1. Mobile: +91-9899201553
Email: manish.eck@gmail.com/manishgupta83@yahoo.co.in
Academic Credentials
Qualification Institution Year Grade Percentage
BE (Mech.) Govt. Engineering College, Kota 2002-06 First Class 69.54 %
XII (H.Sec.) AVM Sec. School, Jaipur, Rajasthan 2001 First Class 74.15 %
X (Sec.) S.M.L. Sec. School, Jaipur, Rajasthan 1999 First Class 71 %
Key Qualifications
Over a 10 Years of Experience as Equipment & Packages Engineer in Conceptual and Detailed Design, FEED,
Engineering & Procurement of various types of Equipment likes Unfired Pressure Vessel, Column, Shell &
Tube type Heat Exchanger, Reactors, Static Mixers, Filter Packages, Ejector, Separator Packages and Storage
Tanks and in the field of Oil & Gas, fertilizers & Chemical Plants.
Knowledge of design software COMPRESS, PVelite, CodeCale, Aspen Teams (B-Jac), AutoCAD and MS office
etc.
Knowledge in various International & National codes & standards e.g. ASME Sec VIII Div. I and Div. 2 (Revised
2007 Ed.), ASTM, NACE, API-650, TEMA, B-16.50, B16.47, WRC-107/297/537, IS-803, all major wind and seismic
design code e.g. IS-875, IS-1893, ASCE 7-05/10 & UBC-97 etc.
Having spent time in EPC industry, well conversant with major engineering activities i.e. Preparation of
Material Requisition, Mechanical Datasheet, Vendor Quotation review/clarifications, PO Document and TBE &
CBE preparation, Vendor General Arrangement and Fabrication drawing & Vendor Design Calculations check
etc.
Conversant with various material of construction (like Carbon steel, Stainless Steels, Low Alloy Steel etc)
Career History (In reverse chronological order)
From To Organization / Location Last Position Held
Nov-2011 Date SAMSUNG ENGG INDIA PVT. LTD. , INDIA, NOIDA Senior Engineer
Aug-2010 Aug-2011 SAMSUNG HEAVY INDUSTRIES India Pvt. Ltd, INDIA Senior Engineer
Mar-2008 Aug-2010 GS E & C INDIA PVT LTD, INDIA, GURGAON Engineer
Jul-2006 Mar-2008 PROJECTS & DEVELOPMENT INDIA LTD, INDIA Asst. Engineer
Project Experience
MANISH GUPTA
2. (1) SAMSUNG ENGG INDIA PVT. LTD. , INDIA, NOIDA (Nov 2011 – Till Now)
Project: KNPC-Clean Fuels Project (CFP-2020), Kuwait (6 months Seoul Deputation)
Period : March 2014 – Till Now
Client : Kuwait National Petroleum Company
Position : Preparation and Checker for All Mechanical Deliverables for Static & Package Items,
A.E. for Vessel and column MR.
Activities : From the Initial phase , I have been assigned to Seoul Office for the Mechanical part of
job. Briefly, my job responsibilities includes following activities:
- During the Initial Phase, I have been integral part of Taskforce team while review
ITB requirement and identify special requirement.
- Prepare salient points/ queries of Vessel specification and Preparations of Pv-elite
master file. Worked with Shell DEP, as major licensor is Shell.
- During deputation to Samsung Head Office, act as discipline technical focal point for
the project to HO/India office, clients, vendors and subcontractors.
- Preparations of mechanical data sheet(MDS) for various type of Pressure vessels(7
tags for high pressure vessels,38 tags for CS/SS items,2 tags for low alloy items
Total 47 tags)
- MR preparation, Review of vendor offers and Carry out technical queries, technical
bid evaluations of vendors to ensure that quality and requirements are met.
- Responsible for technical matters, procedures, design deliverables, schedule
compliance and man hour control by providing input to project execution plans and
schedules for the project
- Approve of discipline deliverables, contents of IDC prints and vendor documents
for the project.
- Coordination of technical matters within the discipline and with other disciplines as
required.
- Prepare reports on job progress/status and discipline Change Requests (CR).
