1. CURRICULUM VITAE
Full name: HA MINH TIN.
Date of birth: 06 Jan 1983.
Place of birth: Vung Tau City.
Sexual: Male.
Marital status: Married.
Nationality: Vietnamese.
Vietnam I.D. No : 273100120
Telephone No: +8464.839542
Mobile No: +84985717149
Email: tinhaminhvt@gmail.com; tinhaminhvt@yahoo.com
Permanent Address: 25/22/6 Nguyen Huu Canh st, Thang Nhat ward, Vung
Tau city, Vietnam.
Education:
• Bachelor of Science (Nuclear Physics – Dalat’s
University – Da Lat City- Vietnam. (September
2002 – March 2006).
• Bachelor of Art: Business English (April 2007 to
April 2010) – Ton Duc Thang University – Ho Chi
Minh City - Vietnam.
Qualification:
• Rope Access (IRATA Level I – 2011 to 2014)
• NDT Level III MT & PT (March 2013 exp. 2018)
• Welding inspection Level II CSWIP 3.1 (Jun-
2014) – Cert No.: 82931 exp June 2019.
• Radiographic Interpretation (RI) PCN Level II.
exp June 2020.
• Magnetic particle Inspection (the first cert from
2006, newest exp. 2018).
• Dye penetrates Inspection (the first cert from
2006, newest exp. 2018).
• Radiographic Inspection (the first cert from 2006,
newest exp. 2018).
• Ultra-Sonic Inspection (the first cert from 2006,
newest exp. 2018).
International Code and Standard familiar:
• ASME Code: IX; VIII; V; I; II; B31.3; B31.1;
B16.1; B16.11…
• AWS Code: AWS D1.1; A5.1; A5.4; A5.5;
A5.18…
• API: API1 1104/650510/5L;2A/2B/6A.
• BS: BS EN 25817/287/288; BS 499; EN 20025;
EN 10164.
• ABS; DNV Code/ Sandard.
Ha Minh Tin Page 1 of 6
2. Foreign language: English (Post – intermediate),
Chinese (Elementary),
Korean (Beginner).
Current position: NDT Level III/ Level II Inspector, Welding Inspector,
Painting/ QA/QC Inspector; Rope Access Technician.
Summary of Experiences:
- MT (Magnetic testing), PT (Penetrant Testing) Level III: exp. Mar 2018
- MT, PT, UT, RT Level II (started from 2006): exp. Mar 2018
- Lifting Gear Inspection (started from 2008).
- Rope Access IRATA Level I ( started from 2009): exp. 2014.
- CSWIP 3.1 Welding Inspection Level II. (Cert No.:89231; Exp: 20 Jun
2019)
- RI PCN Level II (PCN No.: 304352; Cert No: A014S3624141; Exp: 22
Nov 2019)
- 10 years of working experience in Quality covering all aspects of
Quality Assurance/Quality Control Engineer related to piping and
structural construction of barge, topside, offshore container and Non-
Destructive Testing includes certification and documentation during
fabrication, installation, commissioning of Oil & Gas Offshore Platform,
Pipeline.
- Familiar with international codes and standards such as – ASME
Section I, II, V, VIII, IX, ASME B31.1, B31.3, AWS D1.1, API 650, API
1104, API 5L, API 510, API 570, ASTM, BS, DNV; ABS and other
specification of involved projects.
- Review/ supervise for PRQ carbon steel, high strength steel, Stainless
Steel, Duplex, Super Duplex….
Detail of Experiences:
DEC – 2009 To Present:
- Piping & Structure/NDT/ Painting engineer for PVD Offshore
(March 2015 – Present):
- Carry out all QA/QC activities for company project (fabrication Gas-Lift;
Flow-line, Container, Basket, Lifting Gear Equipment, Inspection NDT/
Painting… activities).
- Piping & Structure/NDT/ Painting engineer for PVD VI (JACK UP
RIG) project in Keppel Fels Singapore (Project No. B.363 ;Aug
2013 – March 2015):
- Piping & Structure engineer for PVD V (TAD RIG) project in
Keppel Fels Singapore (Project No. B.316 April 2010 – Dec 2010).
(Working in two shift alternative between Vietnam and Singapore)
Ha Minh Tin Page 2 of 6
3. - MAJOR DUTIES:
Member of Project Management Team for the building project of a Jack
Up Rig which is being built in Keppel FELS shipyard, Singapore.
- Supervise the engineering design package and fabrication of Jack up
Rig at the project site, being a focal point of supervision for Structure/
piping/ painting.
- Review AFC/AFU drawings from Rig Builder; figure out improvement
points to perfection rig design.
- Perform other duties to assist Management Team with respect to
Project Supervision/ Project Management.
- Piping & Structure/ Painting engineer for new Jack up Rig project of PV
Drilling Corporation.
- Responsibilities to check the material certificate chemical composition
and the physical properties.
- Confirm the material against the material certificate.
- To check the material surface condition, thickness, diameter and
length, prepare the heat certificate register.
- To monitor the welding activities as per Project Specification and
Procedure.
- Review the Radiographic film, witness Hydrostatic test and Post Weld
Heat Treatment.
- Visual Inspection Welds.
- Dimensional pipe spool to control quality.
- Supervise for painting process.
- Responsibilities to check the documents related to the work as follow:
Drawing, Welding Procedure, Welder Qualification and Project
Specification.
- Check the pipe and any component size, thickness & surface condition
prior fit-up/weld.
- To follow the NDT/ related Heat Treatment per the Client/Project
Specification.
