SlideShare a Scribd company logo
1 of 38
Energy Sector in India
M. SABESH MANIKANDAN
Assistant Professor of Economics
Ayya Nadar Janaki Ammal College
Sivakasi
1
Introduction
Energy: Meaning and pattern of energy consumption in India
2
Types of Energy
Conventional and non-conventional, renewable and non-renewable
& commercial and non-commercial
3
Energy Sources
Power, Thermal, Hydro, wind, tidal, nuclear etc.,
4
Energy in India
Energy and Economic Development
Energy Sector in India
Energy
Introduction
energia which means
“in work”
Greek
01 The capacity to do work
and overcome resistances
Physics
02
Power or capacity to work
Meaning
03 The stored ability to
perform work
Meaning
04
Introduction
the strength and vitality
required for sustained physical
or mental activity
Meaning
05 power derived from the utilization of
physical or chemical resources,
especially to provide light and heat
or to work machines.
Meaning
06
No power is costlier than no
power
Homi Bhava
07 Energy effects favourable change in
human – environemntal interraction,
involving those things that modern people
can advantageously convert, such as teh
temperature adn form of certain pysical
matter.
Nathaniel & Guyol
08
Introduction
2010–11 2011–12 2012 – 13 2013 – 14 2014–15
20317 20843 21498 21607 22465
Percapita Energy Consumption
(in peta Joules)
Year
Energy Consumption
(peta joules)
Mid year Population
(in million)
GDP
(Rs. In Crore)
Per capita energy
Consumption (in
mega joules)
2005 – 06 14286 1118 3253073 12781
2006 – 07 15519 1134 3564364 13685
2007 – 08 16489 1148 3896636 14368
2008 - 09 17255 1161 4158676 14856
2009 – 10 19544 1175 4516071 16626
2010 – 11 20317 1182 4918533 17187
2011 – 12 20843 1220 5247530 17084
2012 – 13 21498 1235 5482111 17407
2013 – 14 21607 1251 5741791 17272
2014 – 15 22465 1267 10552151 17731
CAGR 4.63 1.26 12.49 3.33
Per capita Energy consumption in India
Insert the title of your subtitle Here
Year
Coal
(mn. tn.)
Lignite
(mn.tn)
Crude Oil
(mmt)
Natural Gas
(Billion Cubic Meters)
Electricity
(GWh)
2005 – 06 433.27 30.24 130.11 36.39 118,818.00
2006 – 07 462.35 30.81 146.55 37.60 132,304.00
2007 – 08 502.82 34.65 156.10 39.80 137,344.00
2008 - 09 549.57 31.85 160.77 39.81 142,576.00
2009 – 10 585.30 34.41 192.77 55.67 125,316.00
2010 – 11 589.87 37.69 196.99 61.18 140,524.00
2011 – 12 642.64 42.77 204.12 59.69 163,000.00
2012 – 13 688.75 46.83 219.21 52.92 146,497.00
2013 – 14 724.18 44.64 222.50 47.67 169,076.00
2014 – 15 827.57 49.57 223.24 48.25 165,346.00
CAGR 6.69 5.07 5.55 2.86 3.36
Energy Consumption in India
Source wise energy consumption in India
8.07 8.10
4.99
7.046.46
10.69
Domestic
Commercial
Traction
and
Railway
OthersAgriculture
Industry
Expansion of consumer
goods, TV, Refrigerator,
washing machine etc.,
Domestic
The establishment of new
industries - iron & steel
machine tools. Engineering
fertilizersetc., (only 68%)
Industry
The demand for power
has increased from
4% to 21%
Agriculture
Business, Trade and
commerce
Commercial
Development of Rail
transport
Traction and Railway
Others
Electricity Consumption in India
Percentage distribution of sector wise electricity consumption in 2016
Electricity Power
Is one form of energy, is
an essential ingredient of
economic development
Electricity
Industry, agriculture and
transport
Commercial use
Domestic lighting , cooking use of
domestic mechanical gadgets –
Refrigeratos, air conditioners
Non-commercial use ● The per capita annual consumption of
electricity in India is one of the lowest
in the world at approximately 734 kwh
Power & Economic
Development
● Power or electricity is one of the
most critical components of
infrastructure affecting economic
growth and well being of nations
● 8 – 9 % of the total GDP Growth rate
is sustained by the power sector
Electricity Power
Year
Industry Agriculture Domestic Commercial Traction &
Railway
Others Total
Electricity
consumption
2005 – 06 151557 90292 100090 35965 9944 24039 411887
2006 – 07 171293 99023 111002 40220 10800 23411 455749
2007 – 08 189424 104182 120918 46685 11108 59660 501977
2008 - 09 209474 109610 131720 54189 11425 37577 553995
2009 – 10 236752 120209 146080 60600 12408 36595 612645
2010 – 11 272589 131967 169326 67289 14003 39218 694392
2011 – 12 352291 140960 171104 65381 14206 41252 785194
2012 – 13 365989 147462 183700 72794 14100 40256 824301
2013 – 14 384418 152744 199842 74247 15540 47418 874209
2014 – 15 418346 168913 217405 78391 16177 49095 948328
CAGR 10.69 6.49 8.07 8.10 4.99 7.40 8.72
Energy Consumption in India
Source wise energy consumption in India
Year
Utilities Non-utilities Grand
Total
Thermal Hydro Nuclear Total
2006 88601 32326 3360 124287 21468 145755
2007 93775 34654 3900 132329 22335 154664
2008 103032 35909 4120 143061 24986 168047
2009 106968 36878 4120 147966 26980 174946
2010 117975 36863 4560 159398 28474 187872
2011 131279 37567 4780 173626 32900 206526
2012 156107 38990 4780 199877 39375 239252
2013 179072 39491 4780 223344 43300 266644
2014 199947 40531 4780 245259 42257 287516
2015 224674 41268 5780 271722 44657 316379
CAGR 9.75 2.47 5.57 8.14 7.60 8.06
Installed Generating Capacity of electricity
Source wise energy in India
Hydroelectrical Power
Hydro Power
Largest hydro electric
dam in South Asia.
10,000 – 12, 000 (MW)
10th tallest Dam in the
world
Tehri Dam
USA and Russia in the
first China is the
second largest dams in
the world
