1. DIDI SUDIPRAYITNA
CURRICULUM VITAE
✓ Work Method System for Civil & Structure
✓ Quality Management
✓ Project Management
✓ Ensuring the correct equipment and materials are being used for Civil
& Structur
✓ Inspecting completed welds.
✓ Assessing the quality and strength of completed welds.
✓ Suggesting alternative welding techniques.
✓ Demonstrating correct welding procedures.
✓ Generating new welding techniques.
✓ Maintaining a clean and safe work area.
✓ Ensuring welders adhere to state health and safety regulations.
✓ NDT & DT Process in Factory or Site.
Contact Detail
Address
ZIP Code
Telephone
E-mail
: Jl. Toyogiri selatan, Jembatan 3 kampung jati rt/rw : 7/8 No :7
Desa Jatimulya, Kec. Tambun selatan , Bekasi Timur
: 17510
: +6285319960441 (Mobile)
: +6285319960441 (Whatsapp)
: didisudi79@gmail.com
: didisudiprayitna@rocketmail.com
Personal Particular
Date of birth
Nationality
Gender
Religion
Marital status
Blood Type
Identity Number
Driving License (A)
: June, 21st
1979
: Indonesia
: Male
: Moslem
: Married
: A
: 3275112106790003
: 1223170309214
Qualification
Qualification
Field of Study
Major
University
GPA
: Bachelor Degree
: Engineering
: Mechanical Engineering
: Institut Teknologi Budi Utomo - JAKARTA
: 3.12/4.00
Formal Education
1985 – 1991
1991 – 1994
1994 – 1997
2011 – 2016
: SD Negeri Purwawinangun VII-Kuningan (Elementary School)
: SMP Negeri IV Kuningan (Junior High School)
: SMU Negeri 1 Kadugede (Senior High School)
: S1 TEKNIK MESIN, INSTITUT TEKNOLOGI BUDI UTOMO
(Bachelor Degree)
2. Position Title (Level)
Specialization
Role
Industry
Period
Project
Client
Job description
1. Review document i.e. Mill certificate, Welding Procedure
Specification (WPS), Inspection Test Plan (ITP), Welding
Performance Qualification Test,
2. Inspection Received Material,
3. Inspection of joints fit up, alignment and dimensional accuracy
as per drawing requirements,
4. Review and witness of holiday test pipelines,
5. Review and witness of visual welding joints, Field Joint Coating,
NDT Radiography interpretation and Penetrant examination,
6. Checking elevation trenching, back filling pipelines,
7. Review and witness of Hydrotest piping and pipilines as code
or standart requirements,
8. Inspection of coating and painting,
9. Monitoring field work and data progressing,
10. Prepared and monitoring for welding traceability,
11. Check and review certificate welding consumable,
12. Make all inspection reports from material arrival, Work in
Process, and Finish good,
13. Make a QC Dossier based on Project.
: LIPPO CIKARANG-WEST JAVA
: QC CIVIL-STRUCTURE & WELDING INSPECTOR (Freelance)
: Engineering – Mechanical & Electrical /Construction/Structural
: Structure/Mechanical-Electrical/Building Construction
: Construction / Building / Engineering
: December 2020– Present
: Structure & Chimney
: Kohler Mnaufacturing Indonesia.
Working Experience
1. PT. NITTAN KARYA INDONESIA
3. 2. PT. BASUKIGRAHA FABRIKATAMA
Position Title (Level)
Specialization
Role
Industry
Period
Project
Client
Job’s Description
: DELTA SILICON III-LIPPO CIKARANG-WEST JAVA
: QC Inspector & WELDING INSPECTOR
: Engineering – Mechanical & Electrical /Construction/Structural
: Structure/Mechanical-Electrical/Building Construction
: Oil and Gas
: May 2019– November 2020
: E-House, Porta camp(Chevron),E-House(Schneider)
: Kereta Api Indonesia (KAI), VALE INDONESIA, Schneider Electric
Indonesia (SEHI)
1. Before Welding
a. Check of contract documents
b. Verify of WPS
c. Check the design of all welding symbols
d. Ensuring materials and consumables meet the specifications at
WPS,
e. Ensure that the welding equipment is still fit for use,
f. Check and ensure joint preparation, fit-up based on working
drawings,
g. Identify all welding process materials, consumables and
equipment,
h. Check and ensure the welder's qualifications,
i. Ensure the welding work area is in accordance with K3,
j. Explain to the welder the welding process,
k. Check & control WIP (cutting & fitting process),
l. Making NDT, DT & Repair procedures,
m. Make a Quality Plan about welding
2. During Welding
a. Check and control the WIP (cutting, fitting).
b. Ensure that the welding parameters for amperage, voltage and
travel speed are correct.
