SlideShare a Scribd company logo
1 of 16
Download to read offline
Personal Data
Name : Alamin
Place/date of birth : Sambu Island ( Batam Island ) , December 11th
, 1968
Nationality : Indonesian
Marital Status : Married
Passport No. : B 0114163
Address : Komplek Mantang Permai Blok G N.26 Batu Aji
Batam Island – Indonesia 29439
Mobile : +62 (0) 812-70061792
Email Address : alaminabdullah93@ymail.com
Position : Welding Inspector
Education Backround : Diploma3. Academy finance & banking Borobudur Jakarta
Training and Course Attended :

Welding Inspector Course 19st
– 23th
May 2014
Examination Date 26 May 2014
CSWIP 3.1 Welding Inspector Certificate No. 88313
Radiographic Film Interpretation PCN ( Level-II ) 28 may 2012.
Certificate No :F00753628570 ( Issue number 2 )
Welding Inspector Course ( 399 Hrs ) 07 August 2006.
Conducted by B4T ( Balai Besar Bahandan Barang teknik ) Bandung. ( Indonesia )
Certificate No: 0806 / 12-9BTM / 1479

IWS ( Indonesia Welding Society ). 08 August 2006
Certificate No: 540 / 0806 / WI / BTM

AK3 ( Occupational Safety and Health Expert ) 10 to 15 May 2004
Conducted by DISNAKER – RI
Certificate No: 168 / AK3 / U/2004

Computer literate ( Microsoft Window Excel )
Professional Project Experiences
Januari 2015 to February 2016
ICHTHYS ON SHORE LNG FACILITIES
KAWASAKI HEAVY INDUSTRIES .Ltd
Position : Client Inspector
Project : Kawasaki Heavy industries.Ltd cryogenic Tanks (Australian)
PT ProfabBatam
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Witness visual dimensional assembly for structural members
 Check fit up dimensional assembly of structural
 Monitor the pursing gas used for SS welding
 Weld visual inspection as per ASME B 31.3,ASME IX, & AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Monitoring Installation structural members of erection and rectification
 Ensure that non-comforming product or corrective action request are identified and solved
 Monitoring and evaluating the Corrective Actions.
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
 Preparing the structural punch list for completion erection
March 2013 to september 2014
TAN BURRUP PROJECT 120 MODULE( AUSTRALIAN )
TECNICAS REUNIDAS
Position : Leader QC Inspector.
Project : Tan Burrup ( Australian )
PT nippon Steel Batam
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Monitor the weld parameters
 Monitor the pursing gas used for duplex / SS welding
 Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX & AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Monitoring and evaluating the Corrective Actions.
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
March 2011 to April 2012
SOUTH MAHAKAM FIELD DEVELOPMENT PHASE 1 & 2
( MAIN STUPA,EAST MANDU & WEST STUPA )
Position : Leader QC Inspector.
Project : South Mahakam development phase 1 & 2
PT nippon Steel Batam
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX & AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Witnessing of welder qualification test / PQR’s
 Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Monitoring and evaluating the Corrective Actions.
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
Januari 2010 to Februari 2011
PREMIER 0IL GAJAH BARU & PSVM FPSO PROJECT ( MODEC )
Position : QC Inspector.
Project : Gajah baru & BP Exploration ( Angola ) Ltd.
PT nippon Steel Batam
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Monitor the weld parameters
 Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Witnessing of welder qualification test / PQR’s
 Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
Januari 2009 to December 2009
PT NIPPON STEEL Batam
DLB KUROSHIO NEW DECK LIVING QUARTER Project
Position :QC Inspector.
Project : Fabricated Living Quarter
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Monitor the weld parameters
 Weld visual inspection as per ASME B 31.3 & AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Witnessing of welder qualification test / PQR’s
 Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Monitoring and evaluating the Corrective Actions.
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
April, 2007 to December 2008
Conoco Phillips Indonesia Ltd.
Position : QC Inspector.
Project : North Belut WHP EPC.
Total E & P Indonesie.
Peciko 5 Platform Project
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Monitor the weld parameters
 Monitor the pursing gas used for duplex / SS welding
 Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Witnessing of welder qualification test / PQR’s
 Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Monitoring and evaluating the Corrective Actions.
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
January, 2005 – April 2007
Total E & P Indonesie.
SisiNubi Fields Development Project – Phase I
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Monitor the weld parameters
 Monitor the pursing gas used for duplex / SS welding
 Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Witnessing of welder qualification test / PQR’s
 Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Monitoring and evaluating the Corrective Actions.
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
June, 2005 – April 2006
PREMIER OIL NATUNA SEA B.V.
West Lobe Wellhead Platform Project
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Monitor the weld parameters
 Monitor the pursing gas used for duplex / SS welding
 Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Witnessing of welder qualification test / PQR’s
 Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Monitoring and evaluating the Corrective Actions.
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
June, 2002 – February 2003
Clough Engineering Ltd
Bass gas Development Project
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Monitor the weld parameters
 Monitor the pursing gas used for duplex / SS welding
 Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Witnessing of welder qualification test / PQR’s
 Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Monitoring and evaluating the Corrective Actions.
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
May, 2002 – July 2002
ADFG SUBSEA PROTECTION PROJECT
Conoco Indonesia
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Monitor the weld parameters
 Monitor the pursing gas used for duplex / SS welding
 Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Witnessing of welder qualification test / PQR’s
 Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Monitoring and evaluating the Corrective Actions.
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
December, 2001 – April 2002
WEST SENO PROJECT
87 man Living Quarter Structural
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Monitor the weld parameters
 Monitor the pursing gas used for duplex / SS welding
 Weld visual inspection as per ASME B 31.3,ASME IX & AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Witnessing of welder qualification test / PQR’s
 Coordinating NDT activities RT, MT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
November, 2001 – March 2002
LAKSHMI PLATFORM A - B
4 Leg Production Deck ( LA – B )
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Monitor the weld parameters
 Monitor the pursing gas used for duplex / SS welding
 Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Witnessing of welder qualification test / PQR’s
 Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Monitoring and evaluating the Corrective Actions.
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
March, 2001 – October 2001
UNOCAL THAILAND PROJECT
4 Leg Production Jacket and Deck
Phase 22/5,Phase 22/6 Phase 22/7, Phase 22/8
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Monitor the weld parameters
 Monitor the pursing gas used for duplex / SS welding
 Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Witnessing of welder qualification test / PQR’s
 Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Monitoring and evaluating the Corrective Actions.
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
February – March 2001
RAVVA MODIFICATION PROJECT
3 leg Production Jacket And Deck
Location : PT. Nippon Steel Fabrication Yard – Batam Island Indonesia.
Duties and Responsibilities:

