Origin Destination Surveys OD调查…and Trip Generation Surveys…交通出行率调查
Sample Size (100 vehicles or more) of randomly selected vehicles that turned left to go south at Interchange/Intersection 8.
In this Survey:
55% of samples went south past机场高速
45% turned right onto黄山大道
Total Left Turn Vol = 1630 vph
Result: 900 vehicles (55%) go south
730 vehicles go west on黄山大道
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Vijai Krishnan V
This presentation gives a glimpse on estimating the capacity and Level of Service (LOS) of highway midblock sections and signalized intersections under heterogeneous traffic conditions using the Indo-HCM 2017 Manual. It also compares the Indo-HCM LOS estimation methods with US-HCM. Some practice questions are also included.
I acknowledge the co-author Ms. Sethulakshmi G (Ph. D. Scholar, NIT Surathkal) for her valuable contribution to this presentation.
Traffic congestion have a big impact on our personal life, career, future and even our safety. it causes stress, annoy and frustrate us. the traffic jams burns fuel at a higher rate .
The high fuel consumption hiked fares for public means and it also contributes greatly to the amount of emissions of greenhouse gases that create air pollution and eventually global warming.
we trying here partially to solve this problem in critical segments such as bridge, viaduct or tunnel etc. by using Excel simulation for Flow – Density relationship.
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Vijai Krishnan V
This presentation gives a glimpse on estimating the capacity and Level of Service (LOS) of highway midblock sections and signalized intersections under heterogeneous traffic conditions using the Indo-HCM 2017 Manual. It also compares the Indo-HCM LOS estimation methods with US-HCM. Some practice questions are also included.
I acknowledge the co-author Ms. Sethulakshmi G (Ph. D. Scholar, NIT Surathkal) for her valuable contribution to this presentation.
Traffic congestion have a big impact on our personal life, career, future and even our safety. it causes stress, annoy and frustrate us. the traffic jams burns fuel at a higher rate .
The high fuel consumption hiked fares for public means and it also contributes greatly to the amount of emissions of greenhouse gases that create air pollution and eventually global warming.
we trying here partially to solve this problem in critical segments such as bridge, viaduct or tunnel etc. by using Excel simulation for Flow – Density relationship.
Transportation Engineering
Brief study on measurement of spot speed with the help of enoscope for diploma engineering students of civil engineering stream.
This presentation talks about the process of Traffic & Transportation surveys, the bases of delineating Traffic Analysis Zones and the various surveys required to be carried out to understand the traffic behavior of the city.
Transportation Engineering
Brief study on measurement of spot speed with the help of enoscope for diploma engineering students of civil engineering stream.
This presentation talks about the process of Traffic & Transportation surveys, the bases of delineating Traffic Analysis Zones and the various surveys required to be carried out to understand the traffic behavior of the city.
Transportation planning is an integral part of overall urban planning and needs systematic approach.
Travel demand estimation is an important part of comprehensive transportation planning process.
However, planning does not end by predicting travel demand.
The ultimate aim of urban transport planning is to generate alternatives for improving transportation system to meet future demand and selecting the best alternative after proper evaluation.
Determining trip generation of commercial land use of kaptaiKazi Mahfuzur Rahman
Abstract
Trip generation is the first step in the conventional transportation forecasting process. Trip generation rates can
influence the magnitude of the roadway improvements that are constructed like the amount of land that is
required to be dedicated for road’s right-of-way, and calculation of long term maintenance costs of the roadway
network. Therefore, an accurate estimate of vehicle trip generation is required to construct the necessary roadway
infrastructure without overbuilding it. Mohora to Kaptai road is an important and a busy road in Chittagong
because some important commercial buildings, power plants, industries and institutions are situated along this
road. The goal of this paper is to determine trip generation of adjacent commercial land uses of Kaptai Road. To
fulfill the goal, our objectives are to identify the number of trips generation by the adjacent commercial land uses
and to relate trip generation with respect to land use and socio-economic characteristics of Kaptai road. This
study utilizes Geographic Information System (GIS), Questionnaire Survey, Personal Interview and Multiple
Linear Regression Analysis for the trip generation analysis and calculation. Trip generation surveys have
completed at a total of 10 commercial sites, covering five different shopping centers and five different banks at
different important intersection point. The findings have clarified the existing land uses, trip generation situation
with multiple linear regression model and trip rates of commercial land uses.
