UHF partial discharge
detection system for GIS:
Application guide for
sensitivity verification
UHF partial discharge detection system for GIS Application
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)AHMED MOHAMED HEGAB
Several non-conventional PD detection methods based on acoustic and electromagnetic phenomenon have been used for some time for PD detection on power cables, transformers, GIS and generators. Up to now there have not been accepted procedures and guidelines for “non-conventional methods” compared to conventional methods. There are many open questions including: calibration or sensitivity verification procedures, techniques for noise suppression, methods of
fault location, and energy equivalency, among others. The authors of this guide believe that now is the time to prepare guidelines and international recommendations for these non-conventional PD detection methods in order to ensure reproducible and comparative PD measurements on high voltage equipment between users.
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)AHMED MOHAMED HEGAB
During the life cycle of high voltage (HV) apparatus or systems many tests and measurements are performed to characterize the insulation condition. The results of these tests and
measurements should be compiled in a “life data record”, which supplies information on trends of diagnostic indicator values. The HV on-site test with partial discharge (PD) measurement has an intermediate position between routine tests and in-service monitoring measurements (on-line or offline)
This document summarizes techniques for partial discharge (PD) measurements on transformers. It discusses PD detection systems using electrical, acoustic, and UHF signals. Typical PD patterns are presented that can help identify different types of PD sources. Procedures are provided for PD measurements in laboratories and on-site, including characterizing the transformer, localizing PD sources using different signals, and a recommended multi-step process for solving PD problems. The document concludes that while measurement techniques have improved, unambiguous identification of dangerous PD sources remains an ongoing challenge requiring further research.
Operation and maintenance of transformerKapil Singh
The document provides information on operation and maintenance of distribution transformers. It defines transformers and describes their working principle of mutual electromagnetic induction. It then discusses transformation ratios, the purposes of transformers, their advantages, types, parts, insulation, testing, and maintenance procedures. Key points covered include daily, quarterly and yearly maintenance checks, oil testing parameters, and common transformer tests like ratio, no load, short circuit and insulation tests.
Partial discharge is a discharge event that does not bridge the entire insulation system between electrodes. It occurs within cavities in insulation materials under high electric fields. During partial discharge, a plasma channel briefly forms within the cavity, conducting electricity from one side to the other without crossing the entire material. Measurement setups use coupling devices and detectors to monitor the short voltage pulses caused by partial discharge, in order to evaluate insulation condition and detect defects.
The document discusses the loss tangent delta (tan δ) test, which is used to detect deviations in the insulation of rotating machines during their service lifetime. Tan δ is a ratio that measures the loss component versus the capacitive component of current in an insulation. It increases with temperature and applied voltage. Periodic tan δ measurements are recommended to monitor changes from the baseline reading, as increases could indicate deterioration of the insulation system. The test procedure, safety precautions, and interpretation of results are described.
This document discusses the benefits of partial discharge (PD) diagnosis for assessing the condition of high voltage gas-insulated switchgear (GIS). It begins by describing different technical methods for PD diagnosis, including UHF, acoustic, and conventional methods. It then addresses how the reliability of PD diagnosis results influences risk assessment and discusses approaches to determine an 'asset risk index'. Next, it analyzes the costs and benefits of investing in PD diagnosis systems through various scenarios and examples. It also provides case studies of PD diagnosis from several countries. In conclusion, reliable PD diagnosis can help optimize maintenance, prevent unexpected outages, and lower costs when used to inform decision making about GIS equipment condition and risk of failure.
Test done on Power transformers.
Insulation Resistance test, Winding Resistance test, Ratio Measurements, Magnetic balance test, Tan delta test, DIssolved gas analysis for transformer, Sweep frequency response analysis.
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)AHMED MOHAMED HEGAB
Several non-conventional PD detection methods based on acoustic and electromagnetic phenomenon have been used for some time for PD detection on power cables, transformers, GIS and generators. Up to now there have not been accepted procedures and guidelines for “non-conventional methods” compared to conventional methods. There are many open questions including: calibration or sensitivity verification procedures, techniques for noise suppression, methods of
fault location, and energy equivalency, among others. The authors of this guide believe that now is the time to prepare guidelines and international recommendations for these non-conventional PD detection methods in order to ensure reproducible and comparative PD measurements on high voltage equipment between users.
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)AHMED MOHAMED HEGAB
During the life cycle of high voltage (HV) apparatus or systems many tests and measurements are performed to characterize the insulation condition. The results of these tests and
measurements should be compiled in a “life data record”, which supplies information on trends of diagnostic indicator values. The HV on-site test with partial discharge (PD) measurement has an intermediate position between routine tests and in-service monitoring measurements (on-line or offline)
This document summarizes techniques for partial discharge (PD) measurements on transformers. It discusses PD detection systems using electrical, acoustic, and UHF signals. Typical PD patterns are presented that can help identify different types of PD sources. Procedures are provided for PD measurements in laboratories and on-site, including characterizing the transformer, localizing PD sources using different signals, and a recommended multi-step process for solving PD problems. The document concludes that while measurement techniques have improved, unambiguous identification of dangerous PD sources remains an ongoing challenge requiring further research.
Operation and maintenance of transformerKapil Singh
The document provides information on operation and maintenance of distribution transformers. It defines transformers and describes their working principle of mutual electromagnetic induction. It then discusses transformation ratios, the purposes of transformers, their advantages, types, parts, insulation, testing, and maintenance procedures. Key points covered include daily, quarterly and yearly maintenance checks, oil testing parameters, and common transformer tests like ratio, no load, short circuit and insulation tests.
Partial discharge is a discharge event that does not bridge the entire insulation system between electrodes. It occurs within cavities in insulation materials under high electric fields. During partial discharge, a plasma channel briefly forms within the cavity, conducting electricity from one side to the other without crossing the entire material. Measurement setups use coupling devices and detectors to monitor the short voltage pulses caused by partial discharge, in order to evaluate insulation condition and detect defects.
The document discusses the loss tangent delta (tan δ) test, which is used to detect deviations in the insulation of rotating machines during their service lifetime. Tan δ is a ratio that measures the loss component versus the capacitive component of current in an insulation. It increases with temperature and applied voltage. Periodic tan δ measurements are recommended to monitor changes from the baseline reading, as increases could indicate deterioration of the insulation system. The test procedure, safety precautions, and interpretation of results are described.
This document discusses the benefits of partial discharge (PD) diagnosis for assessing the condition of high voltage gas-insulated switchgear (GIS). It begins by describing different technical methods for PD diagnosis, including UHF, acoustic, and conventional methods. It then addresses how the reliability of PD diagnosis results influences risk assessment and discusses approaches to determine an 'asset risk index'. Next, it analyzes the costs and benefits of investing in PD diagnosis systems through various scenarios and examples. It also provides case studies of PD diagnosis from several countries. In conclusion, reliable PD diagnosis can help optimize maintenance, prevent unexpected outages, and lower costs when used to inform decision making about GIS equipment condition and risk of failure.
Test done on Power transformers.
Insulation Resistance test, Winding Resistance test, Ratio Measurements, Magnetic balance test, Tan delta test, DIssolved gas analysis for transformer, Sweep frequency response analysis.
This document provides guidance for carrying out pre-commissioning checks and tests for switchyard equipment at Power Grid Corporation of India Ltd. It outlines the constitution and responsibilities of the commissioning team, general safety procedures, documentation requirements, and pre-commissioning formats for recording test results. Specific guidance is provided for transformers, reactors, and other switchyard equipment such as circuit breakers, current transformers, surge arresters, and more. The aim is to ascertain the correctness and completeness of installation and healthiness of equipment before charging.
Tan delta is the insulation power factor & is equal to the ratio of power dissipated in the insulation in watts to the product of effective voltage & current in volt ampere when tested under sinusoidal voltage.
This document discusses tests performed on transformers and surge arresters, including induced voltage tests, partial discharge tests, impulse tests, and surge arrester tests like spark over tests and residual voltage tests. The tests are used to evaluate the insulation strength and ability to withstand transient overvoltages of transformers and effectiveness of surge arresters in protecting equipment.
IEEE Guide for the Application and Interpretation of FRA for oil TransformerAHMED MOHAMED HEGAB
This document provides guidelines for performing frequency response analysis (FRA) on oil-immersed power transformers. It covers instrumentation requirements, test procedures, data analysis techniques, and recommendations for long-term data storage. FRA involves measuring a transformer's impedance and admittance characteristics over a range of frequencies to identify resonances that could lead to failures. The guidelines aim to standardize the FRA process for consistent evaluation of transformer condition and performance.
The document discusses various aspects of partial discharge (PD) testing, including definitions, types, and detection methods. It defines PD as localized electrical discharges that only partially bridge insulation between conductors. Four main types are discussed: corona, surface, cavity, and treeing discharges. Detection methods covered include electrical, acoustic, UHF, optical, and chemical (DGA) techniques. The electrical method measures apparent charge, while acoustic localization and UHF detection have advantages of immunity to electromagnetic noise. Optical detection relies on light emission during discharges. A comparison table outlines advantages and disadvantages of each detection method.
Partial Discharge Detection Products by EA TechnologyRyan McFallo
EA Technology is the global leader in MV Partial Discharge detection. EA’s unique technology allows real time partial discharge detection and monitoring without interrupting service, EA also provides on-site partial discharge surveys.
Would you like to learn more about partial discharge detection and monitoring products/services?
Visit Technical Sales-Northwest at http://www.techsalesnw.com
This guide presents a methodology based on standard PN-IEC 60354 to check overloading capacity of transformers. Main changes versus standard PN-71/E-81000 are discussed and step by step examples are given. An essential advantage of the recommended methods of verification of overloading capacity of transformers is that the size and cooling modes of transformers are considered.
This document discusses transformer vector groups and the phase shift between primary and secondary currents. It begins by introducing transformer basics like magnetically coupled circuits and phase relationships between voltages. Diagrams show how polarity markings and connections determine the vector group. Specific examples analyze the Yd1 and Yd11 vector groups in detail, showing how primary and secondary phase currents are related for both positive and negative sequence components. Tables summarize the results, and shortcuts are provided for identifying the vector group from winding configurations.
SFRA and Tan Delta tests are used to analyze the electrical characteristics of transformers. SFRA tests measure the frequency response to detect changes from physical damage, while Tan Delta tests measure the dielectric loss to identify moisture, shorts, or opens in the windings or insulation. Together these tests help ensure the transformer is functioning properly. Ratio, voltage, magnetizing current, balance, and BDV oil tests further verify the transformer's performance and insulation strength.
This document provides a tutorial on transformer maintenance best practices. It outlines a maintenance strategy, process, and considerations for component selection and maintenance. The maintenance strategy discusses factors that influence maintenance practices such as transformer characteristics, duty, and environment. It also presents results from a survey on current maintenance practices. The maintenance process covers planning, organization, execution, recording, and optimization. Levels of competence for maintenance tasks and safety aspects are discussed. Component selection impacts maintenance effort, and considerations for various transformer components are provided.
This document provides an overview of circuit breakers, including their operating principles, components, and classifications. Circuit breakers are mechanical switching devices that open and close electrical circuits under normal and abnormal conditions. They contain fixed and moving contacts to carry current when closed. When a fault occurs, the contacts separate, creating an arc that must be extinguished quickly. Circuit breakers use various insulating fluids or methods to cool the arc and reduce its conduction in order to interrupt the current. Common types include oil, air, sulfur hexafluoride, and vacuum circuit breakers.
Silicon Control Rectifier Phase ControlDerrick Tiew
These slides provide brief introduction to the use of silicon control rectifier in phase control circuit, i.e. half-wave as well as full-wave rectifier circuit.
Distribution transformers are used to transform power from high voltages on the distribution lines to lower voltages that can be used in homes and businesses. Routine maintenance and testing of distribution transformers is important to ensure proper functioning and protection. Key tests include measuring winding resistance, insulation levels, voltage ratios and losses to check for any issues. Proper oil levels, insulation and bushings must also be maintained. Protective devices like Buchholz relays and temperature indicators help monitor the transformer and prevent failures from overloading, faults or low oil levels.
This document discusses partial discharge (PD) testing methods for predictive maintenance of medium voltage switchgear. It provides definitions and explanations of partial discharge from standards bodies like IEC and IEEE. It describes the three main types of PD sources as internal, surface, and corona discharge. It then explains various online and offline PD testing methods like ultrasonic, transient earth voltage, high frequency current transformer, and the capacitance voltage divider method. Key aspects of each method like frequency ranges, sensor placement, and background noise measurement are outlined. Causes of partial discharge like cavities, electrical trees, water trees, and corona are described in detail.
This document discusses the testing and maintenance of power transformers. It outlines the various routine tests performed on transformers according to standards, including winding resistance measurement, insulation resistance measurement, high voltage tests, no load and load loss measurements. It also describes type tests such as lightning impulse and short circuit tests. Finally, it discusses the importance of preventive maintenance through regular checks of oil levels, insulation resistance, bushings, connections and other components.
MO SURGE ARRESTERS - METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING S...Power System Operation
MO SURGE ARRESTERS -
METAL OXIDE RESISTORS
AND SURGE ARRESTERS
FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS
The document discusses partial discharge (PD) techniques for measuring the condition of aging high voltage and medium voltage switchgear. It provides 3 key points:
1) PD activity is a major cause of long-term degradation of insulation in switchgear. Measuring PD can detect defects before complete failure and allow targeted maintenance.
2) The latest PD measuring instruments use dual sensors to detect both surface and internal PD non-intrusively. Measurements of PD pulses externally can indicate the insulation condition.
3) Condition-based maintenance using PD measurements can improve safety, reliability and lower costs compared to time-based maintenance. Utilities like SP Powergrid in Singapore have seen significant benefits including reduced outages and savings of
This document discusses power cable installation methods. It covers various topics such as:
1. Underground installation methods including direct laying, draw in system, and solid system. Direct laying is the most common but has faults that can be difficult to locate.
