More Related Content
Similar to Introduction presentation
Similar to Introduction presentation (20)
Introduction presentation
- 4. Critical Air Systems Hospitals Wastewater Treatment Plants Pharmaceutical Buildings Food Processing Facilities
- 16. Impact of Ductwork - Leakage Sealed Pipe Unsealed Duct .562 1500 20.30 1500 Positive Pressure Positive Pressure Leakage L/sec Pa Leakage L/sec Pa 0.378 125 4.73 125 NR 17.16 11.81 7.86 1.50 2500 2500 0.378 1000 1000 0.378 500 500 0.378 250 250
- 18. Impact of Ductwork - Energy Impact of Ductwork - Energy 101% 33.6 12033 1,462 48 36% 22.79 22395 618 24 14% 19.03 9953 286 12 4% 17.4 9668 137 6 0% 16.7 9530 67 3 Class 3 HP Pa Leakage Class % Increase L.S.S L.P.S Leakage
- 19. Impact of Ductwork - Energy Fan loads Conditioned air ‘ R’ Value Indoor Air Quality Energy consumption Operating costs
- 26. Commercial Rectangular Systems Ductmate 25 ’35’ 45’ Sealants & Gaskets PROseal® Gasket Hanging Systems Clutcher™ Access Doors UL timate Door™ Round Duct Connection Systems Spiralmate® Quick-Sleeve Flexible Duct Connectors PROflex™ PROGUARD Easyrod Turning Vane PROrail™ Ductmate Family of Products Pipe & Fittings GreenSeam™
- 33. “ Sandwich Doors” High Pressure / F1 - F2 High Temperature / Insulated / Un-Insulated / Observation / Clean Out / Circular
Editor's Notes
- Our products are designed and manufactured to meet the requirements of each of these associations.
- Our products are designed and manufactured to meet the requirements of each of these associations.
- Australian Boab Tree