1. Curriculum Vitae
Name : Ahmad Anbika Akhmar, ST
Place of Birth : Amassangan, South Sulawesi
Date of Birth : June 18th, 1984
Marital Status : Single
Nationality : Indonesian
Contact Address : Jl. Anggrek 1 No. 8C
Bintaro, Pesanggrahan, South Jakarta, Indonesia
Email Address : ahmad_anbika@yahoo.com
Contact Person : +628119636999 / +6282310263999
Passport No : A9582648 (Valid until Feburary 09, 2020)
CAREER SUMMARY
Almost 10 years experience As NDT Technician, QA/QC Engineer or Inspector and Supervisor
Construction (Welding, Piping, Structure, and Mechanical) in Yard Fabriacation and Site Erection,
Installation Petrochemical, Geothermal, Oil and Gas Project.Well familiar in the preparation of Test
Package (Leak Test of Hydro and Pneumatic Test),Reinstatement, Punch list untill commissioning,
Inspection of Positve Material Identification (PMI), Witness Preheatand PostWeld HeatTreatment,
Maintanance of Interpass temperatur, Technical Reports, Testing Procedures,Documentation and
Project Hand-over.Capable of Co-ordination, Supervision, Motivating personnel and doing physical
work and other duties the Company may require.
My background education is Bachelor Degree of Naval Architecture Engineering with holder
Welding Inspector (B4T Bandung, Indonesia), International Welding Inspection Personnel (IWIP)
and ASNT LevelII of Radiongraphy Interpreter,Ultrasonic Test,Magnetic Test and Penetrant Test.
Beside that, familiar with various national & International codes such as : ASME – B31.1, B31.3
Sec. IX, Sec. VIII, Sec. V, Sec II, API-1104, AWS D1.1 etc.
2006 - 2010 : University of Pembangunan Nasional “Veteran” Jakarta
Bachelor of Naval Architecture Engineering
(GPA 3,27/Scala 4,00)
PERSONAL DATA
F0RMAL EDUCATION
2. WELDING INSPECTOR (WI) – Centre for Material and Technical Product/
Certificate No. : 1210.12.72.2001 Balai Besar Bahan dan Barang Teknik (B4T)
INTERNATIONAL WELDING INSPECTION BANDUNG, INDONESIA
PERSONNEL (IWIP) (September 28th, 2010 - December 31st, 2010)
Certificate of Attendance No. 1210.12.72.2001.A
RADIOGRAPHY INTERPRETER (RI) – Centre for Material and Technical Product/
Certificate No. : 0313.23.1199 Balai Besar Bahan dan Barang Teknik (B4T)
Certificate Date : March, 2013 BANDUNG, INDONESIA
Expiration Date : March,2018 (March 05th, 2013 – March 22nd, 2013)
NDT – Radiographic Film Interpretation and Evaluation Level II course and examination in
accordance with SNT - TC – 1A-2006 Edition.
ULTRASONIC TESTING Level 2 (UT) - SAR NDT SERVICES ( SNS )
Certificate No. : SNS/UT/131069 TANGERANG, INDONESIA
Certificate Date : July 04, 2013
Expiration Date : July 03,2018
NDT – Ultrasonic Test Level II course and examination in accordance with
SNT - TC – 1A-2006 Edition.
MAGNETIC TESTING Level 2 (MT) - MULTI SPEC SINERGINDO ( M S S )
Certificate No. : 1409/MT/N/14 BEKASI, INDONESIA
Certificate Date : Juni 20, 2014 (June 17th, 2014 – June 20th, 2014)
Expiration Date : Juni 19, 2019
NDT – Magnetic Testing Level II course and examination in accordance with
SNT - TC – 1A-2006 Edition.
PENETRANT TESTING Level 2 (PT) - MULTI SPEC SINERGINDO ( M S S )
Certificate No. : 1391/PT/N/14 BEKASI, INDONESIA
Certificate Date : Juni 20, 2014 (June 14th, 2014 – June 16th, 2014)
Expiration Date : Juni 19, 2018
NDT – Penetrant Testing Level II course and examination in accordance with
SNT - TC – 1A-2006 Edition.