 Visually check all gaps of members to be welded to ensure they are in
accordance to the welding configuration details as stipulated in the applicable
WPS and AFC Drawing.
 At the same time check all parent metal surfaces to be welded to avoid
misalignment, bad workmanship.
 During fabrication check all weld profiles to ensure all undefiled and undercut
remedied. Check applications of preheat on each parent metal as stipulated by
the PQR and WPS or AFC Drawing to ensure the correct temperatures are
properly adhered to.
 Prepare punchlist on outstanding work distributed them to each concerned
area to ensure the remaining outstanding work are complete in time lye
manner.
 Control all records prepared by QC documentation clerk get them approved by
each concerned client for proper reference.
 Prepared drawing isometric , pipe support and NDT weld map for structural
drawing
 Request Applicable NDT after welding completed as per ITP and specification
NDT requirement
December 2000 – April 2001
TOTAL INDONESIE PHASE 2
4 Leg Production Jacket and Deck
Duties and Responsibilities:
 Visually check all gaps of members to be welded to ensure they are in
accordance to the welding configuration details as stipulated in the applicable
WPS and AFC Drawing.
 At the same time check all parent metal surfaces to be welded to avoid
misalignment, bad workmanship.
 During fabrication check all weld profiles to ensure all undefiled and undercut
remedied. Check applications of preheat on each parent metal as stipulated by
the PQR and WPS or AFC Drawing to ensure the correct temperatures are
properly adhered to.
 Prepare punchlist on outstanding work distributed them to each concerned
area to ensure the remaining outstanding work are complete in time lye
manner.
 Control all records prepared by QC documentation clerk get them approved by
each concerned client for proper reference.
 Prepared drawing isometric , pipe support and NDT weld map for structural
drawing
 Request Applicable NDT after welding completed as per ITP and specification
NDT requirement
December 2000 – July 2001
PREMIER OIL NATUNA SEA Ltd.
4 Leg Production Jacket and Deck
Duties and Responsibilities :
 Check the material used are complying with AFC drawings
 Witness the hydrotest activity and ensure all requirements stated in procedure
shall be complied
 Monitor the preheating and interpass temperature
 Monitor the weld parameters
 Monitor the pursing gas used for duplex / SS welding
 Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 &
AWS D1.1
 Ensure project specification requirements related to welding are been followed
 Monitor the welder performance and check their qualification
 Witnessing of welder qualification test / PQR’s
 Coordinating NDT activities RT, MT, UT, PTNDT Coordinator
 Leasing with documentation supervisor to ensure that inspection report by using proper form and
met the client requerements
 Ensure that non-comforming product or corrective action request are identified and solved
 Monitoring and evaluating the Corrective Actions.
 Ensuring all material and fabrication are certified in accordance with specified requirements.
 Ensuring visual inspected and NDT procedures are produced in accordance with contract
specifications and NDT is carried out and reported when required.
 Review Radiographic Film as per specifications and code
 Review test package and NDT
 Preparing the piping punch list prior and after hydrotest
April, 1998 up to Mar 2000
Location : PT Rotary Engineering Indonesia - Batam
Position : QC Inspector
Duties and Responsibilities:
 Visually check all gaps of members to be welded to ensure they are in
accordance to the welding configuration details as stipulated in the applicable
WPS and AFC Drawing.
 At the same time check all parent metal surfaces to be welded to avoid
misalignment, bad workmanship.
 During fabrication check all weld profiles to ensure all undefiled and undercut
remedied. Check applications of preheat on each parent metal as stipulated by
the PQR and WPS or AFC Drawing to ensure the correct temperatures are
properly adhered to.
 Prepare punchlist on outstanding work distributed them to each concerned
area to ensure the remaining outstanding work are complete in time lye
manner.
 Control all records prepared by QC documentation clerk get them approved by
each concerned client for proper reference.
 Prepared drawing isometric , pipe support and NDT weld map for structural
drawing
 Request Applicable NDT after welding completed as per ITP and specification
NDT requirement
Project Completion
 Oil Tanking Singapore Chemical Storage PTE.LTD- Chem I &Chem II Expansion
