1. Page 1 of 7
C U R RI C U L U M V I T A E
POSITION: Welding & NDT Inspector (Aramco Approved),(SABIC Approved).
Name : Gurajada Santosh Brahmaji
Nationality : Indian
Languages Known : English, Hindi, Tamil, & Telugu etc.
E-Mail ID : san153santosh@gmail.com , sangurajada@yahoo.co.in
Mobile No : , 0048 739672061 , 0048 731388626 , 0091 7416256624.
Diploma in Mechanical Engineering.
State Board of Technical Education (SBTET), Visakhapatnam, A.P (INDIA).
State Board of Technical Education & Training- (Visakhapatnam)
Computer Den Training & Software Development Centre (MS-OFFICE)
TECHNICAL CERTIFICATIONS:
CertifiedWeldingInspectorCSWIP3.1( TWI-CERTIFICATION LTD- ENGLAND)
Certificate No - 46061/2
Date of Expiry - 14 March 2020.
( SNT-TC- 1A-2006 of ASNT).
ASNT - NDT Level II –Radiographic test film Interpretation (NO:NDT-120702/RTFI)
ASNT - NDT Level II - Penetrant testing (CERTIFICATE NO:NDT-TCS/2028/PT)
ASNT - NDT Level II - Magnetic particle testing (CERTIFICATE NO:NDT-TCS/2028/MT)
ASNT - NDT Level II - Ultrasonic testing (CERTIFICATE NO:NDT-TCS/2028/UT)
ASNT - NDT Level II - Radiography Testing (CERTIFICATE NO:ASNT-SNT-1A/2001/RT)
Attended 10 days training on Welding inspection Training of various welding
Methods conducted by NDT & Welding Institute. Visakhapatnam.
Attended 25 days training on over view of various NDT Methods conducted by
NDT Training & Consulting Services, VISAKHAPATNAM, AP, INDIA.
Safety Training: Taken for H2S, Confined Space In Gas & Petrochemicals fields.
( NIOSH SAFETY PASSPORT ) MALAYSIA.
HSE PDO (SAFETY PASSPORT) OMAN.
2. Page 2 of 7
WORK EXPERIENCE TOTAL : 12 YEARS.
Company : M/S.energoPLsp.z o.o
ul.Laczna 39, 41-303 Dabrowa Gornicza,
office:ul.mickiewicza 15 , 40-951 Katowice.
POLAND.
Project : Demontaż Elektrofiltrai montaż filtra workowegoPGNIGECŻerań
Name ofClient : Bilfinger ELWOS.A.
PositionHeld : QC Welding & NDT Inspector
Duration : February 2015 to Till Date.
Duties And Responsibilities :
Conducting and Participation in Pre-InspectionMeeting with Client and formulating the waysof
Inspection as per the Approved Inspection Test Plan.
Review of Inspection and Test Plan & Inspecting Material forverificationat all stages of inspection as per
the approved inspection test plane.
Organize and conductwelder’s qualification test as per EN287-1 and client specification.
Inspection of Electrodes, filler wires and gas used for welding.
Control welding consumables & documents.
Coordinate forNon DestructiveExamination of Welds (RT/UT/MT/PT),inaccordancewith approved
procedures and QC Plans.
Preparation of QC Documentation, Inspection Checklist, Preparation of Final Dossier for Projectas
required by the Client such as NDT Reports, Final Inspection Reports, Calibration Records& Welder
PerformanceCertificates Etc.,(MTC, Visual/Dimensional Inspection Reports, Weld Map,
WPS/PQR/WQRT,NDTREPORTS) Review of Final Dossier Priorto Acceptance.
Company : AlaaInternational contractingCo. (AFI)
P.O.Box-9998, Dammam-31423(Yanbu),
Kingdom Of Saudi Arabia.
Tel: +966 3 8470033, Fax: +966 3 8473994.
Project : REPLACE OF AUXILARY CONTROLSYSTEM@ YRD.
