1. Personal Data
Name : Alamin
Place/date of birth : Sambu Island ( Batam Island ) , December 11th
, 1968
Nationality : Indonesian
Marital Status : Married
Passport No. : B 0114163
Address : Komplek Mantang Permai Blok G N.26 Batu Aji
Batam Island – Indonesia 29439
Mobile : +62 (0) 812-70061792
Email Address : alaminabdullah93@ymail.com
Position : Welding Inspector
Education Backround : Diploma3. Academy finance & banking Borobudur Jakarta
Training and Course Attended :
Welding Inspector Course 19st
– 23th
May 2014
Examination Date 26 May 2014
CSWIP 3.1 Welding Inspector Certificate No. 88313
Radiographic Film Interpretation PCN ( Level-II ) 28 may 2012.
Certificate No :F00753628570 ( Issue number 2 )
Welding Inspector Course ( 399 Hrs ) 07 August 2006.
Conducted by B4T ( Balai Besar Bahandan Barang teknik ) Bandung. ( Indonesia )
Certificate No: 0806 / 12-9BTM / 1479
IWS ( Indonesia Welding Society ). 08 August 2006
Certificate No: 540 / 0806 / WI / BTM
AK3 ( Occupational Safety and Health Expert ) 10 to 15 May 2004
Conducted by DISNAKER – RI
Certificate No: 168 / AK3 / U/2004
Computer literate ( Microsoft Window Excel )
2. Professional Project Experiences
Januari 2015 to February 2016
ICHTHYS ON SHORE LNG FACILITIES
KAWASAKI HEAVY INDUSTRIES .Ltd
Position : Client Inspector
Project : Kawasaki Heavy industries.Ltd cryogenic Tanks (Australian)
PT ProfabBatam
Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Witness visual dimensional assembly for structural members
Check fit up dimensional assembly of structural
Monitor the pursing gas used for SS welding
Weld visual inspection as per ASME B 31.3,ASME IX, & AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Monitoring Installation structural members of erection and rectification
Ensure that non-comforming product or corrective action request are identified and solved
Monitoring and evaluating the Corrective Actions.
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
Preparing the structural punch list for completion erection
March 2013 to september 2014
TAN BURRUP PROJECT 120 MODULE( AUSTRALIAN )
TECNICAS REUNIDAS
Position : Leader QC Inspector.
Project : Tan Burrup ( Australian )
PT nippon Steel Batam
3. Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
Monitor the weld parameters
Monitor the pursing gas used for duplex / SS welding
Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX & AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Monitoring and evaluating the Corrective Actions.
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
March 2011 to April 2012
SOUTH MAHAKAM FIELD DEVELOPMENT PHASE 1 & 2
( MAIN STUPA,EAST MANDU & WEST STUPA )
Position : Leader QC Inspector.
Project : South Mahakam development phase 1 & 2
PT nippon Steel Batam
Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX & AWS D1.1
4. Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Witnessing of welder qualification test / PQR’s
Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Monitoring and evaluating the Corrective Actions.
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
Januari 2010 to Februari 2011
PREMIER 0IL GAJAH BARU & PSVM FPSO PROJECT ( MODEC )
Position : QC Inspector.
Project : Gajah baru & BP Exploration ( Angola ) Ltd.
PT nippon Steel Batam
Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
Monitor the weld parameters
Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Witnessing of welder qualification test / PQR’s
Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
5. Review test package and NDT
Preparing the piping punch list prior and after hydrotest
Januari 2009 to December 2009
PT NIPPON STEEL Batam
DLB KUROSHIO NEW DECK LIVING QUARTER Project
Position :QC Inspector.
Project : Fabricated Living Quarter
Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
Monitor the weld parameters
Weld visual inspection as per ASME B 31.3 & AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Witnessing of welder qualification test / PQR’s
Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Monitoring and evaluating the Corrective Actions.
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
April, 2007 to December 2008
6. Conoco Phillips Indonesia Ltd.
Position : QC Inspector.
Project : North Belut WHP EPC.
