SlideShare a Scribd company logo
1 of 8
RESUME 
Senior Inspection Engineer 
Mobile: 09493186772 
E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, 
Page 1 of 8 
First /Given Name 
: 
Chandrasekhar 
Family / Surname 
: 
Vangapandu 
Date of Birth 
: 
15 / 08/ 1975 
Nationality 
: 
Indian 
Profession 
: 
Engineer 
Experience : 18 Years 2 months ( 11 years in QAQC, Inspection of Cross country pipelines and 7 
Years in NDT ) 
Educational Background 
: 
B.Tch in Mechanical Engineering 
D.M.E (Diploma in Mechanical Engineering) 
+2 in A.E.T (Automobile engineering Technician) 
Additional 
Qualification/Certification 
: ASNT Lev-2 in MUT, RT, DPT, MPT and VT. 
BARC Lev-2. 
CSWIP-3.1 
Language(s) known : English, Hindi, Tamil & Telugu 
Summary of Experiences : Inspection coordination, project inspection and QA/QC for Cross country pipeline. 
Experienced in AUT / TOFED for Automatic welding technique By RTG inspection and 
also experienced in NDT for Shipping, Submarines, Off-shore piping, Plant piping, Oil 
storage tanks, Boiler tubing, Pressure vessels, Power plant shut downs, Refinery shut 
downs, Experienced in visual inspection by Fiberoscope.Vast experience in NDT 
handled in Fertilizers, Refineries, Heavy pressure vessels, Boilers, Atomic energy units, 
Special experience in 15Mev Leenac X-ray and Neutron Radiography. City gas 
distribution lines etc. Well experienced in 3LPE Coating, External polyurethane 
Coating, Liquid Epoxy Coating also have experience in surface preparation like sand 
blasting, Grit blasting and painting. Involvement includes but not limited to 
Documentation, Review of QAP and ITP’s Establishing WPS & PQR and final handing 
over of documentation. Cross country Pipeline experience looking in to Row survey, 
Cold field bending, WQT/EQT and PQR review, Mainline welding, Tie-In welding, 
Radiography interpretation, Field joint Coating, FBU Coating, Jacketing, Holiday 
testing press ‘o’ film testing. Trenching and Pipe book verification Lowering, OFC lying 
and Jointing/Splicing, final OFC continuity test Back filling. Pre Hydro testing of 
crossing sections likes River, canal, and Railway crossings State Highway/National 
highways. Pipe line cleaning pigging/Gauging and Final hydro testing. 
Inspection Capabilities: 
Mechanical Equipment Rotating Equipment Electrical Equipment 
Coatings (Various types) Gears OFC Jointing / Splicing 
Boiler Tubing and fittings Compressors SEHMS 
Storage tanks (All types) Gas turbines 
Shipping / Submarine piping Engines / spare parts 
Castings / Forgings 
Cross-country/City Gas 
pipelines
RESUME 
Senior Inspection Engineer 
Mobile: 09493186772 
E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, 
Page 2 of 8 
Period 
From: Dec-2010 
To: Oct-2014 
: Germanischer Lloyd Industrial Services GmbH. 
Company 
: 
AMERICAN BEROU OF INDUSTRIAL VERIFICATION India Pvt. Ltd. (ABSIV) 
Position : Senior. Surveyor 
Project Description : Man gala development pipe line project (MDPL),24” Ø Gr X 70 and 8”Ø Gr X 65 for 53 Km’s 
MARINE FACILITIES AT BHOGAT (6.5 Km’s 24Ø” CWC Coated Parallel pipeline up to SPM) 
Salaya Bhogat pipe line (SBPL) 24” Ø Gr X 70 and 8”Ø Gr X 65 for 53 Km’s 
Client : Cairn India Pvt Ltd 
Functions & 
Responsibilities 
: Worked as Senior Pipeline Inspector (SPI), Responsible for Operational and Technical 
involvement includes coordination with the Clint’s construction manager / Senior QA/QC 
Engineer, review of QAP/ITP’s Procedures and Clint specification. Coordinating with Client’s 
Construction manager and contractor QA/QC manager. Regular meeting with all inspectors 
and Clint construction manager reviewing site issues and new developments. Review of daily 
inspection reports of all inspectors’ and any technical or non-technical issues (like land owner 
issues) which effects site work. Issuing NCR’s and conforming the corrective action taken or 
not and close out of NCR’’s and Informing and regular reporting to clients Sr.Engineer (QA & 
QC). Reviewing of T.Q’s and coordinating with contractors QA & QC manger. Handled site 
office and inspectors for this project. Also responsible for SEHMS continuity test and Mapping 
and 1’’Ø tube cleaning and testing. Hi-pot testing witness along with Tyco Thermal systems. 
Involving in civil activities like special protection for river crossings when found Scour cover 
protecting the pipe line with approved procedure for Rip-Rap method, Civil activities like Pour 
cord /Cube testing, and also Grouting material filling in the cased crossing sections. Work 
related pipeline construction from Pipeline inspection; weld visual, Field cold Bending as per 
procedure, Epoxy premier, Field joint coating with HDPE outer covering and PU foam filling in 
the Pup piece & Bare pipe and weld joint areas, lowering and OFC laying in the same tre nch 
above 8’’Ø after post padding the pipeline .OFC jointing and splicing to be witnessed by after 
that with Allu Bucket filtering the soil and stones in the backfilling. Final clean up Pigging and 
Final Hydro testing. Inspection at Calliper pigging and final hand over to Clint with properly 
cleaned dry pipeline. Final Radiography films Digitization and final film handovering with 
approved method / procedure. Restoration and final acceptance by formers / land owners 
and hand over the pipeline with punch l ist and close out of punch list and hand over to 
Operation and maintains. 
Period 
From: May- 
2008 
To: Sep-2010 
Company : Germanischer Lloyd Industrial Services GmbH. 
Position : Senior Inspection Engineer 
Client : Cairn India Pvt Ltd 
Project 
Description 
: Mangala Development Pipeline Project (MDPL), 
24’’Ø Insulated crude oil pipeline & 8’’Ø Gas pipeline 106Km & 106Km. API5LX70 & 
X. 65
RESUME 
Senior Inspection Engineer 
Mobile: 09493186772 
E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, 
Page 3 of 8 
Functions & 
Responsibiliti 
es 
: Worked as Senior Pipeline Inspector (SPI), Responsible for Operational and 
Technical involvement includes coordination with the Clint’s construction manager 
/ Senior QA/QC Engineer, review of QAP/ITP’s Procedures and Clint specification. 
Coordinating with Client’s Construction manager and contractor QA/QC manager. 
Regular meeting with all inspectors and Clint construction manager reviewing site 
issues and new developments. Review of daily inspection reports of all inspectors’ 
and any technical or non-technical issues (like land owner issues) which effects site 