2. Overhead installation including considerations for sag and tension based on span length, weight, and temperature as well as ice and wind loading.
3. Installation in conduit including determining appropriate conduit size based on clearance, jamming ratios, and fill percentages.
4. IEC 60364 provides guidance on installation methods for different conductor and cable types including without fixings, clipped direct, and conduit systems.
Motor & generator protection example settingsH. Kheir
The document provides settings for a microprocessor motor protection relay for a 500 HP motor rated at 4.16 kV. It lists typical motor data like nameplate full load amps of 60 A, service factor of 1, overload classes of 20 for start and 10 for run, and voltage and frequency settings of 4.16 kV and 60 Hz. It also provides settings for functions like overload reset, current imbalance trip, over current trip, under voltage trip and more. Thresholds, delays and increments for triggering each function are detailed.
1) Tan delta testing uses a very low frequency AC voltage to measure the dissipation factor of insulation to determine its quality and condition. A higher loss angle indicates more contamination.
2) The cable or winding is disconnected and the test voltage is applied and increased in steps while tan delta measurements are taken. A straight trend line indicates healthy insulation while a rising line indicates contamination.
3) Routine maintenance of bushings includes inspecting the porcelain for cracks, metal parts for corrosion, oil levels, and cleaning surface contamination which can cause flashovers. Leaks should be repaired to prevent moisture issues.
LPC2138 Based Temperature Compensated Ultrasonic Ranging For Blind Personpaperpublications3
Abstract: This paper is intended to provide a theoretical model of object detection and real time assistance via Global Positioning System (GPS).This paper aims at the development of an Electronic Travelling Aid (ETA) kit to help the blind people to find obstacle free path. This ETA is fixed to the stick of the blind people. When the object is detected near to the blinds’ stick it alerts them with the help of vibratory circuit. Ultrasonic sensors are used to evaluate distance of the objects around the blind person to guide the user towards the secure and available path. Output is in the form of vibrations which the blind person can easily recognize. The hardware of entire system contains ARM7 (LPC2138), temperature sensor, ultrasonic sensors and mobile vibrator, Global positioning system (GPS) module and Global System for Mobile (GSM) module. It contains temperature compensation method to reduce the error in measurement of distance using ultrasonic sensors.
International Journal of Engineering Research and Applications (IJERA) is an open access online peer reviewed international journal that publishes research and review articles in the fields of Computer Science, Neural Networks, Electrical Engineering, Software Engineering, Information Technology, Mechanical Engineering, Chemical Engineering, Plastic Engineering, Food Technology, Textile Engineering, Nano Technology & science, Power Electronics, Electronics & Communication Engineering, Computational mathematics, Image processing, Civil Engineering, Structural Engineering, Environmental Engineering, VLSI Testing & Low Power VLSI Design etc.
This document provides guidance for carrying out pre-commissioning checks and tests for switchyard equipment at Power Grid Corporation of India Ltd. It outlines the constitution and responsibilities of the commissioning team, general safety procedures, documentation requirements, and pre-commissioning formats for recording test results. Specific guidance is provided for transformers, reactors, and other switchyard equipment such as circuit breakers, current transformers, surge arresters, and more. The aim is to ascertain the correctness and completeness of installation and healthiness of equipment before charging.
Tan delta is the insulation power factor & is equal to the ratio of power dissipated in the insulation in watts to the product of effective voltage & current in volt ampere when tested under sinusoidal voltage.
This document discusses tests performed on transformers and surge arresters, including induced voltage tests, partial discharge tests, impulse tests, and surge arrester tests like spark over tests and residual voltage tests. The tests are used to evaluate the insulation strength and ability to withstand transient overvoltages of transformers and effectiveness of surge arresters in protecting equipment.
IEEE Guide for the Application and Interpretation of FRA for oil TransformerAHMED MOHAMED HEGAB
This document provides guidelines for performing frequency response analysis (FRA) on oil-immersed power transformers. It covers instrumentation requirements, test procedures, data analysis techniques, and recommendations for long-term data storage. FRA involves measuring a transformer's impedance and admittance characteristics over a range of frequencies to identify resonances that could lead to failures. The guidelines aim to standardize the FRA process for consistent evaluation of transformer condition and performance.
The document discusses various aspects of partial discharge (PD) testing, including definitions, types, and detection methods. It defines PD as localized electrical discharges that only partially bridge insulation between conductors. Four main types are discussed: corona, surface, cavity, and treeing discharges. Detection methods covered include electrical, acoustic, UHF, optical, and chemical (DGA) techniques. The electrical method measures apparent charge, while acoustic localization and UHF detection have advantages of immunity to electromagnetic noise. Optical detection relies on light emission during discharges. A comparison table outlines advantages and disadvantages of each detection method.
Partial Discharge Detection Products by EA TechnologyRyan McFallo
EA Technology is the global leader in MV Partial Discharge detection. EA’s unique technology allows real time partial discharge detection and monitoring without interrupting service, EA also provides on-site partial discharge surveys.
Would you like to learn more about partial discharge detection and monitoring products/services?
Visit Technical Sales-Northwest at http://www.techsalesnw.com
This guide presents a methodology based on standard PN-IEC 60354 to check overloading capacity of transformers. Main changes versus standard PN-71/E-81000 are discussed and step by step examples are given. An essential advantage of the recommended methods of verification of overloading capacity of transformers is that the size and cooling modes of transformers are considered.
This document discusses transformer vector groups and the phase shift between primary and secondary currents. It begins by introducing transformer basics like magnetically coupled circuits and phase relationships between voltages. Diagrams show how polarity markings and connections determine the vector group. Specific examples analyze the Yd1 and Yd11 vector groups in detail, showing how primary and secondary phase currents are related for both positive and negative sequence components. Tables summarize the results, and shortcuts are provided for identifying the vector group from winding configurations.
SFRA and Tan Delta tests are used to analyze the electrical characteristics of transformers. SFRA tests measure the frequency response to detect changes from physical damage, while Tan Delta tests measure the dielectric loss to identify moisture, shorts, or opens in the windings or insulation. Together these tests help ensure the transformer is functioning properly. Ratio, voltage, magnetizing current, balance, and BDV oil tests further verify the transformer's performance and insulation strength.
This document provides a tutorial on transformer maintenance best practices. It outlines a maintenance strategy, process, and considerations for component selection and maintenance. The maintenance strategy discusses factors that influence maintenance practices such as transformer characteristics, duty, and environment. It also presents results from a survey on current maintenance practices. The maintenance process covers planning, organization, execution, recording, and optimization. Levels of competence for maintenance tasks and safety aspects are discussed. Component selection impacts maintenance effort, and considerations for various transformer components are provided.
This document provides an overview of circuit breakers, including their operating principles, components, and classifications. Circuit breakers are mechanical switching devices that open and close electrical circuits under normal and abnormal conditions. They contain fixed and moving contacts to carry current when closed. When a fault occurs, the contacts separate, creating an arc that must be extinguished quickly. Circuit breakers use various insulating fluids or methods to cool the arc and reduce its conduction in order to interrupt the current. Common types include oil, air, sulfur hexafluoride, and vacuum circuit breakers.
Silicon Control Rectifier Phase ControlDerrick Tiew
These slides provide brief introduction to the use of silicon control rectifier in phase control circuit, i.e. half-wave as well as full-wave rectifier circuit.
Distribution transformers are used to transform power from high voltages on the distribution lines to lower voltages that can be used in homes and businesses. Routine maintenance and testing of distribution transformers is important to ensure proper functioning and protection. Key tests include measuring winding resistance, insulation levels, voltage ratios and losses to check for any issues. Proper oil levels, insulation and bushings must also be maintained. Protective devices like Buchholz relays and temperature indicators help monitor the transformer and prevent failures from overloading, faults or low oil levels.
This document discusses partial discharge (PD) testing methods for predictive maintenance of medium voltage switchgear. It provides definitions and explanations of partial discharge from standards bodies like IEC and IEEE. It describes the three main types of PD sources as internal, surface, and corona discharge. It then explains various online and offline PD testing methods like ultrasonic, transient earth voltage, high frequency current transformer, and the capacitance voltage divider method. Key aspects of each method like frequency ranges, sensor placement, and background noise measurement are outlined. Causes of partial discharge like cavities, electrical trees, water trees, and corona are described in detail.
This document discusses the testing and maintenance of power transformers. It outlines the various routine tests performed on transformers according to standards, including winding resistance measurement, insulation resistance measurement, high voltage tests, no load and load loss measurements. It also describes type tests such as lightning impulse and short circuit tests. Finally, it discusses the importance of preventive maintenance through regular checks of oil levels, insulation resistance, bushings, connections and other components.
MO SURGE ARRESTERS - METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING S...Power System Operation
MO SURGE ARRESTERS -
METAL OXIDE RESISTORS
AND SURGE ARRESTERS
FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS METAL OXIDE RESISTORS AND SURGE ARRESTERS FOR EMERGING SYSTEM CONDITIONS
The document discusses partial discharge (PD) techniques for measuring the condition of aging high voltage and medium voltage switchgear. It provides 3 key points:
1) PD activity is a major cause of long-term degradation of insulation in switchgear. Measuring PD can detect defects before complete failure and allow targeted maintenance.
2) The latest PD measuring instruments use dual sensors to detect both surface and internal PD non-intrusively. Measurements of PD pulses externally can indicate the insulation condition.
3) Condition-based maintenance using PD measurements can improve safety, reliability and lower costs compared to time-based maintenance. Utilities like SP Powergrid in Singapore have seen significant benefits including reduced outages and savings of
This document discusses power cable installation methods. It covers various topics such as:
1. Underground installation methods including direct laying, draw in system, and solid system. Direct laying is the most common but has faults that can be difficult to locate.
2. Overhead installation including considerations for sag and tension based on span length, weight, and temperature as well as ice and wind loading.
3. Installation in conduit including determining appropriate conduit size based on clearance, jamming ratios, and fill percentages.
4. IEC 60364 provides guidance on installation methods for different conductor and cable types including without fixings, clipped direct, and conduit systems.
Motor & generator protection example settingsH. Kheir
The document provides settings for a microprocessor motor protection relay for a 500 HP motor rated at 4.16 kV. It lists typical motor data like nameplate full load amps of 60 A, service factor of 1, overload classes of 20 for start and 10 for run, and voltage and frequency settings of 4.16 kV and 60 Hz. It also provides settings for functions like overload reset, current imbalance trip, over current trip, under voltage trip and more. Thresholds, delays and increments for triggering each function are detailed.
1) Tan delta testing uses a very low frequency AC voltage to measure the dissipation factor of insulation to determine its quality and condition. A higher loss angle indicates more contamination.
2) The cable or winding is disconnected and the test voltage is applied and increased in steps while tan delta measurements are taken. A straight trend line indicates healthy insulation while a rising line indicates contamination.
3) Routine maintenance of bushings includes inspecting the porcelain for cracks, metal parts for corrosion, oil levels, and cleaning surface contamination which can cause flashovers. Leaks should be repaired to prevent moisture issues.
LPC2138 Based Temperature Compensated Ultrasonic Ranging For Blind Personpaperpublications3
Abstract: This paper is intended to provide a theoretical model of object detection and real time assistance via Global Positioning System (GPS).This paper aims at the development of an Electronic Travelling Aid (ETA) kit to help the blind people to find obstacle free path. This ETA is fixed to the stick of the blind people. When the object is detected near to the blinds’ stick it alerts them with the help of vibratory circuit. Ultrasonic sensors are used to evaluate distance of the objects around the blind person to guide the user towards the secure and available path. Output is in the form of vibrations which the blind person can easily recognize. The hardware of entire system contains ARM7 (LPC2138), temperature sensor, ultrasonic sensors and mobile vibrator, Global positioning system (GPS) module and Global System for Mobile (GSM) module. It contains temperature compensation method to reduce the error in measurement of distance using ultrasonic sensors.
International Journal of Engineering Research and Applications (IJERA) is an open access online peer reviewed international journal that publishes research and review articles in the fields of Computer Science, Neural Networks, Electrical Engineering, Software Engineering, Information Technology, Mechanical Engineering, Chemical Engineering, Plastic Engineering, Food Technology, Textile Engineering, Nano Technology & science, Power Electronics, Electronics & Communication Engineering, Computational mathematics, Image processing, Civil Engineering, Structural Engineering, Environmental Engineering, VLSI Testing & Low Power VLSI Design etc.
IJARCCE4J s govinda Public Transport Assistant for Visually Impaired (PuTAVI)SreekarV
The document describes a public transport assistance system called PuTAVI for visually impaired people. PuTAVI uses ultrasonic sensors, RF transmitters and receivers, a microcontroller, and an audio playback system to provide audio guidance to users about obstacles and nearby bus identification. The system is designed to be low-cost, portable, and user-friendly to help visually impaired people safely navigate public transportation independently. It consists of subsystems for obstacle detection, bus identification, signal conditioning, audio feedback, and microcontroller synchronization of all components. PuTAVI is intended to make commuting easier for the visually impaired through real-time audio guidance.
Automatic Altitude Control of Quadroto3isaac chang
The document discusses testing various sensors for automatic altitude control of a quadrotor. It analyzes the built-in pressure sensor and finds it insufficient due to lack of stability and accuracy. Additional distance sensors are considered, including ultrasonic and infrared sensors. The pressure, ultrasonic, and infrared sensors are experimentally tested to evaluate their performance for automatic altitude control. The testing examines measurement accuracy, detection range, and sensitivity to object shape and surface for each sensor.
This document describes a student project to build a distance meter using ultrasonic transducers. It includes an abstract, table of contents, and sections on background, literature review, and methodology. The project will use an ultrasonic reflection method to measure distance, which is simpler than laser methods. An Arduino board will control an ultrasonic sensor module to emit and receive ultrasonic pulses and calculate distance based on time of flight.
