Critical Path Analysis for a
     New Product Release
                    Overview
Critical Path Analysis
 • Identifies all the individual activities that make up a larger
   project.
 • Identifies the sequence in which activities have to be
   undertaken.
 • Identifies which activities can only taken place once other
   activities have been completed.
 • Identifies which activities can be undertaken
   simultaneously, thereby reducing the overall time taken to
   complete the whole project.
 • Identifies when certain resources will be needed – for
   example, developing a new product launch.
Critical Path Analysis for a New
Product Release
You are welcome to contact Nigel Bairstow at B2B
Whiteboard your source of B2B Asia / Pacific
marketing advice

http://www.linkedin.com/pub/nigel-bairstow/6/41b/726

http://twitter.com/#!/b2bwhiteboard

More Related Content

What's hot

Project, Program and Portfolio Comparison
Project, Program and Portfolio ComparisonProject, Program and Portfolio Comparison
Project, Program and Portfolio ComparisonRicardo Viana Vargas
 
Difference between PERT and CPM
Difference between PERT and CPMDifference between PERT and CPM
Difference between PERT and CPMMunaf Dayee
 
Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve Satish Yadavalli
 
Project & Project managment
Project & Project managmentProject & Project managment
Project & Project managmentPramod Sharma
 
Project management case study
Project management case studyProject management case study
Project management case study'VD' Vishnu
 
SWOT Analysis
SWOT AnalysisSWOT Analysis
SWOT Analysistutor2u
 
Project Feasibility [DECEMBER 2006]
Project Feasibility [DECEMBER 2006]Project Feasibility [DECEMBER 2006]
Project Feasibility [DECEMBER 2006]Fahad Mahmud Mirza
 
Business Models in the Music Industry
Business Models in the Music IndustryBusiness Models in the Music Industry
Business Models in the Music IndustryCamilla van den Boom
 
Easy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationEasy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationDr. Mahmoud Al-Naimi
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysistutor2u
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
Feasibilty Study And Report
Feasibilty Study And Report Feasibilty Study And Report
Feasibilty Study And Report Ejaz Bhatti
 

What's hot (20)

Project, Program and Portfolio Comparison
Project, Program and Portfolio ComparisonProject, Program and Portfolio Comparison
Project, Program and Portfolio Comparison
 
Difference between PERT and CPM
Difference between PERT and CPMDifference between PERT and CPM
Difference between PERT and CPM
 
Event management
Event managementEvent management
Event management
 
Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve
 
Project & Project managment
Project & Project managmentProject & Project managment
Project & Project managment
 
Chap 4 Defining A Project
Chap 4 Defining A ProjectChap 4 Defining A Project
Chap 4 Defining A Project
 
Project Closing
Project ClosingProject Closing
Project Closing
 
Project management case study
Project management case studyProject management case study
Project management case study
 
SWOT Analysis
SWOT AnalysisSWOT Analysis
SWOT Analysis
 
Project Feasibility [DECEMBER 2006]
Project Feasibility [DECEMBER 2006]Project Feasibility [DECEMBER 2006]
Project Feasibility [DECEMBER 2006]
 
Business Models in the Music Industry
Business Models in the Music IndustryBusiness Models in the Music Industry
Business Models in the Music Industry
 
Project management structures
Project management structuresProject management structures
Project management structures
 
Easy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationEasy steps to network construction and critical path determination
Easy steps to network construction and critical path determination
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysis
 
Project Management for non Project Managers
Project Management for non Project ManagersProject Management for non Project Managers
Project Management for non Project Managers
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
SWOT analysis
SWOT analysisSWOT analysis
SWOT analysis
 
Feasibilty Study And Report
Feasibilty Study And Report Feasibilty Study And Report
Feasibilty Study And Report
 

Viewers also liked

Critical Path Ppt
Critical Path PptCritical Path Ppt
Critical Path PptJeff Hilton
 
ELASTICITY OF DEMAND OF CELL PHONE
ELASTICITY OF DEMAND OF CELL PHONEELASTICITY OF DEMAND OF CELL PHONE
ELASTICITY OF DEMAND OF CELL PHONEleenpaws
 
The Critical Role of Sales Throughout the New Product Development Process
The Critical Role of Sales Throughout the New Product Development ProcessThe Critical Role of Sales Throughout the New Product Development Process
The Critical Role of Sales Throughout the New Product Development ProcessGreg Bonsib
 