Project
 CONOCO Belanak – FPSO roject (Tertiary steelwork).
 CONOCO Belanak – WHP A& WHP-B Project (Teriatery steel work).
 PT.McDermott Indonesia-Dominion Spar Hull project.
 Clough Engr LTD / Unocal Makasar LTD ( West Seno)- Busckle Arrestor Pipe
line Project.
 Foster Wheeler Eastern PteLtd ? Exxon Mobil Asia PasificPte Ltd – Site
Integration Pipe Line
 Foster Wheeler Eastern Pte Ltd. - Multi Product plant Project ( Schering Plough
Ltd) Singapore
 Toyo Engineering Corporation-Mitsui Bishenol Singapore Refinery Project Phase
II.
 PT.Clatex Pacific Indonesia – Sludge Tank Project Duri.
 Oil Tanking Singapore Chemical Storage PTE.LTD-Chem I &Chem II Expansion
Project.
 Maxus South East Sumatera-Process Control Room Widuri C Project.
 Foster Wheeler Eastern Pte Ltd – RIF Project ( Refinery Interface Facilities)
Singapore.
 Foster Wheeler Eastern Pte Ltd- Singapore Acetyles Refinery Project.
 TheMW.Kellog Company – Singapore Olefin Refinery Project.
 TheMW.Kellog Company – Singapore Gas Refinery Project.
 Toyo Engineering Corporation – Mitsui Bisphenol Singapore Phase I Refinery
Project.
 Van Omerentherminal Tank Singapore – Storege Tank Expansion Project.
 Toyo Engineering Corporation – PurifieldIsophthalic Acid Plant Refinery Project
Lonza Singapore.
October, 1996 up to Dec 1997
Location : PT BatamasJala Nusantara
Position : QC Inspector
Duties and Responsibilities:
 Prepared isometric Drawing, pipe support, NDT drawing Weld Map and Shop
Drawing Structural
 Line check with client before hydrotest
Project Completion
Algeria Sonatragh GPL Phase II Refinery Project
May, 1990 up to Sept 1996
Location : PT. Mc Dermott Indonesia Batam Yard Fabrication
Position : QC Inspector
Duties and Responsibilities:
 Prepared shop drawing Structural, Isometric Drawing,Pipe support and,NDT drawing weld Map
 Prepared for Hydrotest,Line check with client before hydrotest and make thepunclist before and
after hydrotest
 Control all records prepared by QC documentation clerk get them approved by
each concerned client for proper reference.
 Prepared drawing isometric , pipe support and NDT weld map for structural
drawing
 Request Applicable NDT after welding completed as per ITP and specification
NDT requirement
Project Completion
 ACT China HZ 26-1
Process Platform 8piles deck
 Total Thailand WP.1 thru WP.8
Wellhead platform 4 piles jacket & deck
 Total Thailand RP & QP
Riser & Quarter Platform 4piles jacket & deck
 Total Thailand PP
Production latform 8 piles jacket & deck
 Arco Indonesia BL & BN-A
Welhead Platform 4 piles jacket & deck
 Conoco Indonesia DPP-A
Drilling Process Platform 8piles jacket & deck
 Conoco Indonesia FP & Bridge
Flare Platform 3 piles jacket & deck
 Interprise Oil CPP-A & CPP-b
Central Process Platform 4 piles jacket & deck
 Arco Indonesia KLXA,KLXB,KLYA& KLYB
Wellhead Platform 3 piles jacket & deck
 Arco Indonesia B2C
Production Platform 8 piles jacket & deck
 Carigali malaysia BNG-B
Drilling & Production Platform 8 piles jacket
 Brunei Shell Petrolium CPCB-7
Production Platform 6 piles jacket
 Serawak Shell Berhad QA & RA
Wellhead & production Platform 4 piles jacket & deck
 Serawak Shell Berhad PG-A
Wlhead & Production Platform 4 piles jacket & deck
 Esso Petrolium Malaysia Lawit -a & M3PQ-a
Wellhead & Production Platform 8 piles jacket
 Woodside Petrolium Australia Goodwyn-A
Production latform 8 piles jacket & MSF
 Phillips Petrolium China Block 24-1 & 30-2
Wellhead & Production Platform 8 piles jacket
 Arco China Xijiang
Wellhead & Production Platform 8 piles jacket
 Singapore Aromatic Company
99 modules PAR,PAU & VAU
 Yadana Field WP-a & WP-B
Wellhead Platform 4 Piles jacket & deck
 Unocal Indonesia Santan ST-A
Process Platform 8 piles deck
 Total Mynmar WP-1 & WP-2
Welhead Platform 6 piles jacket,deck & MSF
 Total myanmar QP
Quarter Platform 4 piles jacket,deck MSF & Living quarter
 Unocal Thailand CPP
Central Process Platform 8 piles jacket & deck
 Unocal Thailand LQ
Living Quarter Platform 4 piles jacket & Living Quarter
 Mobil Oil Indonesia NSO-A
Production Platform 8 piles jacket & deck
 Singapore Acetyls Project for Ester & Acids unitr at Sakra Island (Singapore)
10000 spool included support
 RotaryIntregrated Miantenance Center at Merlimau Island (Singapore)
110 Tons Steel Building ( Werhaouse,Workshop,fabrication,piant & repair shop)
 PIA LONZA Project
Production module,pipe spool & support
 MBS Project
Production
 Singapore Olenfins Project
Production module,pipe spool & support
 FOSTER WHEELER EASTERN
Production module,pipe spol,Support and building monitor
 SYNGAS PROJECT
Production module and tank oil