- Prepare and submit the MDR (Manufacture Data Record) to the Client
after complete project.
- QA/QC; NDT; Welding Inspector for PV Drilling (Dec
2009 – 2010):
- Inspection all Lifting gear equipment, Drilling tools, piping, welds…..
- Rope Access NDT inspection for PVDI, PVD II, PVD III, ENCSO 107…
- Carrying out MT, PT for drill pipe, casing, tubing, stabilizer piping, BHA.
- Performing UT for drill pipe.
- Performed onshore/offshore oil field inspection services including, Drill
String, BHA such as Casing, Tubing, Drill Pipes, Drill Collars, Hevi-
Wate Drill Pipes, Drill-stem Subs, etc…by carrying out wet fluorescent
magnetic particle inspection, Dye penetrant inspection of non-Magnetic
materials.
Ha Minh Tin Page 3 of 6
4. - Full-length inspection of tubing, casing and drill pipe using Electro
Magnetic and Gamma radioactive source for inspection of wall
thickness, transverse/longitudinal defects, grade comparison.
- Proficient in shoulders re-facing, Pipe straightening, Drift testing and
etc....
- Ultrasonic wall thickness.
NOV-2008– DEC 2009: VIETNAM OFFSHORE
FABRICATION AND ENGINEERING LIMITED:
- QC Inspector for Vietnam Offshore Fabrication and Engineering
Limited:
All QC/QC activities like material inspection/ dimension/ visual
NDT Inspection, make paperwork for MDR; QA/QC Procedure…
Project ever worked in Vina offshore:
Duration : September 2009
Project : WHP-A 21P, 26P Sutuden Field.
Client : Cuu Long Joint Operating Company
Position : QC Inspector.
Duration : June 2009
Project : 10P Sutuvang Field
Client : Cuu Long Joint Operating Company
Position : QC Inspector.
Duration : March & May 2009
Project : 9P Flowlines Sutuvang Field.
Client : Cuu Long Joint Operating Company.
Position : QC Inspector.
Duration : September 2009
Project title : Site survey, Fabrication & Installation of the WHP-A 21P, 26P
Flowline c/w Pipe support, STD Field
Client : Cuu Long Joint Operating Company
Position : QC Inspector
Duration : August 2009
Project title : Carry out site survey, fabrication and installation of the WHP-A
12P Flowline c/w pipe support, Sutuden field
Client : Cuu Long Joint Operating Company
Position : QC Inspector
Duration : June 2009
Project title : Carry Out Site Survey, Fabrication and Installation Of 10P
Flowlines C/w Pipe Supports on CPP, Sutuvang Field
CLient : Cuu Long Joint Operating Company
Position : QC Inspector
Duration : May 2009
Ha Minh Tin Page 4 of 6
5. Project title : Carry Out Site Survey, Fabrication and Installation Of 9P
Flowlines C/w Pipe Supports on CPP, Sutuvang Field
Client : Cuu Long Joint Operating Company
Position : QC Inspector
Duration : April & May 2009
Project title : Site measurement, fabrication and installation of the WHP-A 26I
Flowline and pipe support, Sutuden fieldCarry out site survey,
fabrication and installation for Nozzle 1-3-5-6 on CPP, Sutuvang
Field.
Client : Cuu Long Joint Operating Company
Position : QC Inspector
Duration : March & April 2009
Project title : Site Measurement, Fabrication and installation Of Seawater
Crossover, Sutuvang Field.
Client : Cuu Long Joint Operating Company
Position : QC Inspector
Duration : March & April 2009
Project title : Carry Out Site Survey, Fabrication and Installation Of 7P, 8P
Flowlines C/w Pipe Supports on CPP, Sutuvang Field.
MAY-2006 – NOV-2008: ALPHA-NDT Co. Ltd.:
Employer: Alpha - NDT Co., Ltd.
Job title: ASNT Level II (MT, PT, UT, RT) Inspector.
Job Description:
05- 08/2006: TALISMAN BUNGATULIP – A TOPSIDE PROJECT:
- This project is co-operated by Malaysia and Vietnam Government. The
owner is Talisman Ltd and fabricated by PTSC – MC. Alpha co., Ltd
has been performing NDT for technological piping system, offshore
structure (Y-, T-, K-, joint) and the relevant.
- Duties: Performing NDT work as MT, DT, UT, and RT for all structures
and pipe spools.
− PTSC RANG DONG FULL FIELD DEVELOPMENT PROJECT
- The owner is JVPC and the main contractor is the Southern Oil and
Gas Fabrication Joint - Stock Company. Alpha is an NDT approved
Inspection Subcontractor.
- Carrying out RT, PT, MT, UT work for piping structure.
- TAN SON NHAT AIRPORT DEVELOPMENT PROJECT:
- Carrying out RT, MT, UT, PT works for piping system and other
structures; film implementing and report completing of finished works.
- HYDROELECTRIC POWER PLANTS BUON KUOP PROJECT:
- inspecting RT, works for piping system (OD: 5 -7 m).
Ha Minh Tin Page 5 of 6
6. PREVIOUS EXPERIENCES:
- 2 years as a Secretary to the DaLat University’s youth union (at
Physics Department).
- Summer 2004, To be on a fact finding and working in Dalat Nuclear
Research Institute.
Ha Minh Tin Page 6 of 6
7. PREVIOUS EXPERIENCES:
- 2 years as a Secretary to the DaLat University’s youth union (at
Physics Department).
- Summer 2004, To be on a fact finding and working in Dalat Nuclear
Research Institute.
Ha Minh Tin Page 6 of 6