Our project is the complete study about both Spot speed studies and Speed delay time survey. This topic is a part of Transportation Engineering. This report helps you to understand this topic in detail. This report will also help you to make project on associated topics in traffic engineering. In spot speed, We discussed regarding various methods available to perform the test, Our team practically performed test and established a speed limit zone near a school. Coming to speed delay time survey, we conducted a survey at a selected stretch and came out with solutions to the problems faced by the vehicle users using that stretch.
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #1Arry Rahmawan
Ketika saya mengampu mata kuliah permodelan sistem, di mana mata kuliah ini merupakan mata kuliah untuk mahasiswa tingkat 3, saya menugaskan mahasiswa untuk melakukan sebuah penelitian sederhana dengan menerapkan prinsip - prinsip ilmiah ke lapangan langsung. Saya juga menantang mereka untuk dapat mempresentasikan hasil penelitian mereka dengan tampilan slide yang tidak biasa dan menjemukan. Hingga akhirnya, inilah beberapa di antaranya. Bagaimana menurut Anda?
Industrial Sensory Data Analystics: a research area of the chair for technologies and management of digital transformation from the university of Wuppertal, Germany.
For more information, see here: https://www.tmdt.uni-wuppertal.de/de
Industrial Sensory Data Analysis: a research area of the chair for technologies and management of digital transformation from the university of Wuppertal, Germany.
For more information, see here: https://www.tmdt.uni-wuppertal.de/de
Using Crowdsourcing, Automated Methods and Google Street View to Collect Side...Kotaro Hara
In this presentation, I describe a system that uses crowdsourcing, computer vision, machine learning, and Google Street View to collect sidewalk accessibility data.
London web performance WPO Lessons from the field June 2013Stephen Thair
Web Performance - random lessons learnt from delivering WPO, Load testing and APM consulting in the UK. PLus a bit about WebPageTest Private Instances etc
Blue Pearl Software Inc. provides products that automate the generation of timing constraints, validate existing timing constraints and check functional design issues at the functional or register transfer level (RTL) of the digital chip design flow.
With the Fujitsu’s Automated Business Process Discovery & Visualization service, we aim to help solve one of the biggest challenges faced by companies embarking on a process improvement and governance initiative – illuminating the exposure to inefficiencies, non-compliance, fraud, legal, and other business value leakage issues lying hidden in operational workflows.
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #3Arry Rahmawan
Ketika saya mengampu mata kuliah permodelan sistem, di mana mata kuliah ini merupakan mata kuliah untuk mahasiswa tingkat 3, saya menugaskan mahasiswa untuk melakukan sebuah penelitian sederhana dengan menerapkan prinsip - prinsip ilmiah ke lapangan langsung. Saya juga menantang mereka untuk dapat mempresentasikan hasil penelitian mereka dengan tampilan slide yang tidak biasa dan menjemukan. Hingga akhirnya, inilah beberapa di antaranya. Bagaimana menurut Anda?
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
4. Scoping Site in Advance for
Intersection Traffic Counts
计算前的准备工作
Visit the project site
take pictures of traffic controls and lanes 拍摄交通控制
和路面情况
observe intersection conditions
Minimize Complications in taking traffic counts
Engineer should make determination of staff needs, in
advance.
Timing of intervals, Recording
Complications means LOST DATA and a bad count on the
day of survey.