HYDROGENSULFIDE TRAINING ( H2S ) – HSE IKPT-ADHI
Certificate No. : 016/HSE-06/X/2013 Cepu, Central Java, Indonesia
October 20th
,2013
HAZCOM TRAINING – HSE IKPT-ADHI
Certificate No. : 015/HSE-11/X/2013 Cepu,Central Java,Indonesia
October 20th
,2013
CONFINED SPACE TRAINING – HSE IKPT-ADHI
Certificate No. : 061/HSE-02/X/2013 Cepu, Central Java, Indonesia
October 28th
,2013
SAFETY PASSPORT TRAINING – HSE IKPT
* Fundamental K3LL Jakarta,Indonesia
* Personal Protective Equipment (June 10 th
,2014 Untill June 12 nd
,2014)
* Job Safety Analysis(JSA)
* Hazard Identification
* Supervision & Observation
PROFESIONAL QUALIFICATION
3. SARULLA OPERATIONS LTD
(Medco Energy, Kyushu, Itochu, Ormat, Inpex)
Core Business : Owner of Geothermal Power Plan
Term : August 26th, 2015 – Now
Position : Piping/Mechanical Construction Supervisor
Project : Sarulla Geothermal Power Plan Project
North Sumatera, Indonesia
Reason of Termination : ---
Responsibilities :
• Review ITP, Drawing, Method statement and Procedure related work in project.
• Meeting Co-ordinate with contractors to achieve the targets and schedule set by the
Planning.
• Prepare daily reports of work progress and man power utilization.
• Supervision and Inspection of all piping and mechanical work and ensures safety
and quality standards of the client.
• Supervision of workshop activities for pre-fabrication of associated piping work.
• Review and evaluation weekly reports of the total spool erection, isometric pipe
installed, welded dia inches of supports and joints and the remaining work front with
the materials available.
• Supervision and Inspection mechancal work such as cek elevation, alignment,
grouting, bolt tighteen and ect.
• Supervision and inspection site erection mechanical static of storage water tank.
• Supervision and inspection site installation mechanical rotating of Pumps, Turbin,
Generator together with vendor Toshiba.
• Issue the work permits ensuring SHE requirements.
• Conduct safety walk through in the site co-ordination with the safety department on
weekly basis.
• Supervise and Inspection of painting, insulation, cladding on piping and equipments.
• Line check to verify the use of correct material fittings, valves, and supports, prior
to hydro test and prepare punch list for incomplete works, check and closing after
the work is done.
• Report data and information to Site Manager.
WORK EXPERIENCE
4. SPENCER OGDEN ENERGY PTE, LTD.
PT. TRIPATRA ENGINEERS AND CONTRUCTORS
Core Business : Mechanical, Engineering and Fabrication
Oil and Gas
Term : March 20th, 2015 – June 20th, 2015
Position : QA/QC Piping Inspector
Client : JOB PERTAMINA & MEDCO ENERGY
Project : EPC CENTRAL PROCESSING PLAN (CPP)
SENORO GAS DEVELOPMENT PROJECT (SGDP)
Reason of Termination : Contract Completed.
Location : SITE SGDP Luwuk, Central Sulawesi.
Scope of Work :
Inspection of Welding Visual.
Witness inspection and testing for NDT (Magnetic Test, Penetrant Test and
Radiography Test)
Incharge for Line check and Reline check piping with Client and Supervisor to
make and killing punchlist before Leak Test.
Monitoring Test Package for Leak Test (Hidro & Pneumatic Test)
Report data and information to QA/QC Manager
TOYO ENGINEERING
PT. INTI KARYA PERSADA TEHNIK
CONSORTIUM
Core Business : Mechanical, Engineering and Fabrication Oil, Gas, Petrochemical
Term : June 23th, 2014 – March 22nd, 2015
Position : QA/QC Welding & Piping Inspector
Client : PT. Chandra Asri
Project : EPC Chandra Asri Petrochemical Project
Ethylene Cracker Complex Expansion (ECCx)
Reason of Termination : Contract Completed
Job Responsibilities :
Perform inspection activities as instructed in accordance with the requirements of
the relevant Inspecton and Test Plant.