Name ofClient : SAUDIARAMCO( YANBU REFINERY DEPARTMENT)
PositionHeld : QC Welding & NDT Inspector
Duration : February 2013 to August 2014
Duties And Responsibilities :
Conducting and Participation in Pre-InspectionMeeting with Client and formulating the waysof
Inspection as per the Approved Inspection Test Plan.
3. Page 3 of 7
Review of Inspection and Test Plan & Inspecting Material forverificationat all stages of inspection as per
the approved inspection test plane.
Organize and conductwelder’s qualification test as per ASME Section IX and client specification.
Inspection of Electrodes, filler wires and gas used for welding.
Control welding consumables & documents.
Visual Inspection of pipe fit up and welds joints and reject/acceptas per acceptance criteria of ASME B
31.3
Visual Inspection of Structural members fit up and weld joints as per acceptance criteria of AWS D1.1.
Monitor preheating prior commencement of welding and inter pass temperatures during the welding.
Monitor performance of the welders on the basis of radiographic inspection and promote corrective
action where necessary.
Check final dimension, material traceability, orientation and cleanliness after completion of pipe spool
fabrication / structural members.
Coordinate forPost Weld Heat Treatment of welds, monitor the heating rate, soaking time and cooling
rate during heat treatment.
Liaise with Client, Authorized Inspector & Third Party.
Coordinate Technical Queries with project management team on daily basis.
Coordinate with client inspection department / third party inspection department for quality issues.
Documentation
Preparation of QC Documentation, Inspection Checklist, Preparation of Final Dossier for Projectas
required by the Client such as NDT Reports, Final Inspection Reports, Calibration Records& Welder
PerformanceCertificates Etc.,(MTC, Visual/Dimensional Inspection Reports, Weld Map,
WPS/PQR/WQRT,NDTREPORTS) Review of Final Dossier Priorto Acceptance.
Company : AlaaInternational contractingCo. (AFI)
Project : IBN-RUSHD –II, U&O-DBN (PROJECT)
Name ofClient : SAUDI ARABIA-SABIC
Name ofContractor : CTCI CORPORATION ARABIA
PositionHeld : QC-Welding & NDT Inspector
Duration : 29th January 2012 to 10th January 2013.
Duties And Responsibilities :
4. Page 4 of 7
Duties Include Surveillance and Checking of Piping Fabrication and Installation Procedure and welding
requirements, receiving materials to the Project quality procedure and clients project specific.
Inspection and monitoring on fabrication and installation of pipe supports and various structures.
Conducting Welder’s Qualification Test as per ASME Sec IX.
Responsibilities include in monitoring and inspection of delivered and installed material as IS, BS ANSI
& ASTM code and standards.
Liaise with QC Engineer and client representative for day-to-day quality related activities of the
project/contract.
Inspection and acceptance of materials as per Specification and Project requirement.
Visual Inspection of weldsand acceptingas per Projectspecificationsand preparing reports making QCW
clearance for further activities.
Monitoring and Inspection of fit-up for pipe joints with dimensional and orientation, welding activities
in all area of the project as per welding.
Monitoring welding consumable control, welder qualification and welding activities at fabrication shop
and field as per the (QCP).
Preparing various documents such as welding inspection report prior to endorsement to the client and
Project Management Team (PMT) to raise Request for Inspection (RFI) for final acceptance.
Monitoring positive material identification (PMI) for stainless steel, Alloy steel and copper Nickel
associating with other tests like bend tests, hardness tests, Macro examinations.
Witnessing Non-Destructive Testing for welds which involve R.T, P.T., M.T and U.T & PWHT.
Familiar With Codes :
ASME Sec V, ASME Sec VIII, ASME Sec IX & Saudi Aramco Engineering Standards &
Procedures
Company : M/S. Denholm Yam Contracting Company.
Abu Dhabi, PO Box- 94243. (U.A.E).
Tel: 971 2 659 3333, Fax: 971 2 659 3334.
Clients
DOLPHIN ENERGY( Taweelah Fujairah-Gas Power Pipeline Project)
PETROFAC INTERNATIONAL LTD ( Fabrication of Pipe Spools For ASAB Full Field
Development Project)
SBM (Deep Panuke Project Offshore Nova Scotia)
Designation : QC WeldingInspector
Period : May-25-2010 to April-9-2011
Duties and Responsibilities:
5. Page 5 of 7
Inspections of all activities from Shop Fabrication to Site Erection – Dimensional, Welding & NDT.