Incorrect Counts
Missing Information.Wrong North Arrow, etc
5. Traffic Count Sheet: Hard to Interpret
交通流量调查问卷: 用中文很难解释
Problem:
Intersection mis-
labeled because road
closure was at
LongShouLu
9. 15 Minute Count is Not Enough
15分钟流量调查不够
Left
Out
Right
Out
Left In Right In
3:30 12 8 16 12
3:45 20 16 24 28
4:00 20 4 8 24
4:15 32 28 12 24
4:30 32 8 20 48
4:45 16 16 24 52
5:00 28 12 32 64
5:15 32 20 32 88
5:30 40 24 28 92
5:45 16 12 72 104
6:00 40 12 60 116
6:15 32 8 20 60
What you get when you
multiply a 15 minute count by
4:
DIFFERENT RESULTS!
不同的结果
32 17 48 100
32 17 48 100
32 17 48 100
32 17 48 100
32 17 48 100
32 17 48 100
32 17 48 100
32 17 48 100
32 17 48 100
32 17 48 100
32 17 48 100
Actual:
Actual:
Actual:
Actual:
Actual:
Actual:
Actual:
Actual:
Actual:
Actual:
Actual:
10. 15 Minute Count is Not Enough
15分钟流量调查不够
Long Hu Xi Juan 3 hr. Count. 龙湖西苑3小时流量调查 A real count.
What happens when you multiply a 15 minute count
by 4 to “short-cut” the count process. 4当你计算15分
钟的流量,会发生什么?You get vastly different
hourly totals!你会得到不同的结果 Likely Incorrect.
很有可能是不正确的
0
20
40
60
80
100
120
140
3:30 3:45 4:00 4:15 4:30 4:45 5:00 5:15 5:30 5:45 6:00 6:15 Actual
Left Out
Right Out
Left In
Right In
Actual Peak HourTotal实际高峰时段总
Actual Peak HourTotal 实际高峰时段总
Actual Peak HourTotal实际高峰时段总
PeakHourVolume
左出口
右出口
左入口
右入口
11. We need to Count for:
TWO HOURS minimum
We find the peak HOUR from
these two hours of data.
It cannot be guessed…
…it is incorrect to multiply a 15
minute count by four(4) to get an
hourly total. 15min x 4 peak hour
12. 15 Minute Count is Not Enough
This example shows that you get four very different answers
The first 15 minutes x 4 is 15% of actual.
The second 15 minutes x 4 is 25% of actual.
The third 15 minutes x 4 is 50% of actual, etc. etc.
The fourth set was close, but that was LUCKY
0
20
40
60
80
100
120
140
3:30 3:45 4:00 4:15 4:30 4:45 5:00 5:15 5:30 5:45 6:00 6:15 Actual
Left Out
Right Out
Left In
Right In
Actual Peak HourTotal
Actual Peak HourTotal
Actual Peak HourTotal
PeakHourVolume
23. TDA: Origin Destination Surveys
O&D and Mode Split Surveys OD&交通方式调查
Different Methodologies.
License Plate Study (video, audio, or handwritten)
Check-Point / Intercept Interviews.
Ask questions.在街上采访
This can be at say, toll booth, or just on the street too.
Video and Analysis. Observe. 视频和分析。守
“Big Data” and BlueTooth “大数据”和蓝牙
Phone Calls. Ask direct questions.拨打电话。提问
Interpretation and Summary of Data
Currently, Big Data has highest level of assumptions built into it,
because of:
Limited data set comprised of cell phone users, or those that use blue tooth.
Latency of up to a minute.
24. License Plate Survey, VIDEO
can “zoom in” later for clarity, engineer
just shoots video… easy
?
?
?
?
???
Can’t see all plates… this is a problem.
25. 20 video Cameras Survey
…filmed during PEAK HOUR. Got ALL plates.
26. License Plate Survey, AUDIO
Requires visual clarity, can be difficult
for engineer to see…
?
?
?
???
Again, Can’t see many plates… Problem.
??
27. One Solution: Expensive.
When you want to get ALL cars, you need to put
a video camera on ALL lanes, and get EVERY car.
You must use high speed camera shutter.
You need an overhead bridge, or some other way
to get a clear shot
You need a camera operator for EACH lane.
Even with only two locations, you need 6-8
camera operators and 8 cameras total.
One such study for one day cost $45k in USA,
and had only 6 locations (25 camera operators).