Automatic Object Detection and Target using Ultrasonic SensorIRJET Journal
The document describes an automatic object detection and targeting system using ultrasonic sensors. The system is intended to secure border areas by reducing human effort and increasing response time and precision. It uses an ultrasonic sensor to detect objects, determines the distance, and then automatically targets the object's position. The system is mounted on a robot that moves and rotates using stepper motors controlled by a microcontroller. When an object is detected, the ultrasonic sensor sends signals to the microcontroller which processes the data and activates a laser targeting mechanism. The system is capable of detecting objects from 2-400cm away with 3mm accuracy.
IRJET - Design and Development of an Advanced Multi-Dimensional Ultrasonic Se...IRJET Journal
1) The document describes the design and development of an advanced multi-dimensional ultrasonic sensor that can detect obstacles in all directions.
2) The sensor is a spherical array of ultrasonic transducers operating at different frequencies that can reconstruct the shape of obstacles.
3) By mapping the sensor readings to grayscale pixel values and arranging them in a matrix, the sensor can generate an image of the obstacles surroundings in real-time. This allows it to identify obstacles and their distance for applications like navigation assistance.
IRJET- Iot Based Route Assistance for Visually ChallengedIRJET Journal
This document proposes an IoT-based route assistance system for the visually impaired using ultrasonic sensors and an alcohol sensor. The system attaches three ultrasonic sensors and an alcohol sensor to a cane. The ultrasonic sensors detect obstacles in front, left, and right directions and an Arduino determines the clearest path. A buzzer then provides directional tones to guide the user, avoiding obstacles. An alcohol sensor also warns if the user's alcohol levels are too high for safe walking. The system aims to provide independent mobility and navigation assistance to the visually impaired.
FBG Interrogator Communication with the Embedded SystemIRJET Journal
- The document discusses using an embedded system to communicate with an FBG interrogator instead of using a PC software. It aims to make the interrogation system more portable and flexible.
- The embedded system chosen is a Raspberry Pi, which can communicate with the interrogator via a USB connection. Python code is used to send firmware commands to set parameters and receive measurement responses.
- An experiment is described where an FBG temperature sensor and thermocouple measure the temperature of heated water. The sensors' readings are logged via the Raspberry Pi communicating with the interrogator. This demonstrates eliminating the need for PC software in FBG interrogation systems.
This document describes a wireless radiation monitoring system using Zigbee technology. The system consists of two units: a monitoring unit that detects radiation using a GM counter and sends the measured counts wirelessly via Zigbee; and a readout unit that receives the counts via Zigbee and displays them on an LCD screen. The monitoring unit processes the GM counter pulses to remove noise before counting and transmitting the readings. Tests of the system showed deviations within 4% of a certified device and the Zigbee network can extend the range using additional router nodes. The wireless design reduces costs compared to wired systems and provides multiple transmission paths.
IRJET - IoT based Smart Oil and Gas Monitoring SystemIRJET Journal
The document presents a smart oil and gas monitoring system using IoT that incorporates sensors to detect gas leaks, temperature, and pressure. Data from the sensors is transmitted wirelessly via ZigBee to a receiver and displayed on an LCD. The system is intended to remotely monitor oil and gas pipelines to detect issues like leaks and prevent accidents.
IRJET- Obstacle Detection using Ultrasonic Sensor in MAV (Micro Air Vehicle)IRJET Journal
This document describes research on using an ultrasonic sensor for obstacle detection on a micro air vehicle (MAV). The ultrasonic sensor is connected to an Arduino Uno board to measure distances up to 4 meters. An algorithm is developed to detect obstacles and control the MAV servos to avoid collisions. The ultrasonic sensor and Arduino board connection is tested, with distances accurately detected through the serial monitor up to 3.15 meters. The ultrasonic sensor provides effective obstacle detection for indoor and outdoor MAV applications.
The three documents discuss sensor technologies and applications. The first discusses using graphene for chemical, electrochemical, magnetic, electric, optical, mass and strain sensors due to its remarkable electronic and mechanical properties. The second describes tactile sensors using fiber Bragg grating and microbending optical fiber sensors to detect external forces. The third proposes extending the Low Level Reader Protocol finite state machine to model RFID systems and identify potential failures for testing and diagnosis.
This document is a work term report submitted by James Herriot to the University of Victoria in partial fulfillment of a Bachelor of Engineering degree. The report reviews portable vibration analyzers that were researched during a co-op term working for BC Ferries. It provides information on vibration analysis and different portable vibration analyzer models, finding that they vary in price and capabilities. FFT analyzers can perform more in-depth analysis but require more training than basic vibration meters. The report also defines key vibration analysis terms and concepts.
This document describes a virtual instrumentation-based surveillance system for monitoring hazardous industrial environments. It uses sensors to detect gas leaks, temperature changes, smoke, and obstacles. A microcontroller programmed with GENIE software analyzes the sensor data and sends alerts via ZigBee wireless modules to a LabVIEW interface. The system allows unmanned monitoring of inaccessible areas. It aims to prevent disasters by quickly detecting issues like fires or gas leaks and notifying operators. The document outlines the sensor components, microcontroller programming, wireless transmission, and graphical user interface of the proposed monitoring system.
IRJET- Smart Walking Stick for the Visually ImpairedIRJET Journal
This document describes a smart walking stick designed to help the visually impaired navigate independently. It uses three sensors - an infrared sensor, ultrasonic sensor, and flame sensor - connected to an Arduino microcontroller. The infrared and ultrasonic sensors detect obstacles within 2 meters of the user. When obstacles are detected, the stick activates a buzzer and vibrator to warn the user, with the signals varying based on the obstacle's distance. The system aims to provide an affordable and reliable mobility aid for the visually impaired. It was tested successfully with the sensors and alarms functioning as intended to detect obstacles and alert the user.
VARIOUS SENSOR USED IN ROBOTICS WITH APPLICATIONS | J4RV3I12003Journal For Research
This paper gives brief introduction about various sensors used in robotics and their applications. A sensor is a device that detects the changes in electrical or physical or other quantities and thereby produces an output and whose purpose is to detect events or changes in its environment and send the information to other electronic devices. Robotic sensors are used to estimate robots condition and environment. Sensors in robots are based on the functions of human sensory organs. Sensors used in robots provide intelligence to the robot and improve their performance.
IRJET- Design and Fabrication of Digital Fuel Meter with the Help of Ultrason...IRJET Journal
The document describes the design and fabrication of a digital fuel meter that uses ultrasonic sensors to measure the amount of fuel entering a vehicle's fuel tank. It has two phases: 1) A measuring tank with an ultrasonic sensor at the top to measure the distance to the fuel surface and calculate the fuel volume. 2) A storage tank that receives the fuel after measurement and supplies it to the engine. The device aims to accurately measure the fuel amount provided, which is often incorrectly reported. It works by sending and receiving ultrasonic waves and calculating the time for their propagation to determine the fuel level based on known speed of sound in air.
IRJET-Smart Saline Monitoring System using Load Cell and RF SensorIRJET Journal
This document describes a smart saline monitoring system that uses a load cell and RF sensor to automatically monitor saline levels for patients in hospitals. The system is designed to alert nurses and doctors through a buzzer and indicator light when the saline level reaches a critical point to prevent harm to patients from saline not being changed in time. The system uses a load cell sensor connected to an HX711 amplifier to measure the weight of the saline bottle. An Arduino Nano sends the data via an RF transmitter module. An RF receiver module connected to a PIC16F877A microcontroller receives the data and triggers alerts like LEDs and a buzzer when the critical level is reached to notify staff. The system is intended to reduce
Similar to UHF partial discharge detection system for GIS Application guide for sensitivity verification (20)
The document provides highlights and key insights from the DNV Energy Transition Outlook 2021 report. It finds that:
1) Global emissions are not decreasing fast enough to meet Paris Agreement goals, and warming is projected to reach 2.3°C by 2100 despite renewable growth.
2) Electrification is surging, with renewables like solar and wind outcompeting other sources by 2030 and providing over 80% of power by 2050, supported by technologies like storage.
3) Energy efficiency gains lead to flat global energy demand after the 2030s, with a 2.4% annual improvement in energy intensity outpacing economic growth.
Thermography test of electrical panels Thermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panelThermography test of electrical panel
What does peak shaving meanWhat does peak shaving meanWhat does peak shaving meanWhat does peak shaving meanWhat does peak shaving meanWhat does peak shaving meanWhat does peak shaving meanWhat does peak shaving meanWhat does peak shaving meanWhat does peak shaving meanWhat does peak shaving meanWhat does peak shaving meanWhat does peak shaving meanWhat does peak shaving mean
Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide Power System Restoration Guide
Big data analytics Big data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analyticsBig data analytics
Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action SchemeSPS to RAS Special Protection Scheme Remedial Action Scheme
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...Power System Operation
SVC PLUS
Frequency Stabilizer
Frequency and voltage support for dynamic grid stability
SVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer FrequencySVC PLUS Frequency Stabilizer Frequency
What is load management What is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load managementWhat is load management
What does merit order mean What does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order meanWhat does merit order mean
Balancing services help maintain the frequency of the power grid by providing short-term energy or capacity reserves. They include balancing energy, which system operators use to maintain grid frequency, and balancing capacity, which providers agree to keep available. Different balancing services have varying activation speeds to respond to frequency deviations. Harmonization efforts in Europe are working to establish common balancing markets and platforms for cross-border exchange of reserves.
The Need for Enhanced Power System Modelling Techniques & Simulation Tools Power System Operation
The Need for Enhanced Power System Modelling Techniques & Simulation Tools The Need for Enhanced Power System Modelling Techniques The Need for Enhanced Power System Modelling Techniques & Simulation Tools The Need for Enhanced Power System Modelling Techniques & Simulation Tools & Simulation Tools
Power Quality Trends in the Transition to Carbon-Free Electrical Energy SystemPower System Operation
Power Quality
Trends in the Transition to
Carbon-Free Electrical Energy System Carbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy SystemCarbon-Free Electrical Energy System
A Power Purchase Agreement (PPA) is a long-term contract between an electricity generator and purchaser that defines the conditions for the sale of electricity. PPAs provide price stability and help finance renewable energy projects by guaranteeing revenue. There are physical PPAs, which deliver electricity directly, and virtual PPAs, which financially settle the contract without physical delivery. PPAs benefit both renewable developers by enabling project financing, and buyers seeking long-term electricity price certainty and renewable attributes.
Harmonic study and analysis Harmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysisHarmonic study and analysis
What is leakage current testing What is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testingWhat is leakage current testing
Comparative analysis between traditional aquaponics and reconstructed aquapon...bijceesjournal
The aquaponic system of planting is a method that does not require soil usage. It is a method that only needs water, fish, lava rocks (a substitute for soil), and plants. Aquaponic systems are sustainable and environmentally friendly. Its use not only helps to plant in small spaces but also helps reduce artificial chemical use and minimizes excess water use, as aquaponics consumes 90% less water than soil-based gardening. The study applied a descriptive and experimental design to assess and compare conventional and reconstructed aquaponic methods for reproducing tomatoes. The researchers created an observation checklist to determine the significant factors of the study. The study aims to determine the significant difference between traditional aquaponics and reconstructed aquaponics systems propagating tomatoes in terms of height, weight, girth, and number of fruits. The reconstructed aquaponics system’s higher growth yield results in a much more nourished crop than the traditional aquaponics system. It is superior in its number of fruits, height, weight, and girth measurement. Moreover, the reconstructed aquaponics system is proven to eliminate all the hindrances present in the traditional aquaponics system, which are overcrowding of fish, algae growth, pest problems, contaminated water, and dead fish.
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...IJECEIAES
Climate change's impact on the planet forced the United Nations and governments to promote green energies and electric transportation. The deployments of photovoltaic (PV) and electric vehicle (EV) systems gained stronger momentum due to their numerous advantages over fossil fuel types. The advantages go beyond sustainability to reach financial support and stability. The work in this paper introduces the hybrid system between PV and EV to support industrial and commercial plants. This paper covers the theoretical framework of the proposed hybrid system including the required equation to complete the cost analysis when PV and EV are present. In addition, the proposed design diagram which sets the priorities and requirements of the system is presented. The proposed approach allows setup to advance their power stability, especially during power outages. The presented information supports researchers and plant owners to complete the necessary analysis while promoting the deployment of clean energy. The result of a case study that represents a dairy milk farmer supports the theoretical works and highlights its advanced benefits to existing plants. The short return on investment of the proposed approach supports the paper's novelty approach for the sustainable electrical system. In addition, the proposed system allows for an isolated power setup without the need for a transmission line which enhances the safety of the electrical network
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...University of Maribor
Slides from talk presenting:
Aleš Zamuda: Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapter and Networking.
Presentation at IcETRAN 2024 session:
"Inter-Society Networking Panel GRSS/MTT-S/CIS
Panel Session: Promoting Connection and Cooperation"
IEEE Slovenia GRSS
IEEE Serbia and Montenegro MTT-S
IEEE Slovenia CIS
11TH INTERNATIONAL CONFERENCE ON ELECTRICAL, ELECTRONIC AND COMPUTING ENGINEERING
3-6 June 2024, Niš, Serbia
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...IJECEIAES
Medical image analysis has witnessed significant advancements with deep learning techniques. In the domain of brain tumor segmentation, the ability to
precisely delineate tumor boundaries from magnetic resonance imaging (MRI)
scans holds profound implications for diagnosis. This study presents an ensemble convolutional neural network (CNN) with transfer learning, integrating
the state-of-the-art Deeplabv3+ architecture with the ResNet18 backbone. The
model is rigorously trained and evaluated, exhibiting remarkable performance
metrics, including an impressive global accuracy of 99.286%, a high-class accuracy of 82.191%, a mean intersection over union (IoU) of 79.900%, a weighted
IoU of 98.620%, and a Boundary F1 (BF) score of 83.303%. Notably, a detailed comparative analysis with existing methods showcases the superiority of
our proposed model. These findings underscore the model’s competence in precise brain tumor localization, underscoring its potential to revolutionize medical
image analysis and enhance healthcare outcomes. This research paves the way
for future exploration and optimization of advanced CNN models in medical
imaging, emphasizing addressing false positives and resource efficiency.