3 largest in the world
Completed large dams
in India
4710
Hydroelectric Power
Tehri Dam
Tehri ,
Uttrakhand
855ft hight adn
575 mt. Lenght
2400 MW.
The Koyna
Western Ghats
2nd largest in India
1960MW
The Sri Sailam
Sri Sailam,
Karnool District
Andrapradesh
1670 MW
The Nathpa
Jhakri
Himachal Pradesh
1500MW with
underground
powerstation with
water
Major Hydro Power projects in India
Thermal Power
Installed Generating Capacity of electricity
Thermal Energy power plant
a power plant in which
heat energy is converted
to electric power
Thermal Power
Water is heated, turns
into steam and spins a
steam turbine which
drives an electrical
generator.
Process
Nuclear Power
● Thermal electricity generation
contributes around 75% of India’s
power supply
Thermal Power
● Thermal power plants accounted for
an overwhelming 71.01% of the total
installed capacity in the country
Thermal
Power
Central Government : 28
State Government : 65
Total Units in Plants:431 Private: 37
Western : 41
Norther : 27
Eastern : 36
Southern : 28
Total plants 132
Western : 67029.01
Norther : 40943.50
Eastern : 28892.87
Southern : 30842.50
Power Generation
167707.88 (MW)
Mundra
Kutch, Gujarat
1st rank in India
4,620MW
&
3rd biggest thermal
plant also in Gujarat
Vindhyachal
Thermal
Singrauli
Madhya Pradesh
2nd biggest
4260MW,
Talcher Super
Thermal
Angul ,Odisha
4th biggest Plant
3,000MW
coal-fired power
plant
Sipat Thermal
Power Plant
Sipat, Bilaspur
Chhattisgarh,
5th biggest plant
2980 MW
Major Thermal Power projects in India
Nuclear Power
Electricity wasn’t
produced with nuclear
energy
Until 1951
Splitting atoms and
releasing a tremendous
amount of heat.
Nuclear Energy
The heat is used to generate
steam which drives a steam
turbine connected to an electric
generator which
produces electricity
Process ● Electricity demand increasing tripled
and 1287 TWh gross produced in
2014
Nuclear Power
● Nuclear power contributes less than
5% of World's energy production
● The per capita electricity consumption
figure – 1000 kWh/yr in 2014 – is
expected to double by 2020, with
6.3% annual growth
Nuclear Power
● Nuclear reactors produce 20% of the
electricity in the USA by 400 power
reactors in the world (100 of these are
in the USA).
● Energy consumption more than
doubled between 1990 and 2011 to
nearly 25,000 PJ
Nuclear
Power
Increase from 2.8%
to 9 % within 25
years
Nuclear power in India
No. of Plants: 7
No. of reactor: 21
Installed capacity :
6780MW
4th largest power
sector
Power generated :
30292Gwh
Power Generation
5780 (MW)
Year
Gross
Generation
(MUs)
Capacity Factor
(%)
Availability Factor
(%)
2010-11 26472 71 89
2011-12 32455 79 91
2012-13 32863 80 90
2013-14 35333 83 88
2014-15 37835 82 88
2015-16 37456 75 77
2016-17
(Upto February -
2017)
34137 79 81
Nuclear Energy in India
Solar Power
Renewable energy, together, will
supply 12 % of world energy by
2020
World Energy Council
The direct sun-rays tapped in
photovoltaic cells can be
converted into energy.
Solar Energy
It is a process of converting direct
sunlight into electrical energy
through semiconductor devices.
Process
● In rural areas, the domestic sector
accounts for nearly 80 percent of total
energy consumption
Need for Solar Power
● 2.4 % of land are with 16% of the
World’s population.
● Household sector: largest consumer
of energy accounting for 40-50 % of
total energy consumption
Solar Power
● About two thirds of India’s more than 1
billion people live in rural areas
● Life Expectancy 64.71 years
Solar Power
1000 watts per square
meter
32.8 million MW every
second
Production possibility
Growth : 38 % during
2012 – 2013
Market Size
1. Tamilnadu (1.60GW)
2. Rajastan (1.32 GW)
3. Gujarat (1.16 GW)
(2016)
Capacity : 9 GW
India ranks 3rd in annual
production next to Germany,
France and Australia
Production Capacity
2012 2013 2014 2015 2016
Tata Patapur
Odisha
9 MW
Sakri solar
plant
Maharashtra.
125 MW
Neemuch Solar
Plant
Neemuch
Madhya Pradesh
151 MW
NTPC solar plants
(16.6%)
INDIA
110 MW
Kamuthi Solar
Power Project-
Tamil Nadu
Worlds Second
Largest solar Park
.
648 MW
Major Solar Power Plants
Wind Power
Renewable energy, together, will
supply 12 % of world energy by
2020
World Energy Council
Mechanism of energy conversion
from blowing wind
The kinetic energy of wind, through
turbines is converted into electrical
energy
Wind Energy
Air flow through wind
turbines to mechanically
power generators for electric power
Process ● Indian annual wind power market has
grown by almost 68%
Scope for Wind Power
● Indian market is emerging as one of
the major manufacturing hubs for wind
turbines in Asia.
● Muppandal wind farm is the Second
largest onshore wind farm in the
world.
Wind Power
● The states - Tamil Nadu,
Maharashtra, Gujarat, Rajasthan,
Karnataka, Madhya Pradesh and
Andhra Pradesh with highest wind
power concentration
● 17 manufacturers have an annual
production capacity of 7,500 MW
Wind Power
8.6% of the total installed
capacity
64.62% of the total
renewable energy sources
Production Efficiency
70% of Wind energy
generated during the
month of May –
September
Season
1. Tamilnadu (4132.72 MW)
2. Maharastra (2077.70 MW)
3. Gujarat (1863.64 MW)
4. Karnataka (1472.75 MW)
Capacity:28,871.59 MW
India ranks 4th largest
installed capacity in the world
Production Capacity
2011 2012 2013 2014 2015
18421 MW 20149 MW 21264 MW 23354 MW 26769 MW
Wind Power Plants
E2 a02 unit_iv_infrastructure(3)