Total E & P Indonesie.
Peciko 5 Platform Project
Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
Monitor the weld parameters
Monitor the pursing gas used for duplex / SS welding
Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Witnessing of welder qualification test / PQR’s
Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Monitoring and evaluating the Corrective Actions.
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
January, 2005 – April 2007
Total E & P Indonesie.
SisiNubi Fields Development Project – Phase I
Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
7. Monitor the weld parameters
Monitor the pursing gas used for duplex / SS welding
Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Witnessing of welder qualification test / PQR’s
Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Monitoring and evaluating the Corrective Actions.
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
June, 2005 – April 2006
PREMIER OIL NATUNA SEA B.V.
West Lobe Wellhead Platform Project
Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
Monitor the weld parameters
Monitor the pursing gas used for duplex / SS welding
Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Witnessing of welder qualification test / PQR’s
Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Monitoring and evaluating the Corrective Actions.
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
8. June, 2002 – February 2003
Clough Engineering Ltd
Bass gas Development Project
Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
Monitor the weld parameters
Monitor the pursing gas used for duplex / SS welding
Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Witnessing of welder qualification test / PQR’s
Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Monitoring and evaluating the Corrective Actions.
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
May, 2002 – July 2002
ADFG SUBSEA PROTECTION PROJECT
Conoco Indonesia
9. Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
Monitor the weld parameters
Monitor the pursing gas used for duplex / SS welding
Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Witnessing of welder qualification test / PQR’s
Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Monitoring and evaluating the Corrective Actions.
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
December, 2001 – April 2002
WEST SENO PROJECT
87 man Living Quarter Structural
Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
Monitor the weld parameters
Monitor the pursing gas used for duplex / SS welding
Weld visual inspection as per ASME B 31.3,ASME IX & AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Witnessing of welder qualification test / PQR’s
Coordinating NDT activities RT, MT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Ensuring all material and fabrication are certified in accordance with specified requirements.
10. Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
November, 2001 – March 2002
LAKSHMI PLATFORM A - B
4 Leg Production Deck ( LA – B )
Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
Monitor the weld parameters
Monitor the pursing gas used for duplex / SS welding
Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Witnessing of welder qualification test / PQR’s
Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Monitoring and evaluating the Corrective Actions.
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
11. March, 2001 – October 2001
UNOCAL THAILAND PROJECT
4 Leg Production Jacket and Deck
Phase 22/5,Phase 22/6 Phase 22/7, Phase 22/8
Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
Monitor the weld parameters
Monitor the pursing gas used for duplex / SS welding
Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Witnessing of welder qualification test / PQR’s
Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Monitoring and evaluating the Corrective Actions.
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
February – March 2001
RAVVA MODIFICATION PROJECT
3 leg Production Jacket And Deck
Location : PT. Nippon Steel Fabrication Yard – Batam Island Indonesia.
12. Duties and Responsibilities:
Visually check all gaps of members to be welded to ensure they are in
accordance to the welding configuration details as stipulated in the applicable
WPS and AFC Drawing.
At the same time check all parent metal surfaces to be welded to avoid
misalignment, bad workmanship.
During fabrication check all weld profiles to ensure all undefiled and undercut
remedied. Check applications of preheat on each parent metal as stipulated by
the PQR and WPS or AFC Drawing to ensure the correct temperatures are
properly adhered to.
Prepare punchlist on outstanding work distributed them to each concerned
area to ensure the remaining outstanding work are complete in time lye
manner.
Control all records prepared by QC documentation clerk get them approved by
each concerned client for proper reference.
Prepared drawing isometric , pipe support and NDT weld map for structural
drawing
Request Applicable NDT after welding completed as per ITP and specification
NDT requirement
December 2000 – April 2001
TOTAL INDONESIE PHASE 2
4 Leg Production Jacket and Deck
Duties and Responsibilities:
Visually check all gaps of members to be welded to ensure they are in
accordance to the welding configuration details as stipulated in the applicable
WPS and AFC Drawing.
At the same time check all parent metal surfaces to be welded to avoid
misalignment, bad workmanship.