More Related Content

What's hot

Multidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAIMultidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAIDeepak Rai
 
Multidispline Inspector - DEEPAK Rai
Multidispline Inspector - DEEPAK RaiMultidispline Inspector - DEEPAK Rai
Multidispline Inspector - DEEPAK RaiDeepak Rai
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher
 
MD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalMD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalM.Nafis Haque
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expVijay Raghavan
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCkhursheed aiam
 
Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017Slamet Nurhadi
 
Resume Tariq QA
Resume Tariq QAResume Tariq QA
Resume Tariq QATariq mohd
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016Kirana Devasya
 
jaynt singh (CV) (5)
jaynt singh (CV) (5)jaynt singh (CV) (5)
jaynt singh (CV) (5)Jayant Singh
 

What's hot (20)

Phairat-CV(2015)
Phairat-CV(2015)Phairat-CV(2015)
Phairat-CV(2015)
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
BALAJI-2016
BALAJI-2016BALAJI-2016
BALAJI-2016
 
Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1
 
Multidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAIMultidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAI
 
Multidispline Inspector - DEEPAK Rai
Multidispline Inspector - DEEPAK RaiMultidispline Inspector - DEEPAK Rai
Multidispline Inspector - DEEPAK Rai
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
qaiser shahzad cv
qaiser shahzad cvqaiser shahzad cv
qaiser shahzad cv
 
MD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalMD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_original
 
Imran CV
Imran CVImran CV
Imran CV
 
T.rajakumar.cv
T.rajakumar.cvT.rajakumar.cv
T.rajakumar.cv
 
CV_Sa-nga Last Revision
CV_Sa-nga Last RevisionCV_Sa-nga Last Revision
CV_Sa-nga Last Revision
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of exp
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
 
Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017
 
CV FOR N.R.IYER
CV FOR N.R.IYERCV FOR N.R.IYER
CV FOR N.R.IYER
 
Resume Tariq QA
Resume Tariq QAResume Tariq QA
Resume Tariq QA
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 
jaynt singh (CV) (5)
jaynt singh (CV) (5)jaynt singh (CV) (5)
jaynt singh (CV) (5)
 

Viewers also liked

Retail Operations A Snapshot by Mr.Narendrababu
Retail Operations A Snapshot by Mr.NarendrababuRetail Operations A Snapshot by Mr.Narendrababu
Retail Operations A Snapshot by Mr.NarendrababuNarendra Babu
 
Philip kotler__gary_armstrong__principles_of_mark_book_fi.org_
 Philip kotler__gary_armstrong__principles_of_mark_book_fi.org_ Philip kotler__gary_armstrong__principles_of_mark_book_fi.org_
Philip kotler__gary_armstrong__principles_of_mark_book_fi.org_suresh ghimire
 
Trends in FMCG by Mr.Narendrababu -ok
Trends in FMCG by Mr.Narendrababu -okTrends in FMCG by Mr.Narendrababu -ok
Trends in FMCG by Mr.Narendrababu -okNarendra Babu
 
Human resource management_report_-_based
Human resource management_report_-_basedHuman resource management_report_-_based
Human resource management_report_-_basedsuresh ghimire
 
Internet of Energy Things IERC 2015
Internet of Energy Things IERC 2015Internet of Energy Things IERC 2015
Internet of Energy Things IERC 2015Paul Malone
 
CV. Syech Rieffan MB
CV. Syech Rieffan MBCV. Syech Rieffan MB
CV. Syech Rieffan MBS Rieffan
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)Ahmed Kamal
 
The Rick Gonzalez Mechanical Designer Resume Nov2016
The Rick Gonzalez Mechanical Designer Resume Nov2016The Rick Gonzalez Mechanical Designer Resume Nov2016
The Rick Gonzalez Mechanical Designer Resume Nov2016Rick Gonzalez
 
朝日新聞 福島県内バイオマス発電計画次々凍結2013.11.29
朝日新聞 福島県内バイオマス発電計画次々凍結2013.11.29 朝日新聞 福島県内バイオマス発電計画次々凍結2013.11.29
朝日新聞 福島県内バイオマス発電計画次々凍結2013.11.29 コーヒー プリン
 
20131024 The role of Research Generating Knowledge
20131024 The role of Research Generating  Knowledge20131024 The role of Research Generating  Knowledge
20131024 The role of Research Generating KnowledgeWalter de Ruyter
 
Análisis de tendencias pedagógicas-Jorge Osorio Martínez
Análisis de tendencias pedagógicas-Jorge Osorio MartínezAnálisis de tendencias pedagógicas-Jorge Osorio Martínez
Análisis de tendencias pedagógicas-Jorge Osorio MartínezJorge Armando Osorio Martinez
 