Continuos monitor the work to ensure that the specified requirements for the
project are being followed.
Witness inspection and testing as instructed ensuring that the testing menthods,
inspection menthods and acceptance criteria are in accordance with agreed
procedures.
Review all the necessary quality control records for adequacy and verify results.
5. Location :Yard Fabrication in Workshop PT. Sankyu Indonesia
International and Workshop PT. Guna Teguh Abadi, Cilegon
Banten, Indonesia.
Scope of Work :
Check/Inspect receiving Material and Consumable.
Perform Welder Test
Monitoring Welding Before, During and After
Inspection of Fit-Up, Dimensional, and rotation of pipe spool base on isometric
drawing.
Inspection of Welding Visual
Check and Sign Daily Welding Report
Ensure Welding and material Pipe and Plate with Positive Material Identification
(PMI).
Witness inspection and testing for NDT (Magnetic Test, Penetrant Test and
Radiography Test)
Meeting Coordination with Supervisor and Personel of Sub Contrator PT. SII and
PT. GTA.
Report data and information to QA/QC Manager.
Location : SITE (Erection and Installation) ECCx Project, Cilegon
Banten, Indonesia.
Scope of Work :
Review Document (Drawing, Mill Certificate, Document Procedure in Welding
(ITP, WPS, PQR,Welder Certificate, QA/QC Procedure, etc).
Meeting Coordination with Supervisor and Personel of Client Owner and Sub
Contructor.
Inspection of Welding Visual.
Ensure Welding and material Pipe and Plate with Positive Material Identification
(PMI)
Review film Radiography on Welding Pipe, Plate and Etc.
Witness inspection and testing for NDT (Magnetic Test, Penetrant Test and
Radiography Test)
Check and Sign Daily Welding Report
Witness of Leak Test for Test Package (Hydro test and Pneumatic Test)
Witness Post Weld Heat Treatment (PWHT)
Cek Hardness Test After Post Weld Heat Treatment (PWHT)
Report data and information to QA/QC Manager.
6. KONSORSIUM
PT. INTI KARYA PERSADA TEHNIK
PT. ADHI KARYA (Persero) Tbk
Core Business : Mechanical, Engineering and Fabrication Oil and Gas
Term : Mei 18th, 2013 - Mei 18th, 2014
Position : QA/QC Pipeline/Flowline Inspector
Client : PT. Pertamina EP (Persero)
Project : EPC CENTRAL PROCESSING PLAN (CPP)
Proyek Pengembangan Gas Jawa (PPGJ)
Reason of Termination : Job Completed.
Location : SITE PPGJ, Central Java, Indoenesia
Scope of Work :
Review Document (Drawing, Mill Certificate, Document Procedure in Welding
(ITP, WPS, PQR,Welder Certificate, QA/QC Procedure, etc)
Check/Inspect Material and Consumable.
Monitoring Welding Before, During and After
Inspection of Fit-Up, Welding Visual Inspection
Check and Sign Daily Welding Report
Witness NDE (UT, RT, MT/PT) for NDE Clearance
Inspection used Film Radiography are Welding Pipe, Plate and Etc.
Witness Holiday Test,
Witness Lowering of Pipe,
Witness Swabing, Flashing, and Piging (Foam Pig and Gauging plate Pig).
Witness Watering and Dewatering for Hidrotest.
Witness and Monitoring Test Package (Hidro Test and Pneumatic Test)
Perform Welder Test
Report data and information to QA/QC Manager.
PT. INTI KARYA PERSADA TEHNIK
GLOBAL TOYO CONSORTIUM
Core Business : Mechanical, Engineering and Fabrication Oil and Gas
Term : April 01st, 2013 - Mei 17th, 2013
Position : QA/QC Piping Inspector
Client : PT. Pupuk Kaltim
Project : EPC PETROCHEMICAL PROJECT
PUPUK KALTIM – 5, Bontang, East Kalimantan.