During fabrication check all weld profiles to ensure all undefiled and undercut
remedied. Check applications of preheat on each parent metal as stipulated by
the PQR and WPS or AFC Drawing to ensure the correct temperatures are
properly adhered to.
Prepare punchlist on outstanding work distributed them to each concerned
area to ensure the remaining outstanding work are complete in time lye
manner.
Control all records prepared by QC documentation clerk get them approved by
each concerned client for proper reference.
Prepared drawing isometric , pipe support and NDT weld map for structural
drawing
Request Applicable NDT after welding completed as per ITP and specification
NDT requirement
13. December 2000 – July 2001
PREMIER OIL NATUNA SEA Ltd.
4 Leg Production Jacket and Deck
Duties and Responsibilities :
Check the material used are complying with AFC drawings
Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
Monitor the preheating and interpass temperature
Monitor the weld parameters
Monitor the pursing gas used for duplex / SS welding
Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
Ensure project specification requirements related to welding are been followed
Monitor the welder performance and check their qualification
Witnessing of welder qualification test / PQR’s
Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
Ensure that non-comforming product or corrective action request are identified and solved
Monitoring and evaluating the Corrective Actions.
Ensuring all material and fabrication are certified in accordance with specified requirements.
Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
Review Radiographic Film as per specifications and code
Review test package and NDT
Preparing the piping punch list prior and after hydrotest
April, 1998 up to Mar 2000
Location : PT Rotary Engineering Indonesia - Batam
Position : QC Inspector
Duties and Responsibilities:
Visually check all gaps of members to be welded to ensure they are in
accordance to the welding configuration details as stipulated in the applicable
WPS and AFC Drawing.
At the same time check all parent metal surfaces to be welded to avoid
misalignment, bad workmanship.
During fabrication check all weld profiles to ensure all undefiled and undercut
remedied. Check applications of preheat on each parent metal as stipulated by
the PQR and WPS or AFC Drawing to ensure the correct temperatures are
properly adhered to.
Prepare punchlist on outstanding work distributed them to each concerned
area to ensure the remaining outstanding work are complete in time lye
manner.
Control all records prepared by QC documentation clerk get them approved by
14. each concerned client for proper reference.
Prepared drawing isometric , pipe support and NDT weld map for structural
drawing
Request Applicable NDT after welding completed as per ITP and specification
NDT requirement
Project Completion
Oil Tanking Singapore Chemical Storage PTE.LTD- Chem I &Chem II Expansion
Project
CONOCO Belanak – FPSO roject (Tertiary steelwork).
CONOCO Belanak – WHP A& WHP-B Project (Teriatery steel work).
PT.McDermott Indonesia-Dominion Spar Hull project.
Clough Engr LTD / Unocal Makasar LTD ( West Seno)- Busckle Arrestor Pipe
line Project.
Foster Wheeler Eastern PteLtd ? Exxon Mobil Asia PasificPte Ltd – Site
Integration Pipe Line
Foster Wheeler Eastern Pte Ltd. - Multi Product plant Project ( Schering Plough
Ltd) Singapore
Toyo Engineering Corporation-Mitsui Bishenol Singapore Refinery Project Phase
II.
PT.Clatex Pacific Indonesia – Sludge Tank Project Duri.
Oil Tanking Singapore Chemical Storage PTE.LTD-Chem I &Chem II Expansion
Project.
Maxus South East Sumatera-Process Control Room Widuri C Project.
Foster Wheeler Eastern Pte Ltd – RIF Project ( Refinery Interface Facilities)
Singapore.
Foster Wheeler Eastern Pte Ltd- Singapore Acetyles Refinery Project.
TheMW.Kellog Company – Singapore Olefin Refinery Project.
TheMW.Kellog Company – Singapore Gas Refinery Project.
Toyo Engineering Corporation – Mitsui Bisphenol Singapore Phase I Refinery
Project.
Van Omerentherminal Tank Singapore – Storege Tank Expansion Project.