Lesson02_new
Lesson02_newLesson02_new
Lesson02_newshengvn
 
Pre-Con Ed: Critical Path Analysis with CA Workload Automation (AE) iDash - O...
Pre-Con Ed: Critical Path Analysis with CA Workload Automation (AE) iDash - O...Pre-Con Ed: Critical Path Analysis with CA Workload Automation (AE) iDash - O...
Pre-Con Ed: Critical Path Analysis with CA Workload Automation (AE) iDash - O...CA Technologies
 
Syam critical path cpa
Syam critical path cpaSyam critical path cpa
Syam critical path cpasyamputra
 
Boeing C-17 Critical Path Tooling ASQ(Oct_11 _R2)
Boeing  C-17 Critical Path Tooling  ASQ(Oct_11 _R2)Boeing  C-17 Critical Path Tooling  ASQ(Oct_11 _R2)
Boeing C-17 Critical Path Tooling ASQ(Oct_11 _R2)Ron Gill
 
Integrated Marketing Communications
Integrated Marketing CommunicationsIntegrated Marketing Communications
Integrated Marketing CommunicationsJeff Hilton
 
Session 4 critical path method upload
Session 4   critical path method uploadSession 4   critical path method upload
Session 4 critical path method uploadArun
 
Lesson in Feasibility Study- Critical Path method, Critical Path Analysis
Lesson in Feasibility Study- Critical Path method, Critical Path AnalysisLesson in Feasibility Study- Critical Path method, Critical Path Analysis
Lesson in Feasibility Study- Critical Path method, Critical Path AnalysisHoly Angel University
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysissimu_mihai
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path AnalysisDavid Zaki
 
Year 12 Maths A Textbook - Chapter 8
Year 12 Maths A Textbook - Chapter 8Year 12 Maths A Textbook - Chapter 8
Year 12 Maths A Textbook - Chapter 8westy67968
 

Viewers also liked (20)

Critical path method
Critical path methodCritical path method
Critical path method
 
Critical Path Ppt
Critical Path PptCritical Path Ppt
Critical Path Ppt
 
Critical Path Method(CPM)
Critical Path Method(CPM)Critical Path Method(CPM)
Critical Path Method(CPM)
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
ELASTICITY OF DEMAND OF CELL PHONE
ELASTICITY OF DEMAND OF CELL PHONEELASTICITY OF DEMAND OF CELL PHONE
ELASTICITY OF DEMAND OF CELL PHONE
 
The Critical Role of Sales Throughout the New Product Development Process
The Critical Role of Sales Throughout the New Product Development ProcessThe Critical Role of Sales Throughout the New Product Development Process
The Critical Role of Sales Throughout the New Product Development Process
 
Lesson02_new
Lesson02_newLesson02_new
Lesson02_new
 
Pre-Con Ed: Critical Path Analysis with CA Workload Automation (AE) iDash - O...
Pre-Con Ed: Critical Path Analysis with CA Workload Automation (AE) iDash - O...Pre-Con Ed: Critical Path Analysis with CA Workload Automation (AE) iDash - O...
Pre-Con Ed: Critical Path Analysis with CA Workload Automation (AE) iDash - O...
 
Syam critical path cpa
Syam critical path cpaSyam critical path cpa
Syam critical path cpa
 
Boeing C-17 Critical Path Tooling ASQ(Oct_11 _R2)
Boeing  C-17 Critical Path Tooling  ASQ(Oct_11 _R2)Boeing  C-17 Critical Path Tooling  ASQ(Oct_11 _R2)
Boeing C-17 Critical Path Tooling ASQ(Oct_11 _R2)
 
Integrated Marketing Communications
Integrated Marketing CommunicationsIntegrated Marketing Communications
Integrated Marketing Communications
 
Network Anaysis_ critical path methods
Network Anaysis_ critical path methodsNetwork Anaysis_ critical path methods
Network Anaysis_ critical path methods
 
Bpp 3213 lecture 2
Bpp 3213 lecture 2Bpp 3213 lecture 2
Bpp 3213 lecture 2
 
Session 4 critical path method upload
Session 4   critical path method uploadSession 4   critical path method upload
Session 4 critical path method upload
 
Lesson in Feasibility Study- Critical Path method, Critical Path Analysis
Lesson in Feasibility Study- Critical Path method, Critical Path AnalysisLesson in Feasibility Study- Critical Path method, Critical Path Analysis
Lesson in Feasibility Study- Critical Path method, Critical Path Analysis
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysis
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysis
 
Year 12 Maths A Textbook - Chapter 8
Year 12 Maths A Textbook - Chapter 8Year 12 Maths A Textbook - Chapter 8
Year 12 Maths A Textbook - Chapter 8
 