Batteries -Introduction – Types of Batteries – discharging and charging of battery - characteristics of battery –battery rating- various tests on battery- – Primary battery: silver button cell- Secondary battery :Ni-Cd battery-modern battery: lithium ion battery-maintenance of batteries-choices of batteries for electric vehicle applications.
Fuel Cells: Introduction- importance and classification of fuel cells - description, principle, components, applications of fuel cells: H2-O2 fuel cell, alkaline fuel cell, molten carbonate fuel cell and direct methanol fuel cells.
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsVictor Morales
K8sGPT is a tool that analyzes and diagnoses Kubernetes clusters. This presentation was used to share the requirements and dependencies to deploy K8sGPT in a local environment.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
3. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 2
UHF Partial Discharge Detection
System for GIS: Application Guide
for Sensitivity Verification
Table of Contents
Executive Summary..............................................................................................................................................3
1 Introduction......................................................................................................................................................4
2 Sensitivity verification Step 1: laboratory test.........................................................................................5
2.1 Background and general aspects.......................................................................................................5
2.2 Test setup.................................................................................................................................................6
2.3 UHF measuring device ..........................................................................................................................8
2.4 Pulse generator......................................................................................................................................9
2.5 Determination of artificial pulse magnitude.....................................................................................9
3 Sensitivity verification Step 2: on-site test.............................................................................................. 12
3.1 General aspects.................................................................................................................................. 12
3.2 Arrangement of the sensors: principle, details and important aspects .................................... 12
3.2.1 Sensor locations according to ELECTRA Report.................................................................. 12
3.2.2 Alternative method for the location of sensors .................................................................. 14
3.3 Influence of switching devices........................................................................................................... 16
3.4 Test equipment .................................................................................................................................... 17
3.5 Execution of the on-site sensitivity verification.............................................................................. 17
3.6 Criteria to pass the on-site test ........................................................................................................ 17
4 Conclusion ..................................................................................................................................................... 18
References.......................................................................................................................................................... 20
Annexes
Annex 1: Fundamental PD signal propagation characteristics................................................................. 22
Annex 2: Sensors............................................................................................................................................... 25
Annex 3: Distance between sensors .............................................................................................................. 29
Annex 4: Type of PD defects ......................................................................................................................... 30
Annex 5: Mixed technology switchgear....................................................................................................... 33
Annex 6: Vintage GIS...................................................................................................................................... 34
4. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 3
EXECUTIVE SUMMARY
Gas-insulated switchgear (GIS) have been in operation for more than 45 years and it shows a high level of
reliability. However, the return of experience indicates that some of the in-service failures are related to defects
in the insulation system. Many of these defects can be detected by partial discharge (PD) diagnostics. The ultra-
high frequency (UHF) measurement method, which was introduced in the late 1980’s for PD detection, is used
worldwide by GIS manufacturers during routine testing in factory, during commissioning on-site and by utilities
for continuous monitoring in service. The UHF method is less sensitive to noise, so easier to handle in comparison
with the conventional method according to IEC 60270.
An Electra Report published in 1999 by CIGRE Task Force 15/33.03.05 describes the two-step procedure for
the sensitivity verification of the UHF system in a very general way. After 15 years of its application, it became
obvious that a more detailed description of the sensitivity verification procedure is necessary to avoid technical
misinterpretations.
This Technical Brochure collects the available experience on sensitivity verification and describes its practical
applications for GIS. A detailed description of the two-step procedure is given and supported by examples.
Guidelines will help manufacturers and users for the effective application of the UHF method for PD detection on
GIS.
In Chapter 2, the sensitivity verification (Step 1) is described. The aim is to determine in the laboratory an artificial
PD pulse magnitude equivalent to 5 pC of apparent charge of a defined defect, which will be applied later on-
site during Step 2. The compact test set-up for single-phase GIS is defined (Chapter 2.1), as well as for a
complete bay of three-phase GIS (Chapter 2.2). The examples of PD defect types to be used in Step 1 are given
in Chapter 2.2 and in Annex 4.
The components of the measuring chain like e.g. UHF sensor (Annex 2), PD acquisition unit (Chapter 2.3) and pulse
generator (Chapter 2.4) are described. The determination of the artificial pulse magnitude is shown with
particular attention to different methods of comparison of UHF spectra from the real PD defect with the spectra
of artificial calibration pulse (Chapter 2.5).
In Chapter 3, the sensitivity verification (Step 2) to be performed on-site is described. The aim of this step is to
verify that the installed sensors and the UHF measurement or monitoring system have sufficient sensitivity to detect
signals, equivalent to those from a specific type of PD defect, within any compartment of the GIS being checked.
At the same time, the correct functioning of the sensors themselves and the measurement chain is also tested. The
principle of the Step 2 procedure and sensor arrangement is described in Chapter 3.2. The typical and
alternative methods for the location of sensors leading to the reduction in the number of sensors, by limiting the
overall detection sensitivity for all GIS compartments to the required detection sensitivity of 5 pC, are also
proposed (Chapter 3.2). The influence of the position of the GIS switching devices on the attenuation of the UHF
signal is shown in Chapter 3.3. The criteria to pass the UHF sensitivity verification test are described in Chapter
3.6 and Chapter 4 presents the conclusions.
5. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 4
1 INTRODUCTION
Gas-insulated switchgear (GIS) have been in operation for more than 45 years and they have shown a high level
of reliability with very low failure rates. This is the result of quality assurance during the development and
manufacturing process as well as during installation and commissioning. However, the return of experience shows
that some of the in-service failures are related to defects in the insulation system. Many of these defects can be
detected by partial discharge (PD) diagnostics.
Nowadays the UHF method, which was introduced in the late 1980’s for PD detection, is used worldwide by GIS
manufacturers in the factory, during commissioning and by utilities for monitoring in service based on positive
return of experience from the field. The UHF method is less sensitive to noise and easier to handle in comparison
with the conventional method according to IEC 60270. For the UHF method a calibration to “apparent charge in
pC” is not possible due to the complex PD pulse propagation characteristics. The PD detection sensitivity depends
on various parameters like the distance between the PD defect (UHF signal source) and the sensor.
In 1999 a report was published by CIGRE Task Force 15/33.03.05 which described the sensitivity verification
on GIS applicable to the UHF method. The proposed two-step procedure ensures that defects causing an
apparent charge of 5 pC or greater can be detected by the UHF method [1]. Manufacturers and users gained
a lot of experience since the proposed sensitivity verification method was applied for GIS commissioning and PD
monitoring in service. The previous challenges according to PD identification and risk assessment based on PD
diagnostics were discussed in the last years by CIGRE WG D1.03 (TF 09) and the published report provides
valuable information to facilitate the application of UHF method [2]. Today the on-site testing of GIS with lightning
impulse voltage is nearly completely replaced by the sensitive PD measurement using the UHF method. However,
it is necessary to keep in mind that the UHF method for PD detection is still a complex technique and by now not
standardized.
The ELECTRA report from CIGRE Task Force 15/33.03.05 describes the two-step procedure for sensitivity
verification in a very general way. During the last years it became obvious that a more detailed description of
the sensitivity verification is necessary to avoid technical misinterpretations on the proposed two-step procedure
and the required measures at the laboratory test (Step 1) and the on-site test (Step 2).
This Technical Brochure collects the available experience on sensitivity verification and describes practical
applications of the sensitivity verification for GIS. A detailed description of the two-step procedure is given and
supported by examples. Guidelines will help manufacturers and users in the effective application of the UHF
method for PD detection on GIS.
6. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 5
2 SENSITIVITY VERIFICATION STEP 1: LABORATORY TEST
2.1 Background and general aspects
The signals in the UHF frequency range can be detected by means of dedicated sensors [3]. Because of the
distortion of UHF signals described, a certain number of sensors have to be installed in a GIS in order to cover
it overall with sufficient sensitivity to detect PD defects. Due to the complexity of the resonance patterns, the
magnitude of the detected signals depends strongly on the PD location relative to the sensor and to a minor
degree on the orientation of the defect and the sensor installed on the GIS compartment (Annex 1). A detailed
high frequency model would be required to enable the formulation of an overall transfer function between PD
defect (emitter) and sensor (receiver). Nowadays a numerical calculation seems to be not possible because the
precise location and orientation of the defect are generally not known, and moreover different defect types
generate different Radio frequency (RF) spectra. Creating an accurate RF model of a GIS would already pose
a formidable challenge, requiring highly sophisticated RF modelling software and entry of every internal
construction detail of the GIS. However, such a model would represent only a perfect version of the GIS, mostly
due to the skin effect, which determines the penetration depth of RF signals on conductors. For aluminium at 100
MHz, the skin depth is already on the order of 10 µm. Since a GIS is built to transport kiloamperes and kilovolts
at typical power frequencies - many orders away from the magnitude of the PD signal in the UHF frequency
range - the inner contact design and assemblies simply do not meet the precision and repeatability at µm-scales
to guarantee a reliable RF signal transfer. Thus even if a high quality RF model were to be created, both trying
to verify its validity and assuming its accuracy for predicting actual transfer functions would be virtually
impossible.
When attempting to compare the magnitude of PD using the UHF method versus the conventional method
according to IEC 60270, the actual charge transferred at the defect results in the well-known apparent charge
measured via a coupling capacitor. However, PD signals measured with the UHF method depend on the following
factors:
1. The type of defect
2. The location of the defect within the GIS compartment
3. Propagation effects including reflection, dispersion, interference and attenuation [4, 5]
4. The position of the sensor relative to the defect and the signal transmission path [6, 7, 8]
5. The characteristics of the sensor, i. e. its own transfer function
6. The characteristics of the complete chain of the measurement system (from sensors to data acquisition
and display)
The above mentioned factors are well-known and have been widely documented in the literature. The position
dependence of UHF PD signal strength is easy to demonstrate in a laboratory. The situation described clearly
indicates that a charge calibration of the UHF method is not possible for GIS installations [1, 9]. However, when
carrying out PD measurements, e.g. for the purpose of commissioning tests or when implementing PD monitoring
systems utilizing the UHF technique, it is highly desirable to be able to verify that those systems are functioning
at required level of sensitivity. Therefore, a method of verifying this detection sensitivity is proposed in this report,
based on correlating the UHF signal to the apparent charge measured in an IEC 60270 set-up using a real PD
defect. Using this comparison, a two-step procedure can be used to establish that a UHF measuring system is
functioning and able to detect defects with an apparent charge of e.g. 5 pC [1].
In general the UHF method has proved to be at least as sensitive in detecting most of the defects as the
conventional method according to IEC 60270, and this is mainly due to the GIS enclosure functioning as a Faraday
cage, thus helping to screen out external electromagnetic interference (EMI) disturbances and thus enable a low
background noise level [10]. The sensitivity of the UHF measuring system can be influenced by using suitable
sensors, amplifiers, filters, and associated signal-processing equipment (Annex 2). Tests in laboratories and on-
site have shown that critical defects - and even other defects - may be detected [11].
7. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 6
2.2 Test set-up
The laboratory test must be performed in order to determine the magnitude of an artificial PD pulse, which will
be applied later on-site during Step 2 of sensitivity verification, by comparison to a real defect measured
according to IEC 60270.
The laboratory test is carried out as follows: A real defect is placed close to the UHF sensor C1 of a laboratory
set-up as shown in Figure 1a. The defect will start to discharge when the applied voltage is high enough. When
the apparent charge of the related PD signal, measured according to IEC 60270, reaches the threshold of e.g.
5 pC, the value of the UHF signal related to the signal intensity (e.g. pulse energy, pulse magnitude) is measured
at sensor C2. This UHF signal magnitude A (signal A) will be used for comparison in the next step of the laboratory
test.
The artificial pulses - as described below - are injected into sensor C1 as indicated in Figure 1b. The UHF signal
is again acquired at sensor C2, as during the preceding step. The resulting UHF signal magnitude B (signal B) is
to be compared with the magnitude A from the preceding HV measurements. The amplitude of the artificial pulse
has to be varied until the magnitude of the measured UHF signal B is equivalent to the magnitude of the UHF
signal A within an accepted tolerance of ± 20 % [1].
The lowest possible attenuation (shortest distance) between two sensors is preferable [1]. If not possible, the
sensitivity verification Step 1 could be performed, without any disadvantages, using a complete GIS bay
(Annex 3).
Figure 1: Laboratory set-up for the high voltage measurements (a) and low-voltage measurements (b)
during sensitivity verification Step 1 [1]
Figure 2 shows a typical test setup which is used in the laboratory [12, 13]. It consists of two GIS compartments
in which sensors are installed. The compartments are divided by an insulator and connected to a high voltage
transformer. The test setup is equipped with a coupling capacitor and a conventional PD measuring system
according to IEC 60270. The complete test setup does have a background noise level below 2 pC. Sensor C1 is
only used for the injection of artificial voltage pulses from a pulse generator (PG). The UHF PD measurement
system which is used in the laboratory test is always connected to sensor C2.
8. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 7
Figure 2: Typical test set-up for sensitivity verification Step 1 of single-phase GIS [13]
The defect has to be placed inside the compartment that is as near to sensor C1 as possible. Often a moving
particle is used, e.g. with a length of 3 - 5 mm and a diameter of 1 mm. It is normally placed on the enclosure
at a location near to sensor C1. Instead of a moving particle, protrusions on the high voltage conductor, simulated
by a needle with a length of 5 - 10 mm and a tip radius of about 0.5 mm that could be positioned preferably
right underneath the sensor (Figure 3), are used [13].