- Ensure past lessons learnt are considered and Conduct lesson learnt exercise.
Project: UGCC GSP AND POLYMER PROJECT, Uzbekistan
Period: Jun 2012 – Feb 2014
Client: UZ-KOR GAS CHEMICAL LLC.
Position: AE(Mechanical)
Activities: For the Project, I have been part of whole project cycle. My job responsibilities includes
following activities:
- Review the ITB (Preparation of technical specification summary)
- Engineering Drawing preparation, PV-Elite calculation, MR preparation(Assigned for
SS items (15 tag) vessels, 4 filters, large CS items (10 tags) Vessels)
- Review of vendor’s offers preparation of technical queries, TBE's, MOM’s, Kick of
Meetings & purchase orders.
3. - Coordination / Follow up with different disciplines for the static equipments
- Review & approval of vendor design calculations & Vendor Prints, IDC to/ from
other Deptt. Comments.
- Resolved the queries of the vendor/PMC/HO in line with communication with other
departments and KEY person in Head office.
- Took the Additional charge of other MR due to left of the assigned engineer.
- Support to assigned engineer for B-Jac Calculations, Engg. Drawing preparation,
Vendor print review, and calculation check of Heat exchanger items.
Project: Riyadh Refinery Clean Transportation Fuel project
Period: Jun 2013 – Feb 2014
Client: Samsung Engineering Saudi Arabia
Position: Checker for Mechanical Engg. Drawings
Activities: Checking of Vessels, Columns, Reactors, Tanks (Total 31 tag) Engg. Drawings and
Coordination with Third-party vendors.
Proposal: SOCAR&TURCAS AEGEAN REFINERY ,Turkey
SATAH AL RAZBOOT (SARB) FIELD DEVELOPMENT PROJECT, ABU DHABI
IRPC PUBLIC COMPANY LTD. UHV PROJECT, RAYONG THAILAND
LAFFAN REFINERY, YANBU LYR, GABON REFINERY
Period : Nov 2011 – Jun 2012
Position : Assign Engineer(Mechanical)
Activities : My job responsibilities includes Strength calculation/ Weight Estimation, Preparation
of MRs, Technical Clarifications and TBE for the static equipments e.g. Reactor,
Columns , Pressure Vessels ,Heat Exchangers.
(2) SAMSUNG HEAVY INDUSTRIES India Pvt. Ltd, INDIA (August 2010 – August 2011):
Project : Shell’s Prelude FLNG, Offshore Project
Period : 2010-2011
Client : Shell FPSO, northwestern Australia
Position : Assign Engineer(Mechanical)
Activities : For the Project, I was deputed at Goeje, South Korea Office for 1 year. My job
responsibilities includes review the Shell DEP requirement, review the ITB (Preparation
of technical specification summary), Identifying requirements and scope of work,
Preparation and issue inquiry requisitions to the Vendors, Mechanical
Datasheets/Engineering Drawing, Review techno-commercial vendor offers, Technical
Clarifications with vendors ,TBE.
(3) GS E & C INDIA PVT LTD, INDIA, GURGAON (March 2008 – August 2010)
Project : RUWAIS 4th NGL TRAIN PROJECT
Period : 2009 – 2010
Client : ABU DHABI GAS INDUSTRIES LTD.
4. Position : Assign Engineer(Mechanical)
Activities : For the Project, I was deputed at SEOUL Office for 6 months. My job responsibility
includes review the ITB (Preparation of technical specification summary), Preparation
of MRs, Mechanical Datasheets/Engineering Drawing, Technical Clarifications with
vendors ,TBE ,PO, Checking/ Approval of vendor design calculations & Vendor Prints ,
Coordination / Follow up with different disciplines for the static equipments e.g.
Columns, Pressure Vessels. In addition, I got opportunity to participate in a Kick of
meeting with the client & Vendor.
