WATER SUPPLY PLANNING
It generally consist of :
1. Collection Works
2. Purification Works
3. Transmission Works
4. Distribution Works
Collection Works:
Tape water continuously adequate in volume for present &
reasonable future demands. OR
Convert an intermittently (from time to time) insufficient
source into a continuous adequate supply.
2
WATER SUPPLY PLANNING
Purification Works:
When the quality of raw water collected is not satisfactory,
purification works are introduced to render (purify) it,
suitable for its intended use.
Transmission Works:
To convey the collected and purified waters to the
community.
Distribution Works:
To supply treated water to the consumers in the desired
quantity and at adequate pressures. 3
WATER DEMAND
It is necessary to find total quantity of water (Q) required
for various purposes by the city for the design of water
supply scheme.
 Duty of engineer is to find “Q” & suitable water source.
 For design of water supply scheme: Determine total
yearly demand variations in the demand rates.
 The actual demand can be found by certain empirical
formulas and thumb rule.
4
ESTIMATION OF DEMAND FOR WATER SUPPLY
1. Design period
2. Design population (population forecasting)
3. Design flow ( or per capita consumption)
4. Design area
1. Design Period:
It is the number of years in future for which the excess
capacity is provided, the proposed system, its component
structures and equipment's are to be adequate.
(Excess capacity = Use larger pipe diameter in advance)
5
ESTIMATION OF DEMAND FOR WATER SUPPLY
Selection of design period :
1. Physical (useful) life of structure
2. Ease or difficulty of extension of facility
3. Rate of growth of population
4. Rate of interest on the borrowed money
5. Lead time (i.e. time from execution to completion of a
project)
6. Economies of scale “a” (i.e. profit)
6
ESTIMATION OF DEMAND FOR WATER SUPPLY
2. Design Population:
It is the number of people to be served in future. Increases
in the demand on a water supply system over a period of
years result from;
I. Population growth
II. Increase per capita consumption
III. Industrial development
Since it would be uneconomical & impracticable to augment
(expand) the system year by year to meet the growing
demand. 7
ESTIMATION OF DEMAND FOR WATER SUPPLY
Design Population:
Therefore each component is designed to satisfy the
estimated demand at the end of design period. In the early
part of the period , some of the components will therefore
not be operating at their full capacity.
Long design periods (50 yrs) are suitable for dams, tunnels
and large canal's which are difficult to enlarge. Short design
periods (i.e. 10 – 30 yrs) are suitable for pumps, pipelines ,
treatment plants and wells; which can be duplicated,
replaced or extended more easily.
8
ESTIMATION OF DEMAND FOR WATER SUPPLY
3. Design Flow: (lpcd or gpcd)
It is the rate of water flow in terms of “per capita
consumption”. It is annual average quantity of daily water
required by a person.
It is based on complete one year supply of water.
4. Design Area:
It is the area to be served in future. Eg. Recreational area
(zoo, parks) , residential area, commercial and industrial
area. 9
TYPES OF DEMAND
1. Domestic water demand (44%)