Figure 3: Needle placed inside the GIS compartment to simulate a protrusion on the inner conductor [13]
On three-phase encapsulated GIS the sensitivity verification Step 1 can be performed as well on small
arrangements like described in Figure 2. Nevertheless, due to their limited size and the less homogenous
transmission line characteristic of these GIS the sensitivity verification might be performed on a complete bay as
presented in Figure 4.
Figure 4: Test set-up for sensitivity verification Step 1 on a three-phase encapsulated 145 kV GIS
(Courtesy of GE Grid (Switzerland) GmbH)
Sensor C1
Sensor C2
HV Connection
Defect location
Position Sensor C1
Needle
9. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 8
Just as in single-phase arrangements the sensor C1 and the defect have to be placed as near as possible to
each other. Investigations have shown that the distance between the sensors C1 and C2 has a negligible effect
as long as it is in the range of some meters (Annex 3, [14]).
2.3 UHF measuring device
UHF signals can be detected in the time domain or the frequency domain. The results obtained in the time domain
can be characterized by the magnitude of the UHF signals. Measurements in the frequency domain result in
spectra which show the amplitudes of the various frequency resonances stimulated by the PD pulses.
There is no recommendation for any specific acquisition and evaluation method, but it is mandatory that the same
method should be used throughout for the sensitivity verification. Therefore any meaningful method may be used.
Narrow-band systems (Figure 5) examine a part of the frequency range for PD signals (e.g. spectrum analyzer).
This has the advantages of being able to provide high rejection of ambient interference signals and improved
signal-to-noise ratio. In addition to these advantages, the examination of the frequency spectrum itself often
reveals important information about the PD defect type and location [4].
Figure 5: Narrow-band spectrum and PD system block diagram [4]
Wide-band systems (Figure 6) amplify a broadband frequency spectrum (e.g. 300 - 1500 MHz) and feed the
signal directly into a detector. The output is shaped and sent directly to a display device (oscilloscope) or to
an A/D converter, which might be part of PD measurement or monitoring systems.
Figure 6: Wide-band spectrum and PD system block diagram [4]
2.4 Pulse generator
10. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 9
Depending on the means by which the UHF signal is recorded and compared, the magnitude for the artificial
pulses may vary slightly [15]. These variations are not significant in view of the accuracy which is inherent in the
present procedure. The measuring cables should be suitable for frequencies in the applied UHF range.
The exact shape of the artificial pulse is not critical. However, the following parameters are of importance:
• The rise time of the artificial pulse determines the upper frequency limit of its output spectrum and thus that
of the signal emitted at the sensor. Therefore, the rise time of the artificial pulse must be appropriate that such
frequencies across the whole measurement bandwidth are excited. As different bandwidths can be used for the
detection of the UHF signals, there is no need for a detailed definition, however the rise time of the artificial
pulses must not exceed 0.5 ns.
• The magnitude of the pulse voltage (chapter 2.5).
• The time between consecutive pulses must be greater than the longest duration of the resonating UHF signals
observed at the sensors in order to avoid superposition of multiple pulses. Usually any repetition rate less than
100 kHz can be used, e.g. 50 Hz or 60 Hz.
The above mentioned parameters of the pulse generator have to be documented by test certificates or
measurements during the laboratory test. The same type of pulse generator must be used for the on-site test
(sensitivity verification Step 2) to ensure that the tests are comparable. It is recommended to use the same type
of pulse generator at the laboratory tests (sensitivity verification Step 1) and on-site (sensitivity verification Step
2).
Measurements have been carried out at several laboratories using different GIS designs and different methods
for generating the artificial pulses. The available results indicate that the pulse magnitude of the artificial pulses
typically lie in the range from 5 - 20 V depending on pulse shape, sensor design and type of GIS.
Note: Export control regulations for high-speed pulse generators must be considered in EU, US, and JP.
2.5 Determination of artificial pulse magnitude
The methods presented here are not a calibration. However, the aim is to find the best possible match between
a real PD defect and the artificial pulse magnitude in order to verify the sensitivity of the measurement system
during the on-site sensitivity verification (Step 2). A tolerance of ± 20% is acceptable for the determination of
the artificial pulse magnitude.
A) Determination of artificial pulse magnitude in frequency domain (using a spectrum analyzer)
Figure 7 shows the measured amplitude spectrum of a 5 pC PD defect compared with the noise spectrum, i.e.
without applied high voltage [12, 16, 17]. The different lines or peaks in the noise signal are caused by radio
and TV stations, mobile radio transmitters and from a nearby airport radar [16]. This is not a result of a poorly
shielded measurement arrangement, but rather these interfering signals are directly coupled into the GIS test-
setup, e.g. via the flanges or in the present case through the bushings. Figure 8 shows that the spectrum of the
applied signal at sensor C1 is best aligned with that of the real 5 pC PD using a pulse with a magnitude of 2 V.
11. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 10
Figure 7: Amplitude spectra - noise signal without applied high voltage and
signal of a 5 pC PD - measured at sensor C2
Figure 8: Comparison of the amplitude spectrum measured at sensor C2 for a real 5 pC PD
with the amplitude spectrum of an artificial pulse with a magnitude of 2 V
A comparison with the spectra of different voltage pulses can be done by visual comparison or with the aid of
statistical tools. The choice of an extracted characteristic based on spectrum power is one of the most relevant
parameters [18] compared to average amplitude (AA). Average amplitude (AA), maximum measured power
(MP) and the average power (AP) applied for a moving particle are listed in Table 1.
Table 1: Statistical values of frequency spectra calculated in case of a particle defect
showing 5 pC apparent charge and different pulse magnitudes from a pulse generator
In this example a voltage pulse magnitude of 10 V fits well with the signal extracted from the particle. A visual
comparison confirms that this method can be used for such type of defect.
Typically, a comparison of the entire frequency spectrum is used for the determination of the required artificial
impulse amplitude and narrow-band measurements are used in addition because of higher sensitivity. In the case
where a narrow-band measurement system with fixed frequency band is used without comparing the entire
spectrum, special attention has to be drawn on the sensitivity verification. Narrow-band measurements have the
disadvantage that the results do not only depend on the PD defect signal but also on the measuring frequency.
This can turn into an advantage (meaning an even lower susceptibility to external noise) if the measuring
MP
[dBm]
AP
[dBm]
AA
[dBµV]
Moving particle -25.7 -50.9 53.4
10 V -25.8 -51.2 50.9
20 V -19.5 -44.8 56.5
12. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 11
frequencies are carefully chosen [13]. That has been done for the current setup with a narrow-band UHF PD
measuring system. Table 2 contains the measured equivalent voltage pulses. There is a good correlation in case
of the measurements made at 740 MHz and it can be seen that the results obtained at the two other frequencies
show significant deviations.
Table 2: Equivalent voltage pulses of both artificial defects of 5 pC measured
with a narrow band system at different frequencies
B) Determination of artificial pulse magnitude in time domain (using PRPD pattern)
For wide-band peak detection systems like PD monitoring systems a comparison can be made using PRPD pattern
(Figure 9). In the given example an artificial pulse magnitude of 20 V is equivalent to 5 pC caused by a moving
particle.
Figure 9: Determination of artificial pulse magnitude by using PRPD pattern for a PD defect showing e.g.
an apparent charge of 5 pC from moving particle (left) and artificial pulses with different magnitudes (right)
Frequency Protrusion
Moving
particle
540 MHz 2 - 5 V 1 - 2 V
740 MHz 2 - 5 V about 10 V
1240 MHz 1 - 2 V 10 - 20 V
13. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 12
3 SENSITIVITY VERIFICATION STEP 2: ON-SITE TEST
3.1 General aspects
The second step of the CIGRE sensitivity verification is carried out on-site on the installed GIS (same type of GIS
as used in the laboratory test) in order to verify that the installed sensors and the UHF measurement or monitoring
system has sufficient sensitivity to detect signals, equivalent to those from a specific type of PD defect, within any
compartment of the GIS being checked. In addition and at the same time, the correct functioning of the sensors
themselves and the measurement chain is tested.
It is understood that the same type of sensors and the same pulse generator must be used during the on-site
sensitivity verification as employed for the laboratory test (Step 1). Step 2 should be carried out with the same
measuring system which was used at Step 1 or with a system with similar or better detection sensitivity.
In general the on-site sensitivity verification is fulfilled if the injected artificial pulse can be measured at the
adjacent sensors as described in [1].
The number of sensors required to be installed in the GIS depends on the PD defect and the required detection
sensitivity. In addition to the sensor arrangement according to [1] an alternative proposal is presented for sensor
arrangements which are strongly limited to the required detection sensitivity.
3.2 Arrangement of the sensors: principle and important aspects
3.2.1 Sensor locations according to ELECTRA Report
The positioning of the sensors within the GIS should be done in such a way that a PD defect (e.g. a moving
particle showing an apparent charge of 5 pC) can be detected in any compartment of the GIS by at least two
sensors [1].
The number and location of the sensors will determine the sensitivity of the UHF PD measurement. Many
parameters impact the attenuation observed between two sensors, for instance diameter changes of the enclosure
or geometrical shapes of gas compartments [11]. It is not possible to establish fixed rules describing the best
arrangement of the sensors.
Principle: The locations of the UHF PD-sensors should be chosen in a way that a predefined sensitivity is
guaranteed for the entire GIS. Figure 10 shows a GIS section with three sensor locations. In the laboratory test
(Step 1), the pulse generator magnitude has been determined, e.g. 10 V.
Figure 10: Principle of CIGRE sensitivity verification Step 2
At the GIS erected on site, the pulse generator is connected to one sensor (II) and the UHF PD measuring system
is connected to the neighbouring sensors (I) and (III). When the predetermined pulse magnitude injected from the
pulse generator (e.g. 10 V signal as above) can be measured at the adjacent sensors, the sensitivity check is
fulfilled for both GIS sections. If this is valid for all sensor configurations it is considered that the combination of
14. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 13
sensor locations and measurement system is sufficient to measure the entire GIS with a predefined sensitivity (e.g.
5 pC of a moving particle).
In detail: Consider a single phase encapsulated GIS with five UHF PD-sensors located at the positions A, B, C, D
and E on each phase according to Figure 11 [19]. The cable termination A and the transformer bushing E
correspond to the endpoints of the GIS.
Figure 11: 420 kV GIS with five sensor locations: A - E (section view (left) and schematic (right))
An illustration of the measuring sequence is presented in Figure 12a for different injection and measuring points
on the GIS. To simplify this representation, the attenuation between two sensors is considered to be linear (see
Annex 1 for details). Two cases of defect location will be considered.
Case A: A 5 pC defect is located in the middle of the section B-C. From Figure 12b it can be deduced that the
defect can be detect by sensor B and sensor C but not by sensors A and D.
Case B: A 5 pC defect is located close to sensor C. From Figure 12c it can be deduced that the defect can be
detected by UHF PD-sensor B, C, D and E.
Figure 12a: Simplified UHF signal attenuation for different injection and measurement locations
15. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 14
Figure 12b: Simplified UHF measuring level for a PD defect location in the middle of the section B-C
Figure 12c: Simplified UHF measuring level for a 5 pC equivalent defect close to C
The method proposed in [1] for on-site sensitivity verification may lead to the installation of more sensors than
effectively necessary to detect a 5 pC PD defect. Whatever the position of the defect, it can be detected by at
least two sensors. This also means that the detection sensitivity with such locations and number of sensors is much
better than 5 pC.
3.2.2 Alternative method for the location of sensors
In this chapter an alternative method is shown which allows a reduction in the number of sensors by limiting the
overall detection sensitivity for all GIS compartments to the required detection sensitivity of e.g. 5 pC [19].
Considering Figure 13a, only the sensors at locations B and D are required to fulfil the requirement of 5 pC
detection level in the sections A-B, B-D and D-E.
Figure 13a: Simplified UHF signal attenuation according to sensor injection point
BA C D
X:
Distance along GIS
Level measured
in B
Level measured
in C
E
[m]
UHF
signal
[dBm]
B
A
C D
X:
Distance along GIS
Level measured in B
Level measured in C
Level measured in D
E
[m]
UHF
signal
[dBm]
16. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 15
A 5 pC defect in the section B-C will be detected by sensor B whereas one in section C-D is detected by sensor
D. A defect in the sections A-B or D-E are respectively detected by sensor B or D. Only two sensors at the correct
position instead of five sensors are necessary to fulfil the sensitivity requirement. A defect at position C should
be detected either by sensor B or sensor D (Figure 13b). The position of sensors B and D has to be validated
during the on-site sensitivity check. Due to the long distance separating both sensors, the artificial pulse injected
on one sensor cannot be detected on the second one. Nevertheless, different procedures are available to perform
the on-site sensitivity verification for this alternative arrangement of sensors.
Figure 13b: Simplified UHF measuring level for a defect close to location C
Procedure 1: The same sensor (built-in type expected) as those installed on the GIS is installed at the intermediate
position (position C) on one phase and used only for pulse injection. The three phases of a single-phase
encapsulated GIS can be considered similar from the design and consequently attenuation point of view. This is
based on having the identical sensor location on the compartments of the three phases and a limited variation of
length between two sensors which will not modify the attenuation significantly. It is however recommended to
equip the longest phase of the GIS section.
Procedure 2: An external UHF PD-sensor is applied at the intermediate position (position C) and used only for
pulse injection. In this case the determination of pulse generator magnitude should also be done in the laboratory
test (Step 1) for the external sensor. Consequently two voltage levels might be determined corresponding to the
injection by the internal and the external sensor.
