SlideShare a Scribd company logo
MITSUBA F.N.E. Maintenance Department TPM / ODR T otal  P roductive  M aintenance O perator  D riven  R eliability (  focused on GF08 winding section )
What is Total Productive Maintenance?   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],TPM is a  slow culture change  to get people to do the right things at the right time. TPM is a  long term process …not a three worded jargon and a trendy program. TPM is an organization-wide equipment improvement strategy… TPM is a systematic focus on eliminating the major equipment-related losses… TPM is a strategy that demands the involvement of anyone who contributes to a problem… TPM is a strategy that assures that all critical equipment is reliable by focusing on improving overall equipment effectiveness… TPM is a culture change (evolution) led by top management with very clear business expectations… TPM is the only proven work culture that promotes and sustains reliable equipment at lower cost…
A common misunderstanding  about TPM !   Total Productive Maintenance (TPM) provided the framework for policies, the structures, the tools, and the results for consistently reliable, low operating cost equipment and facilities during the evolution of the Toyota Production System (TPS). … TPM is the backbone of the TPS… This is where the misunderstanding begins for today’s corporate leaders: they see, they analyze, and adopt or adapt the TPS tools that they see when they see TPS in action. Unfortunately this tools  are not  the “system” which makes TPS working: what our western culture fails to see is the “TPS journey” from the old ways of doing business to the new and continuously improving ways, generating sustainable results.
TPM HOUSE PLANNED MAINTENANCE SYSTEM SKILL TRAINING PROGRAM QUALITY MAINTENANCE  SYSTEM TPM IN OFFICE 5S S eiri (Sort out) -  S eiton (Set in order) -  S eiso (Shine) -  S eiketsu (Standardize) -  S hitsuke (Sustain) THE EIGHT PILLARS OF TPM “ KOBETSU - KAIZEN” SYSTEM “ JISHU - HOZEN” SYSTEM SAFETY, HYGIENE AND WORKING ENVIRONMENT
What is Operator Driven Reliability? PLANNED MAINTENANCE SYSTEM SKILL TRAINING PROGRAM 5S S eiri (Sort out) -  S eiton (Set in order) -  S eiso (Shine) -  S eiketsu (Standardize) -  S hitsuke (Sustain) THE FIVE PILLARS OF ODR “ KOBETSU - KAIZEN” SYSTEM “ JISHU - HOZEN” SYSTEM TPM is a slow culture change to get people to do the right things at the right time: the TPM journey must be covered using much attention and pursuing the goals in a systematic way (step by step). The first step of TPM is the ODR: the ODR is a new and innovative approach to the maintenance, used for example in SKF Industrie (Massa plant), to drive the maintenance operations toward the excellence!
5S TPM starts with 5S. Problems cannot be clearly seen when the work place is unorganized. Cleaning and organizing the workplace helps the team to uncover problems.  Making problems visible is the first step of improvement. SEIRI - Sort out  : this means sorting and organizing the items as critical, important, frequently used items, useless, or items that are not need as of now. Unwanted items can be salvaged. Critical items should be kept for use nearby and items that are not be used in near future, should be stored in some place. For this step, the worth of the item should be decided based on utility and not cost. As a result of this step, the search time is reduced. SEITON - Set in order  : the concept here is that "Each items has a place, and only one place". The items should be placed back after usage at the same place. To identify items easily, name plates and coloured tags has to be used. Vertical racks can be used for this purpose, and heavy items occupy the bottom position in the racks.  SEISO - Shine the workplace  : this involves cleaning the work place free of burrs, grease, oil, waste, scrap etc. No loosely hanging wires or oil leakage from machines.  SEIKETSU - Standardize  : employees has to discuss together and decide on standards for keeping the work place / Machines / pathways neat and clean. This standards are implemented for whole organization and are tested / Inspected randomly.  SHITSUKE - Sustain  : considering 5S as a way of life and bring about self-discipline among the employees of the organization. This includes wearing badges, following work procedures, punctuality, dedication to the organization etc.