work. Issuing NCR’s and conforming the corrective action taken or not and close 
out of NCR’’s and Informing and regular reporting to clients Sr.Engineer (QA & QC). 
Reviewing of T.Q’s and coordinating with contractors QA & QC manger. Handled 
site office and inspectors for this project. Also responsible for SEHMS continuity 
test and Mapping and 1’’Ø tube cleaning and testing. Hi -pot testing witness along 
with Tyco Thermal systems. Involving in civil activities like special protection for 
river crossings when found Scour cover protecting the pipe line with approved 
procedure for Rip-Rap method, Civil activities like Pour cord /Cube testing, and 
also Grouting material filling in the cased crossing sections. Work related pipeline 
construction from Pipeline inspection; weld visual, Field cold Bending as per 
procedure, Epoxy premier, Field joint coating with HDPE outer covering and PU 
foam filling in the Pup piece & Bare pipe and weld joint areas, lowering and OFC 
laying in the same trench above 8’’Ø after post padding the pipeline .OFC jointing 
and splicing to be witnessed by after that with Allu Bucket filtering the soil and 
stones in the backfilling. Final clean up Pigging and Final Hydro testing. Inspection 
at Calliper pigging and final hand over to Clint with properly cleaned dry pipeline. 
Final Radiography films Digitization and final film hand over with approved method 
/ procedure. Restoration and final acceptance by formers / land owners and hand 
over the pipeline with punch list and close out of punch list and hand over to 
Operation and maintains. 
Period 
From: Sep-2006 
To: Mar-2008 
Company : Germanischer Lloyd Industrial Services India Pvt. Ltd. 
Position : Inspection Engineer 
Project 
Description 
: Dhahej to Uran Pipeline Project (DUPL). (Clint GAIL) 
STG & Gammon India Pty.Ltd. Consortium. (Contractor) 
Tractable Engineers India Pvt. Ltd (Consultant) 
38’’Ø High pressure gas pipe line 110Km. (Spiral welded pipes) 
24’’Ø High pressure gas pipeline 42Km API5LX60 & X65 and X70 
Functions & 
Responsibiliti 
es 
: Worked as Inspection Engineer Includes the job responsibility to witness the WQT/ 
PQT.Inspection of WQT and EQT as per Clint specification and Inspection of both 
Mechanical tests and NDT.In line inspection of Automatic welding and AUT for the same 
welding and checking welding parameters. Calibration of testing equipment and materials. 
Regular reporting of site activities to site manager. Attending Weekly meetings with both 
Clint and contractor regarding QA /QC matters. Pipe book checking and Evaluation of Auto 
ultrasonic testing and TOFD with sub contractor (RTG) and giving results faster and avoid 
delay in making repair of joints and inspection of MUT for the weld repair locations. And 
also avoid the discontinuities in further welding. OFC jointing and splicing to be witnessed. 
Final clean up Pigging and Final Work related pipeline construction from Pipeline 
inspection of ROW, weld visual, Cold field bending, Field joint coating, Trenching, lowering 
and Backfilling with Allu Bucket to filter the soil and stones in the backfilling. Pre Hydro 
testing for crossing sections like major River/canal and National Highway/State Highways 
and cased crossings. Final clean up Pigging for entire pipe line section as per approved 
procedure. and Final Hydro testing etc. 
Period Company : SAI AMBAY Organisation Pty.Ltd.
RESUME 
Senior Inspection Engineer 
Mobile: 09493186772 
E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, 
Page 4 of 8 
From: May- 
2005 
To: May-2006 
Position : QA/QC Engineer 
Project 
Description 
: Anand Rajkot pipeline Project (ARPL) for GSPL. (Clint L &T) 
Valdel Engineers (Consultant) 
API 5LX65, 24’’Øx11.1mm & 14.3mm and 17.5mm, Thk for 53 Km’s. 
Functions & 
Responsibiliti 
es 
: Worked as QA & QC Engineer for pipeline construction activities starts from WQT, Field 
joint Coating with Liquid Epoxy coating. Job responsibilities include weld visual and 
maintain quality according to Clint specification and As per API-1104. Maintaining the 
front end of the pipeline crew as well as back end welding team to get progress as well 
as quality without affecting the welding quality. Maintaining the Quality records and 
coordinating with TPI (EIL) and Preparing of pipe book before lowering and maintaining 
quality while backfilling. O FC laying and Jointing& splicing. Pre Hydro testing of crossing 
sections like river / Highways with proper planning with Auger boring and open cut 
method in small crossings. Looking into pigging, cleaning and Final Hydro testing of total 
pipeline in two sections. Monitoring of Test records and Finishing of testing and 
handover dry pipeline to Clint. 
Period 
From: January - 
2004 
To: April-2005 
Company : ESSAR Construction Pvt. Ltd. 
Position : QA QC Engineer 
Project 
Description 
: Balledilla to Visakhapatnam Slurry Pipeline (BVSPL) 
API5LX 60 and 14.3, 12.7 and 11.9 mm Thk Slurry pipeline and 6.4mm Thk 53 Km’s water 
line. 
Functions & 
Responsibilities 
: Working as QA & QC Engineer and responsible for total quality of pipeline 
construction activity (in the deep forest and hill area). Preparing Procedures 
for all activities and WQT & PQT before starting work. Welder qualification 
tests and preparing welder I.D cards and maintain all Quality records. Looking 
in to welder performances and welding parameters recording. Field Liquid 
Epoxy coating for butt joints and cooperating with construction manager and 
QA/QC manager. Monitoring site QA /QC Engineers and site Inspection 
reports. Activities like weld visual, Offering for NDT, Field joint coating for 
3LPE Coating in Slurry pipe line and Coal tar Epoxy coating for water pipeline, 
Checking surface preparation, Peel test / Press ‘o’ film. Radiography 
interpretation and marking of welds for repair joints and giving warning letter 
to welder and maintain the Quality. Cold field Bending as per procedure and 
consulting with Bending surveyor to better progress and easy fit-Up’s in Tie-In 
welding. Inspection of trenching bedding and padding before Lowering .In this 
project both water and Slurry pipelines layed in the same trench. OFC Laying 
done after post padding the pipelines. OFC Splicing and jointing and also final 
continuity test witnessed. Backfilling monitored. Preparing pipe book for Final 
Hydro testing. Cleaning /Swabbing of entire pipeline and witnessing the Final 
Hydro testing. Making Restoration reports and final acceptance of Formers / 