2. Commercial (15%) and industrial (24%) demand
3. Demand for public use (9%)
4. Loss and waste (8%)
5. Fire demand
10
DOMESTIC WATER DEMAND
It includes water for drinking, bathing, cooking &
washing. It depends upon habits, social status, climatic
conditions and customs of people.
In Pakistan average domestic consumption is 125 lpcd.
For developing countries it is 350 lpcd.
11
COMMERCIAL & INDUSTRIAL DEMAND
Commercial centers : water requirement is 45 lpcd.
 Office building
 Stores and hotels
 Shopping centers
 Schools, cinema houses
 Mosques, railway and bus stations.
Industrial demand is 20 – 25 % of total demand.
12
Public Use:
Water furnished to public buildings and used for public
services. Water for buildings, sprinkling and cleaning of
roads, sewers, public parks, gardens and fire protection etc.
It is 9 % of total demand.
Loss and Waste:
Water which is “unaccounted for” in the sense that it is not
assigned to a specific user.
Unaccounted for water is due to errors in meter readings,
unauthorized connections, and leaks in the distribution
system.
13
TYPES OF DEMAND
FIRE DEMAND (F)
 It is the total amount of water in a year to turn off fire.
 The actual amount of water used for fire fighting in a
year is small, the rate of use is high.
 However during a fire, the rate of demand increases.
Thus, it will effect the capacity of pumps, reservoirs and
distribution pipes.
 F is defined as the quantity of water required to turn off
the largest possible fire in the area.
14
FIRE DEMAND
 It can be found from:
 Minimum number of streams ( 5 at least)
 Discharge (Q) through each stream (200 – 250 gpm)
 Duration of fire (at least 4 hours)
 No. of simultaneous fires.
 F is function of population (p).
 Low risk areas – P ≤ 2500 duration of fire:4-5hrs
 High risk areas - P > 2500 duration of fire:10 hrs
15
EMPIRICAL FORMULA FOR FIRE DEMAND
1. National board of fire under-writers formula (NBFU):
 𝑄 = 1020 𝑃( 1 − 0.01 √𝑃)
 Q is fire flow / demand in gpm.
 P is population in 1000’s.
2. Insurance services office (ISO) formula:
 F = 18 C√A
 F = Required fire flow in gallon/min or gpm or l/min/3.78
 A = Floor area (ft2) excluding basement (m2 * 10.76)
 C = Co-efficient related to type of construction
16
Type of construction Value of C
Wooden frame structure 1.5
Ordinary frame structure 1
Non combustible structure 0.8
Fire resistant structure 0.6
EMPIRICAL FORMULA FOR FIRE DEMAND
4. Kuichling Formula:
It is based on fire stream flow of 250 gpm.
𝑄 = 750√P
Q in gpm
P in 1000’s
5. Freeman’s Formula:
𝑄 = 250
𝑃
5
+ 10
Q in gpm
17
FIRE DEMAND PROBLEMS
1) Calculate the fire demand of water for a town having a
population of 81,000 by National Board of Fire
underwriters formula?
Required: Q = ?
Solution:
𝑄 = 1020 𝑃( 1 − 0.01 √𝑃)
= 1020 81 ( 1 - 0.01 √81)
= 1020 * 9 ( 1 - 0.01 * 9)
Q = 8354 gpm
18
FACTORS AFFECTING WATER USE
1. Size of city
2. Climatic conditions (summer = increase in water use)
3. Characteristics of population
4. Industrial & commercial activities
5. Quality of water (good quality = high use of water)
6. Pressure (high pressure = greater use)
7. System of water supply ( good system maintenance =
reduce loss & waste)
8. Cost of water (high price = reduce water use)
9. Metering (it reduce water consumption)
19
THE END
20