Toyo Engineering Corporation – PurifieldIsophthalic Acid Plant Refinery Project
Lonza Singapore.
October, 1996 up to Dec 1997
Location : PT BatamasJala Nusantara
Position : QC Inspector
Duties and Responsibilities:
Prepared isometric Drawing, pipe support, NDT drawing Weld Map and Shop
Drawing Structural
Line check with client before hydrotest
Project Completion
Algeria Sonatragh GPL Phase II Refinery Project
15. May, 1990 up to Sept 1996
Location : PT. Mc Dermott Indonesia Batam Yard Fabrication
Position : QC Inspector
Duties and Responsibilities:
Prepared shop drawing Structural, Isometric Drawing,Pipe support and,NDT drawing weld Map
Prepared for Hydrotest,Line check with client before hydrotest and make thepunclist before and
after hydrotest
Control all records prepared by QC documentation clerk get them approved by
each concerned client for proper reference.
Prepared drawing isometric , pipe support and NDT weld map for structural
drawing
Request Applicable NDT after welding completed as per ITP and specification
NDT requirement
Project Completion
ACT China HZ 26-1
Process Platform 8piles deck
Total Thailand WP.1 thru WP.8
Wellhead platform 4 piles jacket & deck
Total Thailand RP & QP
Riser & Quarter Platform 4piles jacket & deck
Total Thailand PP
Production latform 8 piles jacket & deck
Arco Indonesia BL & BN-A
Welhead Platform 4 piles jacket & deck
Conoco Indonesia DPP-A
Drilling Process Platform 8piles jacket & deck
Conoco Indonesia FP & Bridge
Flare Platform 3 piles jacket & deck
Interprise Oil CPP-A & CPP-b
Central Process Platform 4 piles jacket & deck
Arco Indonesia KLXA,KLXB,KLYA& KLYB
Wellhead Platform 3 piles jacket & deck
Arco Indonesia B2C
Production Platform 8 piles jacket & deck
Carigali malaysia BNG-B
Drilling & Production Platform 8 piles jacket
Brunei Shell Petrolium CPCB-7
Production Platform 6 piles jacket
Serawak Shell Berhad QA & RA
Wellhead & production Platform 4 piles jacket & deck
Serawak Shell Berhad PG-A
Wlhead & Production Platform 4 piles jacket & deck
16. Esso Petrolium Malaysia Lawit -a & M3PQ-a
Wellhead & Production Platform 8 piles jacket
Woodside Petrolium Australia Goodwyn-A
Production latform 8 piles jacket & MSF
Phillips Petrolium China Block 24-1 & 30-2
Wellhead & Production Platform 8 piles jacket
Arco China Xijiang
Wellhead & Production Platform 8 piles jacket
Singapore Aromatic Company
99 modules PAR,PAU & VAU
Yadana Field WP-a & WP-B
Wellhead Platform 4 Piles jacket & deck
Unocal Indonesia Santan ST-A
Process Platform 8 piles deck
Total Mynmar WP-1 & WP-2
Welhead Platform 6 piles jacket,deck & MSF
Total myanmar QP
Quarter Platform 4 piles jacket,deck MSF & Living quarter
Unocal Thailand CPP
Central Process Platform 8 piles jacket & deck
Unocal Thailand LQ
Living Quarter Platform 4 piles jacket & Living Quarter
Mobil Oil Indonesia NSO-A
Production Platform 8 piles jacket & deck
Singapore Acetyls Project for Ester & Acids unitr at Sakra Island (Singapore)
10000 spool included support
RotaryIntregrated Miantenance Center at Merlimau Island (Singapore)
110 Tons Steel Building ( Werhaouse,Workshop,fabrication,piant & repair shop)
PIA LONZA Project
Production module,pipe spool & support
MBS Project
Production
Singapore Olenfins Project
Production module,pipe spool & support
FOSTER WHEELER EASTERN
Production module,pipe spol,Support and building monitor
SYNGAS PROJECT
Production module and tank oil