 Average person consumes no more than 5 to 8
lit. of water per day.
 However total water drawn from public water
supply is quite high.
 Types of demand
1. Residential or domestic
2. Institutional use
3. Public or civic use
4. Industrial use
5. Water system loses
 Water is needed for
- Drinking
- Cooking
- Bathing
- Washing of cloths
- Washing of utensils
- Washing of house
S.NO. Description Amount of water in Ipcd
1 Bathing 55
2 Washing of cloths 20
3 Flushing of WCs 30
4 Washing of house 10
5 Washing of utensils 10
6 Cooking 05
7 Drinking 05
Total 135
S.NO. institution Water Req.
(lit/head/day)
1 Hospitals 340 or 450 per bed
2 Hotels 180 per bed
3 Hostels 135
4 Boarding schools & collages 135
5 Restaurants 70 per seat
6 Airport & Seaport 70
7 Terminal stations 45
8 Day schools & collages 45
9 Offices 45
10 Cinema, concert hall & theater 15
11 Factories 45
12 Junction station 70
- Road washing =5 lit/cap/day
- Sanitation =3 to 5 lpcd
- Public parks =2 to 3 lpcd
- Fire fighting = calculated by various formulae
- P = Population in thousands
- Q = Quantity of water in Lit/min
- F = number of simultaneous fire stream
S.NO. Authority Formulae
1 American insurance
association
Q(L/min) = 4637 P^1/2
(1-0.01 P^1/2)
2 Kuchling’s formula Q(L/min) =3182 P^1/2
3 Freeman formula Q(L/min) = 1136(P/5+10)
& F= 2.8 P^1/2
4 Ministry of urban
developmently manual
formula
Q (kilo lit/d) = 100 P^1/2
For P > 50000
5 Buston’s formula 5663 P^1/2
S.NO. Industry Unit of production Water Req. in
kilolitre per
unit
1 Automobile Vehicle 40
2 Distillary Kilolitre (proof alcohol) 122-170
3 Fertilizer Tonne 80-200
4 Leather 100 kg (tonne) 4
5 Paper Toone 200-400
6 Special quality paper Toone 400-1000
7 Straw board Tonne 70-100
8 Petroleum Tonne (crude) 1.5-2.0
9 Steel Tonne 200-205
10 Sugar Tonne (cane crushed) 1-2
11 Textile 100 kg (goods) 8-14
 Leakages & overflows from reservoirs.
 Leakages from main & service pipe
connection.
 Leakages & losses on consumer premises.
 Leakages & losses from public taps.
 Under registration of water meters
(water thefts)
 Size of the city : per capita demand for big
cities is generally large as compared to that for
smaller towns as big cities have sewered
houses.
 Presence of industries : more the industries
more will be the water required.
 Climatic condition : in winter seasons lesser
water demand & in summer season water
demand is more.
 Quality of water : If water is aesthetically &
medically safe, the consumption will increase as
people will not resort to private wells, etc.
 Pressure in the distribution system : more pressure
more will be demand & vice versa.
 Efficiency of water work administration : Leaks in
water mains & services & unauthorised use of
water can be kept to a minimum by surveys.
 Policy of metering & charging method : water tax
is charged in two different ways on the basis of
meter reading & on the basis of certain fixed
monthly rate.
 System of supply : continuous system increase
water use whereas intermittent system
 The demand peaks
during summer,
Firebreak outs are
generally more in
summer, Increasing
demand. So , there is
seasonal variation.
 Hourly variations are very
important as they have a
wide range. During active
household working hours
i.e. from six to ten in the
morning & four to eight in
the evening, the bulk of the
daily req. is taken. During
other hours the req. is
negligible. Moreover, if a
fire breaks out, a huge
quantity of water is req. to
be supplied during short
duration, necessitating the
need for a maximum rate of
hourly supply.
WATER DEMAND

More Related Content

What's hot

Water demand and factor affecting water demand
Water demand and factor affecting water demandWater demand and factor affecting water demand
Water demand and factor affecting water demand
Ankit Gola
 

What's hot (20)

Introduction, water demand
Introduction, water demandIntroduction, water demand
Introduction, water demand
 
water quality, water demands
water quality, water demandswater quality, water demands
water quality, water demands
 