More Related Content

What's hot

Make in india and future of renewable energy
Make in india and future of renewable energyMake in india and future of renewable energy
Make in india and future of renewable energyManoj Bhambu
 
Wind Energy in Context of India
Wind Energy in Context of IndiaWind Energy in Context of India
Wind Energy in Context of IndiaBhupendra Singh
 
Lecture 6 Energy & Load survey of India
Lecture 6 Energy & Load survey of IndiaLecture 6 Energy & Load survey of India
Lecture 6 Energy & Load survey of IndiaSwapnil Gadgune
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in indiaAnkur Mahajan
 
Ret leccture 2 energy scenario in rural india
Ret leccture 2 energy scenario in rural indiaRet leccture 2 energy scenario in rural india
Ret leccture 2 energy scenario in rural indiaB.k. Das
 
Renewable energy potential for india
Renewable energy potential for indiaRenewable energy potential for india
Renewable energy potential for indiaRajkumar Viral
 
Energy scenario -past -present & Future
Energy scenario -past -present & Future  Energy scenario -past -present & Future
Energy scenario -past -present & Future VS E
 
Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018AshwaniSinha11
 
Non-conventional Energy Sources in Present Power Sector in India
Non-conventional Energy Sources in Present Power Sector in IndiaNon-conventional Energy Sources in Present Power Sector in India
Non-conventional Energy Sources in Present Power Sector in IndiaIRJET Journal
 
Renewables Country Profile - India
Renewables Country Profile - IndiaRenewables Country Profile - India
Renewables Country Profile - IndiaFINERGREEN
 
Energy Scenario in India by Prayaas
Energy Scenario in India by PrayaasEnergy Scenario in India by Prayaas
Energy Scenario in India by Prayaassambhaavnaa
 
Renewable Potential in India
Renewable Potential in IndiaRenewable Potential in India
Renewable Potential in IndiaShantam Warkad
 
Adani Power, Tirora- Project Report
Adani Power, Tirora- Project ReportAdani Power, Tirora- Project Report
Adani Power, Tirora- Project ReportNemish Kanwar
 

What's hot (20)

Make in india and future of renewable energy
Make in india and future of renewable energyMake in india and future of renewable energy
Make in india and future of renewable energy
 
