015.
I hereby declare that the above written particulars are true to the best of my
knowledge and belief.
N.KARTHIK

More Related Content

What's hot

RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpSURENDRA BABU
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisorJames Ct
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
00-Mechanical Technician---
00-Mechanical Technician---00-Mechanical Technician---
00-Mechanical Technician---rohan contractor
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
Rotating Equipment Engineer
Rotating Equipment  EngineerRotating Equipment  Engineer
Rotating Equipment EngineerPrem Kumar R
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical TechnicianRashid Minhas
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 
Piping engineer cv
Piping engineer cvPiping engineer cv
Piping engineer cvMuhammad Ali
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarSandip Karmakar
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007REHAN MUMTAZ
 

What's hot (20)

RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
00-Mechanical Technician---
00-Mechanical Technician---00-Mechanical Technician---
00-Mechanical Technician---
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Rotating Equipment Engineer
Rotating Equipment  EngineerRotating Equipment  Engineer
Rotating Equipment Engineer
 
mechanical technician (1)
mechanical technician (1)mechanical technician (1)
mechanical technician (1)
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Technician
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
Piping engineer cv
Piping engineer cvPiping engineer cv
Piping engineer cv
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
 

Viewers also liked

Web advt 55 part i 0
Web advt 55   part i 0Web advt 55   part i 0
Web advt 55 part i 0Navyapais
 
Cover letter of mahesh pandit for ndt l iii
Cover letter of mahesh pandit for ndt l iiiCover letter of mahesh pandit for ndt l iii
Cover letter of mahesh pandit for ndt l iiiMAHESH PANDIT
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
 
5 oil refinery_processes
5 oil refinery_processes5 oil refinery_processes
5 oil refinery_processesGovind Manglani
 
Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of riversAshwath Sriram
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICRoy Encallado
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume Arun Das
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 

Viewers also liked (9)

RESUME
RESUMERESUME
RESUME
 
Web advt 55 part i 0
Web advt 55   part i 0Web advt 55   part i 0
Web advt 55 part i 0
 
Cover letter of mahesh pandit for ndt l iii
Cover letter of mahesh pandit for ndt l iiiCover letter of mahesh pandit for ndt l iii
Cover letter of mahesh pandit for ndt l iii
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
5 oil refinery_processes
5 oil refinery_processes5 oil refinery_processes
5 oil refinery_processes
 
Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of rivers
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 

Similar to Karthik Resume (20)

Kamal resume
Kamal resumeKamal resume
Kamal resume
 
Shakeb_CV
Shakeb_CVShakeb_CV
Shakeb_CV
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CV
 
THINAKARAN.R
THINAKARAN.RTHINAKARAN.R
THINAKARAN.R
 
Anandakrishnan-resume s
Anandakrishnan-resume  sAnandakrishnan-resume  s
Anandakrishnan-resume s
 
CV_Format_-_Shailendra_Shukla_16_07_2016
CV_Format_-_Shailendra_Shukla_16_07_2016CV_Format_-_Shailendra_Shukla_16_07_2016
CV_Format_-_Shailendra_Shukla_16_07_2016
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
Abhishek
AbhishekAbhishek
Abhishek
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
NANIK COMMISSIONING
NANIK COMMISSIONINGNANIK COMMISSIONING
NANIK COMMISSIONING
 
Jayshish (1)
Jayshish (1)Jayshish (1)
Jayshish (1)
 
Profile kumaresan
Profile        kumaresanProfile        kumaresan
Profile kumaresan
 
jayaprakash
jayaprakashjayaprakash
jayaprakash
 
Resume-Subhakar
Resume-SubhakarResume-Subhakar
Resume-Subhakar
 
Cv
CvCv
Cv
 
CV_Thangaraj Raja
CV_Thangaraj RajaCV_Thangaraj Raja
CV_Thangaraj Raja
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
Arunkumar_cv-1-1
Arunkumar_cv-1-1Arunkumar_cv-1-1
Arunkumar_cv-1-1
 
zubair cv for Maintenance mechanical TTT 2 (1)
zubair cv for Maintenance mechanical TTT 2 (1)zubair cv for Maintenance mechanical TTT 2 (1)
zubair cv for Maintenance mechanical TTT 2 (1)
 