“ KOBETSU - KAIZEN” SYSTEM “ Kai” means change, and “Zen” means good (for the better). Basically kaizen is for small improvements, but carried out on a continual basis and involve all people in the organization. Kaizen is opposite to big spectacular innovations. Kaizen requires no or little investment. The principle behind is that “a very large number of small improvements are more effective in an organizational environment than a few improvements of large value”. This pillar is aimed at reducing losses in the workplace that affect our efficiencies. By using a detailed and thorough procedure we eliminate losses in a systematic method using various Kaizen tools. These activities are not limited to production areas and can be implemented in administrative areas as well.  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
“ JISHU - HOZEN” SYSTEM ,[object Object],[object Object],[object Object],[object Object],[object Object],This pillar is oriented towards developing operators to be able to take care of small maintenance tasks, thus freeing up the skilled maintenance people to spend time on more value added activity and technical repairs. The operators are responsible for upkeep of their equipment to prevent it from deteriorating.   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PLANNED MAINTENANCE SYSTEM ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Productive Maintenance ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
SKILL TRAINING PROGRAM ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
QUALITY MAINT. SYSTEM It is aimed towards customer delight through highest quality through defect free manufacturing. Focus is on eliminating non-conformances in a systematic manner, much like Focused Improvement. We gain understanding of what parts of the equipment affect product quality and begin to eliminate current quality concerns, then move to potential quality concerns. Transition is from reactive to proactive (Quality Control to Quality Assurance).  QM activities is to set equipment conditions that preclude quality defects, based on the basic concept of maintaining perfect equipment to maintain perfect quality of products. The condition are checked and measure in time series to very that measure values are within standard values to prevent defects. The transition of measured values is watched to predict possibilities of defects occurring and to take counter measures before hand.   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
TPM IN OFFICE
SAFETY, HYGIENE AND  WORKING ENVIRONMENT
LOSS STRUCTURE IN  PRODUCTION ACTIVITIES Operating worker-hours Operating hours Loading worker-hours Loading hours Actual working worker-hours Utilization hours Effective working worker-hours Net utilization hours Value-added worker-hours Value-added hours Human Equipment Management Losses Motion Losses Line Organization Losses Losses resulting from failure to automate Measuring and adjustment losses Shut Down Losses Failure Losses Setup and Adjustment Losses Start-Up Losses The losses which decrease the human work efficiency The losses which decrease the equipment efficiency Other Stoppage Losses Speed Losses Typical Equipment Losses Defect/Rework Losses Minor stoppage/Idling Losses
OVERALL EQUIPMENT EFFICIENCY (OEE) Operating hours Loading hours Utilization hours Net utilization hours Value-added hours 1 2 3 4 ,[object Object],[object Object],[object Object],[object Object],Availability = (UT) / (UT+DT) Performance Rate = (SCT • PU) / (UT) Quality Products Rate = (TP-DP) / (TP)  UT  -> UpTime DT -> DownTime SCT -> Standard Cycle Time TP -> Total Production DP -> Defective Production OEE = Availability  ·   Performance Rate  ·   Quality Products Rate Failure Setup/Adjustment Speed Losses Defect/Rework Minor Stoppage