EXECUTED PROJECT LIST
EXECUTED PROJECT LISTEXECUTED PROJECT LIST
EXECUTED PROJECT LISTKhabir Ali
 

Viewers also liked (16)

Other samples
Other samplesOther samples
Other samples
 
Retail Operations A Snapshot by Mr.Narendrababu
Retail Operations A Snapshot by Mr.NarendrababuRetail Operations A Snapshot by Mr.Narendrababu
Retail Operations A Snapshot by Mr.Narendrababu
 
Philip kotler__gary_armstrong__principles_of_mark_book_fi.org_
 Philip kotler__gary_armstrong__principles_of_mark_book_fi.org_ Philip kotler__gary_armstrong__principles_of_mark_book_fi.org_
Philip kotler__gary_armstrong__principles_of_mark_book_fi.org_
 
Sva updated cv (1)
Sva updated cv (1)Sva updated cv (1)
Sva updated cv (1)
 
Magazine Sample 2
Magazine Sample 2Magazine Sample 2
Magazine Sample 2
 
Trends in FMCG by Mr.Narendrababu -ok
Trends in FMCG by Mr.Narendrababu -okTrends in FMCG by Mr.Narendrababu -ok
Trends in FMCG by Mr.Narendrababu -ok
 
Magazine Sample 1
Magazine Sample 1Magazine Sample 1
Magazine Sample 1
 
Human resource management_report_-_based
Human resource management_report_-_basedHuman resource management_report_-_based
Human resource management_report_-_based
 
Internet of Energy Things IERC 2015
Internet of Energy Things IERC 2015Internet of Energy Things IERC 2015
Internet of Energy Things IERC 2015
 
CV. Syech Rieffan MB
CV. Syech Rieffan MBCV. Syech Rieffan MB
CV. Syech Rieffan MB
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
The Rick Gonzalez Mechanical Designer Resume Nov2016
The Rick Gonzalez Mechanical Designer Resume Nov2016The Rick Gonzalez Mechanical Designer Resume Nov2016
The Rick Gonzalez Mechanical Designer Resume Nov2016
 
朝日新聞 福島県内バイオマス発電計画次々凍結2013.11.29
朝日新聞 福島県内バイオマス発電計画次々凍結2013.11.29 朝日新聞 福島県内バイオマス発電計画次々凍結2013.11.29
朝日新聞 福島県内バイオマス発電計画次々凍結2013.11.29
 
20131024 The role of Research Generating Knowledge
20131024 The role of Research Generating  Knowledge20131024 The role of Research Generating  Knowledge
20131024 The role of Research Generating Knowledge
 
Análisis de tendencias pedagógicas-Jorge Osorio Martínez
Análisis de tendencias pedagógicas-Jorge Osorio MartínezAnálisis de tendencias pedagógicas-Jorge Osorio Martínez
Análisis de tendencias pedagógicas-Jorge Osorio Martínez
 
EXECUTED PROJECT LIST
EXECUTED PROJECT LISTEXECUTED PROJECT LIST
EXECUTED PROJECT LIST
 

Similar to CV-Alamin2016 (20)

Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
 
RESUME 26 JAN
RESUME 26 JANRESUME 26 JAN
RESUME 26 JAN
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
Linsin CV
Linsin CVLinsin CV
Linsin CV
 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - Copy
 
cv
cvcv
cv
 
javed_C.V.
javed_C.V.javed_C.V.
javed_C.V.
 
Javed c.v.
Javed c.v.Javed c.v.
Javed c.v.
 
C.V.
C.V.C.V.
C.V.
 
Javed c.v.
Javed c.v.Javed c.v.
Javed c.v.
 
Mohamad Elyaas CV & Certf
Mohamad Elyaas CV & CertfMohamad Elyaas CV & Certf
Mohamad Elyaas CV & Certf
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
Vijay konathala Resume
Vijay konathala ResumeVijay konathala Resume
Vijay konathala Resume
 
01. cv qc civil structur & wi
01. cv qc civil structur & wi01. cv qc civil structur & wi
01. cv qc civil structur & wi
 
JIMJITH QC INSPECTOR
JIMJITH QC INSPECTORJIMJITH QC INSPECTOR
JIMJITH QC INSPECTOR
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
Anuj resume 21 - copy
Anuj resume 21 - copyAnuj resume 21 - copy
Anuj resume 21 - copy
 