Project : NHR-TANECO PROJECT (PHASE-I)-REPUBLIC OF TATARSTAN
Period : 2008 – 2009
Client : Nizhnekamsk oil refining & petrochemical plant
Position : Assign Engineer(Mechanical)
Activities : For the Project, I was deputed at SEOUL Office for 9 months. It was a great experience
working on this project as all the equipments as well as material had to be designed for
extremely low MDMT as low as -47o
C. Also since these equipments were to be
designed as per Russian Regulations like GOST, GOST R, SNIP, OST etc. as well as
American standards, it was a great learning experience of Russian Norms & Standards.
My job responsibilities includes following activities:
- Study & review of ITB documents & preparation of clarification list for clarification
from client.
- Preparation of Material Requisition of Pressure Vessels, Heat exchangers, Columns.
- Preparation of Mechanical Data sheets for all the Static Equipments with the help
of Draughtsmen’s & Designers.
- Evaluation of Vendor quotation & Technical bid evaluation for these items
- Kick off Meeting with Vendors of the above items
Proposal: CILACAP REFINERY BOTTOM UPGRADING RFCC, INDONESIA.
Period : March 2008 – June 2008
Position : Assign Engineer(Mechanical)
Activities : My job responsibilities includes Preparation of MRs, Strength calculation/ Weight
Estimation , Technical Clarifications and TBE for the static equipments e.g. Reactor,
Columns , Pressure Vessels ,Heat Exchangers.
(4) Project & Development India Ltd., NOIDA (July 2006- March 2008)
Project : Debottlenecking of Ammonia & Urea Plant
Period : 2006 – 2008
Client : CFCL, Kota(India)
Position : Asst. Eng. (Mechanical)
Activities : Responsible Engineer for Pressure vessel , Heat Exchanger and Columns. My
responsibilities included Preparation of Mechanical Datasheet, MRs, Technical Bid
5. evaluation etc. It also includes Checking & approval of Vendor drawings & design
calculations for static equipments for the same.
Project : Revamp of Urea Plant
Period : 2007 – 2008
Client : Tata Chemical Ltd, Babrala (India)
Position : Asst. Eng. (Mechanical)
Activities : Responsible for Design of Pressure vessel , Heat Exchanger and tanks. My
responsibility includes Preparation of Mechanical Datasheet, MRs, Technical Bid
evaluation etc. It also includes Checking & approval of Vendor drawings & design
calculations for static equipments for the same.
FIELD EXPERIENCE
• Vendor Shop Visits in South Korea (Woo yang HC Co., Ltd. And JMC Heavy Industries Co., Ltd.) to view
the equipments for detail understanding.
• 2 days Plant visit in at TCL (TATA Chemical Limited), Babrala (UP).
PESONAL DETAILS
Date of Birth : 26-Nov-1983
Languages Known : English, Hindi
Nationality : Indian
Permanent Address : 904, Eleganza Tower, Imperial Estate, Sector-82, Faridabad
Passport No. : G 35 18607
I, Manish Gupta, hereby declare that all of above mentioned are true and best of my knowledge.
Manish Gupta
6. evaluation etc. It also includes Checking & approval of Vendor drawings & design
calculations for static equipments for the same.
Project : Revamp of Urea Plant
Period : 2007 – 2008
Client : Tata Chemical Ltd, Babrala (India)
Position : Asst. Eng. (Mechanical)
Activities : Responsible for Design of Pressure vessel , Heat Exchanger and tanks. My
responsibility includes Preparation of Mechanical Datasheet, MRs, Technical Bid
evaluation etc. It also includes Checking & approval of Vendor drawings & design
calculations for static equipments for the same.
FIELD EXPERIENCE
• Vendor Shop Visits in South Korea (Woo yang HC Co., Ltd. And JMC Heavy Industries Co., Ltd.) to view
the equipments for detail understanding.
• 2 days Plant visit in at TCL (TATA Chemical Limited), Babrala (UP).
PESONAL DETAILS
Date of Birth : 26-Nov-1983
Languages Known : English, Hindi
Nationality : Indian
Permanent Address : 904, Eleganza Tower, Imperial Estate, Sector-82, Faridabad
Passport No. : G 35 18607
I, Manish Gupta, hereby declare that all of above mentioned are true and best of my knowledge.
Manish Gupta