Pictographs
PictographsPictographs
Pictographs
 
5. entr lesson 13
5. entr   lesson 135. entr   lesson 13
5. entr lesson 13
 

Similar to Critical Path Analysis for a New Product Release

Products and Value: An Agile Perspective BY Matt Nudelmann (GUEST PRESENTER)
Products and Value: An Agile Perspective BY Matt Nudelmann (GUEST PRESENTER)Products and Value: An Agile Perspective BY Matt Nudelmann (GUEST PRESENTER)
Products and Value: An Agile Perspective BY Matt Nudelmann (GUEST PRESENTER)Samuel Chin, PMP, CSM
 
New Product Development
New Product DevelopmentNew Product Development
New Product DevelopmentLinda Gorchels
 
A Repeatable Project Management Methodology
A Repeatable Project Management MethodologyA Repeatable Project Management Methodology
A Repeatable Project Management MethodologyShaun Smith, MSPM, PMP
 
feasibility study and idea alanysis-- semi 1
feasibility study and idea alanysis-- semi 1feasibility study and idea alanysis-- semi 1
feasibility study and idea alanysis-- semi 1Mohammed Ghorab
 
Product planning
Product planningProduct planning
Product planningKavin P
 
How to take the stress out of writing case studies
How to take the stress out of writing case studiesHow to take the stress out of writing case studies
How to take the stress out of writing case studiesDesignHammer
 
Project Analysis and Appraisal.pdf
Project Analysis and Appraisal.pdfProject Analysis and Appraisal.pdf
Project Analysis and Appraisal.pdfZelalemGizachew5
 
Feasibility study
Feasibility studyFeasibility study
Feasibility studyartipradhan
 
Improving Your Government Proposals' Pwin Part 3: Rethink Your BD Processes
Improving Your Government Proposals' Pwin Part 3: Rethink Your BD ProcessesImproving Your Government Proposals' Pwin Part 3: Rethink Your BD Processes
Improving Your Government Proposals' Pwin Part 3: Rethink Your BD ProcessesOST Global Solutions
 
How to take the stress out of writing case studies
How to take the stress out of writing case studiesHow to take the stress out of writing case studies
How to take the stress out of writing case studiesDesignHammer
 
Agile Project Management By Professor Lili Saghafi
Agile Project Management By Professor Lili Saghafi Agile Project Management By Professor Lili Saghafi
Agile Project Management By Professor Lili Saghafi Professor Lili Saghafi
 
Introduction to Business Analysis
Introduction to Business AnalysisIntroduction to Business Analysis
Introduction to Business AnalysisMihika-QA
 
Interactive activity I
Interactive activity IInteractive activity I
Interactive activity IPamela Maurat
 
Introduction to Business Analysis
Introduction to Business Analysis Introduction to Business Analysis
Introduction to Business Analysis Sunil-QA
 
Introduction to Business Analysis
Introduction to Business AnalysisIntroduction to Business Analysis
Introduction to Business AnalysisShwetha-BA
 

Similar to Critical Path Analysis for a New Product Release (20)

MPA-209-Intro 1st Sem 2023
MPA-209-Intro 1st Sem 2023MPA-209-Intro 1st Sem 2023
MPA-209-Intro 1st Sem 2023
 
Products and Value: An Agile Perspective BY Matt Nudelmann (GUEST PRESENTER)
Products and Value: An Agile Perspective BY Matt Nudelmann (GUEST PRESENTER)Products and Value: An Agile Perspective BY Matt Nudelmann (GUEST PRESENTER)
Products and Value: An Agile Perspective BY Matt Nudelmann (GUEST PRESENTER)
 
Chapter 1.pptx
Chapter 1.pptxChapter 1.pptx
Chapter 1.pptx
 
New Product Development
New Product DevelopmentNew Product Development
New Product Development
 
Product Planning
Product PlanningProduct Planning
Product Planning
 
A Repeatable Project Management Methodology
A Repeatable Project Management MethodologyA Repeatable Project Management Methodology
A Repeatable Project Management Methodology
 
feasibility study and idea alanysis-- semi 1
feasibility study and idea alanysis-- semi 1feasibility study and idea alanysis-- semi 1
feasibility study and idea alanysis-- semi 1
 
Product planning
Product planningProduct planning
Product planning
 
How to take the stress out of writing case studies
How to take the stress out of writing case studiesHow to take the stress out of writing case studies
How to take the stress out of writing case studies
 
Project Analysis and Appraisal.pdf
Project Analysis and Appraisal.pdfProject Analysis and Appraisal.pdf
Project Analysis and Appraisal.pdf
 