HOW MUCH DOES AN OEE IMPROVEMENT COST? Measurement of actual level of defects and breakdowns. Modelling the plant behaviour and validate the simulation model. Determination of current OEE. INTERNAL SPEC. Evaluation of  possible single or combined equipments interventions. Determination of Percentage of  OEE Improvements for intervention (%OEEI) Evaluation of Equipments Improvements Costs (EIC) Determination of the Cost Percentage Improvement index for interventions. DESIGN A PLANT MAINTENANCE PROGRAM. OEE = A ·PR·QR CPI = EIC/(%OEEI)
TPM APPLICATION IN 12 STEPS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Maintenance and reliability as a core business strategy is key to a successful TPM implementation. Without the support of top management, TPM will be just another “flavour of the month.”  Implementing TPM using the above 12 steps will lead us on the road to “ zero breakdowns ” and “ zero defects ”.
Why should Mitsuba start the TPM application? IMPROVE QUALITY COST DECREASES PRODUCTIVITY IMPROVES CAPTURE THE MARKET STAY IN BUSINESS PROVIDE JOBS AND MORE JOBS Cost decreases because of less rework, fewer mistakes, fewer delays, snags, better use of machine-time and materials. Capture the market with better quality and lower price. Deming Chain Reaction
Where should Mitsuba start the TPM application?
COIL CORE ASSY FLOW PROCESS WINDING MACHINE COIL CORE UNIT WIRE COIL BOBBIN COIL CORE ASSY
NITTOKU WINDING MACHINE
ATOP WINDING MACHINE
WINDING MACHINE STRUCTURE Winding Machine Equipment Software Equipment Hardware Equipment NC Axis Wire Guide Wire Tightener Flyer Wire Guide Tools Brake Program
PM ANALYSIS ( visible defect ) PM P henomena P hysical After the winding process, wire insulator has been damaged!  Wire guide tools damage the wire insulator. M echanism Wire guide tools touch the wire insulator during the process. M achine Hardware Software M aterial Wire insulator is too fragile. Wrong position of wire guide tools. Wrong dimension of layering. Wire Tightener does not work properly. M ethod Wrong transition between two poles. CHECK
PM ANALYSIS ( not visible defect ) PM P henomena P hysical Stator Assy fails the tests at the ending of production line! M echanism Wire guide tools touch the wire insulator during the process. M achine Hardware Software M aterial Wrong height of coil core unit. Wrong position of wire guide tools. Wrong dimension of layering. Wire Tightener does not work properly. M ethod A too high load on the wire during the winding process produces a high stress into the insulator Wire insulator is too fragile. Wrong design of coil bobbin. Resistance CHECK Inductance Wire insulator has been damaged during the winding process and it makes a short-circuit.
WHY-WHY ANALYSIS Kaizen Idea and schedule… … … … Why 2 Why 1 Due to/Action Why did you take above action? □  In case of spare-part no replacement. Describe Countermeasure: □  In case of spare-part replacement. What your final action? Breakdown, physical phenomenon: (6)  □ Poor Skill (5)  □ Weak Design (4)  □ Deterioration (3)  □ Material  □ Coil Bobbin □ Coil Core Unit □ Wire (2)  □ Poor Condition  □ Basic □ Operating (1)  □ Winding Machine  □ Hardware □ Software E&T SKILL DESIGN PM JH Root cause is one of the following 5 items.
WHY-WHY PROCESS ANALYSIS NEW  TEST Worker must not spend time for “NG” pieces. Why 2 Add facilities to test the coil core assy. Worker has to test the coil core assy. Why 1 Due to/Action Why did you take above action? □  In case of spare-part no replacement. Describe Countermeasure:  first of all, the countermeasure avoids that a “NG” piece could be used in the downstream operations, as the resin treatment and the lead wire assembly ( it decreases the waste ); beside this, at this point of the process flow it is possible to rework the coil core assy. □  In case of spare-part replacement. What your final action?  Add facilities to test the coil core assy. Phenomenon:  Worker can not test the coil core assy before the resin treatment and the lead wire assembly! (6)  □ Poor Skill (5)  □ Weak Design (4)  □ Deterioration (3)  □ Material  □ Coil Bobbin □ Coil Core Unit □ Wire ▣ (2)  ▣   Poor Condition   □ Basic  ▣   Operating (1)  □ Winding Machine  □ Hardware □ Software E&T SKILL DESIGN PM JH Root cause is one of the following 5 items.