Land owners. Pre commissioning of AGI’s and Pipeline and hand over the 
pipeline to Operation & Maintaining team. 
Period 
From: June- 
2002 
To: December- 
Company : Quality Evaluation Services. 
Position : Site In charge NDT Operations 
Project 
Description 
: HPCL oil Storage facilities at Ghatkesar (Hyderabad) 
(Clint HPCL), Contractor Bridge & Roof Ltd.
RESUME 
Senior Inspection Engineer 
Mobile: 09493186772 
E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, 
Page 5 of 8 
2003 Functions & 
Responsibilities 
: As per API-650 Oil storage facility 80’’Ø & 60’’Ø HSD and Kerosene oil storage 
tanks constructed by Bridge & Roof. Worked as site in charge for NDT 
activities. Taking Radiography of storage tanks and piping weld joints. 
Reporting and offering interpretation of Radiographs to TPI (EIL). Coordinates 
with QA/QC engineer and supporting as teamwork and completing the job. 
Following safety rules and regulations as per BARC (India). Coordinating with 
NDT technicians and supporting technically .MUT for ≥25mm all Horizontal 
and Vertical weld joints. Radiography for Bottom plate with Backing strip 
welding. Fire fighting pipe joints % radiography. 
Period 
From: June- 
2002 
To: Dec-2003 
Company : Quality Evaluation Services. 
Position : Site In charge NDT Operations 
Project 
Description 
: HPCL shut down in FCCU, SRU units. (HPCL. Vizag) 
Functions & 
Responsibilities 
: Worked as site in charge for shutdown units at HPCL refinery in the FCCU, SRU 
units. A Job responsibility includes various sizes of pipes ranging from 2"Ø to 
24"Ø taking Gamma Radiography (Ir 192 source) for weld joints on the ground 
level and on pipe racks at a height of 60 meters. Interpretation of Radiography 
films and submitting the results and marking of repair weld joints. D.P.test for 
weld joints and M.P.Test for Gears and other equipments. M.U.Test carried 
out for Bearings and Crankshafts for D.G.engines and other spare parts. Safety 
followed as per BARC / AERB. Taking Thickness gauging at offered pipe bend 
locations and submitting results to QA/QC department. 
Period 
From: February- 
2001 
To: May-2002 
Company : Quality Evaluation Services. 
Position : Site In charge NDT Operations 
Project 
Description 
: Rolls Roy’s Powers Station, Kakinada (Clint Rolls Roy’s) 
Company : Quality Evaluation Services. 
Position : Site In charge NDT Operations 
Project 
Description 
: VTPS, Vijayawada, (Clint VTPS) 
Vijayawada thermal power station. 
Annual shut downs of # 1, # 3, # 5 Boilers 
Functions & 
Responsibilities 
: Radiography for Boiler piping tube welded joints at inside and outside of the 
boiler in the critical position. Interpretation of films and finding discontinuities 
and giving results to QA/QC Department and committing to work with safety. 
Radiography at fabrication and other components offered by QA / QC 
management. 
Company : Quality Evaluation Services 
Position : Site In charge NDT Operations. 
Project 
Description 
: NTPC Simhadri Power Plant, Visakhapatnam 
(Clint NTPS &BHEL) 
Functions & 
Responsibilities 
: Worked as In charge for NDT Operations in the newly constructed plant. Pre-fabrication 
at yards preparing welds of piping and plates offered by QA /. QC 
department. For job identifying and confirming the joints giving offering to 
Radiographers to take Radiography. Looking safety at yards before taking 
radiography and assuming the risk levels. When working at erection more 
than 60meters high checking the scaffolding and giving all instructions to 
technicians working with work permits and communicating with NTPC & BHEL 
(Clint). 
Company : Quality Evaluation Services.
RESUME 
Senior Inspection Engineer 
Mobile: 09493186772 
E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, 
Page 6 of 8 
Position : Site In charge NDT Operations 
Project 
Description 
: BHPV (client Bharath Heavy Plates and Vessels), Visakhapatnam 
NAVAL DOCKYARD, Visakhapatnam 
Period 
From:December 
-2000 
To: Janauary- 
2001 
Company : Scaanray Metallurgical Services. 
Position : Multy NDT technician. 
Project 
Description 
: Special Job for Indian Space Research Organisation (ISRO) 
Satishdhavan Space Research Centre, (SHAR – Sriharikota) 
Company : Scaanray Metallurgical Services 
Position : Multy Technician in NDT 
Project 
Description 
: 1999-2001 Job carried out for Integral Coach Factory 
(ICF). Chennai 
Functions & 
Responsibilities 
: 
Functions & 
Responsibilities 
: Worked as NDT technician for this special project in the SHAR Centre. Worked 
in the NDT (SPROB-Solid Prop lent Rocket Booster) department .As a Multy 
NDT techecian works in the building supporting with SHAR staff handling the 
Radiography films and Processing of Films in the Dark room. X-ray with 15Mev 
Leenac and 350Kv –X-ray machine for Segments / stages of Rocket and its 
parts. Departments Sr.management.Newtron Radiography will do 
interpretation by using 15Mev Leenac for powder RDX in the firing igniters. 
Highly Safety and advanced technology used in this centre. Learned the visual 
inspection of bonding and disbandment inside the small rocket boosters by 
using Optical Fibro Scope. Tacking X-ray for Cryogenic Engine station tubing 
Tig weld joints material like high grade steel sized 10 mm Ø with 350 Kv X-ray 
machine and submitting the results with high quality to Clint for their 
acceptance 
Period 
From: February- 
2001 
To: May-2002 
Company : Scaanray Metallurgical Services. 
Position : Multy NDT technician 
Project 
Description 
: Indian Space Research Organisation (ISRO), 
Blue star Air conditioning Systems (Chennai), 2ND Launching Pad (SHAR - 
Sriharikota) 
Functions & 
Responsibilities 
: Worked as Multy NDT technician for the second launching pad construction. 
Works with Blue star Air conditioning systems. Gamma Radiography for piping 
system. Submitting the radiographs to contractor and interpreting with Third 
party Inspection (TPI) by EIL. X-ray for Cross country pipe line by using 
external -350Kv X-ray machine from piping unit to Launching pad area ranging 
from 4’’Ø to 24’’Ø in different thickness. Both 100% for fuel lines and partial 
Radiography for water cooling system pipeline. Gamma Radiography in the 
boiler unit tubing and piping. 
Company : Scaanray Metallurgical Services 
Position : Multy NDT technician 
Project 
Description 
: Cairn Energy India Pty.Ltd (S.Yanam) 
NDT in the Off –Shore & On-Shore and Pre fabrication at pipe yard in the 
plant 
Functions & 