Wind Energy in Context of India
Wind Energy in Context of IndiaWind Energy in Context of India
Wind Energy in Context of India
 
Ijesdmv4n3 18
Ijesdmv4n3 18Ijesdmv4n3 18
Ijesdmv4n3 18
 
RE 2022
RE 2022RE 2022
RE 2022
 
Energy scenario sachin 27.05.14
Energy scenario sachin 27.05.14Energy scenario sachin 27.05.14
Energy scenario sachin 27.05.14
 
Lecture 6 Energy & Load survey of India
Lecture 6 Energy & Load survey of IndiaLecture 6 Energy & Load survey of India
Lecture 6 Energy & Load survey of India
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in india
 
Ret leccture 2 energy scenario in rural india
Ret leccture 2 energy scenario in rural indiaRet leccture 2 energy scenario in rural india
Ret leccture 2 energy scenario in rural india
 
Renewable energy potential for india
Renewable energy potential for indiaRenewable energy potential for india
Renewable energy potential for india
 
Energy scenario -past -present & Future
Energy scenario -past -present & Future  Energy scenario -past -present & Future
Energy scenario -past -present & Future
 
Future of the Indian power sector
Future of the Indian power sectorFuture of the Indian power sector
Future of the Indian power sector
 
Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018
 
Renewable Energy Sector
Renewable Energy SectorRenewable Energy Sector
Renewable Energy Sector
 
Renewable Energy in India
Renewable Energy in IndiaRenewable Energy in India
Renewable Energy in India
 
Non-conventional Energy Sources in Present Power Sector in India
Non-conventional Energy Sources in Present Power Sector in IndiaNon-conventional Energy Sources in Present Power Sector in India
Non-conventional Energy Sources in Present Power Sector in India
 
Renewable Energy Sector Report - February 2019
Renewable Energy Sector Report - February 2019Renewable Energy Sector Report - February 2019
Renewable Energy Sector Report - February 2019
 
Renewables Country Profile - India
Renewables Country Profile - IndiaRenewables Country Profile - India
Renewables Country Profile - India
 
Energy Scenario in India by Prayaas
Energy Scenario in India by PrayaasEnergy Scenario in India by Prayaas
Energy Scenario in India by Prayaas
 
Renewable Potential in India
Renewable Potential in IndiaRenewable Potential in India
Renewable Potential in India
 
Adani Power, Tirora- Project Report
Adani Power, Tirora- Project ReportAdani Power, Tirora- Project Report
Adani Power, Tirora- Project Report
 

Similar to E2 a02 unit_iv_infrastructure(3)

Environment and energy sustainability
Environment and energy sustainabilityEnvironment and energy sustainability
Environment and energy sustainabilityManoj Bhambu
 
COST ESTIMATION OF SMALL HYDRO POWER GENERATION
COST ESTIMATION OF SMALL HYDRO POWER GENERATIONCOST ESTIMATION OF SMALL HYDRO POWER GENERATION
COST ESTIMATION OF SMALL HYDRO POWER GENERATIONRajeev Kumar
 
Energy Scenario in India
Energy Scenario in IndiaEnergy Scenario in India
Energy Scenario in IndiaRavijesh Kumar
 
Renewable energy in india
Renewable energy in indiaRenewable energy in india
Renewable energy in indiaSHAMSHAD AHAMAD
 
“Street Lights Replacement System- A Key Necessity for Make in India Campaign”
“Street Lights Replacement System- A Key Necessity for Make in India Campaign”“Street Lights Replacement System- A Key Necessity for Make in India Campaign”
“Street Lights Replacement System- A Key Necessity for Make in India Campaign”inventionjournals
 
OFFSHORE WIND ENERGY
OFFSHORE WIND ENERGYOFFSHORE WIND ENERGY
OFFSHORE WIND ENERGYMadan Singh
 
Pathways to Low Carbon Development: Impediments and Opportunities: Nepal
Pathways to Low Carbon Development: Impediments and Opportunities: NepalPathways to Low Carbon Development: Impediments and Opportunities: Nepal
Pathways to Low Carbon Development: Impediments and Opportunities: NepalClimate Action Network South Asia
 
Prospects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyProspects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyAbhishek Ashok
 
Vibrant Gujarat Summit Profile for Energy Spectrum Sector
Vibrant Gujarat Summit Profile for Energy Spectrum SectorVibrant Gujarat Summit Profile for Energy Spectrum Sector
Vibrant Gujarat Summit Profile for Energy Spectrum SectorVibrant Gujarat
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadriVirat Shishodia
 
STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)sajidpk92
 
Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...SINGHZEE
 
New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13Peerasak C.
 