CV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOCCV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOC
 
cv
cvcv
cv
 

CV-Alamin2016

  • 1. Personal Data Name : Alamin Place/date of birth : Sambu Island ( Batam Island ) , December 11th , 1968 Nationality : Indonesian Marital Status : Married Passport No. : B 0114163 Address : Komplek Mantang Permai Blok G N.26 Batu Aji Batam Island – Indonesia 29439 Mobile : +62 (0) 812-70061792 Email Address : alaminabdullah93@ymail.com Position : Welding Inspector Education Backround : Diploma3. Academy finance & banking Borobudur Jakarta Training and Course Attended :  Welding Inspector Course 19st – 23th May 2014 Examination Date 26 May 2014 CSWIP 3.1 Welding Inspector Certificate No. 88313 Radiographic Film Interpretation PCN ( Level-II ) 28 may 2012. Certificate No :F00753628570 ( Issue number 2 ) Welding Inspector Course ( 399 Hrs ) 07 August 2006. Conducted by B4T ( Balai Besar Bahandan Barang teknik ) Bandung. ( Indonesia ) Certificate No: 0806 / 12-9BTM / 1479  IWS ( Indonesia Welding Society ). 08 August 2006 Certificate No: 540 / 0806 / WI / BTM  AK3 ( Occupational Safety and Health Expert ) 10 to 15 May 2004 Conducted by DISNAKER – RI Certificate No: 168 / AK3 / U/2004  Computer literate ( Microsoft Window Excel )
  • 2. Professional Project Experiences Januari 2015 to February 2016 ICHTHYS ON SHORE LNG FACILITIES KAWASAKI HEAVY INDUSTRIES .Ltd Position : Client Inspector Project : Kawasaki Heavy industries.Ltd cryogenic Tanks (Australian) PT ProfabBatam Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Witness visual dimensional assembly for structural members  Check fit up dimensional assembly of structural  Monitor the pursing gas used for SS welding  Weld visual inspection as per ASME B 31.3,ASME IX, & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Monitoring Installation structural members of erection and rectification  Ensure that non-comforming product or corrective action request are identified and solved  Monitoring and evaluating the Corrective Actions.  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest  Preparing the structural punch list for completion erection March 2013 to september 2014 TAN BURRUP PROJECT 120 MODULE( AUSTRALIAN ) TECNICAS REUNIDAS Position : Leader QC Inspector. Project : Tan Burrup ( Australian ) PT nippon Steel Batam
  • 3. Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature  Monitor the weld parameters  Monitor the pursing gas used for duplex / SS welding  Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Coordinating NDT activities RT, MT, UT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Monitoring and evaluating the Corrective Actions.  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest March 2011 to April 2012 SOUTH MAHAKAM FIELD DEVELOPMENT PHASE 1 & 2 ( MAIN STUPA,EAST MANDU & WEST STUPA ) Position : Leader QC Inspector. Project : South Mahakam development phase 1 & 2 PT nippon Steel Batam Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature  Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX & AWS D1.1
  • 4.  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Witnessing of welder qualification test / PQR’s  Coordinating NDT activities RT, MT, UT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Monitoring and evaluating the Corrective Actions.  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest Januari 2010 to Februari 2011 PREMIER 0IL GAJAH BARU & PSVM FPSO PROJECT ( MODEC ) Position : QC Inspector. Project : Gajah baru & BP Exploration ( Angola ) Ltd. PT nippon Steel Batam Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature  Monitor the weld parameters  Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Witnessing of welder qualification test / PQR’s  Coordinating NDT activities RT, MT, UT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code
  • 5.  Review test package and NDT  Preparing the piping punch list prior and after hydrotest Januari 2009 to December 2009 PT NIPPON STEEL Batam DLB KUROSHIO NEW DECK LIVING QUARTER Project Position :QC Inspector. Project : Fabricated Living Quarter Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature  Monitor the weld parameters  Weld visual inspection as per ASME B 31.3 & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Witnessing of welder qualification test / PQR’s  Coordinating NDT activities RT, MT, UT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Monitoring and evaluating the Corrective Actions.  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest April, 2007 to December 2008
  • 6. Conoco Phillips Indonesia Ltd. Position : QC Inspector. Project : North Belut WHP EPC. Total E & P Indonesie. Peciko 5 Platform Project Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature  Monitor the weld parameters  Monitor the pursing gas used for duplex / SS welding  Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Witnessing of welder qualification test / PQR’s  Coordinating NDT activities RT, MT, UT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Monitoring and evaluating the Corrective Actions.  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest January, 2005 – April 2007 Total E & P Indonesie. SisiNubi Fields Development Project – Phase I Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature
  • 7.  Monitor the weld parameters  Monitor the pursing gas used for duplex / SS welding  Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Witnessing of welder qualification test / PQR’s  Coordinating NDT activities RT, MT, UT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Monitoring and evaluating the Corrective Actions.  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest June, 2005 – April 2006 PREMIER OIL NATUNA SEA B.V. West Lobe Wellhead Platform Project Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature  Monitor the weld parameters  Monitor the pursing gas used for duplex / SS welding  Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Witnessing of welder qualification test / PQR’s  Coordinating NDT activities RT, MT, UT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Monitoring and evaluating the Corrective Actions.  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest
  • 8. June, 2002 – February 2003 Clough Engineering Ltd Bass gas Development Project Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature  Monitor the weld parameters  Monitor the pursing gas used for duplex / SS welding  Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Witnessing of welder qualification test / PQR’s  Coordinating NDT activities RT, MT, UT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Monitoring and evaluating the Corrective Actions.  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest May, 2002 – July 2002 ADFG SUBSEA PROTECTION PROJECT Conoco Indonesia
  • 9. Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature  Monitor the weld parameters  Monitor the pursing gas used for duplex / SS welding  Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Witnessing of welder qualification test / PQR’s  Coordinating NDT activities RT, MT, UT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Monitoring and evaluating the Corrective Actions.  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest December, 2001 – April 2002 WEST SENO PROJECT 87 man Living Quarter Structural Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature  Monitor the weld parameters  Monitor the pursing gas used for duplex / SS welding  Weld visual inspection as per ASME B 31.3,ASME IX & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Witnessing of welder qualification test / PQR’s  Coordinating NDT activities RT, MT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Ensuring all material and fabrication are certified in accordance with specified requirements.
  • 10.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest November, 2001 – March 2002 LAKSHMI PLATFORM A - B 4 Leg Production Deck ( LA – B ) Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature  Monitor the weld parameters  Monitor the pursing gas used for duplex / SS welding  Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Witnessing of welder qualification test / PQR’s  Coordinating NDT activities RT, MT, UT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Monitoring and evaluating the Corrective Actions.  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest
  • 11. March, 2001 – October 2001 UNOCAL THAILAND PROJECT 4 Leg Production Jacket and Deck Phase 22/5,Phase 22/6 Phase 22/7, Phase 22/8 Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature  Monitor the weld parameters  Monitor the pursing gas used for duplex / SS welding  Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Witnessing of welder qualification test / PQR’s  Coordinating NDT activities RT, MT, UT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Monitoring and evaluating the Corrective Actions.  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest February – March 2001 RAVVA MODIFICATION PROJECT 3 leg Production Jacket And Deck Location : PT. Nippon Steel Fabrication Yard – Batam Island Indonesia.
  • 12. Duties and Responsibilities:   Visually check all gaps of members to be welded to ensure they are in accordance to the welding configuration details as stipulated in the applicable WPS and AFC Drawing.  At the same time check all parent metal surfaces to be welded to avoid misalignment, bad workmanship.  During fabrication check all weld profiles to ensure all undefiled and undercut remedied. Check applications of preheat on each parent metal as stipulated by the PQR and WPS or AFC Drawing to ensure the correct temperatures are properly adhered to.  Prepare punchlist on outstanding work distributed them to each concerned area to ensure the remaining outstanding work are complete in time lye manner.  Control all records prepared by QC documentation clerk get them approved by each concerned client for proper reference.  Prepared drawing isometric , pipe support and NDT weld map for structural drawing  Request Applicable NDT after welding completed as per ITP and specification NDT requirement December 2000 – April 2001 TOTAL INDONESIE PHASE 2 4 Leg Production Jacket and Deck Duties and Responsibilities:  Visually check all gaps of members to be welded to ensure they are in accordance to the welding configuration details as stipulated in the applicable WPS and AFC Drawing.  At the same time check all parent metal surfaces to be welded to avoid misalignment, bad workmanship.  During fabrication check all weld profiles to ensure all undefiled and undercut remedied. Check applications of preheat on each parent metal as stipulated by the PQR and WPS or AFC Drawing to ensure the correct temperatures are properly adhered to.  Prepare punchlist on outstanding work distributed them to each concerned area to ensure the remaining outstanding work are complete in time lye manner.  Control all records prepared by QC documentation clerk get them approved by each concerned client for proper reference.  Prepared drawing isometric , pipe support and NDT weld map for structural drawing  Request Applicable NDT after welding completed as per ITP and specification NDT requirement
  • 13. December 2000 – July 2001 PREMIER OIL NATUNA SEA Ltd. 4 Leg Production Jacket and Deck Duties and Responsibilities :  Check the material used are complying with AFC drawings  Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied  Monitor the preheating and interpass temperature  Monitor the weld parameters  Monitor the pursing gas used for duplex / SS welding  Weld visual inspection as per ASME B 31.3,ASME 31.8,ASME IX, API 1104 & AWS D1.1  Ensure project specification requirements related to welding are been followed  Monitor the welder performance and check their qualification  Witnessing of welder qualification test / PQR’s  Coordinating NDT activities RT, MT, UT, PTNDT Coordinator  Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements  Ensure that non-comforming product or corrective action request are identified and solved  Monitoring and evaluating the Corrective Actions.  