More Related Content

What's hot

Methods Of Flood Control1274
Methods Of Flood Control1274Methods Of Flood Control1274
Methods Of Flood Control1274
whiskeyhj
 
Water demand
Water demandWater demand
Water demand
Mood Naik
 
water supply scheme
water supply schemewater supply scheme
water supply scheme
sunil9666
 
Water demand and factor affecting water demand
Water demand and factor affecting water demandWater demand and factor affecting water demand
Water demand and factor affecting water demand
Ankit Gola
 
5 Reservoir Planning
5 Reservoir Planning5 Reservoir Planning
5 Reservoir Planning
pradeepkumawat4142
 
Introduction, water demand
Introduction, water demandIntroduction, water demand
Introduction, water demand
GARRE RAVI KUMAR
 
water supply Project theory
water supply Project theorywater supply Project theory
water supply Project theory
Madhav Parajuli
 
Public Health Engineering - Concepts Regarding Water
Public Health Engineering - Concepts Regarding WaterPublic Health Engineering - Concepts Regarding Water
Public Health Engineering - Concepts Regarding Water
Waleed Liaqat
 
P.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyP.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish Pandey
Manish Pandey
 
Sewer Design
Sewer Design Sewer Design
Sewer Design
Tej Binod Pandey
 
Ce 401 introduction to environmental engineering
Ce 401 introduction to environmental engineeringCe 401 introduction to environmental engineering
Ce 401 introduction to environmental engineering
Muhammad Nouman
 
Unit hydrograph by anwar
Unit hydrograph by anwarUnit hydrograph by anwar
Unit hydrograph by anwar
Muhammad Anwar
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
Sunny Agarwal
 
Dam safety
Dam safetyDam safety
Dam safety
Preeti Rashmi
 
Water demand
Water demandWater demand
Water demand
Riya2001998
 
Intake structures-Introduction
Intake structures-IntroductionIntake structures-Introduction
Intake structures-Introduction
Deepak Paithankar
 
Introduction to River Engineering
Introduction to River EngineeringIntroduction to River Engineering
Introduction to River Engineering
ManamnoBeza1
 
desposal by dilution
desposal by dilutiondesposal by dilution
desposal by dilution
Ankit Gola
 
Hydraulic design of sewer
Hydraulic design of sewerHydraulic design of sewer
Hydraulic design of sewer
Bibhabasu Mohanty
 
Reservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentationReservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentation
Pramoda Raj
 

What's hot (20)

Methods Of Flood Control1274
Methods Of Flood Control1274Methods Of Flood Control1274
Methods Of Flood Control1274
 
Water demand
Water demandWater demand
Water demand
 
water supply scheme
water supply schemewater supply scheme
water supply scheme
 
Water demand and factor affecting water demand
Water demand and factor affecting water demandWater demand and factor affecting water demand
Water demand and factor affecting water demand
 
5 Reservoir Planning
5 Reservoir Planning5 Reservoir Planning
5 Reservoir Planning
 
Introduction, water demand
Introduction, water demandIntroduction, water demand
Introduction, water demand
 
water supply Project theory
water supply Project theorywater supply Project theory
water supply Project theory
 
Public Health Engineering - Concepts Regarding Water
Public Health Engineering - Concepts Regarding WaterPublic Health Engineering - Concepts Regarding Water
Public Health Engineering - Concepts Regarding Water
 
P.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyP.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish Pandey
 
Sewer Design
Sewer Design Sewer Design
Sewer Design
 
Ce 401 introduction to environmental engineering
Ce 401 introduction to environmental engineeringCe 401 introduction to environmental engineering
Ce 401 introduction to environmental engineering
 
Unit hydrograph by anwar
Unit hydrograph by anwarUnit hydrograph by anwar
Unit hydrograph by anwar
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Dam safety
Dam safetyDam safety
Dam safety
 
Water demand
Water demandWater demand
Water demand
 
Intake structures-Introduction
Intake structures-IntroductionIntake structures-Introduction
Intake structures-Introduction
 
Introduction to River Engineering
Introduction to River EngineeringIntroduction to River Engineering
Introduction to River Engineering
 
desposal by dilution
desposal by dilutiondesposal by dilution
desposal by dilution
 
Hydraulic design of sewer
Hydraulic design of sewerHydraulic design of sewer
Hydraulic design of sewer
 
Reservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentationReservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentation
 

Similar to introduction to water supply planning

water supply and treatment introductions
water supply and treatment introductionswater supply and treatment introductions
water supply and treatment introductions
mentwabeasiratu21
 
L 3 and l-4 water demand
L 3  and l-4 water demandL 3  and l-4 water demand
L 3 and l-4 water demand
Dr. shrikant jahagirdar
 
chapter 1 - part 1.pptx
chapter 1 - part 1.pptxchapter 1 - part 1.pptx
chapter 1 - part 1.pptx
abdi977630
 
Chapter 1..Water Demand (1) examples.pptx
Chapter 1..Water Demand (1) examples.pptxChapter 1..Water Demand (1) examples.pptx
Chapter 1..Water Demand (1) examples.pptx
Heniyit
 