Similar to E2 a02 unit_iv_infrastructure(3) (20)

Environment and energy sustainability
Environment and energy sustainabilityEnvironment and energy sustainability
Environment and energy sustainability
 
COST ESTIMATION OF SMALL HYDRO POWER GENERATION
COST ESTIMATION OF SMALL HYDRO POWER GENERATIONCOST ESTIMATION OF SMALL HYDRO POWER GENERATION
COST ESTIMATION OF SMALL HYDRO POWER GENERATION
 
ssssAmit kumar-pres
ssssAmit kumar-presssssAmit kumar-pres
ssssAmit kumar-pres
 
A n srivastava
A n srivastavaA n srivastava
A n srivastava
 
Energy Scenario in India
Energy Scenario in IndiaEnergy Scenario in India
Energy Scenario in India
 
Renewable energy in india
Renewable energy in indiaRenewable energy in india
Renewable energy in india
 
“Street Lights Replacement System- A Key Necessity for Make in India Campaign”
“Street Lights Replacement System- A Key Necessity for Make in India Campaign”“Street Lights Replacement System- A Key Necessity for Make in India Campaign”
“Street Lights Replacement System- A Key Necessity for Make in India Campaign”
 
OFFSHORE WIND ENERGY
OFFSHORE WIND ENERGYOFFSHORE WIND ENERGY
OFFSHORE WIND ENERGY
 
Types of Energy
Types of EnergyTypes of Energy
Types of Energy
 
Pathways to Low Carbon Development: Impediments and Opportunities: Nepal
Pathways to Low Carbon Development: Impediments and Opportunities: NepalPathways to Low Carbon Development: Impediments and Opportunities: Nepal
Pathways to Low Carbon Development: Impediments and Opportunities: Nepal
 
Prospects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyProspects and Challenges of Solar Energy
Prospects and Challenges of Solar Energy
 
Vibrant Gujarat Summit Profile for Energy Spectrum Sector
Vibrant Gujarat Summit Profile for Energy Spectrum SectorVibrant Gujarat Summit Profile for Energy Spectrum Sector
Vibrant Gujarat Summit Profile for Energy Spectrum Sector
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadri
 
STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)
 
Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...
 
Nl energy july 4 - july 10, 2015
Nl energy july 4 - july 10, 2015Nl energy july 4 - july 10, 2015
Nl energy july 4 - july 10, 2015
 
RE 2022
RE 2022RE 2022
RE 2022
 
Energy sector
Energy sectorEnergy sector
Energy sector
 
New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13
 
Ijesdmv4n3 18
Ijesdmv4n3 18Ijesdmv4n3 18
Ijesdmv4n3 18
 

More from 4512452

E6 l01 unit_v_ancient economic thought in india
E6 l01 unit_v_ancient economic thought in indiaE6 l01 unit_v_ancient economic thought in india
E6 l01 unit_v_ancient economic thought in india4512452
 
E6 l01 unit_iv_nce&we
E6 l01 unit_iv_nce&weE6 l01 unit_iv_nce&we
E6 l01 unit_iv_nce&we4512452
 
E1 a01 demand analysis
E1 a01 demand analysisE1 a01 demand analysis
E1 a01 demand analysis4512452
 
Unit iii cost and revenue
Unit iii cost and revenueUnit iii cost and revenue
Unit iii cost and revenue4512452
 
E2 a02 unit_v_ foreign trade
E2 a02 unit_v_ foreign tradeE2 a02 unit_v_ foreign trade
E2 a02 unit_v_ foreign trade4512452
 
E2 a02 unit_iv_infrastructure(2)
E2 a02 unit_iv_infrastructure(2)E2 a02 unit_iv_infrastructure(2)
E2 a02 unit_iv_infrastructure(2)4512452
 
E2 a02 unit_iv_infrastructure(1)
E2 a02 unit_iv_infrastructure(1)E2 a02 unit_iv_infrastructure(1)
E2 a02 unit_iv_infrastructure(1)4512452
 
E2 a02 unit_iii_poverty and unemployment
E2 a02 unit_iii_poverty and unemploymentE2 a02 unit_iii_poverty and unemployment
E2 a02 unit_iii_poverty and unemployment4512452
 
E2 a02 unit_ii_population growth and policy
E2 a02 unit_ii_population growth and policyE2 a02 unit_ii_population growth and policy
E2 a02 unit_ii_population growth and policy4512452
 
E2 a02 unit_i_sectoral development in india
E2 a02 unit_i_sectoral development in indiaE2 a02 unit_i_sectoral development in india
E2 a02 unit_i_sectoral development in india4512452
 
Unit v e-banking
Unit v e-bankingUnit v e-banking
Unit v e-banking4512452
 
E5E02 unit_II_Types of Planning
E5E02 unit_II_Types of PlanningE5E02 unit_II_Types of Planning
E5E02 unit_II_Types of Planning4512452
 
E5E02_unit_II_Types of Planning
E5E02_unit_II_Types of PlanningE5E02_unit_II_Types of Planning
E5E02_unit_II_Types of Planning4512452
 