c. Monitor interplas temperature during the welding process.
d. Supervise & Ensure the cleaning, gouging and repair process is
according to the procedure
3. After Welding
a. Ensures the weld identification around the weld matches the
welding map,
b. Performs a visual inspection of the welds,
c. Making recommendations for implementation of ndt,
d. Check the dimensions of the welded workpiece,
e. Oversee the implementation of repair,
f. Oversee the implementation of pwht,
g. Supervise pressure / load test activities,
4. 3. PT. Indotech Karya Mandiri (IKM)
Position Title (Level)
Specialization
Role
Industry
Period
Project
Client
Job’s Description
h. Ensure ndt records are complete and properly administered,
i. Making Reports: Visual inspection report, Dimension after
welding, Welding inspection report, NDT welding Report.
j. Make and submitte a Request for inspections to client/Owner
k. Make a QC Dossier of History Project for Client
: Jakarta barat – DKI JAKARTA
: QC Civil Inspector in site
: Engineering – Civil/Construction/Structural
: Civil/Building Construction
: Oil and Gas
: October 2018 – April 2019
: LNG – Tangguh Expansion Project – WEST PAPUA
: BP INDONESIA, SKK MIGAS, CSTS
1. Responbility for Civil :
a. Executes the specific inspections on materials, equipment and
construction/installation activities on site.
b. Issues the relevant Quality Records and, when necessary, write
and send to Quality Control Supervisor non-conformances
reports.
c. Checks the preparation of foundations.
d. Checks the correct preparation of reinforcements.
e. Checks the certifications regarding element mixes. LASTM test,
chemical analysis, grain size analysis.
f. Monitors atmospheric conditions during pouring operations.
g. Monitors correct curing operations.
h. Checks the sampling operations (when required).
i. Reviews the laboratory examination results.
j. Cecks sub-grade dry density.
k. Checks moisture content.
l. Checks compression strength test.
m. Checks after execution of costing.
n. Checks after concrete puring.
o. Checks materials quality (wire, fitting etc.).
p. Verifies special processes and the relevant workers’
qualifications.
q. Orderly collect, check and manage documents certifying tests,
controls and inspections carried out witnessing the tests, controls
and inspections carried out.
r. Check the conformity with the Quality Control Plan and obtain
the relevant documentation.
5. s. Check the documents certifying the tests, controls and
inspections carried out.
t. Ensure the correct implementation of the approved Inspection
Test Plan according to Clients requirements.
2. Make a report:
a. Incoming Material report & Concrete & Grouting Report
b. Non Conforming Material Report
c. Non Conforming Report
d. Subbmit RFI (Request For Inspection ) to Clien Base on ITP
e. Hand Over to Construction & QC Dossier for Client
4. PT. HOFZ Indonesia
Position Title (Level)
Specialization
Role
Industry
Period
Project
Client
Job’s Description
: Kawasan MM 2100-Cibitung-Jawa Barat
: QA / QC SPV
: Teknik / Manufaktur
: Modifikasi / Suku Cadang
: Otomotif
: Februari 2017 - September 2018
: Modifikasi Proyek 130 HD 4x4 (Penggerak 4 Roda)
: HINO DUTRO, ISUZU, MITSUBISHI, TOYOTA
1. Make a Standard Operating Procedures (SOP) for QC Inspectors,
2. Creating a Quality Plan, inspection and testing plans based on the
project to be started,
3. Ensuring measuring instruments can be used in checking and
scheduling calibrations for all measuring instruments,
4. Carry out checks or tests of materials / materials to be used in
work,
5. Creating work methods and implementation standards that will be
used in inspection and checking,
6. Provide data / reports to the Quality Assurance Engineer regarding
the readiness of implementation in the field as a consideration for
providing recommendations,
7. Carry out inspection or testing of each type of work both in the
field and in the laboratory.
8. Issuing non-conformity reports, in case of irregularities in work
and making reports of non-conformities specifically for materials
and work results that are not in accordance with applicable
technical specifications,
9. Make all product inspection reports from material arrival, Work in
Process, and Finish good as well as internal calibration reports to
the QA / QC Manager.
10. Present product quality results regularly to management
11. Documenting the Function Test Report & QC Dossier
6. 5. PT.BASUKIGRAHA FABRIKATAMA
Position Title (Level)
Specialization
Role
Industry
Period
Project
Client
Job’s Description
: DELTA SILICON III-LIPPO CIKARANG-WEST JAVA
: QC Inspector & Welding Inspector
: Engineering – Mechanical & Electrical /Construction/Structural
: Structure/Mechanical-Electrical/Building Construction
: Oil and Gas
: August 2015 – February 2017
: E-House, Porta camp(Chevron),E-House(Schneider)
: Kereta Api Indonesia (KAI), Chevron Gn. Salak, Schneider Electric
Indonesia (SEHI)
1. Verification of contract documents
2. Verify of WPS & ITP
3. Identification of welding materials based on WPS
4. Check and confirm the WELDER certificate
5. Identify of material defect.
6. Make a report on incoming material according to the specified
spect, and create an NMCR form for the arrival of the reject
material.