28. Another Solution: Sample.
A sample is different than a strict license plate survey.
A sample gives you percentages of what direction people
are going, but it is with a RANDOM selection.
Random selection can be done with watching video in
office and choosing a car.
Random selection can NOT be done by picking a license
plate, because it biases depending on the lane visible to the
engineer. Far lanes are difficult to see, and eliminating
those from the sample creates a bias that is unknown.
Also, because the license plate method requires matching
of plate data at each end, if there are too many missing
plates in the sampling, this makes it less reliable. Hard to
quantify if there are many entrance and exit points being
surveyed.
39. TOOK NEW TRAFFIC COUNTS
Used iPhoneTraffic Count
Tool
Used ManualTraffic Count
Sheet Method
40. Summary of Origin/Destination
Traffic Count Data was used with O&D
Data
Sample Size (100 vehicles or more) of
randomly selected vehicles that turned
left to go south at
Interchange/Intersection 8.
In this Survey:
55% of samples went south past机场高速
45% turned right onto黄山大道
Total LeftTurnVol = 1630 vph
Result: 900 vehicles (55%) go south
730 vehicles go west on黄山大道
41. Video Inspection Methodology
In the video clips that follow, the
methodology used to sample traffic is set
forth.
Video clips are “scrubbed” to watch a vehicle
very quickly, to see where it came from, and
to see where it went.
44. WB Traffic from JinKai
PM Peak Hour is 2273 vehicles WB/SB on
金开大道. 1630 turns to go south on
人和大道. 643 goes west on 金开大道.
55% of 1630 goes south on 人和大道
based on the O&DVideo Survey results.
This is the control volume: 900
45% of 1630 goes west on 黄山大道
48. Same Method Used
for NB Traffic: sampling
Using Sampling methodology
lets the engineer multiple
percentage (%) values by the
TRAFFIC COUNT data to get
the amount of traffic that
would SHIFT.
You need a statistically valid
sample size. At least 100
random samples.
49. Even the NB LEFT TURN traffic
is expected to SHIFT
50. Other Emerging Technologies
that can be used for O&D…
BLUETOOTH
How it works
Advantages:
It is time, date and location data, but needs interpretation
(bus passengers, bikes, peds, etc., mixed with car’s data)
Can helps in determining paths and times
Can be useful in timing studies, speed studies,O&D
Disadvantages:
It is just small sampling, not a traffic count
Traffic counts still need to be performed.
It is ONLY counting the cell phones that have blue tooth
turned ON
Demographics of local Bluetooth users is not known
Interpretation of data to determine car status, ped status,
bike, or even bus status…
54. Bluetooth O&D Result Matches
Can also detect the path traveled (assumed),
depending on # of stations used. It’s still JUST
sampling… because not everyone uses bluetooth.
This kind of information is extremely helpful in setting up a travel
demand model, and calibrating it to real world conditions.
It is the trip distribution variable(s).
56. Trip Generation in USA
two thick manuals, 1500 pages,
users guidebook too.
57. Trip Generation in USA
ITE Manual has 162 landuses
China Manual has 36 landuses
China manual can use more
categories and data.
58. Trip Generation Data in China is 5 times less than
what USA is using. More data is needed.
ITE Manual China Manual
162 landuses 36 landuses
ITE ITE ITE CHINA
ITE ITE
ITE says:
59. ITE Updates Trip Gen Manual
Banking Industry, for example…
ITE examined trip data for banks before and after
technology opened up ATMs and now Internet
Banking.
Vehicle and Ped trips to the bank have gone down
significantly.
Because of technology advances
OlderTrip data for Banks (pre 2000) have been
removed to prevent skewing of data.
Older data is discarded as our world changes.
China is changing fast in many ways with vehicle
ownership UP, and large expansion of METRO lines.
60. ITE FORM only itemizes forTRUCKS. No PEDS. Mindset. Demographic
In China we also need to Count PEDESTRIANS and other MODES
61. Why would we need a
Trip Generation Survey?