E1A01_Unit III
E1A01_Unit IIIE1A01_Unit III
E1A01_Unit III4512452
 
Sabeshmanikandan
SabeshmanikandanSabeshmanikandan
Sabeshmanikandan4512452
 

More from 4512452 (15)

E6 l01 unit_v_ancient economic thought in india
E6 l01 unit_v_ancient economic thought in indiaE6 l01 unit_v_ancient economic thought in india
E6 l01 unit_v_ancient economic thought in india
 
E6 l01 unit_iv_nce&we
E6 l01 unit_iv_nce&weE6 l01 unit_iv_nce&we
E6 l01 unit_iv_nce&we
 
E1 a01 demand analysis
E1 a01 demand analysisE1 a01 demand analysis
E1 a01 demand analysis
 
Unit iii cost and revenue
Unit iii cost and revenueUnit iii cost and revenue
Unit iii cost and revenue
 
E2 a02 unit_v_ foreign trade
E2 a02 unit_v_ foreign tradeE2 a02 unit_v_ foreign trade
E2 a02 unit_v_ foreign trade
 
E2 a02 unit_iv_infrastructure(2)
E2 a02 unit_iv_infrastructure(2)E2 a02 unit_iv_infrastructure(2)
E2 a02 unit_iv_infrastructure(2)
 
E2 a02 unit_iv_infrastructure(1)
E2 a02 unit_iv_infrastructure(1)E2 a02 unit_iv_infrastructure(1)
E2 a02 unit_iv_infrastructure(1)
 
E2 a02 unit_iii_poverty and unemployment
E2 a02 unit_iii_poverty and unemploymentE2 a02 unit_iii_poverty and unemployment
E2 a02 unit_iii_poverty and unemployment
 
E2 a02 unit_ii_population growth and policy
E2 a02 unit_ii_population growth and policyE2 a02 unit_ii_population growth and policy
E2 a02 unit_ii_population growth and policy
 
E2 a02 unit_i_sectoral development in india
E2 a02 unit_i_sectoral development in indiaE2 a02 unit_i_sectoral development in india
E2 a02 unit_i_sectoral development in india
 
Unit v e-banking
Unit v e-bankingUnit v e-banking
Unit v e-banking
 
E5E02 unit_II_Types of Planning
E5E02 unit_II_Types of PlanningE5E02 unit_II_Types of Planning
E5E02 unit_II_Types of Planning
 
E5E02_unit_II_Types of Planning
E5E02_unit_II_Types of PlanningE5E02_unit_II_Types of Planning
E5E02_unit_II_Types of Planning
 
E1A01_Unit III
E1A01_Unit IIIE1A01_Unit III
E1A01_Unit III
 
Sabeshmanikandan
SabeshmanikandanSabeshmanikandan
Sabeshmanikandan
 

Recently uploaded

Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 

Recently uploaded (20)

Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 

E2 a02 unit_iv_infrastructure(3)