7. Perform dimensional checks in Work in process (WIP)
8. Identify the WIP material to be processed to the Fitting stage
9. Check the results of fitting / Fitup before welding
10. Ensure the welding process is according to WPS
11. Doing NDT
12. Witness and assess the results of welding
13. Measure the DFT of the painting according to the specified spec
14. Oversee the implementation of repair
15. Oversee the implementation of pwht
16. Oversee pressure / load test activities
17. Ensure ndt records are complete and properly administered.
18. Making QC reports in the form of: Incoming material, WIP, fitting
/ fitup, welding and painting.
19. Documenting Process Welding Report & Function Test
20. Make a Qc Dossier
7. Client
Job’s Description
: CAKUNG CILINCING – JAKARTA UTARA
: QC INSPECTOR
: Engineering – Civil/Construction/Structural/Oil & Gas
: Civil/Tower/Telecomunication/Road & Bridge Construction
: September 2010 – July 2015
: Telecommunication, Power Plant and Transmission
: Pertamina, PLN, Schneider, siemen,Tripatra
1. Check the arrival of WIP materials
2. Identify defect material.
3. Make a report on incoming material according to the spec that has
been set, and create an NMCR form for the arrival of the reject
material.
4. Perform dimensional checks in the Work in process (WIP)
5. Identify the WIP material to be processed to the Fitting stage
6. Check the results of fitting / Fitup before welding
7. Ensure the welding process according to WPS,
8. Making QC reports in the form of: Incoming material, WIP, fitting
/ fitup & Welding Process
: TAMBUN, BEKASI-WEST JAVA
: QC INSPECTOR
: Manufacture/ EPC / Engineering
: Powerplant/Telecomunication/Road & Bridge Construction
: Agustus 2009 - Agustus 2010
: Power Tranmission Line, General Structur, Under ground Cable
: PLN, PT. WIKA(Wijaya karya, PT KMI (Kabel Metal Indonesia)
1. Identifying defective material.
2. Make a report on the incoming material according to the specified
spect, and make an NMCR form upon the arrival of the rejected
material.
3. perform dimensional checks in Work in process (WIP)
4. Knowing the WIP material to be processed to the Fitting stage
5. Check the results of fitting / Fitup before welding
6. Ensure the welding process is WPS-compliant
7. Implementing Visual NDT method, PT, MT
8. Witness and assess the results of welding
9. Making NCR Report
10. Making QC reports: Incoming material, WIP (Cutting & Fitting /
filling) and welding and Painting
PT. Columbia Chrome Indonesia
Position Title (Level)
Specialization
Role
Period
Project
Client
Job’s Description
7. PT. Citramasjaya Teknik mandiri
Position Title (Level)
Specialization
Role
Period
Project
6.
8. Certificate of Training
Training INSTITUTION YEAR
Welding Technology BLK Bekasi 2010
Environmental Management System ISO
14001:2004
PT. SGS INDONESIA
2013
Internal Audit of EMS ISO 14001 : 2004 PT. SMT SOLUTION INDONESIA 2014
First Aid PT. BASUKIGRAHA FABRIKATAMA (in house training) 2015
Pencegahan Dan Penanggulangan Bahaya
Kebakaran
DINAS PEMADAM KEBAKARAN 2016
Painting & Coating Knowledge PT. BASUKIGRAHA FABRIKATAMA ( in housetraining) 2015
Work at Height PT. CSTS (Tangguh Expansion Project) 2018
Leadership PT. CSTS (Tangguh Expansion Project) 2019
Primavera P6 LPK VIPRO 2019
Microsoft Project Skill Academy 2020
Welding Inspector SLV
2020
Welding Inspector standart BNSP
2020
NDT Penetran Test Level 2
SLV 2020
NDT Magnetic Test Level 2
SLV 2020
NDT Radiographic Interprenter SLV 2020
Additional Info
I certify that the best of my knowledge and belief, the bio contained in this resume correctly described myself, my qualifications
and my expertise.
TYPE LEVEL
INFORMATION
COMPUTER SKILL Fair Good Excelent
Operating System √ Microsoft Office
Microsoft Project √ Sofware Porject Management
Primavera P6 √ Sofware Porject Management
Autocad √ Sofware Shop drawing,2D/3D
Sketc up √ Sofware Shop drawing,2D/3D
Fishbowl √ Software System Inventory