Lec 2.pptx
Lec 2.pptxLec 2.pptx
Lec 2.pptx
mrunmayee20
 
unit 1 EEppc
unit 1 EEppc unit 1 EEppc
unit 1 EEppc
GokulKannan194051
 
L1 - Introduction.ppt
L1 - Introduction.pptL1 - Introduction.ppt
L1 - Introduction.ppt
PRACHI DESSAI
 
Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1
Mujeeb Muji
 
Water resource treatment
Water resource treatmentWater resource treatment
Water resource treatment
Aishwaryap32
 
Quality & quantity of water
Quality & quantity of waterQuality & quantity of water
Quality & quantity of water
dhara dattani
 
Lecture # 03 water supply and waste water management converted
Lecture # 03 water supply and waste water management convertedLecture # 03 water supply and waste water management converted
Lecture # 03 water supply and waste water management converted
EngrHayatHussain
 
Water requirements
Water requirementsWater requirements
Water requirements
Bibhabasu Mohanty
 
Water supply and pipe network
Water supply and pipe networkWater supply and pipe network
Water Management at Rainbow Drive: In Buildotech
Water Management at Rainbow Drive: In BuildotechWater Management at Rainbow Drive: In Buildotech
Water Management at Rainbow Drive: In Buildotech
biomeshubha
 
Domestic water treatment and supply
Domestic water treatment and supplyDomestic water treatment and supply
Domestic water treatment and supply
satyam gupta
 
Water resources planning & environmental considerations
Water resources planning & environmental considerationsWater resources planning & environmental considerations
Water resources planning & environmental considerations
AMIE(I) Study Circle
 
Water Supply & Urban Drainage.pptx
Water Supply & Urban Drainage.pptxWater Supply & Urban Drainage.pptx
Water Supply & Urban Drainage.pptx
Yalelet Abera
 
Quantity of water-1.pdf
Quantity of water-1.pdfQuantity of water-1.pdf
Quantity of water-1.pdf
SunilJangra29
 
water quality, water demands
water quality, water demandswater quality, water demands
water quality, water demands
Mir Zafarullah
 
2. Development .ppt
2.  Development .ppt2.  Development .ppt
2. Development .ppt
hussenbelew
 

Similar to introduction to water supply planning (20)

water supply and treatment introductions
water supply and treatment introductionswater supply and treatment introductions
water supply and treatment introductions
 
L 3 and l-4 water demand
L 3  and l-4 water demandL 3  and l-4 water demand
L 3 and l-4 water demand
 
chapter 1 - part 1.pptx
chapter 1 - part 1.pptxchapter 1 - part 1.pptx
chapter 1 - part 1.pptx
 
Chapter 1..Water Demand (1) examples.pptx
Chapter 1..Water Demand (1) examples.pptxChapter 1..Water Demand (1) examples.pptx
Chapter 1..Water Demand (1) examples.pptx
 
Lec 2.pptx
Lec 2.pptxLec 2.pptx
Lec 2.pptx
 
unit 1 EEppc
unit 1 EEppc unit 1 EEppc
unit 1 EEppc
 
L1 - Introduction.ppt
L1 - Introduction.pptL1 - Introduction.ppt
L1 - Introduction.ppt
 
Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1
 
Water resource treatment
Water resource treatmentWater resource treatment
Water resource treatment
 
Quality & quantity of water
Quality & quantity of waterQuality & quantity of water
Quality & quantity of water
 
Lecture # 03 water supply and waste water management converted
Lecture # 03 water supply and waste water management convertedLecture # 03 water supply and waste water management converted
Lecture # 03 water supply and waste water management converted
 
Water requirements
Water requirementsWater requirements
Water requirements
 
Water supply and pipe network
Water supply and pipe networkWater supply and pipe network
Water supply and pipe network
 