  • 1. Energy Sector in India M. SABESH MANIKANDAN Assistant Professor of Economics Ayya Nadar Janaki Ammal College Sivakasi
  • 2. 1 Introduction Energy: Meaning and pattern of energy consumption in India 2 Types of Energy Conventional and non-conventional, renewable and non-renewable & commercial and non-commercial 3 Energy Sources Power, Thermal, Hydro, wind, tidal, nuclear etc., 4 Energy in India Energy and Economic Development Energy Sector in India
  • 4. energia which means “in work” Greek 01 The capacity to do work and overcome resistances Physics 02 Power or capacity to work Meaning 03 The stored ability to perform work Meaning 04 Introduction
  • 5. the strength and vitality required for sustained physical or mental activity Meaning 05 power derived from the utilization of physical or chemical resources, especially to provide light and heat or to work machines. Meaning 06 No power is costlier than no power Homi Bhava 07 Energy effects favourable change in human – environemntal interraction, involving those things that modern people can advantageously convert, such as teh temperature adn form of certain pysical matter. Nathaniel & Guyol 08 Introduction
  • 6. 2010–11 2011–12 2012 – 13 2013 – 14 2014–15 20317 20843 21498 21607 22465 Percapita Energy Consumption (in peta Joules)
  • 7. Year Energy Consumption (peta joules) Mid year Population (in million) GDP (Rs. In Crore) Per capita energy Consumption (in mega joules) 2005 – 06 14286 1118 3253073 12781 2006 – 07 15519 1134 3564364 13685 2007 – 08 16489 1148 3896636 14368 2008 - 09 17255 1161 4158676 14856 2009 – 10 19544 1175 4516071 16626 2010 – 11 20317 1182 4918533 17187 2011 – 12 20843 1220 5247530 17084 2012 – 13 21498 1235 5482111 17407 2013 – 14 21607 1251 5741791 17272 2014 – 15 22465 1267 10552151 17731 CAGR 4.63 1.26 12.49 3.33 Per capita Energy consumption in India Insert the title of your subtitle Here
  • 8. Year Coal (mn. tn.) Lignite (mn.tn) Crude Oil (mmt) Natural Gas (Billion Cubic Meters) Electricity (GWh) 2005 – 06 433.27 30.24 130.11 36.39 118,818.00 2006 – 07 462.35 30.81 146.55 37.60 132,304.00 2007 – 08 502.82 34.65 156.10 39.80 137,344.00 2008 - 09 549.57 31.85 160.77 39.81 142,576.00 2009 – 10 585.30 34.41 192.77 55.67 125,316.00 2010 – 11 589.87 37.69 196.99 61.18 140,524.00 2011 – 12 642.64 42.77 204.12 59.69 163,000.00 2012 – 13 688.75 46.83 219.21 52.92 146,497.00 2013 – 14 724.18 44.64 222.50 47.67 169,076.00 2014 – 15 827.57 49.57 223.24 48.25 165,346.00 CAGR 6.69 5.07 5.55 2.86 3.36 Energy Consumption in India Source wise energy consumption in India
  • 9. 8.07 8.10 4.99 7.046.46 10.69 Domestic Commercial Traction and Railway OthersAgriculture Industry Expansion of consumer goods, TV, Refrigerator, washing machine etc., Domestic The establishment of new industries - iron & steel machine tools. Engineering fertilizersetc., (only 68%) Industry The demand for power has increased from 4% to 21% Agriculture Business, Trade and commerce Commercial Development of Rail transport Traction and Railway Others Electricity Consumption in India Percentage distribution of sector wise electricity consumption in 2016
  • 11. Is one form of energy, is an essential ingredient of economic development Electricity Industry, agriculture and transport Commercial use Domestic lighting , cooking use of domestic mechanical gadgets – Refrigeratos, air conditioners Non-commercial use ● The per capita annual consumption of electricity in India is one of the lowest in the world at approximately 734 kwh Power & Economic Development ● Power or electricity is one of the most critical components of infrastructure affecting economic growth and well being of nations ● 8 – 9 % of the total GDP Growth rate is sustained by the power sector Electricity Power
  • 12. Year Industry Agriculture Domestic Commercial Traction & Railway Others Total Electricity consumption 2005 – 06 151557 90292 100090 35965 9944 24039 411887 2006 – 07 171293 99023 111002 40220 10800 23411 455749 2007 – 08 189424 104182 120918 46685 11108 59660 501977 2008 - 09 209474 109610 131720 54189 11425 37577 553995 2009 – 10 236752 120209 146080 60600 12408 36595 612645 2010 – 11 272589 131967 169326 67289 14003 39218 694392 2011 – 12 352291 140960 171104 65381 14206 41252 785194 2012 – 13 365989 147462 183700 72794 14100 40256 824301 2013 – 14 384418 152744 199842 74247 15540 47418 874209 2014 – 15 418346 168913 217405 78391 16177 49095 948328 CAGR 10.69 6.49 8.07 8.10 4.99 7.40 8.72 Energy Consumption in India Source wise energy consumption in India
  • 13. Year Utilities Non-utilities Grand Total Thermal Hydro Nuclear Total 2006 88601 32326 3360 124287 21468 145755 2007 93775 34654 3900 132329 22335 154664 2008 103032 35909 4120 143061 24986 168047 2009 106968 36878 4120 147966 26980 174946 2010 117975 36863 4560 159398 28474 187872 2011 131279 37567 4780 173626 32900 206526 2012 156107 38990 4780 199877 39375 239252 2013 179072 39491 4780 223344 43300 266644 2014 199947 40531 4780 245259 42257 287516 2015 224674 41268 5780 271722 44657 316379 CAGR 9.75 2.47 5.57 8.14 7.60 8.06 Installed Generating Capacity of electricity Source wise energy in India
  • 15. Hydro Power Largest hydro electric dam in South Asia. 10,000 – 12, 000 (MW) 10th tallest Dam in the world Tehri Dam USA and Russia in the first China is the second largest dams in the world 3 largest in the world Completed large dams in India 4710