Lacking Data
The ChinaTG Manual does not have rates for many land use
categories (such asVILLA, which is not in there)
We,TYLIN, conducted aVILLA count because LongHu Project
hadVillas as a part of project.
Villas have much higher vehicle trip counts than apts.
Data Not Local. From another area of China
Is it applicable?You will not know until you conduct aTG
Survey to find out if there are similarities.
Are Demographics different?
The Client has a New Land UseType, or a Hybrid
Maybe the ChinaTG Manual does NOT have a hybrid but an
existing hybrid land use exists, and can be surveyed…
If so, DO IT !
62. How to Scope a
Trip Generation Survey
Define the Area to be surveyed
The area should be a single land use type, such as
residential, or commercial, or institutional, etc.
Identify all exit and entrance points.
Trip Purpose:
Find out the MODE SPLIT (car, ped, bike, etc)
Find out theTrip Purpose (traffic model purposes)
Training of Staff.
Diagrams to help define specific duty.
Photos to familiarize staff with area
Execution coordinated by clock, overseen by supervisor
63. Example Project:
礼嘉A区龙湖地块(A61-68)交通研究
We had BeiJingTrip Rates already… but
What should we use forTrip Generation?
Since there is a residential apartment complex in the
City of ChongQing that was also developed by Long Hu
company (龙湖西苑 Long Hu Xi Juan), this is ideal and
similar. There are alsoVILLAS nearby across the street
Find out pedestrian traffic
Find out auto traffic
This can be used forTraffic Study Project
Also the 美地 MeiDiVillas development was surveyed
to get a sample of northern CQVilla trip generation.
64. PM Peak Person Trips / 100户数
(小户型)
Source:
ITE does not have PED data
65. PM Peak Person Trips / 100户数
(中户型)
Source:
ITE does not have PED data
66. PM Peak Person Trips / 100户数
(大户型)
Source:
ITE does not have PED data
70. Example: RESIDENTIAL Landuse
Area in red is a
“closed” land use
area, gated, and filled
with 1683 residential
apartment units.
There are several
locations to count
outside the fence
Car entry/exit
Pedestrian entry/exit
1683
DU
71. Example: RESIDENTIAL Landuse
1
3
5
4
4
2
LongHuXiJuan
Car Entry/Exit
Ped Entry/Exit
Also conduct an
O&D interview
These areas all need
to be counted.
6 locations.
6 people.
72. Variables We Need to Know:
1
3
5 2
how many cars total
(count at night,
garage, and street at
say, 2 am)
population
parking spaces
shopping internal?
other amenities
internal?
Knowing these
variables lets us refine
ourTG information,
and even determine
parking needs, etc.
1683
DU
78. Taking the Count: Location 1
3
1
5
4
4
2
COUNT PEDESTRIANS
AND CARS FORALL 6
MOVEMENTSON
DIAGRAM, FOR 3 HRS.
Peak hour:
5:15 pm-
6:15 pm
79. What We Get From Count:
We get the total PEDESTRIANTraffic
that travels outside of the control area,
and “impacts” the street network and
sidewalks
It is unknown how much of this traffic visits the
local shops and restaurants, but likely is a high
source.
We get the total AUTOTraffic that
travels outside of the control area, and
“impacts” the street network.
What we don’t know is how many
LongHuXiJuan residents who own cars, also
park their cars on the local street instead of the
internal garage. The streets are filled with
parked cars at night. It is likely that our “true”
AUTO trip generation rate is LOW in light of this.
Peds & Cars
83. Comparing New with the OldPEDAUTO
MeiDi was higher, so
we used it
MeiDi was lower, so
we did not use it
LongHuXiJuan was
similar, so we used it
LongHuXiJuan was
similar, so we used it
Origin Destination Surveys
OD调查 diào chá investigation; inquiry; to investigate; to survey; survey; (opinion) poll; CL:項|项[xiang4],個|个[ge4] HSK4
Today’s presentation has to do with the third element of the Traffic Impact Analysis, Travel Demand Analysis. It has to do with collecting and developing the data inputs for the transportation impact analyses.