Procedure 3: The same GIS bay sections are generally provided for different substations and only the connection
to the transformers and bushings may vary. In this case the on-site sensitivity verification can be omitted on GIS
sections assuming that the sensitivity verification has been passed with a complete set of sensors and the same
sensor locations and the same distance in between is respected for both GIS.
However, for the alternative arrangement of sensors the correct functioning of the sensors themselves and the
measurement chain can be tested at any suitable pulse generator magnitude.
It is necessary to mention that a reduced number of internal sensors (causing only one sensor to detect the PD
signal) can reduce the possibility of PD defect location by means of electrical time-of-flight measurement, since
additional external sensors cannot be applied in all GIS designs.
BA C D
X:
Distance along GIS
Level measured
t in Afor a defec
Level measured for
a defect in C
Level measured
for a defect in C
E
[m]
UHF
signal
dBm][
17. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 16
3.3 Position of switching devices
From a general point of view, the GIS can be considered as having a coaxial wave guide geometry with its
internal HV conductor and grounded enclosure. Disconnectors and circuit breakers respect this geometry only in
the closed position, where the gap between contacts is open this causes a discontinuity which acts to prevent the
TEM mode from propagating from one side to the other. The waves propagating in the TEM mode will be
partially reflected and partially converted to TE and TM modes, thus modifying the frequency content of the
traveling wave. Therefore, the position of switching devices influences the attenuation of the UHF signals and has
to be taken into account for the on-site sensitivity verification.
Measurements performed by a PD monitoring system on a three-phase encapsulated GIS bay illustrate the
described effect. The sensor used for pulse injection is located on the upper busbar of the GIS bay and the sensor
location for signal detection is on the cable termination. The combination of switching device positions (OPEN or
CLOSE) significantly influences the resulting amplitude of the measured UHF signal (Figure 14). In this example
the measured UHF signal can vary from 58% to 100%.
injection:
sensor at
busbar
Q1 Q2 Q0 Q9
detection:
sensor at
cable
termination
3-phase encapsulated 145 kV GIS
pulse
generator
C O C C 71%
O C C C 100%
C O O C 65%
O C O C 84%
O O O O 58%
Figure 14: Influence of the switching device positions on the measured UHF signals (PRPD)
The same type of measurements have been performed in the frequency domain on a single-phase encapsulated
245 kV GIS [20]. The frequency spectrum shown in Figure 15, from 300 MHz to 1200 MHz, represents the
maximum amplitudes of the spectra. When the circuit-breaker is switched from the CLOSE to OPEN position, some
frequency resonances disappear in the upper part of the spectrum (800 to 1200 MHz), and some are dominant
in the lower frequency band (less than 800 MHz).
measured spectra test set-up
1-phase encapsulated 245 kV GIS
Figure 15: Influence of the circuit-breaker switching position (CLOSE/OPEN) on the measured UHF signal
Signal
Injection
Measurement
18. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 17
It can be concluded that the magnitude of the measured UHF signals depends on the switching position of the
different switching devices (disconnector switches, circuit-breaker) located between two sensors. Measurements
in frequency domain show that the change in UHF signal does not correspond to a complete attenuation on the
spectrum. Instead, there is a complete modification of the propagation modes which prevents defining a unique
attenuation factor on a per-component basis. Therefore, the sensitivity verification can be made using any
reasonable position of the switching devices. It is recommended that on-site sensitivity verification should be
carried out for the most frequently used configuration in service.
3.4 Test equipment
Sensors
The same type of sensors must be used during the laboratory test (Step 1) and for the on-site sensitivity
verification (Step 2). The length and type of any cables used to connect the sensors to the PD measuring or
monitoring equipment should be the same at Step 1 as in the final configuration used for the monitoring
measurements. When preamplifiers are connected directly to the sensors, e.g. for on-site tests, reasonable and
convenient lengths of the measurement cables may be applied.
Pulse generator
As shown in [21] the rise time of the pulse calibrator can influence the resulting received UHF signal level and
spectrum shape (i.e. higher cut-off frequency). Consequently, the same type of pulse generator as used in Step 1
shall be used also for Step 2.
Measuring equipment
UHF measurements can be performed using narrow band or broadband systems. The detection level and the
minimum noise depend on the type of equipment. Step 2 of the proposed sensitivity verification should be carried
out with the same measuring system which was used at Step 1 or with a system with similar or better sensitivity.
3.5 Execution of the on-site sensitivity verification
For each of the different GIS sections the following steps should be performed and repeated for all sensor
combinations (sensor and adjacent sensor) installed on the GIS:
a. The pulse generator is connected to one UHF PD-sensor.
b. The UHF measurement device is connected to the adjacent sensor of the investigated GIS section.
c. The first measurement is made with the pulse generator switched off (in order to make a measurement of the
background noise level). This has to be done for about 1 min in order to take account of stochastic interference
signals occurring on site.
d. The second measurement is made with the pulse generator switched on and set to the voltage magnitude
determined by the CIGRE sensitivity verification Step 1, performed in the laboratory.
e. The magnitude of the measured UHF signal should be checked and documented (chapter 3.6)
It should be noted that the on-site sensitivity verification can be applied during commissioning as well as during
regular operation of a GIS.
3.6 Criteria to pass the on-site test
To pass the on-site sensitivity verification, when the artificial pulse is injected, the magnitude of the measured
UHF signal should be clearly above the noise level (PRPD display) or it can be considered as sufficient when
some resonance frequencies clearly appear above the background noise spectrum (spectrum analyzer).
19. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 18
4 CONCLUSION
The return of experience from GIS indicates that some of the in-service failures are related to defects in the
insulation system. Many of these defects can be detected by UHF PD diagnostics. An Electra Report published in
1999 describes the two-step procedure for the sensitivity verification of the UHF system. This Technical Brochure
collects the available experience on sensitivity verification from the last 15 years and describes its practical
applications for GIS. Table 3 summarizes the established guidelines and recommendations which will help
manufacturers and users in the effective application of the UHF method for PD detection on GIS.
Table 3: Guidelines and recommendations for sensitivity verification
No Topic Guidelines and Recommendations Reference
Sensitivity Verification Step 1: Laboratory
1 Aim Determination of an artificial PD pulse magnitude equivalent to 5 pC
of apparent charge of a defined defect, which will be applied later
on-site during Step 2 of sensitivity verification on the same type of GIS.
Chapter 2.1
2 Test setup - Compact test setup for single-phase GIS: Figure 1 and Figure 2
- Complete bay for three-phase GIS: Figure 4
Chapter 2.2
3 PD defect and
detection
sensitivity
Often a moving particle is used, e.g. with a length of 3 - 5 mm and a
diameter of 1 mm. It is placed on the enclosure at a location near to the
sensor which is used for pulse injection: Figure 1, sensor C1. Instead of
a moving particle sometimes protrusions on the high voltage conductor,
simulated by a needle with a length of 5 - 10 mm and a tip radius of
about 0.5 mm (Figure 3), are also used. The required detection
sensitivity usually corresponds to an apparent charge of 5 pC according
to IEC 60270.
Chapter 2.2,
Annex 4
4 Sensor Internal and external sensors can be applied with suitable frequency
response. Comparison and optimization of sensors is possible by using
different methods (GTEM cell, cone arrangement etc.)
Annex 2
5 PD measuring
device
UHF signals can be detected in the time domain or in the frequency
domain by narrow or wide band systems (Figure 5 and 6): oscilloscopes,
spectrum analysers, PD instruments, PD monitoring systems with or
without amplifiers and filters.
Chapter 2.3
6 Pulse generator Any pulse generator with variable output and able to generate
artificial pulses of:
- rise time ≤ 0.5 ns
- variable magnitude (see chapter 2.5)
- pulse repetition rate: less than 100 kHz, e.g. 50 Hz or 60 Hz
Chapter 2.4
7 Determination of
artificial pulse
magnitude
The method presented here is not a calibration. However, the aim is to
find the best possible match between the real PD defect and the
artificial pulse in order to verify the sensitivity of the UHF measurement.
A comparison with the spectra of different voltage pulses can be done
by visual comparison or with the aid of statistical tools. A comparison
could also be made using PRPD pattern (Figure 9).
A tolerance of ± 20% is acceptable for the determination of the
artificial pulse magnitude.
Chapter 2.5
8 Result Test report showing magnitude of artificial pulse and documentation of
test setup and PD measuring equipment
20. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 19
Sensitivity Verification Step 2: On-site
9 Aim Verify that the installed sensors and the UHF measurement or monitoring
system has sufficient sensitivity to detect signals, equivalent to those
from a specific type of PD defect, within any compartment of the GIS
being checked. In addition and at the same time, the correct functioning
of the sensors themselves and the measurement chain is tested.
Chapter 3.1
10 Principle of
on-site sensitivity
verification
The pulse generator is connected to one sensor and the UHF PD
measuring system is connected to the adjacent sensors (Figure 10). If the
signal of the pulse generator (magnitude according to Step 1) can be
measured at the adjacent sensors, the sensitivity check is fulfilled for the
GIS sections. If this is valid for all sensor configurations it is considered
that the combination of sensor locations and measurement system is
sufficient to measure the entire GIS with a predefined sensitivity (e.g. 5
pC of a moving particle).
Chapter 3.2
11 Arrangement of
sensors
- Sensor location should be done in such a way that a PD defect (e.g.
a moving particle showing an apparent charge of 5 pC) can be
detected in any compartment of the GIS by at least two sensors.
- Alternative method for the location of sensors realizes a reduction in
the number of sensors by limiting the overall detection sensitivity for
all GIS compartments to the required detection sensitivity of e.g. 5 pC
(PD defect detection by at least one sensor).
Chapter 3.2
12 Position of
switching devices
The magnitude of the measured UHF signals depend on the switching
position of the different devices (disconnectors, circuit-breakers) located
between two sensors.
Therefore, the sensitivity verification should be made using a
reasonable position of the switching devices. It is recommended that on-
site sensitivity verification should be carried out for the most frequently
used configuration in service.
Chapter 3.3
13 Test equipment Step 2 of the proposed sensitivity verification should be carried out with
the same measuring system which was used at Step 1 or with a system
with similar or better detection sensitivity.
The same type of sensors and the same pulse generator must be used
during the laboratory test (Step 1) and for the on-site sensitivity
verification (Step 2).
Chapter 3.4
14 Criteria to pass
the test
When the artificial pulse is injected, the magnitude of the measured
UHF signal should be clearly above the noise level (PRPD display) or it
can be considered as sufficient when some resonance frequencies
clearly appear above the background noise spectrum (spectrum
analyzer).
Chapter 3.6
15 Result Test report showing verification results and documentation of PD
measuring equipment.
21. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 20
REFERENCES
[1] CIGRE Joint Task Force 15/33.03.05: Partial Discharge Detection System for GIS: Sensitivity Verification
for the UHF Method and the Acoustic Method. ELECTRA, No. 183, pp. 75 - 87, 1999
[2] CIGRE Working Group D1.03 (Task Force 09): Risk Assessment on Defects in GIS Based on PD Diagnostics.
CIGRE Technical Brochure No. 525, 2013
[3] Hampton, Meats, Pryor, Watson-Jones: The Application of Partial Discharge Measurements to GIS.
International Symposium on Gas Insulated Substations, Toronto, Canada, pp. 313 - 321, 1985
[4] Doi, Muto, Fuji, Kamei: Frequency Spectrum of Various Partial Discharges in GIS. International Symposium
on Electrical Insulation Materials, Toyohashi, Japan, 1998
[5] Reid, Judd, Stewart, Fouracre: Frequency Distribution of RF Energy from PD Sources and its Application in
Combined RF and IEC 60270 Measurements. Conference on Electrical Insulation and Dielectric Phenomena,
Kansas City, USA, 2006
[6] Masayuki, Ohtsuka, Ueta, Okabe, Hoshino, Maruyama: Influence of Insulating Spacer Type on Propagation
Properties of PD-induced Electromagnetic Wave in GIS. IEEE Transactions on Dielectrics and Electrical
Insulation, Vol. 17, No. 5, 2010
[7] Masayuki, Ohtsuka, Teshima, Okabe, Kaneko: Examination of Electromagnetic Mode Propagation
Characteristics in Straight and L-Section GIS Model using FD-TD Analysis. IEEE Transactions on Dielectrics
and Electrical Insulation, Vol. 14, No. 6, 2007
[8] Okabe, Kaneko, Yoshimura, Muto, Nishida, Kamei: Partial Discharge Diagnosis Method using Electro-
magnetic Wave Mode Transformation in Gas Insulated Switchgear, IEEE Transactions on Dielectrics and
Electrical Insulation, Vol. 14, No. 3, 2007
[9] Sellars, MacGregor, Farish: Calibrating the UHF Technique of Partial Discharge Detection using a PD
Simulator. IEEE Transactions on Dielectrics and Electrical Insulation, Vol. 2, No. 1, 1995
[10] CIGRE WG 15.03: Diagnostic Methods for GIS Insulating Systems. CIGRE Report 15/23-01, Paris, 1992
[11] Behrmann, Neuhold, Pietsch: Results of UHF measurements in a 220 kV GIS Substation during on-site
Commissioning Tests. 10th Int. Symposium on High Voltage Engineering, Montreal, Canada, 1997
[12] Riechert: Gas-insulated Switchgear, Diagnostics & Monitoring - Present & Future. International Conference
on Condition Monitoring and Diagnosis, User Oriented Workshop, Seoul, Korea, 2014
[13] Tröger, Riechert: Influence of Different Parameters on Sensitivity Verification for UHF PD Measurement.