Sewerage System
Sewerage SystemSewerage System
Sewerage System
 
L 2 sources and water supply schemes
L 2 sources and water supply schemesL 2 sources and water supply schemes
L 2 sources and water supply schemes
 
Sewer appurtenances
Sewer appurtenancesSewer appurtenances
Sewer appurtenances
 
Sewerage network
Sewerage networkSewerage network
Sewerage network
 
Pipe water distribution system2
Pipe water distribution system2Pipe water distribution system2
Pipe water distribution system2
 
Sewer appurtenances
Sewer appurtenancesSewer appurtenances
Sewer appurtenances
 
P.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyP.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish Pandey
 
Laying, jointing and testing of pipes
Laying, jointing and testing of pipesLaying, jointing and testing of pipes
Laying, jointing and testing of pipes
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply scheme
 
Water demand and factor affecting water demand
Water demand and factor affecting water demandWater demand and factor affecting water demand
Water demand and factor affecting water demand
 
Sewer Design
Sewer Design Sewer Design
Sewer Design
 
water supply scheme
water supply schemewater supply scheme
water supply scheme
 
Rural water supply
Rural water supplyRural water supply
Rural water supply
 
03 water sources-development-intake works
03 water sources-development-intake works03 water sources-development-intake works
03 water sources-development-intake works
 
Water Appurtenances
Water AppurtenancesWater Appurtenances
Water Appurtenances
 
02 Types of Intake Structures
02 Types of Intake Structures02 Types of Intake Structures
02 Types of Intake Structures
 
CANAL REGULATIONS
CANAL REGULATIONSCANAL REGULATIONS
CANAL REGULATIONS
 
Rainwater harvesting by dnp
Rainwater harvesting by dnpRainwater harvesting by dnp
Rainwater harvesting by dnp
 

Similar to WATER DEMAND

Packaged water plant sandeep gupta
Packaged water plant sandeep guptaPackaged water plant sandeep gupta
Packaged water plant sandeep gupta
ANIKET KULKARNI
 

Similar to WATER DEMAND (20)

L 3 and l-4 water demand
L 3  and l-4 water demandL 3  and l-4 water demand
L 3 and l-4 water demand
 
Water resource treatment
Water resource treatmentWater resource treatment
Water resource treatment
 
Lec 2.pptx
Lec 2.pptxLec 2.pptx
Lec 2.pptx
 
Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1
 
Quality and quantity of water m1
Quality and quantity of water m1Quality and quantity of water m1
Quality and quantity of water m1
 
Water requirements
Water requirementsWater requirements
Water requirements
 
Packaged water plant sandeep gupta
Packaged water plant sandeep guptaPackaged water plant sandeep gupta
Packaged water plant sandeep gupta
 
03 Water Demand
03 Water Demand03 Water Demand
03 Water Demand
 
Water supply and treatment Engineering notes 18 cv46
Water supply and treatment Engineering notes 18 cv46Water supply and treatment Engineering notes 18 cv46
Water supply and treatment Engineering notes 18 cv46
 
Environmental engineering
Environmental engineeringEnvironmental engineering
Environmental engineering
 
Water Conservation
Water ConservationWater Conservation
Water Conservation
 
Quality & quantity of water
Quality & quantity of waterQuality & quantity of water
Quality & quantity of water
 
Water requirements
Water requirementsWater requirements
Water requirements
 
water supply and treatment introductions
water supply and treatment introductionswater supply and treatment introductions
water supply and treatment introductions
 
unit 1 EEppc
unit 1 EEppc unit 1 EEppc
unit 1 EEppc
 
module I.docx
module I.docxmodule I.docx
module I.docx
 
Water Supply System: water treatment, storage and supply.pptx
Water Supply System: water treatment, storage and supply.pptxWater Supply System: water treatment, storage and supply.pptx
Water Supply System: water treatment, storage and supply.pptx
 
Sources, intake structures and water demand in Water Supply Schemes
  Sources, intake structures and water demand in Water Supply Schemes   Sources, intake structures and water demand in Water Supply Schemes
Sources, intake structures and water demand in Water Supply Schemes
 
introduction to water supply planning
introduction to water supply planning introduction to water supply planning
introduction to water supply planning
 