Responsibilities 
: Worked as NDT technician at Offshore platform units of Cairn Energy India 
Pty.Ltd. And Radiography of Heavy wall thickness butt-welding joints 
Radiography and MUT for the same joints. At Pre fabrication yard Piping 
spools ranging from 2’’Ø to 30’’Ø ranging 6.4mm thk to 39mm carried out 
Gamma Radiography. Working with permitting system in the 
running/processing units and shutdown areas with complete safety. Following 
the BARC & AERB rules and regulations along with Clint requirement. 
Submitting the NDT results to QA/QC management. 
Company : Scaanray Metallurgical Services. 
Position : Multy NDT technician 
Project 
Description 
: GVK Power Plant, Rajahmundry
RESUME 
Senior Inspection Engineer 
Mobile: 09493186772 
E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, 
Page 7 of 8 
Functions & 
Responsibilities 
: Worked as In charge for NDT Operations in the newly constructed plant. Pre 
fabrication at yards preparing welds of piping and plates, taking offering for 
job and identifying and confirming the joints, giving offering to Radiographers 
to take Radiography. Looking safety at pre fabrication yards before taking 
radiography and ensure the risk levels. When working at erection more than 
60meters checking the scaffolding and giving all instructions to technicians 
working with work permits and safety. 
Company : Scaanray Metallurgical Services. 
Position : Multy NDT technician 
Project 
Description 
: Talchoore Thermal power plant, Talchore. (Orissa) 
Functions & 
Responsibilities 
: Worked as In charge for NDT Operations in the newly constructed plant. Pre 
fabrication at yards preparing welds of piping and plates taking offering for 
job identifying and confirming the joints giving offering to Radiographers to 
take Radiography. Looking safety at pre-fabrication yards before taking 
radiography and ensures the risk levels when working at erection more than 
60meters height checking the scaffolding and giving all instructions to 
technicians working with work permits. 
Company : Scaanray Metallurgical Services. 
Position : Multy NDT technician 
Project 
Description 
Company : Scaanray Metallurgical Services 
: X-Ray and Gamma Radiography at PRP. 
Atomic Energy Ltd.Kalpakkam 
Mazgon Dock Ltd., Kalpak am C/o. PRP. 
Position : Multy Technician in NDT 
Project 
Description 
: 1999-2001 Job carried out for Integral Coach Factory 
(ICF). Chennai 
Functions & 
Responsibilities 
: 
Functions & 
Responsibilities 
: Worked as NDT Technician under PRP department in the Atomic power plant. 
Taking Gamma radiography for piping weld joints etc. With all safety 
precautions under safe work practice. Submitting radiography results to 
concern authorities. 
A Special job done with MDL & PRP (R&D Team). Worked as Multy NDT 
technician in special job Radiography, MPI, MUT and VT tests for piping 
welding and Plates with heavy wall thickness and submitting best results. 
Radiography of piping in the submarine in critical stages. Taking Panoramic 
exposure for entire shell in single exposure with 80 no’s 15’’x4’’ (Film size). 
Using X-ray and Gamma-Radiography. Taking X-ray for steel, Stainless steel 
and Cuni material etc. 
Period 
From: July-1998 
To: December- 
1999 
Company : Scaanray Metallurgical Services. 
Position : Multy NDT technician 
Project 
Description 
: Manarkudi to Thiruvarur pipeline (client GAIL) 
Aban construction Pty Ltd. (contractor) 
4’’Ø x 40 Kms, API5LX 60 in 6.4mm, 7.1 mm thk. 
Functions & 
Responsibilities 
: Worked as site in charge for NDT team from NDT agency and coordinating 
with Clint and contractor. Using 250Kv X-Ray and Gamma Radiography for 
4’’Ø cross-country pipeline weld joints. Gamma radiography for Tie-in welds. 
Work limited up to Radiography and giving results and offering for 
Interpretation of Radiographs to TPI (Box Council). Coordinating with 
contractor and leading team Radiographers and technicians. Solving technical 
problems in equipment and maintaining Quality in NDT. 
Company : Scaanray Metallurgical Services. 
Position : Multy NDT technician 
Project 
Description 
: Job Carried out for Integral Coach Factory (ICF). Chennai.
RESUME 
Senior Inspection Engineer 
Mobile: 09493186772 
E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, 
Page 8 of 8 
Functions & 
Responsibilities 
: Job responsibility includes Gamma Radiography for Rail wagons Chassis with 
DWSI Mechanic and maintains the Quality as per Railway QA & QC 
requirement. Maintaining the safety norms as per BARC /AERB rules 
regulations. The MUT for Steel bars and Shafts using for Rail Wigan wheels. 
The MUT will witnessed by Railway QA/QC and R&D team operation done in 
presence of them only. 
Company : Scaanray Metallurgical Services. 
Position : Multy NDT technician 
Project 
: Neyveli Coal Mines. Neyveli 
Description 
Functions & 
Responsibilities 
: Job responsibilities includes Gamma-Radiography for Conveyer Belt Rollers 
and Shafts on floor fabricated spools for inspection and giving results and 
submitting the testing results preparing inspection reports for QA&QC 
department..Safety carried out as per BARC & AERB rules and regulations. 
Company : Scaanray Metallurgical Services. 
Position : Multy NDT technician 
Project 
Description 
: Extension Project Neyveli Fertilizers Ltd., Neyveli. 
Extension Project Neyveli thermal Power station I & II, Neyveli 
Neyveli Mines, Neyveli. 
Period 
From: July-1996 
To: June-1998 
Company Scaanray Metallurgical Services. 
Position Multy NDT technician 
Project 
Description 
Castings from Hindustan Motors Ltd., thiruvallur 
Castings from Heavy Vehicle Factory (Defence), Avadi, Chennai. 
Casting Jobs from Audco India Ltd., Chennai & Kancheepuram. 
Company : Scaanray Metallurgical Services. 
Position : Multy NDT technician 
Project 
Description 
: L&T Power Tools Manufacturing Division (Opp to L&T ECC division at 
Madhuravoil)-Chennai. (Clint L&T) 
Company : Scaanray Metallurgical Services. 
Position : Multy NDT technician 
Project 
Description 
: Special Job for R&D kalpakkam at Madras Museum. Chennai. 
Period 
From: July-1996 
To: June-1998 
Company : Scaanray Metallurgical Services. 
Position : Trainee N.D.T Engineer 
Project 
Description 
: Manali Petro Products Ltd.Chennai. 
Madras Fertilizers Ltd. Chennai. 
Tamilnadu Petro Products Ltd. Chennai. 
Company : Scaanray Metallurgical Services. 
Position : Trainee N.D.T Engineer 
Project 
Description 
: Storage Tanks, Hindustan Lever Ltd. Pondicherry