Carry out the Inspection as per the Approved Project Quality Plan. (PQP).
Responsible forRaising RFI & Co-ordination with ProjectInspector for All “Hold Points” activities.
To checkthe Fit / Up as per the ProjectSpecificationand Monitoring Welding activities as per Project
Specification & Procedureand ensure Welding Parameter started in WPShas been followed.
To Check the Pipe Size, Thickness and Surface Condition prior to Fit/Up.
Ensuring Fit Up Clearance for the Welding.
Conduct Inspection of all materials being used for Welding Activities.
Confirm the Material against the Material Certificate.
Check Calibration Welding Equipment’s.
Preparation of Weld Map and Maintaining Traceability of Weld Joints withProper Inspection Reports.
Co-ordinate with the Sub Contractor to fulfill the NDE Requirement.
Witnessing the Inspection of Magnetic Particle and Penetrate Testing Methods According to Client
Requirements.
COMPANY : M/S FPUH AB-PEMONT.
Ul.Okrzei 10;42-450 Lazy ,
POLAND.(EUROPE )
CLIENTS:
GJOA SEMI for AKKER KVAERNER,
YIT SEVERN ,the UK,
LOTOS for POLIMEX-SICES,
PTA WLOCLAWEK, POLAND
Designation : Welder & Supervisor
Period : 01-March-2009 to 30-November 2009
Roles and Responsibilities:
To Check the Fit-Up as per the Project Specification & Monitoring Welding Activities as per Project
Specification & Procedure and ensure Welding Parameter started in WPS has been followed.
To check the Pipe Size, Thickness and Surface Condition prior to Fit/Up.
Ensuring Fit Up clearance for the Welding.
Check Calibration Welding Equipment’s.
6. Page 6 of 7
COMPANEY : M/S. Syarikat Steelcon SDN.BHD
SUMATEC CORPORATION SDN.BHD.
BATU CAVES. KAULALUMPUR. MALAYSIA.
CLIENTS :
SGL CARBON SDN BHD SUPPLY AND FABRICATION OF STORAGE TANK AND
DOSAGE TANK.
INDEPENDENT TECHNOLAGY SDN BHD. FILTER VESSELS FOR WYLOO
COMPRESSOR STATION.
BORN CANADA. RADIANT COILS AND CONVECTION BOXES OF METALS
LIKE SS, P11, P22.
Designation : Jr. Welding Supervisor.
Period : SEP.2006 TO SEP 2008
KEY ROLES AND EXPERIENCE :
Witness of Destructive and Non destructive testing and NDT as per approved
procedures.
Supervision of NDT Technicians, Welders and fitters
Non- Destructive Testing
Interpret RT Films & Drawings and other Documents.
Radiography of tanks, Vessels, Pressure parts, prefabricated weld joint of pipes
using gamma ray.
To carry out the Documentation part for all the Inspection with the Results
COMPANEY : Galfar Al Misnad Engineering&Contracting Wll.
DOHA –QATAR & OMAN.
Designation : Welder
Period : 09-Feb-2004 to 31-July-2005
Familiar with Welding Process :
SMAW, GTAW, GMAW, FCAW & SAW.
COMPANEY : Grafcon Construction Private Limited.
Visakhapatnam.
CLIENTS : Devy Power Gas India PVT.LTD.
Designation : Welding Supervisor
Period : 30-May-2001 to 08-April-2002.
PERSONAL DETAILS:
Date of Birth : 06/02/1982.
Father’sName : Mr. G.MADHUSUDHANA RAO
7. Page 7 of 7
Sex : Male.
Marital Status : Married.
Passport No. : H 7985496 (OLD A8997370)
Date of Expiry : 04/02/2020
DECLARATION:
I hereby declare that the above said statement, given by me is true to the
Best of my knowledge, conscious and belief.
Yours faithfully,
G.SANTOSH BRAHMAJI