16th International Symposium on High Voltage Engineering, Paper B-33, Cape Town, South Africa, 2009
[14] Tröger, Riechert, Burow, Tenbohlen: Sensitivity Evaluation of Different Types of PD-Sensors for UHF-PD-
Measurements. International Conference on Condition Monitoring and Diagnosis, Paper P1-49, Tokyo,
Japan, 2010
[15] Albiez, Leijon: PD-Measurement in GIS with Electric Field Sensor and Acoustic Sensor. 7th International
Symposium on High Voltage Engineering, Dresden, Germany, 1991
[16] Riechert, Linn, Winkler, Pietsch: Reasonable Application of UHF-Partial Discharge Measurements in
Development, Production and Service of Gas Insulated Switchgear (GIS). CIGRE SC 15 Symposium “Gas
Insulated Systems”, Dubai, United Arabic Emirates, 2001
[17] Hoek, Riechert, Strehl, Tenbohlen, Feser: A New Procedure for Partial Discharge Location in Gas-insulated
Switchgear in Frequency Domain. 14th International Symposium on High Voltage Engineering, Paper G-
005, Beijing, China, 2005
[18] Harscoet, Taillebois, Prieur, Girodet: Application of the UHF Method for Partial Discharge Measurement
to Gas Insulated Substation Monitoring. CIGRE Report 15-303, Paris, France, 2000
[19] Schichler, Reuter, Gorablenkow: Partial Discharge Diagnostics on GIS using UHF and Acoustic Method. 16th
International Symposium on High Voltage Engineering, Paper D-9, Cape Town, South Africa, 2009
[20] Girodet, Fifi, Gautschi, Luna, Lebreton: Improvement of Defect Detection by Measurement of the UHF
Signal Transmission inside Single Phase and Three Phase Encapsulated GIS and Power Transformers. CIGRE
Report D1-308, Paris, France, 2012
22. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 21
[21] Okabe, Ueta, Kaneko, Ito, Nishida, Kamei: A New Verification Method of the UHF PD Detection Technique.
16th International Symposium on High Voltage Engineering, Cape Town, South Africa, 2009
[22] Reid, Judd: Ultra-wide Bandwidth Measurement of Partial Discharge Current Pulses in SF6. Journal of
Physics D: Applied Physics, Vol. 45, No. 16, 2012
[23] Hoeck, Riechert, Strehl, Feser, Tenbohlen: New Procedures for Partial Discharge Localization in Gas-
Insulated Switchgears in Frequency and Time Domain. 15th International Symposium on High Voltage
Engineering, Ljubljana, Slovenia, 2007
[24] Kaneko, Okabe, Yoshimura, Muto, Nishida, Kamei: Partial Discharge Diagnosis Method Using
Electromagnetic Wave Mode Transformation in Actual GIS Structure. IEEE Transactions on Dielectrics and
Electrical Insulation, Vol. 15, No. 5, 2008
[25] Park, Goo, Yoon, Hong, Kang: Measurement of Ultra-high Frequency (UHF) Partial Discharge Sensor
Sensitivity and Partial Discharge (PD) Signal Losses in the 800 kV Gas-insulated Substation (GIS). 13th
International Symposium on High Voltage Engineering, Delft, Netherlands, 2003
[26] Kurrer, Feser: Attenuation Measurements of Ultra-High-Frequency Partial Discharge Signals in
Gasinsulated Substations. 10th Int. Symposium on High Voltage Engineering, Montreal, Canada, 1997
[27] Neuhold: Abnahme- und Diagnoseprüfungen von GIS vor Ort - Essenzen und Trends. ETG/FKH-Fachtagung
„Trends bei Hochspannungs-Schaltanlagen“, Baden, Switzerland, 2013
[28] Okubo, Yoshida, Takahashi, Hoshino, Hikita, Miyazaki: Partial Discharge Measurement in a Long Distance
SF6 Gas Insulated Transmission Line (GIL). IEEE Transactions on Power Delivery, Vol. 13, No. 3, 1998
[29] Schoeffner, Boeck, Graf, Diessner: Attenuation of UHF-signals in GIL. 12th International Symposium on High
Voltage Engineering, Bangalore, India, 2001
[30] Riechert, Tröger, Schraudolph, Bräunlich, Neuhold: PD Diagnostics of Gas-insulated Switchgear - Sensitivity
Verification. ETG-Fachbericht 119 “Diagnostik elektrischer Betriebsmittel“, pp. 477 - 482, VDE Verlag,
2009
[31] Hanai: Relation between the Conventional PD Measurement and the UHF Measurement in GIS. CIGRE SC
D1 Session, Contribution to Question 2.13, Paris, 2008
[32] Endo, Hama, Matsumoto, Hironaka: Innovation of GIS Insulation Monitoring Techniques and Application to
Remote Monitoring System. CIGRE Report 15-103, Paris, France, 2002
[33] Putro, Nishigouchi, Khayam, Suwarno, Kozako, Hikita, Urano, Min: Influence of Spacer Aperture Size on
PD-induced Electromagnetic Wave measured with UHF External Sensor in 66 kV GIS Model. International
Conference on Condition Monitoring and Diagnosis, Bali, Indonesia, 2012
[34] Gautschi, Bertholet: Calibration of UHF Sensors for GIS: Comparison of different Methods and Testing of
a Calibration System based on a Conical Antenna. International Conference on High Voltage Engineering
and Application, New Orleans, USA, 2010
[35] Lopez-Roldan, Blundell, Irwin, Charlson: Partial Discharge Diagnostics for Mixed-Technology Switchgear
(MTS) in Outdoor Substations. IEEE Electrical Insulation Magazine. Vol. 29, No. 3, 2013
[36] Lopez-Roldan, Blundell, Allan, Scott, Saha: Insulation Monitoring of Hybrid Switchgear. CIGRE Report A3-
201, Paris, France, 2008
[37] Neuhold, Heizmann, Bräunlich, Koechli, Riechert, Dehne: Experiences with UHF PD Detection in GIS using
External Capacitive Sensors on Windows and Disk-insulators. 15th International Symposium on High
Voltage Engineering, Paper T7-480, Ljubljana, Slovenia, 2007
[38] Albiez: Teilentladungsmessung an SF6-isolierten Schaltanlagen, PhD Thesis, ETH Zurich, Switzerland, 1992
[39] Neumann, Krampe, Feger, Feser, Knapp, Breuer, Rees: PD Measurements on GIS of Different Designs by
Non-conventional UHF Sensors. CIGRE Report 15-305, Paris, France, 2000
[40] CIGRE Joint Working Group 33/23.12: Insulation Co-Ordination of GIS: Return of Experience, On Site
Tests and Diagnostic Techniques. ELECTRA, No. 176, pp. 66 - 97, 1998
23. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 22
Annex 1: Fundamental PD signal propagation characteristics
Partial discharges (PD) in GIS are caused by defects of the insulating system. The resulting discharge currents
have rise-times which are known to be much less than one hundred picoseconds [22]. The defects, e.g. moving
particles, protrusions, floating components etc. cause electromagnetic transients whose frequency spectra exceed
2 GHz. The resulting signals propagate within the coaxial structure of a GIS not only in the basic mode (TEM00)
but also in many higher order modes (TEmn, TMmn). The higher order modes propagate only above their cut-off
frequencies (fc). In Figure A1.1, the cut-off frequencies of the first waveguide modes are shown for three different
compartment diameters, respectively different types of GIS [23].
Reflections occur at the numerous discontinuities in the arrangement and lead to the formation of multiple standing
waves of varying frequencies. In addition, there are coupling effects between the modes which also influence the
field patterns. Due to the finite conductivity of the metallic conductors, coatings, the skin effect, dielectric losses
(e.g. spacers) and other effects, the propagating signals undergo both loss in amplitude and dispersion. The total
reduction in signal strength and signal distortion (from the original fast pulse) is highly frequency dependent and
occurs mainly at the numerous boundaries and discontinuities present in a typical GIS. The result is a complex
resonance pattern of electromagnetic waves within each compartment. Each compartment can be thought of as
a complex composite of high frequency resonator, high-Q filter function (including deep notch filtering), and non-
ideal impedance. A real GIS is composed of many of these units chained together.
Figure A1.1: Cut-off frequencies (fc) within a GIS for 300 kV, 362 kV and 550 kV [23]
Calculations performed on L-shape and T-shape GIS sections show, that TE mode can be preserved or changed
into TEM mode, or that discontinuities such as shields or insulating supports also change the distribution of the TE
mode into a TE and TEM mode [24].
Based on measurements, some values of attenuation have been estimated [25, 26]. They can vary according to
the frequency and depends on the GIS design. Two examples with different signal damping behaviour are shown
in Figures A1.2 and A1.3.
In Figure A1.2 an example of the frequency dependent attenuation characteristics along the busbar of a single-
phase encapsulated 220 kV GIS is shown [27]. The busbar of this type of GIS and this configuration shows quite
low signal damping. The pulse generator signal used for carrying out the on-site sensitivity verification can even
be identified at the sensor 14 bays further away (at 495 MHz). It can be seen that the signal-to-noise ratio is
higher for the frequencies below 1 GHz compared to the frequencies above 1 GHz. Furthermore, with increasing
distance from the artificial pulse signal injection point, the frequency content tends to concentrate on specific
resonance frequencies with decreasing bandwidth.
24. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 23
Figure A1.2: UHF signal attenuation characteristics along 220 kV GIS busbar [27]
In Figure A1.3 an example of a strong damping effect in a 220 kV single-phase encapsulated GIS disconnector
module is shown [11]. Although the disconnector module is below 1 m in length, the frequency content of a UHF
signal passing through this element decreases significantly. This kind of abrupt low-pass filtering for discrete
frequencies of the signal spectra can also be observed at GIS configurations where the enclosure undergoes a
significant change in diameter.
The signal attenuation differs according to the propagation mode (TEM, TE and TM) and is frequency dependent
[28, 29]. The lower attenuation measured on straight GIS portions compared to other components can be
explained by the reduced number of reflections and dispersion of the signal. Due to the complex PD signal
propagation characteristics it is not possible just to sum up attenuation of individual GIS modules and arrive at
an accurate estimate of the attenuation between two sensors in a GIS configuration. Furthermore, since the exact
location of a possible PD defect is unknown, technically demanding calculations of propagation path coefficients
would need to be done for every possible combination of PD defect and sensor location and is therefore
technically not feasible with today’s available technologies.
From a general point of view and based on return of experience, the distance between two sensors typically
falls in the range of a few meters to approx. 20 m. This length can be extended up to more than 100 m in the
case of GIL or GIB.
26. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 25
ANNEX 2: Sensors
A) Typical sensors used for UHF PD measurement
In most types of GIS, the UHF energy is concentrated between 100 MHz and 2 GHz. The sensor's frequency
response depends on its size, shape and the connection method used. Most sensors are themselves resonant
structures at UHF frequencies and this can be used to advantage. Typical sensors are shown in Figure A2.1.
Figure A2.1: Examples of sensors [30]
Internal sensors are normally mounted at a recess in the enclosure. In this region, the radial component of electric
field is predominant. The intensity of this electric field is therefore the primary factor affecting the signal level
that can be obtained from the sensor. Internal sensors must be fitted to the GIS during manufacturing or retrofitted
during maintenance, because degassing of the GIS chambers is necessary. These sensors often take the form of
a metal disc insulated from the GIS enclosure by a dielectric material. The measurement connection is made by
a coaxial connector that is usually connected to the centre of the disc. According to the geometric requirements
of switchgear, the appropriate sensor type has to be chosen (Figure A2.2).
Figure A2.2: Types of internal sensors [31]
Externally mounted sensors (e.g. at an inspection window or barrier insulator) will be affected by the field
patterns in the structure on which they are mounted. In this case, the mounting arrangement should be considered
27. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 26
as part of the sensor. External sensors are fitted to an aperture in the chamber wall, such as an inspection window
or exposed barrier edge. These sensors are suitable for installation on vintage GIS that cannot be retrofitted
with internal sensors or for periodic PD testing of GIS for which a permanently installed sensor is not needed.
The UHF signal is attenuated by impedance discontinuities at the surfaces of the barrier and window materials,
and usually the gap between the chamber flanges or the port on which the window is mounted acts as a high-
pass filter. However, unless the window or barrier on which it is mounted is too small, external sensors can still
reach sufficient sensitivities. Because they are more exposed than internal sensors to interference signals, shielding
of the window or barrier might be necessary.
The diameter of a window sensor, the thickness of the glass and the window recess are factors that influence
the sensitivity. The sensitivity of a barrier sensor with respect to the dimensions of the insulator aperture is
displayed in Figure A2.3. Up to a certain point, increasing the length of the insulator aperture gives no
significant increase of the UHF signal. It should be noted that the sensitivity of an internal sensor in general
cannot be achieved with a window or barrier sensor.
Figure A2.3: Electromagnetic wave (EMW) intensity of a barrier sensor as function of the length of insulator
aperture [33]
In Figure A2.4 a horn antenna type is shown mounted between two metallic flanges [32]. The bottom of the horn
antenna, where the antenna is connected with the enclosure, builds a polarization plane which allows
detection of signals from a PD event. Changing the axis direction of the horn antenna by turning, also changes
the sensitivity. A maximum sensitivity is achieved if the polarization plane lies on the x-axis of the enclosure
[32].
Figure A2.4: Installation of a horn antenna between flanges and PD signals detected
at different orientations of the polarization plane [32]
B) Sensor characterization and comparison
28. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 27
The sensor performance and its frequency response can be determined using different methods:
1. Sensor installed in the switchgear: by the use of the CIGRE sensitivity verification procedure.
2. Sensor installed inside a GIS component: by using special conical injection and termination elements (tapers).
3. Sensor installed on a stand-alone, specific calibration cell.
Each of the above characterization methods has advantages and shortcomings. The approach 1 is the most
favourable method because it takes into account the layout of the switchgear and the surrounding of the sensor.
Unfortunately in special cases this approach cannot be used. This can happen for example when vintage GIS are
retrofitted with UHF sensors or if third party sensors (e.g. external sensors) are used with unknown characteristics.