Before we proceed with the presentation on surveys, I want to review what we talked about before. I want to discuss traffic count data collection procedures.
It is very important for the engineer in charge to first scope out the traffic count site. It is important to take note of any complications that might come up during the count. Pictures should be taken. Once an engineer receives training or has experience on what to do, they can be independent. Unless a professional company collects the data, it is common that even engineers make mistakes in how this is to be done. It is important to be familiar with:
Knowing how many people are needed.
What to do if there are complications.
How to correct bad data collection.
This sheet of paper was mislabeled, because WanShou was not counted. This mistake required interpretation at the office by the P.M.
This count sheet shows three different counts, taken at the same intersection. The first count was for 15 minutes for the north direction. The second 15 minute count was for the east direction. The third 15 minute count was for the south direction. The problem is that this should have been a two hour count for ALL directions, at the same time. There should have been eight (8) 15 minute count sheets. There should have been 8 sets of 15 minute counts. This set of 3 15 minute counts, for different directions, was not useable, and had to be discarded.
This count sheet was hard to read, hard to interpret. There was again incorrect labeling of street names, that had to be corrected in the office later, because it was the wrong street names. This leads to confusion.
This count sheet shows a lack of street names, and so it is difficult for P.M. to interpret this, to make sure the data is correct. All data and directions, etc., should be clearly labeled in the field, so that no one has to guess in the office.
A 15 minute count seems like it might be good enough. But it is not good enough. Not when we use average hourly count volumes in our software. These 15 minute counts are very different. This slide shows that multiplying a 15 minute count by 4, for any of the twelve 15 minute intervals, will give a very different answer than adding up the four highest consecutive 15 minute counts. Some of the differences are very significant.
In this example, the peak hour was calculated to be from 5:15 pm to 6:15 pm. It is shown in the yellow block. The totals of the peak hour are shown at the bottom of the sheet, also in yellow.
This chart shows a few examples of the results we get by multiplying a 15 minute count interval by 4. All six examples are very different.
900 cars now go south past the freeway in pm peak hour on RenHe Blvd. This is the only path currently crossing the freeway. However, the train station and other traffic on the major street TaiShan Blvd could attract 50% of this southbound traffic (since there is a 2nd road connector, it will likely get half). Of the traffic that will go south on RenHe and to the south and west, it is assumed that 50% of THAT traffic will also use the new RenXing extension connector to avoid the major congestion on RenHe southbound between JinKai and the Freeway.
So, 75% of this traffic (900 vph) is expected to use the new road. This is 675 cars turning left to go on these local streets. This is a conservatively high estimate, assuming that traffic will shift to the less congested pathways over time.
Contra Flow was assumed also, in proportion to the SB and NB split at Interchange Junction 8, where the total SB traffic from JinKai is 1630 and the NBR onto JinKai is 1500, therefore this is a close 50/50 split. What is not known, is how many of the current 1500 NBR came from the freeway interchange. It IS known that 900 cars went SB from JinKai to the interchange, by the OandD survey. In this study, we are going to assume 50% of the 1500 came from RenHe Blvd south of the freeway crossings. So use 750 for NB volume that will shift. Therefore 750 cars were shifted from RenHe NB to RenXing NB along these two paths.
The result was LOS B/C at all RenXing intersections for Year 2013 conditions traffic levels.
The opening of intersection 7 to signalization will also create a demand for a northbound RenXing to westbound JinKai Blvd. This new movement will require left turn signalization phasing as well.
In Alternative 2 the fully accessible Intersection #7 was examined. which would allow all turning movements at this intersection.
The amount of traffic going north onto the bridge from RenHe is 112 cars in 4 minutes. and this is 1680 vph. Say 50% of this is going straight, and 50% is going west or left onto JinKai. So 840 cars go left onto JinKai, and 840 cars go north on RenHe at the bridge gore. ASSUME that half of these will shift, or 420 more cars going north onto RenXing and making a left at Intersection #7 to go west onto JinKai as an alternative to the congested RenHe route.
LOS C or better is result at all four (4) RenXing intersections even after these changes.