More Related Content

What's hot

QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updatedSantosh Gurajada
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad Goraya
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_VEERAKAMU C
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingjaison varkey
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping EngineerPopovici Adrian
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CVAbdul Hakkim
 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorAsad Ahsan
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpSURENDRA BABU
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer MechanicalFaizan Raza
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&INASIM NEZAM
 

What's hot (20)

QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
RAJU CV
RAJU  CVRAJU  CV
RAJU CV
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coating
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding Inspector
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)
 
Updated cv
Updated cvUpdated cv
Updated cv
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer Mechanical
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
 

Similar to Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014

Similar to Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014 (20)

SUMER_MECH_Er
SUMER_MECH_ErSUMER_MECH_Er
SUMER_MECH_Er
 
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipelineQa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
 
Venugopal revised cv
Venugopal revised cvVenugopal revised cv
Venugopal revised cv
 
Venugopal revised Cv
Venugopal revised CvVenugopal revised Cv
Venugopal revised Cv
 
R.Krishna Raj Sr. QC_Inspector-19-04-16
R.Krishna Raj Sr. QC_Inspector-19-04-16R.Krishna Raj Sr. QC_Inspector-19-04-16
R.Krishna Raj Sr. QC_Inspector-19-04-16
 
LINGAM
LINGAMLINGAM
LINGAM
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
Mithun Banjan CV
Mithun Banjan CVMithun Banjan CV
Mithun Banjan CV
 
Elsayed Amer CV
Elsayed  Amer CVElsayed  Amer CV
Elsayed Amer CV
 
Linsin CV
Linsin CVLinsin CV
Linsin CV
 
S. Vibin CV
S. Vibin CVS. Vibin CV
S. Vibin CV
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
resume new
resume newresume new
resume new
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 

Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014

  • 1. RESUME Senior Inspection Engineer Mobile: 09493186772 E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, Page 1 of 8 First /Given Name : Chandrasekhar Family / Surname : Vangapandu Date of Birth : 15 / 08/ 1975 Nationality : Indian Profession : Engineer Experience : 18 Years 2 months ( 11 years in QAQC, Inspection of Cross country pipelines and 7 Years in NDT ) Educational Background : B.Tch in Mechanical Engineering D.M.E (Diploma in Mechanical Engineering) +2 in A.E.T (Automobile engineering Technician) Additional Qualification/Certification : ASNT Lev-2 in MUT, RT, DPT, MPT and VT. BARC Lev-2. CSWIP-3.1 Language(s) known : English, Hindi, Tamil & Telugu Summary of Experiences : Inspection coordination, project inspection and QA/QC for Cross country pipeline. Experienced in AUT / TOFED for Automatic welding technique By RTG inspection and also experienced in NDT for Shipping, Submarines, Off-shore piping, Plant piping, Oil storage tanks, Boiler tubing, Pressure vessels, Power plant shut downs, Refinery shut downs, Experienced in visual inspection by Fiberoscope.Vast experience in NDT handled in Fertilizers, Refineries, Heavy pressure vessels, Boilers, Atomic energy units, Special experience in 15Mev Leenac X-ray and Neutron Radiography. City gas distribution lines etc. Well experienced in 3LPE Coating, External polyurethane Coating, Liquid Epoxy Coating also have experience in surface preparation like sand blasting, Grit blasting and painting. Involvement includes but not limited to Documentation, Review of QAP and ITP’s Establishing WPS & PQR and final handing over of documentation. Cross country Pipeline experience looking in to Row survey, Cold field bending, WQT/EQT and PQR review, Mainline welding, Tie-In welding, Radiography interpretation, Field joint Coating, FBU Coating, Jacketing, Holiday testing press ‘o’ film testing. Trenching and Pipe book verification Lowering, OFC lying and Jointing/Splicing, final OFC continuity test Back filling. Pre Hydro testing of crossing sections likes River, canal, and Railway crossings State Highway/National highways. Pipe line cleaning pigging/Gauging and Final hydro testing. Inspection Capabilities: Mechanical Equipment Rotating Equipment Electrical Equipment Coatings (Various types) Gears OFC Jointing / Splicing Boiler Tubing and fittings Compressors SEHMS Storage tanks (All types) Gas turbines Shipping / Submarine piping Engines / spare parts Castings / Forgings Cross-country/City Gas pipelines
  • 2. RESUME Senior Inspection Engineer Mobile: 09493186772 E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, Page 2 of 8 Period From: Dec-2010 To: Oct-2014 : Germanischer Lloyd Industrial Services GmbH. Company : AMERICAN BEROU OF INDUSTRIAL VERIFICATION India Pvt. Ltd. (ABSIV) Position : Senior. Surveyor Project Description : Man gala development pipe line project (MDPL),24” Ø Gr X 70 and 8”Ø Gr X 65 for 53 Km’s MARINE FACILITIES AT BHOGAT (6.5 Km’s 24Ø” CWC Coated Parallel pipeline up to SPM) Salaya Bhogat pipe line (SBPL) 24” Ø Gr X 70 and 8”Ø Gr X 65 for 53 Km’s Client : Cairn India Pvt Ltd Functions & Responsibilities : Worked as Senior Pipeline Inspector (SPI), Responsible for Operational and Technical involvement includes coordination with the Clint’s construction manager / Senior QA/QC Engineer, review of QAP/ITP’s Procedures and Clint specification. Coordinating with Client’s Construction manager and contractor QA/QC manager. Regular meeting with all inspectors and Clint construction manager reviewing site issues and new developments. Review of daily inspection reports of all inspectors’ and any technical or non-technical issues (like land owner issues) which effects site work. Issuing NCR’s and conforming the corrective action taken or not and close out of NCR’’s and Informing and regular reporting to clients Sr.Engineer (QA & QC). Reviewing of T.Q’s and coordinating with contractors QA & QC manger. Handled site office and inspectors for this project. Also responsible for SEHMS continuity test and Mapping and 1’’Ø tube cleaning and testing. Hi-pot testing witness along with Tyco Thermal systems. Involving in civil activities like special protection for river crossings when found Scour cover protecting the pipe line with approved procedure for Rip-Rap method, Civil activities like Pour cord /Cube testing, and also Grouting material filling in the cased crossing sections. Work related pipeline construction from Pipeline inspection; weld visual, Field cold Bending as per procedure, Epoxy premier, Field joint coating with HDPE outer covering and PU foam filling in the Pup piece & Bare pipe and weld joint areas, lowering and OFC laying in the same tre nch above 8’’Ø after post padding the pipeline .OFC jointing and splicing to be witnessed by after that with Allu Bucket filtering the soil and stones in the backfilling. Final clean up Pigging and Final Hydro testing. Inspection at Calliper pigging and final hand over to Clint with properly cleaned dry pipeline. Final Radiography films Digitization and final film handovering with approved method / procedure. Restoration and final acceptance by formers / land owners and hand over the pipeline with punch l ist and close out of punch list and hand over to Operation and maintains. Period From: May- 2008 To: Sep-2010 Company : Germanischer Lloyd Industrial Services GmbH. Position : Senior Inspection Engineer Client : Cairn India Pvt Ltd Project Description : Mangala Development Pipeline Project (MDPL), 24’’Ø Insulated crude oil pipeline & 8’’Ø Gas pipeline 106Km & 106Km. API5LX70 & X. 65
  • 3. RESUME Senior Inspection Engineer Mobile: 09493186772 E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, Page 3 of 8 Functions & Responsibiliti es : Worked as Senior Pipeline Inspector (SPI), Responsible for Operational and Technical involvement includes coordination with the Clint’s construction manager / Senior QA/QC Engineer, review of QAP/ITP’s Procedures and Clint specification. Coordinating with Client’s Construction manager and contractor QA/QC manager. Regular meeting with all inspectors and Clint construction manager reviewing site issues and new developments. Review of daily inspection reports of all inspectors’ and any technical or non-technical issues (like land owner issues) which effects site work. Issuing NCR’s and conforming the corrective action taken or not and close out of NCR’’s and Informing and regular reporting to clients Sr.Engineer (QA & QC). Reviewing of T.Q’s and coordinating with contractors QA & QC manger. Handled site office and inspectors for this project. Also responsible for SEHMS continuity test and Mapping and 1’’Ø tube cleaning and testing. Hi -pot testing witness along with Tyco Thermal systems. Involving in civil activities like special protection for river crossings when found Scour cover protecting the pipe line with approved procedure for Rip-Rap method, Civil activities like Pour cord /Cube testing, and also Grouting material filling in the cased crossing sections. Work related pipeline construction from Pipeline inspection; weld visual, Field cold Bending as per procedure, Epoxy premier, Field joint coating with HDPE outer covering and PU foam filling in the Pup piece & Bare pipe and weld joint areas, lowering and OFC laying in the same trench above 8’’Ø after post padding the pipeline .OFC jointing and splicing to be witnessed by after that with Allu Bucket filtering the soil and stones in the backfilling. Final clean up Pigging and Final Hydro testing. Inspection at Calliper pigging and final hand over to Clint with properly cleaned dry pipeline. Final Radiography films Digitization and final film hand over with approved method / procedure. Restoration and final acceptance by formers / land owners and hand over the pipeline with punch list and close out of punch list and hand over to Operation and maintains. Period From: Sep-2006 To: Mar-2008 Company : Germanischer Lloyd Industrial Services India Pvt. Ltd. Position : Inspection Engineer Project Description : Dhahej to Uran Pipeline Project (DUPL). (Clint GAIL) STG & Gammon India Pty.Ltd. Consortium. (Contractor) Tractable Engineers India Pvt. Ltd (Consultant) 38’’Ø High pressure gas pipe line 110Km. (Spiral welded pipes) 24’’Ø High pressure gas pipeline 42Km API5LX60 & X65 and X70 Functions & Responsibiliti es : Worked as Inspection Engineer Includes the job responsibility to witness the WQT/ PQT.Inspection of WQT and EQT as per Clint specification and Inspection of both Mechanical tests and NDT.In line inspection of Automatic welding and AUT for the same welding and checking welding parameters. Calibration of testing equipment and materials. Regular reporting of site activities to site manager. Attending Weekly meetings with both Clint and contractor regarding QA /QC matters. Pipe book checking and Evaluation of Auto ultrasonic testing and TOFD with sub contractor (RTG) and giving results faster and avoid delay in making repair of joints and inspection of MUT for the weld repair locations. And also avoid the discontinuities in further welding. OFC jointing and splicing to be witnessed. Final clean up Pigging and Final Work related pipeline construction from Pipeline inspection of ROW, weld visual, Cold field bending, Field joint coating, Trenching, lowering and Backfilling with Allu Bucket to filter the soil and stones in the backfilling. Pre Hydro testing for crossing sections like major River/canal and National Highway/State Highways and cased crossings. Final clean up Pigging for entire pipe line section as per approved procedure. and Final Hydro testing etc. Period Company : SAI AMBAY Organisation Pty.Ltd.