Water Management at Rainbow Drive: In Buildotech
Water Management at Rainbow Drive: In BuildotechWater Management at Rainbow Drive: In Buildotech
Water Management at Rainbow Drive: In Buildotech
 
Domestic water treatment and supply
Domestic water treatment and supplyDomestic water treatment and supply
Domestic water treatment and supply
 
Water resources planning & environmental considerations
Water resources planning & environmental considerationsWater resources planning & environmental considerations
Water resources planning & environmental considerations
 
Water Supply & Urban Drainage.pptx
Water Supply & Urban Drainage.pptxWater Supply & Urban Drainage.pptx
Water Supply & Urban Drainage.pptx
 
Quantity of water-1.pdf
Quantity of water-1.pdfQuantity of water-1.pdf
Quantity of water-1.pdf
 
water quality, water demands
water quality, water demandswater quality, water demands
water quality, water demands
 
2. Development .ppt
2.  Development .ppt2.  Development .ppt
2. Development .ppt
 

Recently uploaded

Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 

Recently uploaded (20)

Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 

introduction to water supply planning

  • 1. LECTURE 1 INTRODUCTION Instructor : Engr. Beenish Akbar Khan B.Tech Civil Iqra National University (INU) Water Supply & Waste Water Management
  • 2. WATER SUPPLY PLANNING It generally consist of : 1. Collection Works 2. Purification Works 3. Transmission Works 4. Distribution Works Collection Works: Tape water continuously adequate in volume for present & reasonable future demands. OR Convert an intermittently (from time to time) insufficient source into a continuous adequate supply. 2
  • 3. WATER SUPPLY PLANNING Purification Works: When the quality of raw water collected is not satisfactory, purification works are introduced to render (purify) it, suitable for its intended use. Transmission Works: To convey the collected and purified waters to the community. Distribution Works: To supply treated water to the consumers in the desired quantity and at adequate pressures. 3
  • 4. WATER DEMAND It is necessary to find total quantity of water (Q) required for various purposes by the city for the design of water supply scheme.  Duty of engineer is to find “Q” & suitable water source.  For design of water supply scheme: Determine total yearly demand variations in the demand rates.  The actual demand can be found by certain empirical formulas and thumb rule. 4
  • 5. ESTIMATION OF DEMAND FOR WATER SUPPLY 1. Design period 2. Design population (population forecasting) 3. Design flow ( or per capita consumption) 4. Design area 1. Design Period: It is the number of years in future for which the excess capacity is provided, the proposed system, its component structures and equipment's are to be adequate. (Excess capacity = Use larger pipe diameter in advance) 5
  • 6. ESTIMATION OF DEMAND FOR WATER SUPPLY Selection of design period : 1. Physical (useful) life of structure 2. Ease or difficulty of extension of facility 3. Rate of growth of population 4. Rate of interest on the borrowed money 5. Lead time (i.e. time from execution to completion of a project) 6. Economies of scale “a” (i.e. profit) 6
  • 7. ESTIMATION OF DEMAND FOR WATER SUPPLY 2. Design Population: It is the number of people to be served in future. Increases in the demand on a water supply system over a period of years result from; I. Population growth II. Increase per capita consumption III. Industrial development Since it would be uneconomical & impracticable to augment (expand) the system year by year to meet the growing demand. 7
  • 8. ESTIMATION OF DEMAND FOR WATER SUPPLY Design Population: Therefore each component is designed to satisfy the estimated demand at the end of design period. In the early part of the period , some of the components will therefore not be operating at their full capacity. Long design periods (50 yrs) are suitable for dams, tunnels and large canal's which are difficult to enlarge. Short design periods (i.e. 10 – 30 yrs) are suitable for pumps, pipelines , treatment plants and wells; which can be duplicated, replaced or extended more easily. 8