2 domestic water requirements
2 domestic water requirements2 domestic water requirements
2 domestic water requirements
 

Recently uploaded

Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
Kamal Acharya
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
Atif Razi
 

Recently uploaded (20)

Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 

WATER DEMAND

  • 2.  Average person consumes no more than 5 to 8 lit. of water per day.  However total water drawn from public water supply is quite high.  Types of demand 1. Residential or domestic 2. Institutional use 3. Public or civic use 4. Industrial use 5. Water system loses
  • 3.  Water is needed for - Drinking - Cooking - Bathing - Washing of cloths - Washing of utensils - Washing of house
  • 4. S.NO. Description Amount of water in Ipcd 1 Bathing 55 2 Washing of cloths 20 3 Flushing of WCs 30 4 Washing of house 10 5 Washing of utensils 10 6 Cooking 05 7 Drinking 05 Total 135
  • 5. S.NO. institution Water Req. (lit/head/day) 1 Hospitals 340 or 450 per bed 2 Hotels 180 per bed 3 Hostels 135 4 Boarding schools & collages 135 5 Restaurants 70 per seat 6 Airport & Seaport 70 7 Terminal stations 45 8 Day schools & collages 45 9 Offices 45 10 Cinema, concert hall & theater 15 11 Factories 45 12 Junction station 70
  • 6. - Road washing =5 lit/cap/day - Sanitation =3 to 5 lpcd - Public parks =2 to 3 lpcd - Fire fighting = calculated by various formulae - P = Population in thousands - Q = Quantity of water in Lit/min - F = number of simultaneous fire stream
  • 7. S.NO. Authority Formulae 1 American insurance association Q(L/min) = 4637 P^1/2 (1-0.01 P^1/2) 2 Kuchling’s formula Q(L/min) =3182 P^1/2 3 Freeman formula Q(L/min) = 1136(P/5+10) & F= 2.8 P^1/2 4 Ministry of urban developmently manual formula Q (kilo lit/d) = 100 P^1/2 For P > 50000 5 Buston’s formula 5663 P^1/2
  • 8. S.NO. Industry Unit of production Water Req. in kilolitre per unit 1 Automobile Vehicle 40 2 Distillary Kilolitre (proof alcohol) 122-170 3 Fertilizer Tonne 80-200 4 Leather 100 kg (tonne) 4 5 Paper Toone 200-400 6 Special quality paper Toone 400-1000 7 Straw board Tonne 70-100 8 Petroleum Tonne (crude) 1.5-2.0 9 Steel Tonne 200-205 10 Sugar Tonne (cane crushed) 1-2 11 Textile 100 kg (goods) 8-14
  • 9.  Leakages & overflows from reservoirs.  Leakages from main & service pipe connection.  Leakages & losses on consumer premises.  Leakages & losses from public taps.  Under registration of water meters (water thefts)
  • 10.  Size of the city : per capita demand for big cities is generally large as compared to that for smaller towns as big cities have sewered houses.  Presence of industries : more the industries more will be the water required.  Climatic condition : in winter seasons lesser water demand & in summer season water demand is more.
  • 11.  Quality of water : If water is aesthetically & medically safe, the consumption will increase as people will not resort to private wells, etc.  Pressure in the distribution system : more pressure more will be demand & vice versa.  Efficiency of water work administration : Leaks in water mains & services & unauthorised use of water can be kept to a minimum by surveys.  Policy of metering & charging method : water tax is charged in two different ways on the basis of meter reading & on the basis of certain fixed monthly rate.  System of supply : continuous system increase water use whereas intermittent system
  • 12.  The demand peaks during summer, Firebreak outs are generally more in summer, Increasing demand. So , there is seasonal variation.
  • 13.  Hourly variations are very important as they have a wide range. During active household working hours i.e. from six to ten in the morning & four to eight in the evening, the bulk of the daily req. is taken. During other hours the req. is negligible. Moreover, if a fire breaks out, a huge quantity of water is req. to be supplied during short duration, necessitating the need for a maximum rate of hourly supply.