  • 4. RESUME Senior Inspection Engineer Mobile: 09493186772 E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, Page 4 of 8 From: May- 2005 To: May-2006 Position : QA/QC Engineer Project Description : Anand Rajkot pipeline Project (ARPL) for GSPL. (Clint L &T) Valdel Engineers (Consultant) API 5LX65, 24’’Øx11.1mm & 14.3mm and 17.5mm, Thk for 53 Km’s. Functions & Responsibiliti es : Worked as QA & QC Engineer for pipeline construction activities starts from WQT, Field joint Coating with Liquid Epoxy coating. Job responsibilities include weld visual and maintain quality according to Clint specification and As per API-1104. Maintaining the front end of the pipeline crew as well as back end welding team to get progress as well as quality without affecting the welding quality. Maintaining the Quality records and coordinating with TPI (EIL) and Preparing of pipe book before lowering and maintaining quality while backfilling. O FC laying and Jointing& splicing. Pre Hydro testing of crossing sections like river / Highways with proper planning with Auger boring and open cut method in small crossings. Looking into pigging, cleaning and Final Hydro testing of total pipeline in two sections. Monitoring of Test records and Finishing of testing and handover dry pipeline to Clint. Period From: January - 2004 To: April-2005 Company : ESSAR Construction Pvt. Ltd. Position : QA QC Engineer Project Description : Balledilla to Visakhapatnam Slurry Pipeline (BVSPL) API5LX 60 and 14.3, 12.7 and 11.9 mm Thk Slurry pipeline and 6.4mm Thk 53 Km’s water line. Functions & Responsibilities : Working as QA & QC Engineer and responsible for total quality of pipeline construction activity (in the deep forest and hill area). Preparing Procedures for all activities and WQT & PQT before starting work. Welder qualification tests and preparing welder I.D cards and maintain all Quality records. Looking in to welder performances and welding parameters recording. Field Liquid Epoxy coating for butt joints and cooperating with construction manager and QA/QC manager. Monitoring site QA /QC Engineers and site Inspection reports. Activities like weld visual, Offering for NDT, Field joint coating for 3LPE Coating in Slurry pipe line and Coal tar Epoxy coating for water pipeline, Checking surface preparation, Peel test / Press ‘o’ film. Radiography interpretation and marking of welds for repair joints and giving warning letter to welder and maintain the Quality. Cold field Bending as per procedure and consulting with Bending surveyor to better progress and easy fit-Up’s in Tie-In welding. Inspection of trenching bedding and padding before Lowering .In this project both water and Slurry pipelines layed in the same trench. OFC Laying done after post padding the pipelines. OFC Splicing and jointing and also final continuity test witnessed. Backfilling monitored. Preparing pipe book for Final Hydro testing. Cleaning /Swabbing of entire pipeline and witnessing the Final Hydro testing. Making Restoration reports and final acceptance of Formers / Land owners. Pre commissioning of AGI’s and Pipeline and hand over the pipeline to Operation & Maintaining team. Period From: June- 2002 To: December- Company : Quality Evaluation Services. Position : Site In charge NDT Operations Project Description : HPCL oil Storage facilities at Ghatkesar (Hyderabad) (Clint HPCL), Contractor Bridge & Roof Ltd.
  • 5. RESUME Senior Inspection Engineer Mobile: 09493186772 E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, Page 5 of 8 2003 Functions & Responsibilities : As per API-650 Oil storage facility 80’’Ø & 60’’Ø HSD and Kerosene oil storage tanks constructed by Bridge & Roof. Worked as site in charge for NDT activities. Taking Radiography of storage tanks and piping weld joints. Reporting and offering interpretation of Radiographs to TPI (EIL). Coordinates with QA/QC engineer and supporting as teamwork and completing the job. Following safety rules and regulations as per BARC (India). Coordinating with NDT technicians and supporting technically .MUT for ≥25mm all Horizontal and Vertical weld joints. Radiography for Bottom plate with Backing strip welding. Fire fighting pipe joints % radiography. Period From: June- 2002 To: Dec-2003 Company : Quality Evaluation Services. Position : Site In charge NDT Operations Project Description : HPCL shut down in FCCU, SRU units. (HPCL. Vizag) Functions & Responsibilities : Worked as site in charge for shutdown units at HPCL refinery in the FCCU, SRU units. A Job responsibility includes various sizes of pipes ranging from 2"Ø to 24"Ø taking Gamma Radiography (Ir 192 source) for weld joints on the ground level and on pipe racks at a height of 60 meters. Interpretation of Radiography films and submitting the results and marking of repair weld joints. D.P.test for weld joints and M.P.Test for Gears and other equipments. M.U.Test carried out for Bearings and Crankshafts for D.G.engines and other spare parts. Safety followed as per BARC / AERB. Taking Thickness gauging at offered pipe bend locations and submitting results to QA/QC department. Period From: February- 2001 To: May-2002 Company : Quality Evaluation Services. Position : Site In charge NDT Operations Project Description : Rolls Roy’s Powers Station, Kakinada (Clint Rolls Roy’s) Company : Quality Evaluation Services. Position : Site In charge NDT Operations Project Description : VTPS, Vijayawada, (Clint VTPS) Vijayawada thermal power station. Annual shut downs of # 1, # 3, # 5 Boilers Functions & Responsibilities : Radiography for Boiler piping tube welded joints at inside and outside of the boiler in the critical position. Interpretation of films and finding discontinuities and giving results to QA/QC Department and committing to work with safety. Radiography at fabrication and other components offered by QA / QC management. Company : Quality Evaluation Services Position : Site In charge NDT Operations. Project Description : NTPC Simhadri Power Plant, Visakhapatnam (Clint NTPS &BHEL) Functions & Responsibilities : Worked as In charge for NDT Operations in the newly constructed plant. Pre-fabrication at yards preparing welds of piping and plates offered by QA /. QC department. For job identifying and confirming the joints giving offering to Radiographers to take Radiography. Looking safety at yards before taking radiography and assuming the risk levels. When working at erection more than 60meters high checking the scaffolding and giving all instructions to technicians working with work permits and communicating with NTPC & BHEL (Clint). Company : Quality Evaluation Services.