In these cases it might not be possible to repeat the CIGRE sensitivity check Step 1 which means that the artificial
pulse magnitude might not be determined. It is therefore needed that the sensor performance is characterised in
another way.
In Figure A2.5 an example arrangement according to approach 2 is presented [37]. By the comparison of the
frequency responses of the known sensor (U1) and the external sensors (sensor I1 or I2), the characteristic of the
sensor I1 or I2 can be determined. The same approach can be used by replacing the internal sensor U1 with a
different type of sensor with unknown characteristic. Via the comparison of the different spectra or the measuring
results it is possible to characterise the unknown sensor regarding its sensitivity. This can be done using narrow
band or wideband measuring equipment.
Figure A2.5: Double cone arrangement for comparison of internal and external sensors
(I1, I2: external sensors applied on casting apertures, U1: internal sensor) [37]
To further reduce the complexity of the test setup the comparison of different sensors can be done as well in
dedicated calibration cells (approach 3, [34]). Figure A2.6 shows two possible calibration cells. According to
[34] the type of calibration cell has to be carefully chosen.
Figure A2.6: GTEM calibration cell (left) and conical calibration cell with installed UHF sensor (right) [34]
All of the presented approaches can be used to optimise and to compare sensors. While the approaches 1 and
2 takes the real surrounding of the switchgear into account they are the most demanding in terms of complexity
29. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 28
because a fully equipped GIS or GIS component is needed. Approach 3 is less complex but does not take the
surrounding of the GIS into account.
If the sensitivity check Step 1 has been performed with a sensor of well-known characteristic then the same
artificial pulse can be applied for comparison measurements between a new sensor and the sensor with known
characteristic. The comparison measurements can be made with GIS components or with dedicated calibration
cells.
30. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 29
ANNEX 3: Distance between sensors
The influence of the distance between sensors was investigated using real GIS compartments. In the described
experiments the distance between the sensor for the voltage injection and the sensor for the measurement was
as short as possible. The sensors are placed in adjacent GIS compartments. However, in GIS installations the
sensors are placed throughout the GIS according to rules based on experience and the topology of each
individual GIS installation. The distance between the sensors could reach more than 20 m.
Tests were performed on different test set-ups for the sensitivity verification Step 1 in order to determine the
influence of the test set-up on the resulting artificial pulse magnitude. Figure A3.1 shows the different test set-ups
[14].
In test set-up A, a disconnector module (DES) and a fast-acting earthing switch module (FAES) were installed
between the two UHF sensors. In test set-up B the sensors were directly installed in adjacent compartments. Sensor
1 was always used for the injection of voltage pulses. The UHF PD measurement system was always connected
to sensor 2.
Figure A3.1: Test set-up A (top) and B (bottom) for sensitivity verification Step 1 [14]
Table A3 shows a comparison of the results for both test set-ups based on a comparison of the measured
frequency spectra. It could be concluded, that the effect of the test set-up and therefore the effect of the distance
between the sensors for the sensitivity verification could be neglected [14].
Table A3: Equivalent artificial pulse magnitude using different test setups for sensitivity verification Step 1
Test setup A Test setup B
artificial pulse
magnitude
10 V 10 V
31. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 30
ANNEX 4: Type of PD defect
Insulation imperfections in GIS may cause dielectric breakdown during commissioning or in service. Many of these
insulation imperfections produce PD activity before a complete breakdown finally occurs. Therefore, it has been
a goal for decades to detect these PD signals [2]. As a result, PD measurements are an important tool for testing
the dielectric integrity of a GIS during both the design and production stages. The following paragraphs describe
some of the typical insulation imperfections encountered in GIS along with their probability of occurrence (Figure
A4.1).
Remark: If a detection sensitivity for critical defects like particles on insulation or protrusions on the HV conductor
is required (to detect critical defects sensitive to lightning impulse voltages or to very fast transient
voltages from switching operations [40]) the sensitivity verification Step 1 has to be done with the critical
defect size of this specific defect type. As a consequence, the derived pulse magnitude for the specific
defect type has to be applied for the on-site sensitivity verification (Step 2).
Figure A4.1: Typical defects in GIS [16]
A) Moving Particles
While every attempt is made to prevent contamination during manufacture and assembly, sometimes tiny particles
find their way into the GIS enclosure. Conducting particles located on the inner surface of a GIS enclosure are
charged by the electric field of the applied high voltage. The induced charge and the electric field result in a
force on the particle. At the moment this exceeds the gravitational force it is termed the lifting force since the
particle is lifted off from the enclosure surface. The distance the particle flies depends on its size (i.e. length,
width, diameter, mass), the charge induced on it, and the frequency, amplitude, polarity and phase of the applied
voltage. These parameters result in a complex array of forces being exerted on the particle. It may simply
levitate on the surface of the enclosure or, more often, it will begin moving up and down.
Depending on the local electrical field distribution a particle may remain hopping in one location or it might move
around. It may reach a low field region, where gravitational forces are greater than electrical forces, with the
result that it will stop hopping. It may reach a high stress region, and if conditions permit, it may actually reach
the centre conductor. In this case particles can initiate a gas breakdown. Sometimes when this occurs, the energy
of the flashover destroys the particle (which is usually very small). As the particle bounces (or ‚hops‘), small sparks
between the particle and the electrodes (enclosure and high-voltage conductor) occur. The electrical discharges
and the mechanical impact (as the particle hops) generate electric and acoustic signals that can be detected using
various methods. Extensive tests are performed in the factory and during commissioning so that particles rarely
ever lead to in-service faults.
32. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 31
B) Particle on insulation
Particles lying on the surface of insulators produce PD signals of low magnitude (both electrically and acoustically)
but are critical to transient voltages. Since particles on insulators are difficult to detect, the number of horizontal
spacers in GIS is kept to a minimum to lower the probability of particles resting on insulator surfaces.
C) Protrusions
A protrusion might cause a local electric field enhancement. If the field stress on the protrusion tip exceeds a
critical value a corona discharge starts. Note that the corona inception does not necessarily cause an immediate
gas breakdown due to the effect of corona stabilization (sharp protrusion). The discharge produces both a
displacement current and electromagnetic waves, which can be detected by electrical PD measurement
techniques. Further details of the theory of this PD activity are reported in [2, 3, 10]. As with particles, an acoustic
shock wave is produced as a result of local heating of the gas near the tip of the protrusion. Fixed protrusions
are rare in GIS due to both the specific design and the proprietary fabrication methods used. In addition, they
can be detected easily during routine testing in the factory.
D) Floating Electrode
A conducting object which is not galvanically connected to either the enclosure or the inner conductor will acquire
charge and an undetermined floating potential. As the AC potential changes, the object will charge and discharge
accordingly. The potential difference between the floating component and the adjacent conductor may be
bridged by tiny sparks. Although the PD signals produced are often of high amplitude, such floating defects are
not necessarily harmful. In rare cases this type of discharge process will cause surface charges to accumulate on
an adjacent insulator, resulting in a field inhomogeneity and higher probability for surface breakdowns. In other
cases such defects result in erosion of material. One type of floating defect is formed when metallic components
inside the GIS with no (or poor) electrical contact to the electrodes, e.g. loose shields, cause emissions. Sometimes
the charge/discharge cycle of these defects is modulated by mechanical vibrations in the GIS i.e. at twice the
power frequency, as the object makes and breaks electrical contact. The probability of having floating parts in
a GIS depends on design and assembly procedures. With correct designs and assembly, these faults are rare.
E) Voids
Voids or cracks in spacers or delamination at the surface boundaries of cast-in electrodes are usually filled with
a low-pressure gas mixture. Depending on geometry and / or surface roughness, a local field enhancement may
occur which reaches the critical value for the gas. If free electrons are present a discharge process is initiated
causing a displacement current between the insulator terminals or sparking between electrode and insulator. Both
processes can be generally detected via electrical PD measurement. Discharge processes in epoxy spacers may
also lead to treeing and eventual breakdown. The probability of getting ‘dangerous’ voids is influenced by the
shape of the spacer (or bushing), the material, the production process and the field stress level. Voids and
delaminations can be virtually eliminated by appropriate design of these components and optimized production
processes. Factory PD testing filters out spacers containing voids and so virtually eliminates their appearing in the
field.
Further information on critical PD defects and necessary detection sensitivity are described in [2, 40]. Table A4
shows the relation between artificial voltage pulse magnitudes from a pulse generator to the magnitude of a
protrusion and a moving particle showing an apparent charge of 5 pC. The artificial pulse magnitudes differ
from 2 V for a protrusion to 10 V for a moving particle. Such a difference may have an impact on the number
of sensors at the GIS. However, nowadays it is common practice to focus on moving particles as PD defect for
sensitivity verification.
34. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 33
ANNEX 5: Mixed technology switchgear (MTS)
The term “Mixed Technology” refers to a combination of both traditional air insulated switchgear (AIS) and
newer GIS technologies. The MTS module is a self-contained switching module suitable for use in outdoor
substations. It utilises existing proven GIS components and uses a conventional air insulated busbar to connect the
various modules [35]. The hybrid module itself is an assembly of a GIS type circuit-breaker, disconnector switch,
earthing switch and instrument transformers with SF6/air bushings at either end to permit connection to an air-
insulated bus on one side and a circuit e.g. overhead line or transformer, on the other side. In essence, the
assembly or module, forms a complete switching bay.
Figure A5.1: (a) PD Diagnostic equipment installed in a car; (b) UHF method applied
to 132 kV MTS module; (c, d) external window sensor placed on the inspection window [36].
In many MTS module installations there is just one point to apply an external window sensor (Figure A5.1).
Therefore, the on-site sensitivity verification as used for UHF PD detection in GIS cannot be applied. Experiences
show that a single sensor per 132 kV MTS module is sufficient to cover the complete unit and the application of
additional sensors does not provide any gain in terms of increase in the sensitivity of the UHF PD detection method
[36]. The required detection sensitivity of e.g. 5 pC for the PD measurement system is assumed by the small
dimensions of such MTS modules and can be proven during special agreed laboratory tests with an additional
sensor [36].
Note: Noise rejection measures have to be applied if the background noise level hampers sensitive PD
measurements.
35. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 34
ANNEX 6: Vintage GIS
Although UHF PD detection is a common on-site insulation diagnostic technique for GIS today, elder GIS are
often equipped with sensors for which Step 1 of the sensitivity verification was not done in the laboratory. In
some cases, a GIS internal shielding of e.g. an earthing switch shows enough bandwidth for a sensitive UHF PD
measurement, but with unknown pulse generator magnitude [30]. Some elder GIS do not feature internal sensors
but have some dielectric apertures in the enclosure large enough for the application of external sensors [37, 39].
Trying to perform an UHF PD measurement on such kind of installation, the question of detection sensitivity and
sensor frequency response arises. The following two examples are given for the evaluation of the sensitivity and
an example for the determination of the frequency-characteristics of a non-conventional sensor.
A) Sensitivity check by using the capacitance of sensors
In the early period (up to 1995) of the application of VHF and UHF PD measurement in a moderate frequency
range around 100 MHz the detection sensitivity of capacitive sensors were verified by a method related to the
PD calibration according to IEC 60270 [38]. A defined charge Q was transferred by the sensor capacitance C1
(capacitance of the sensor electrode to the HV conductor) of one sensor in order to simulate a PD pulse and to
verify the sensitivity of the other sensors [37, 38]. The transferred charge Q was produced by a defined step
voltage U, applied to the exciting sensor capacitance C1 (Q = C1
. U).
In Figure A6.1 the relation by how much the amplitude of a reference step voltage determined by the CIGRÉ
proposal differs from the initial defined charge injection to the HV conductor (Uc = Qc/ C1) is shown [30].
Figure A6.1: Comparison of pulse generator magnitudes -
CIGRE sensitivity verification Step 1 versus calculation from C1 for different sensor capacitances [30]
It can be concluded that for sensor capacitances C1 around 1 pF a correlation exists between the artificial pulse
magnitude determined by sensitivity verification Step 1 and the determination on the basis of the sensor
capacitance C1. However, considerable deviations could be observed for other values. When trying to achieve
a simple estimation of the detection sensitivity of internal sensors on vintage GIS, the measurement of the sensor
capacity C1 could give useful information under specific circumstances [30].
B) Sensitivity check by using the GIS apertures and external sensors
For GIS not equipped with internal sensors, different types of external sensors have been designed [37]. The
sensitivity and the usable bandwidth are strongly dependent on the type of sensor and the kind and size of
apertures in the GIS. Examples of apertures at vintage GIS are shown in Figure A6.2.
36. UHF Partial Discharge Detection System for GIS: Application Guide for Sensitivity Verification
Page 35
Figure A6.2: Examples of GIS apertures like inspection window (left) and casting aperture of
insulating material at metallic barrier flange (right) [37]
In the following, an example of sensitivity verification with external sensors at a vintage GIS installation is shown.
The sensitivity verification Step 1 in the laboratory was carried out using a real 5 pC PD defect (needle on the
HV electrode). These tests were carried out in a GIS test setup according to Figure A6.3 with original spare parts
of the vintage GIS to be investigated [37]. The use of the same type of GIS parts is important since differences
in the internal geometry influence the frequency spectrum of the signal and therefore the outcome of the
measurements. Two external sensors were applied to casting apertures of the GIS.
Figure A6.3: Sensitivity verification laboratory test setup with spare parts from vintage GIS
(left side: measuring external sensor; right side: external sensor used for pulse injection) [37]
At the laboratory test, a pulse generator magnitude of 6.5 V was determined to be equivalent for a 5 pC needle
defect. It is important to prevent any unwanted external signals coupling in between the external PD sensors and
the flange. It is often necessary to employ appropriate electromagnetic sealing between the GIS enclosure and
the external sensor, e.g. specialized EMC gasketing material composed of conductive elastomer material or wire
mesh. A measurement to check the sealing effectiveness is recommended.