Reason of Termination : Move to PPGJ Project from IKPT Request.
Location :Yard Fabrication in Workshop PT. Bangun Saran Baja
Gersik, East Jawa, Indonesia.
7. Scope of Work :
Check/Inspect receiving Material and Consumable.
Perform Welder Test
Monitoring Welding Before, During and After Welding
Inspection of Fit-Up, Dimensional, and rotation of pipe spool base on isometric
drawing.
Inspection of Welding Visual
Witness inspection and testing for NDT (Magnetic Test, Penetrant Test and
Ultrasonic Test)
Review film Radiography Welding Pipe.
Meeting Coordination with Personel of Sub Contrator PT. Bangun Sarana Baja
Check and Sign Welding Project Report (Daily Welding Report)
Inspect and control pipe spool before shipment.
Report data and information to QA/QC Manager.
PT. INWHA INDONESIA
Cikande Serang and Banyu Urip Site
Core Business : Mechanical, Engineering and Fabrication Oil and Gas
Term : January 02nd, 2013 – April 02nd , 2013
Position : QA/QC Piping Inpector
Client : Mobile Cepu Ltd (Exxon Mobile) & PT. Tripatra
Project : Banyu Urip Project EPC 1(Onshore)
Reason of Termination : Contract Completed.
Location :Yard Fabrication in Workshop PT. Inwha Indonesia
Cikande Serang, West Jawa, Indonesia.
Scope of Work :
Review Document (Drawing, Mill Certificate, Document Procedure in Welding
(ITP, WPS, PQR,WelderCertificate,QA/QC Procedure, etc)
Check/Inspect receiving Material and Consumable.
Perform Welder Test
Inspection of Fit-Up, Dimensional, and rotation of pipe spool base on isometric
drawing.
Monitoring Welding Before, During and After.
Inspection of Welding Visual
Make and sign daily welding report
Witness NDE (UT, RT, MT/PT)
Inspect and control pipe spool before shipment
Report data and information to QA/QC Coordinator
8. PT. Jakarta Prima Cranes
Head Office : Wisma JPC
Jl. Mampang Prapatan Raya No. 20 Jakarta 12760
Core Business : Mechanical, Engineering and Fabrication
Term : January 10th, 2011 – December 31st, 2012
Position : QA/QC Welding Inspector.
Client : PT. Tapin Coal Terminal
Project : Coal Conveyor Fabrikasi and Erection
Reason of Termination : Contract Completed.
Location :Yard Fabrication in Workshop PT. Sinar Sakti Jaya and PT.
Buana Masa Metalindo. Bogor, West Jawa, Indonesia.
Scope of Work :
Review Document (Drawing, Mill Certificate, Document Procedure in Welding
(ITP, WPS, PQR,WelderCertificate,QA/QC Procedure, etc)
Check/Inspect receiving Material and Consumable.
Monitoring Welding Before, During and After
Inspection of Fit-Up and Dimensional.
Welding Visual Inpection
Check and Sign Daily Welding Report.
Witness UT, RT, MT/PT
Check and control the quality of the sandblast and painting on the product
Inspect and control product quality before shipment
Report data and information to QA/QC Manager.
PT. WADI DAYA SAKTI
Graha WDS
Jl. Alur Laut, Blok MM No. 27 Kec. Koja, Jakarta Utara
Core Business : Thickness Gauging, NDT Services & Marine Consultant
Term : September 01st 2006 – August 30th , 2010.
Position : Lead Operator (NDT Technician)
Client : Owner Ship and Ship Yard
Reason of Termination : Resign for Training Welding Inspector at B4T Bandung.
Location :Yard Fabrication in Dock Yard and At the Sea
Scope of Work :
Checking the thickness of the plates with ultrasonic test method in shipyard or at
sea (Offshore).
Checking defects in the plates disabilities Magnetic test method, penetrant test and
ultrasonic test
Make report of the results examination Ultrasonic test, Magnetic test and Penetrant
test.