  • 6. RESUME Senior Inspection Engineer Mobile: 09493186772 E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, Page 6 of 8 Position : Site In charge NDT Operations Project Description : BHPV (client Bharath Heavy Plates and Vessels), Visakhapatnam NAVAL DOCKYARD, Visakhapatnam Period From:December -2000 To: Janauary- 2001 Company : Scaanray Metallurgical Services. Position : Multy NDT technician. Project Description : Special Job for Indian Space Research Organisation (ISRO) Satishdhavan Space Research Centre, (SHAR – Sriharikota) Company : Scaanray Metallurgical Services Position : Multy Technician in NDT Project Description : 1999-2001 Job carried out for Integral Coach Factory (ICF). Chennai Functions & Responsibilities : Functions & Responsibilities : Worked as NDT technician for this special project in the SHAR Centre. Worked in the NDT (SPROB-Solid Prop lent Rocket Booster) department .As a Multy NDT techecian works in the building supporting with SHAR staff handling the Radiography films and Processing of Films in the Dark room. X-ray with 15Mev Leenac and 350Kv –X-ray machine for Segments / stages of Rocket and its parts. Departments Sr.management.Newtron Radiography will do interpretation by using 15Mev Leenac for powder RDX in the firing igniters. Highly Safety and advanced technology used in this centre. Learned the visual inspection of bonding and disbandment inside the small rocket boosters by using Optical Fibro Scope. Tacking X-ray for Cryogenic Engine station tubing Tig weld joints material like high grade steel sized 10 mm Ø with 350 Kv X-ray machine and submitting the results with high quality to Clint for their acceptance Period From: February- 2001 To: May-2002 Company : Scaanray Metallurgical Services. Position : Multy NDT technician Project Description : Indian Space Research Organisation (ISRO), Blue star Air conditioning Systems (Chennai), 2ND Launching Pad (SHAR - Sriharikota) Functions & Responsibilities : Worked as Multy NDT technician for the second launching pad construction. Works with Blue star Air conditioning systems. Gamma Radiography for piping system. Submitting the radiographs to contractor and interpreting with Third party Inspection (TPI) by EIL. X-ray for Cross country pipe line by using external -350Kv X-ray machine from piping unit to Launching pad area ranging from 4’’Ø to 24’’Ø in different thickness. Both 100% for fuel lines and partial Radiography for water cooling system pipeline. Gamma Radiography in the boiler unit tubing and piping. Company : Scaanray Metallurgical Services Position : Multy NDT technician Project Description : Cairn Energy India Pty.Ltd (S.Yanam) NDT in the Off –Shore & On-Shore and Pre fabrication at pipe yard in the plant Functions & Responsibilities : Worked as NDT technician at Offshore platform units of Cairn Energy India Pty.Ltd. And Radiography of Heavy wall thickness butt-welding joints Radiography and MUT for the same joints. At Pre fabrication yard Piping spools ranging from 2’’Ø to 30’’Ø ranging 6.4mm thk to 39mm carried out Gamma Radiography. Working with permitting system in the running/processing units and shutdown areas with complete safety. Following the BARC & AERB rules and regulations along with Clint requirement. Submitting the NDT results to QA/QC management. Company : Scaanray Metallurgical Services. Position : Multy NDT technician Project Description : GVK Power Plant, Rajahmundry
  • 7. RESUME Senior Inspection Engineer Mobile: 09493186772 E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, Page 7 of 8 Functions & Responsibilities : Worked as In charge for NDT Operations in the newly constructed plant. Pre fabrication at yards preparing welds of piping and plates, taking offering for job and identifying and confirming the joints, giving offering to Radiographers to take Radiography. Looking safety at pre fabrication yards before taking radiography and ensure the risk levels. When working at erection more than 60meters checking the scaffolding and giving all instructions to technicians working with work permits and safety. Company : Scaanray Metallurgical Services. Position : Multy NDT technician Project Description : Talchoore Thermal power plant, Talchore. (Orissa) Functions & Responsibilities : Worked as In charge for NDT Operations in the newly constructed plant. Pre fabrication at yards preparing welds of piping and plates taking offering for job identifying and confirming the joints giving offering to Radiographers to take Radiography. Looking safety at pre-fabrication yards before taking radiography and ensures the risk levels when working at erection more than 60meters height checking the scaffolding and giving all instructions to technicians working with work permits. Company : Scaanray Metallurgical Services. Position : Multy NDT technician Project Description Company : Scaanray Metallurgical Services : X-Ray and Gamma Radiography at PRP. Atomic Energy Ltd.Kalpakkam Mazgon Dock Ltd., Kalpak am C/o. PRP. Position : Multy Technician in NDT Project Description : 1999-2001 Job carried out for Integral Coach Factory (ICF). Chennai Functions & Responsibilities : Functions & Responsibilities : Worked as NDT Technician under PRP department in the Atomic power plant. Taking Gamma radiography for piping weld joints etc. With all safety precautions under safe work practice. Submitting radiography results to concern authorities. A Special job done with MDL & PRP (R&D Team). Worked as Multy NDT technician in special job Radiography, MPI, MUT and VT tests for piping welding and Plates with heavy wall thickness and submitting best results. Radiography of piping in the submarine in critical stages. Taking Panoramic exposure for entire shell in single exposure with 80 no’s 15’’x4’’ (Film size). Using X-ray and Gamma-Radiography. Taking X-ray for steel, Stainless steel and Cuni material etc. Period From: July-1998 To: December- 1999 Company : Scaanray Metallurgical Services. Position : Multy NDT technician Project Description : Manarkudi to Thiruvarur pipeline (client GAIL) Aban construction Pty Ltd. (contractor) 4’’Ø x 40 Kms, API5LX 60 in 6.4mm, 7.1 mm thk. Functions & Responsibilities : Worked as site in charge for NDT team from NDT agency and coordinating with Clint and contractor. Using 250Kv X-Ray and Gamma Radiography for 4’’Ø cross-country pipeline weld joints. Gamma radiography for Tie-in welds. Work limited up to Radiography and giving results and offering for Interpretation of Radiographs to TPI (Box Council). Coordinating with contractor and leading team Radiographers and technicians. Solving technical problems in equipment and maintaining Quality in NDT. Company : Scaanray Metallurgical Services. Position : Multy NDT technician Project Description : Job Carried out for Integral Coach Factory (ICF). Chennai.
  • 8. RESUME Senior Inspection Engineer Mobile: 09493186772 E-Mail: chandrasekhar.vangapandu@gmail.com/ chandrasekhar27@hotmail.com, Page 8 of 8 Functions & Responsibilities : Job responsibility includes Gamma Radiography for Rail wagons Chassis with DWSI Mechanic and maintains the Quality as per Railway QA & QC requirement. Maintaining the safety norms as per BARC /AERB rules regulations. The MUT for Steel bars and Shafts using for Rail Wigan wheels. The MUT will witnessed by Railway QA/QC and R&D team operation done in presence of them only. Company : Scaanray Metallurgical Services. Position : Multy NDT technician Project : Neyveli Coal Mines. Neyveli Description Functions & Responsibilities : Job responsibilities includes Gamma-Radiography for Conveyer Belt Rollers and Shafts on floor fabricated spools for inspection and giving results and submitting the testing results preparing inspection reports for QA&QC department..Safety carried out as per BARC & AERB rules and regulations. Company : Scaanray Metallurgical Services. Position : Multy NDT technician Project Description : Extension Project Neyveli Fertilizers Ltd., Neyveli. Extension Project Neyveli thermal Power station I & II, Neyveli Neyveli Mines, Neyveli. Period From: July-1996 To: June-1998 Company Scaanray Metallurgical Services. Position Multy NDT technician Project Description Castings from Hindustan Motors Ltd., thiruvallur Castings from Heavy Vehicle Factory (Defence), Avadi, Chennai. Casting Jobs from Audco India Ltd., Chennai & Kancheepuram. Company : Scaanray Metallurgical Services. Position : Multy NDT technician Project Description : L&T Power Tools Manufacturing Division (Opp to L&T ECC division at Madhuravoil)-Chennai. (Clint L&T) Company : Scaanray Metallurgical Services. Position : Multy NDT technician Project Description : Special Job for R&D kalpakkam at Madras Museum. Chennai. Period From: July-1996 To: June-1998 Company : Scaanray Metallurgical Services. Position : Trainee N.D.T Engineer Project Description : Manali Petro Products Ltd.Chennai. Madras Fertilizers Ltd. Chennai. Tamilnadu Petro Products Ltd. Chennai. Company : Scaanray Metallurgical Services. Position : Trainee N.D.T Engineer Project Description : Storage Tanks, Hindustan Lever Ltd. Pondicherry