Ensuring all material and fabrication are certified in accordance with specified requirements.  Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required.  Review Radiographic Film as per specifications and code  Review test package and NDT  Preparing the piping punch list prior and after hydrotest April, 1998 up to Mar 2000 Location : PT Rotary Engineering Indonesia - Batam Position : QC Inspector Duties and Responsibilities:  Visually check all gaps of members to be welded to ensure they are in accordance to the welding configuration details as stipulated in the applicable WPS and AFC Drawing.  At the same time check all parent metal surfaces to be welded to avoid misalignment, bad workmanship.  During fabrication check all weld profiles to ensure all undefiled and undercut remedied. Check applications of preheat on each parent metal as stipulated by the PQR and WPS or AFC Drawing to ensure the correct temperatures are properly adhered to.  Prepare punchlist on outstanding work distributed them to each concerned area to ensure the remaining outstanding work are complete in time lye manner.  Control all records prepared by QC documentation clerk get them approved by
  • 14. each concerned client for proper reference.  Prepared drawing isometric , pipe support and NDT weld map for structural drawing  Request Applicable NDT after welding completed as per ITP and specification NDT requirement Project Completion  Oil Tanking Singapore Chemical Storage PTE.LTD- Chem I &Chem II Expansion Project  CONOCO Belanak – FPSO roject (Tertiary steelwork).  CONOCO Belanak – WHP A& WHP-B Project (Teriatery steel work).  PT.McDermott Indonesia-Dominion Spar Hull project.  Clough Engr LTD / Unocal Makasar LTD ( West Seno)- Busckle Arrestor Pipe line Project.  Foster Wheeler Eastern PteLtd ? Exxon Mobil Asia PasificPte Ltd – Site Integration Pipe Line  Foster Wheeler Eastern Pte Ltd. - Multi Product plant Project ( Schering Plough Ltd) Singapore  Toyo Engineering Corporation-Mitsui Bishenol Singapore Refinery Project Phase II.  PT.Clatex Pacific Indonesia – Sludge Tank Project Duri.  Oil Tanking Singapore Chemical Storage PTE.LTD-Chem I &Chem II Expansion Project.  Maxus South East Sumatera-Process Control Room Widuri C Project.  Foster Wheeler Eastern Pte Ltd – RIF Project ( Refinery Interface Facilities) Singapore.  Foster Wheeler Eastern Pte Ltd- Singapore Acetyles Refinery Project.  TheMW.Kellog Company – Singapore Olefin Refinery Project.  TheMW.Kellog Company – Singapore Gas Refinery Project.  Toyo Engineering Corporation – Mitsui Bisphenol Singapore Phase I Refinery Project.  Van Omerentherminal Tank Singapore – Storege Tank Expansion Project.  Toyo Engineering Corporation – PurifieldIsophthalic Acid Plant Refinery Project Lonza Singapore. October, 1996 up to Dec 1997 Location : PT BatamasJala Nusantara Position : QC Inspector Duties and Responsibilities:  Prepared isometric Drawing, pipe support, NDT drawing Weld Map and Shop Drawing Structural  Line check with client before hydrotest Project Completion Algeria Sonatragh GPL Phase II Refinery Project
  • 15. May, 1990 up to Sept 1996 Location : PT. Mc Dermott Indonesia Batam Yard Fabrication Position : QC Inspector Duties and Responsibilities:  Prepared shop drawing Structural, Isometric Drawing,Pipe support and,NDT drawing weld Map  Prepared for Hydrotest,Line check with client before hydrotest and make thepunclist before and after hydrotest  Control all records prepared by QC documentation clerk get them approved by each concerned client for proper reference.  Prepared drawing isometric , pipe support and NDT weld map for structural drawing  Request Applicable NDT after welding completed as per ITP and specification NDT requirement Project Completion  ACT China HZ 26-1 Process Platform 8piles deck  Total Thailand WP.1 thru WP.8 Wellhead platform 4 piles jacket & deck  Total Thailand RP & QP Riser & Quarter Platform 4piles jacket & deck  Total Thailand PP Production latform 8 piles jacket & deck  Arco Indonesia BL & BN-A Welhead Platform 4 piles jacket & deck  Conoco Indonesia DPP-A Drilling Process Platform 8piles jacket & deck  Conoco Indonesia FP & Bridge Flare Platform 3 piles jacket & deck  Interprise Oil CPP-A & CPP-b Central Process Platform 4 piles jacket & deck  Arco Indonesia KLXA,KLXB,KLYA& KLYB Wellhead Platform 3 piles jacket & deck  Arco Indonesia B2C Production Platform 8 piles jacket & deck  Carigali malaysia BNG-B Drilling & Production Platform 8 piles jacket  Brunei Shell Petrolium CPCB-7 Production Platform 6 piles jacket  Serawak Shell Berhad QA & RA Wellhead & production Platform 4 piles jacket & deck  Serawak Shell Berhad PG-A Wlhead & Production Platform 4 piles jacket & deck
  • 16.  Esso Petrolium Malaysia Lawit -a & M3PQ-a Wellhead & Production Platform 8 piles jacket  Woodside Petrolium Australia Goodwyn-A Production latform 8 piles jacket & MSF  Phillips Petrolium China Block 24-1 & 30-2 Wellhead & Production Platform 8 piles jacket  Arco China Xijiang Wellhead & Production Platform 8 piles jacket  Singapore Aromatic Company 99 modules PAR,PAU & VAU  Yadana Field WP-a & WP-B Wellhead Platform 4 Piles jacket & deck  Unocal Indonesia Santan ST-A Process Platform 8 piles deck  Total Mynmar WP-1 & WP-2 Welhead Platform 6 piles jacket,deck & MSF  Total myanmar QP Quarter Platform 4 piles jacket,deck MSF & Living quarter  Unocal Thailand CPP Central Process Platform 8 piles jacket & deck  Unocal Thailand LQ Living Quarter Platform 4 piles jacket & Living Quarter  Mobil Oil Indonesia NSO-A Production Platform 8 piles jacket & deck  Singapore Acetyls Project for Ester & Acids unitr at Sakra Island (Singapore) 10000 spool included support  RotaryIntregrated Miantenance Center at Merlimau Island (Singapore) 110 Tons Steel Building ( Werhaouse,Workshop,fabrication,piant & repair shop)  PIA LONZA Project Production module,pipe spool & support  MBS Project Production  Singapore Olenfins Project Production module,pipe spool & support  FOSTER WHEELER EASTERN Production module,pipe spol,Support and building monitor  SYNGAS PROJECT Production module and tank oil