Feasibility study
Feasibility studyFeasibility study
Feasibility study
 
Improving Your Government Proposals' Pwin Part 3: Rethink Your BD Processes
Improving Your Government Proposals' Pwin Part 3: Rethink Your BD ProcessesImproving Your Government Proposals' Pwin Part 3: Rethink Your BD Processes
Improving Your Government Proposals' Pwin Part 3: Rethink Your BD Processes
 
Business case writing presentation
Business case writing presentationBusiness case writing presentation
Business case writing presentation
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
 
How to take the stress out of writing case studies
How to take the stress out of writing case studiesHow to take the stress out of writing case studies
How to take the stress out of writing case studies
 
Agile Project Management By Professor Lili Saghafi
Agile Project Management By Professor Lili Saghafi Agile Project Management By Professor Lili Saghafi
Agile Project Management By Professor Lili Saghafi
 
Introduction to Business Analysis
Introduction to Business AnalysisIntroduction to Business Analysis
Introduction to Business Analysis
 
Interactive activity I
Interactive activity IInteractive activity I
Interactive activity I
 
Introduction to Business Analysis
Introduction to Business Analysis Introduction to Business Analysis
Introduction to Business Analysis
 
Introduction to Business Analysis
Introduction to Business AnalysisIntroduction to Business Analysis
Introduction to Business Analysis
 

More from Asia Pacific Marketing Institute

More from Asia Pacific Marketing Institute (20)

Doing Business in Australia - Module 1
Doing Business in Australia - Module 1Doing Business in Australia - Module 1
Doing Business in Australia - Module 1
 
Pestle (Environmental analysis) - overview
Pestle  (Environmental analysis)  - overviewPestle  (Environmental analysis)  - overview
Pestle (Environmental analysis) - overview
 
Eight point business plan
Eight point business planEight point business plan
Eight point business plan
 
Business model template - overview
Business model template  -  overviewBusiness model template  -  overview
Business model template - overview
 
Australia at a glance
Australia at a glanceAustralia at a glance
Australia at a glance
 
10 Key Benefits of Local Marketing
10 Key Benefits of Local Marketing10 Key Benefits of Local Marketing
10 Key Benefits of Local Marketing
 
Australian social media trends 2011
Australian social media trends 2011Australian social media trends 2011
Australian social media trends 2011
 
Twenty Two Qualitative Data Methods
Twenty Two Qualitative Data MethodsTwenty Two Qualitative Data Methods
Twenty Two Qualitative Data Methods
 
Positive intelligence
Positive intelligencePositive intelligence
Positive intelligence
 
Neuromarketing
NeuromarketingNeuromarketing
Neuromarketing
 
Power of Public Relations
Power of Public RelationsPower of Public Relations
Power of Public Relations
 
Business Relationship Marriage Metaphors
Business Relationship Marriage MetaphorsBusiness Relationship Marriage Metaphors
Business Relationship Marriage Metaphors
 
B2B Strategy Making and Planning
B2B Strategy Making and PlanningB2B Strategy Making and Planning
B2B Strategy Making and Planning
 
Nostalgia in Marketing
Nostalgia in MarketingNostalgia in Marketing
Nostalgia in Marketing
 
Emotions in Marketing
Emotions in MarketingEmotions in Marketing
Emotions in Marketing
 
IMC Media Strategy Implementation
IMC Media Strategy ImplementationIMC Media Strategy Implementation
IMC Media Strategy Implementation
 
Market Segmentation and Positioning
Market Segmentation and PositioningMarket Segmentation and Positioning
Market Segmentation and Positioning
 
Marketing Communication Process
Marketing Communication ProcessMarketing Communication Process
Marketing Communication Process
 
Power Brands
Power BrandsPower Brands
Power Brands
 
The Role of Integrated Marketing Communications
The Role of Integrated Marketing CommunicationsThe Role of Integrated Marketing Communications
The Role of Integrated Marketing Communications
 

Recently uploaded

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024The Digital Insurer
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...apidays
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 

Recently uploaded (20)

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 

Critical Path Analysis for a New Product Release

  • 1. Critical Path Analysis for a New Product Release Overview
  • 2. Critical Path Analysis • Identifies all the individual activities that make up a larger project. • Identifies the sequence in which activities have to be undertaken. • Identifies which activities can only taken place once other activities have been completed. • Identifies which activities can be undertaken simultaneously, thereby reducing the overall time taken to complete the whole project. • Identifies when certain resources will be needed – for example, developing a new product launch.
  • 3. Critical Path Analysis for a New Product Release
  • 4. You are welcome to contact Nigel Bairstow at B2B Whiteboard your source of B2B Asia / Pacific marketing advice http://www.linkedin.com/pub/nigel-bairstow/6/41b/726 http://twitter.com/#!/b2bwhiteboard