  • 9. ESTIMATION OF DEMAND FOR WATER SUPPLY 3. Design Flow: (lpcd or gpcd) It is the rate of water flow in terms of “per capita consumption”. It is annual average quantity of daily water required by a person. It is based on complete one year supply of water. 4. Design Area: It is the area to be served in future. Eg. Recreational area (zoo, parks) , residential area, commercial and industrial area. 9
  • 10. TYPES OF DEMAND 1. Domestic water demand (44%) 2. Commercial (15%) and industrial (24%) demand 3. Demand for public use (9%) 4. Loss and waste (8%) 5. Fire demand 10
  • 11. DOMESTIC WATER DEMAND It includes water for drinking, bathing, cooking & washing. It depends upon habits, social status, climatic conditions and customs of people. In Pakistan average domestic consumption is 125 lpcd. For developing countries it is 350 lpcd. 11
  • 12. COMMERCIAL & INDUSTRIAL DEMAND Commercial centers : water requirement is 45 lpcd.  Office building  Stores and hotels  Shopping centers  Schools, cinema houses  Mosques, railway and bus stations. Industrial demand is 20 – 25 % of total demand. 12
  • 13. Public Use: Water furnished to public buildings and used for public services. Water for buildings, sprinkling and cleaning of roads, sewers, public parks, gardens and fire protection etc. It is 9 % of total demand. Loss and Waste: Water which is “unaccounted for” in the sense that it is not assigned to a specific user. Unaccounted for water is due to errors in meter readings, unauthorized connections, and leaks in the distribution system. 13 TYPES OF DEMAND
  • 14. FIRE DEMAND (F)  It is the total amount of water in a year to turn off fire.  The actual amount of water used for fire fighting in a year is small, the rate of use is high.  However during a fire, the rate of demand increases. Thus, it will effect the capacity of pumps, reservoirs and distribution pipes.  F is defined as the quantity of water required to turn off the largest possible fire in the area. 14
  • 15. FIRE DEMAND  It can be found from:  Minimum number of streams ( 5 at least)  Discharge (Q) through each stream (200 – 250 gpm)  Duration of fire (at least 4 hours)  No. of simultaneous fires.  F is function of population (p).  Low risk areas – P ≤ 2500 duration of fire:4-5hrs  High risk areas - P > 2500 duration of fire:10 hrs 15
  • 16. EMPIRICAL FORMULA FOR FIRE DEMAND 1. National board of fire under-writers formula (NBFU):  𝑄 = 1020 𝑃( 1 − 0.01 √𝑃)  Q is fire flow / demand in gpm.  P is population in 1000’s. 2. Insurance services office (ISO) formula:  F = 18 C√A  F = Required fire flow in gallon/min or gpm or l/min/3.78  A = Floor area (ft2) excluding basement (m2 * 10.76)  C = Co-efficient related to type of construction 16 Type of construction Value of C Wooden frame structure 1.5 Ordinary frame structure 1 Non combustible structure 0.8 Fire resistant structure 0.6
  • 17. EMPIRICAL FORMULA FOR FIRE DEMAND 4. Kuichling Formula: It is based on fire stream flow of 250 gpm. 𝑄 = 750√P Q in gpm P in 1000’s 5. Freeman’s Formula: 𝑄 = 250 𝑃 5 + 10 Q in gpm 17
  • 18. FIRE DEMAND PROBLEMS 1) Calculate the fire demand of water for a town having a population of 81,000 by National Board of Fire underwriters formula? Required: Q = ? Solution: 𝑄 = 1020 𝑃( 1 − 0.01 √𝑃) = 1020 81 ( 1 - 0.01 √81) = 1020 * 9 ( 1 - 0.01 * 9) Q = 8354 gpm 18
  • 19. FACTORS AFFECTING WATER USE 1. Size of city 2. Climatic conditions (summer = increase in water use) 3. Characteristics of population 4. Industrial & commercial activities 5. Quality of water (good quality = high use of water) 6. Pressure (high pressure = greater use) 7. System of water supply ( good system maintenance = reduce loss & waste) 8. Cost of water (high price = reduce water use) 9. Metering (it reduce water consumption) 19