  • 17. Tehri Dam Tehri , Uttrakhand 855ft hight adn 575 mt. Lenght 2400 MW. The Koyna Western Ghats 2nd largest in India 1960MW The Sri Sailam Sri Sailam, Karnool District Andrapradesh 1670 MW The Nathpa Jhakri Himachal Pradesh 1500MW with underground powerstation with water Major Hydro Power projects in India
  • 19. Installed Generating Capacity of electricity Thermal Energy power plant
  • 20. a power plant in which heat energy is converted to electric power Thermal Power Water is heated, turns into steam and spins a steam turbine which drives an electrical generator. Process Nuclear Power ● Thermal electricity generation contributes around 75% of India’s power supply Thermal Power ● Thermal power plants accounted for an overwhelming 71.01% of the total installed capacity in the country
  • 21. Thermal Power Central Government : 28 State Government : 65 Total Units in Plants:431 Private: 37 Western : 41 Norther : 27 Eastern : 36 Southern : 28 Total plants 132 Western : 67029.01 Norther : 40943.50 Eastern : 28892.87 Southern : 30842.50 Power Generation 167707.88 (MW)
  • 22. Mundra Kutch, Gujarat 1st rank in India 4,620MW & 3rd biggest thermal plant also in Gujarat Vindhyachal Thermal Singrauli Madhya Pradesh 2nd biggest 4260MW, Talcher Super Thermal Angul ,Odisha 4th biggest Plant 3,000MW coal-fired power plant Sipat Thermal Power Plant Sipat, Bilaspur Chhattisgarh, 5th biggest plant 2980 MW Major Thermal Power projects in India
  • 24.
  • 25. Electricity wasn’t produced with nuclear energy Until 1951 Splitting atoms and releasing a tremendous amount of heat. Nuclear Energy The heat is used to generate steam which drives a steam turbine connected to an electric generator which produces electricity Process ● Electricity demand increasing tripled and 1287 TWh gross produced in 2014 Nuclear Power ● Nuclear power contributes less than 5% of World's energy production ● The per capita electricity consumption figure – 1000 kWh/yr in 2014 – is expected to double by 2020, with 6.3% annual growth Nuclear Power ● Nuclear reactors produce 20% of the electricity in the USA by 400 power reactors in the world (100 of these are in the USA). ● Energy consumption more than doubled between 1990 and 2011 to nearly 25,000 PJ
  • 26. Nuclear Power Increase from 2.8% to 9 % within 25 years Nuclear power in India No. of Plants: 7 No. of reactor: 21 Installed capacity : 6780MW 4th largest power sector Power generated : 30292Gwh Power Generation 5780 (MW)
  • 27. Year Gross Generation (MUs) Capacity Factor (%) Availability Factor (%) 2010-11 26472 71 89 2011-12 32455 79 91 2012-13 32863 80 90 2013-14 35333 83 88 2014-15 37835 82 88 2015-16 37456 75 77 2016-17 (Upto February - 2017) 34137 79 81 Nuclear Energy in India
  • 29.
  • 30. Renewable energy, together, will supply 12 % of world energy by 2020 World Energy Council The direct sun-rays tapped in photovoltaic cells can be converted into energy. Solar Energy It is a process of converting direct sunlight into electrical energy through semiconductor devices. Process ● In rural areas, the domestic sector accounts for nearly 80 percent of total energy consumption Need for Solar Power ● 2.4 % of land are with 16% of the World’s population. ● Household sector: largest consumer of energy accounting for 40-50 % of total energy consumption Solar Power ● About two thirds of India’s more than 1 billion people live in rural areas ● Life Expectancy 64.71 years
  • 31. Solar Power 1000 watts per square meter 32.8 million MW every second Production possibility Growth : 38 % during 2012 – 2013 Market Size 1. Tamilnadu (1.60GW) 2. Rajastan (1.32 GW) 3. Gujarat (1.16 GW) (2016) Capacity : 9 GW India ranks 3rd in annual production next to Germany, France and Australia Production Capacity
  • 32. 2012 2013 2014 2015 2016 Tata Patapur Odisha 9 MW Sakri solar plant Maharashtra. 125 MW Neemuch Solar Plant Neemuch Madhya Pradesh 151 MW NTPC solar plants (16.6%) INDIA 110 MW Kamuthi Solar Power Project- Tamil Nadu Worlds Second Largest solar Park . 648 MW Major Solar Power Plants
  • 34.
  • 35. Renewable energy, together, will supply 12 % of world energy by 2020 World Energy Council Mechanism of energy conversion from blowing wind The kinetic energy of wind, through turbines is converted into electrical energy Wind Energy Air flow through wind turbines to mechanically power generators for electric power Process ● Indian annual wind power market has grown by almost 68% Scope for Wind Power ● Indian market is emerging as one of the major manufacturing hubs for wind turbines in Asia. ● Muppandal wind farm is the Second largest onshore wind farm in the world. Wind Power ● The states - Tamil Nadu, Maharashtra, Gujarat, Rajasthan, Karnataka, Madhya Pradesh and Andhra Pradesh with highest wind power concentration ● 17 manufacturers have an annual production capacity of 7,500 MW
  • 36. Wind Power 8.6% of the total installed capacity 64.62% of the total renewable energy sources Production Efficiency 70% of Wind energy generated during the month of May – September Season 1. Tamilnadu (4132.72 MW) 2. Maharastra (2077.70 MW) 3. Gujarat (1863.64 MW) 4. Karnataka (1472.75 MW) Capacity:28,871.59 MW India ranks 4th largest installed capacity in the world Production Capacity
  • 37. 2011 2012 2013 2014 2015 18421 MW 20149 MW 21264 MW 23354 MW 26769 MW Wind Power Plants