Karthik Resume

  • 1. Page 1 of 4 N.KARTHIK Mechanical Engineer Objective Seeking a challenging position in your reputable company to work in the mechanical field Areas of Expertise ∑ Rotating and static equipment installation ∑ Pre-Commissioning, Commissioning and Start up ∑ Running plant maintenance and shutdown Professional Experience Total - 12 Years Gulf - 4 Years April 2014-Till date Company ONGC Mangalore Petrochemicals, Subsidiary of Mangalore Refinery and Petrochemicals (MRPL) Project Aromatic complex Job title and description Mechanical Maintenance Sr. Supervisor March 2012- March 2014 Company Eni Saipem, Abu Dhabi Project Shah gas development project Job title and description Mechanical Equipment installation and commissioning supervisor Qualification Address Mobile No. Date Of Birth Marital Status Passport No. E-Mail Skype ID : : : : : : : : Diploma in Mechanical Engineering Bachelor Of Engineering in Mechanical Flat no - F1, Ramana Park, Lakshmi Nagar Extension, Selaiyur - Chennai, Tamil Nadu, India – 600073 91-9480822173 10-07-1986 Married G-2901534 pnkarthik86@gmail.com Natarajankarthik
  • 2. Page 2 of 4 August 2009-July 2011 Company Tecnicas Reunidas Gulf co. Ltd, Saudi Arabia Project ARAMCO Refinery Job title and description Mechanical Equipment installation and commissioning supervisor May2005-July 2009 Company Siemens (Flender Grafenstaden) Project Power and Energy Division Job title and description High speed gear box Assembly, Testing, Maintenance and commissioning engineer Key responsibilities handled 1. Installation during construction ¸ Coordinating fabrication, shell course shifting and erection activities for the static equipments ¸ Monitoring the job as per ITP and required by client ¸ Reviewing the approval documents about Inspection Test Plan of the project to ensure inspection shall be in accordance with the required quality standard and procedures ¸ Executing and checking documentation works for static and rotating equipments to assure that the required forms used in testing submitted are approved by client representative as per ITP such as:-Installation checklist for static/rotating equipment- levelling/alignment recording forms for horizontal and vertical package type-Axial/radial, soft foot parallelism forms for pumps and compressors ¸ Regular surveillance checking at site to verify the preservation requirements for anchor bolts during construction stage ¸ Checking the preservation status of equipments at site ¸ Obtaining complete check list of the assembling equipment and keep a record of same. ¸ Erection of equipments such as pumps, vessels, tanks and compressors and other equipments as per the approved method statement ¸ Checking equipment orientation and shimming before and after erection ¸ Check the condition of pump alignment (axial/radial) without piping prior for preparation for piping installation
  • 3. Page 3 of 4 2. Pre- Commissioning and commissioning ¸ Preparation of document coding system, defining systems/subsystems, mechanical completion package, setting milestones ¸ Preparation of commissioning package, procedures and check list of plant system and sub-system divisions ¸ Inspection of static equipments hydro test and leak test ¸ System wise plant delivery, installation, hook-up and Operations readiness assurance, operations Readiness assurance plans/methodology/management. ¸ Preparation of punch list and follow up of its completion ¸ Preparation of operation procedure according to the vendor recommendations ¸ Conduction of meetings with sub-contractor for pre-commissioning and commissioning start-up activities ¸ Reviewing the installed equipment and its accessories as per P&ID ¸ Coordination and interface with other disciplines related issues ¸ Final inspection (Alignment and box up ) of rotary and static equipment ¸ Identification and rectification of start- up problems of rotary equipments 3. Maintenance ¸ Maintenance for different types of static and rotating equipment ¸ Rectification of leaks present at heat exchanger tubes, column vessel and reactor trays ¸ Problem fixing with the help of various measuring tools ¸ Conducting a root cause analysis at the time of breakdown of machines ¸ Recommending alternative solution when the execution of the given design becomes difficult at site ¸ Tracking the maintenance work orders using SAP software ¸ Planning, preparation and execution of yearly and short term shutdown Machineries handled ∑ Air fin coolers (Forced and induced type )FD and ID fans, Blowers ∑ All types of pumps ∑ Compressors and auxiliaries system ∑ Steam turbines and auxiliaries system ∑ Gearboxes (High speed gear boxes )
  • 4. Page 4 of 4 Units worked on ∑ Petrochemical Aromatic complex - Mangalore Petrochemicals ∑ Vacuum gas oil Unit ( VGO ) - GGSR refinery ∑ Diesel hydro treated Unit (DHDT) - GGSR refinery / Aram co refinery ∑ Hydro Treated Unit, Hydrogen Unit, Gas storage Unit - Shah gas project Abu Dhabi ∑ Power plant, Cement plant , Sugar plant Software skills Mechanical CADD Training and Certification 1. Training on Operations and Maintenance of Steam Turbine conducted by India Boiler Dot Com from 10th to 11th November 2014. 2. Training on Fire and Safety conducted by ONGC Mangalore Petrochemicals on 29th November 2014. 3. Training on Scaffolding Erection and Certification conducted by National Safety Council, Karnataka Chapter on 18th July 2015. 4. Training on The Proper Use of Selected Crosby Lifting & Rigging Products conducted by Crosby Communication System on 2nd December 2015. I hereby declare that the above written particulars are true to the best of my knowledge and belief. N.KARTHIK