More Related Content

What's hot

tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
Shreya Chaudhary
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
KUN CAPITAL, ASHOK LEYLAND AS A INTERN
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
Paul Robere
 
TPM by Chandan Jha
TPM by Chandan JhaTPM by Chandan Jha
TPM by Chandan JhaChanand Jha
 
Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...
Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...
Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...
Bonny V Pappachan
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
Achuthan Rajagopal
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
ManishaHalai1
 
Srj tpm
Srj tpmSrj tpm
Tpm basic
Tpm basicTpm basic
Tpm basic
Paul Robere
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
AakashGT
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools
博行 門眞
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
Pramod A
 
Total productive maintenance (Total Quality Management)
Total productive maintenance (Total Quality Management)Total productive maintenance (Total Quality Management)
Total productive maintenance (Total Quality Management)Ashwin Ashok Kumar
 
TPM & OEE
TPM & OEETPM & OEE
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsRohit Singh
 
Total productive maintance (tpm)
Total productive maintance (tpm)Total productive maintance (tpm)
Total productive maintance (tpm)
Ankur Kumar
 
total productive maintenance
total productive maintenancetotal productive maintenance
total productive maintenance
Shankha Goswami
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Timothy Wooi
 
Floyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenanceFloyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenance
Floyd Patterson
 

What's hot (20)

tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
TPM by Chandan Jha
TPM by Chandan JhaTPM by Chandan Jha
TPM by Chandan Jha
 
Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...
Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...
Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Total productive maintenance (Total Quality Management)
Total productive maintenance (Total Quality Management)Total productive maintenance (Total Quality Management)
Total productive maintenance (Total Quality Management)
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Total productive maintance (tpm)
Total productive maintance (tpm)Total productive maintance (tpm)
Total productive maintance (tpm)
 
total productive maintenance
total productive maintenancetotal productive maintenance
total productive maintenance
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
 
Floyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenanceFloyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenance
 
Tpm final
Tpm finalTpm final
Tpm final
 

Viewers also liked

TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)
Timothy Wooi
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
Mahendra K SHUKLA
 
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
Dr. V.N. Tikku
 
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...
TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...
博行 門眞
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementRajeev Sharan
 
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
博行 門眞
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
博行 門眞
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
Bisina Keshara
 
Kaizen events -what are they? Driving Performance Improvement
Kaizen events -what are they? Driving Performance ImprovementKaizen events -what are they? Driving Performance Improvement
Kaizen events -what are they? Driving Performance Improvement
Philip Lowe
 
2000 JIPM Bedankbrief
2000 JIPM Bedankbrief2000 JIPM Bedankbrief
2000 JIPM BedankbriefPaul Bekkers
 
Maintenance Scorecard
Maintenance ScorecardMaintenance Scorecard
Maintenance Scorecardyoan_ariesta
 
Manual%204%20 kobetsu kaizen
Manual%204%20 kobetsu kaizenManual%204%20 kobetsu kaizen
Manual%204%20 kobetsu kaizenvikymail
 
Maintenance Manager Balanced Scorecard
Maintenance Manager Balanced ScorecardMaintenance Manager Balanced Scorecard
Maintenance Manager Balanced Scorecard
Ricky Smith CMRP, CMRT
 
Tpm presentation
Tpm presentationTpm presentation
Tpm presentationmahinsasa
 
Quality of electronic products for the automotive
Quality of electronic products for the automotiveQuality of electronic products for the automotive
Quality of electronic products for the automotive
博行 門眞
 
Nesmyslné promoakce - Retail Summit 2016
Nesmyslné promoakce - Retail Summit 2016Nesmyslné promoakce - Retail Summit 2016
Nesmyslné promoakce - Retail Summit 2016
Logio_official
 
TPM CYCLE C
TPM CYCLE CTPM CYCLE C
TPM CYCLE C
Max Lyons
 
TPM SUMMARY
TPM SUMMARYTPM SUMMARY
TPM SUMMARY
Max Lyons
 
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementCondition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
OSIsoft, LLC
 

Viewers also liked (20)

TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
 
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...
TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
 
Maintenence management
Maintenence managementMaintenence management
Maintenence management
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Kaizen events -what are they? Driving Performance Improvement
Kaizen events -what are they? Driving Performance ImprovementKaizen events -what are they? Driving Performance Improvement
Kaizen events -what are they? Driving Performance Improvement
 
2000 JIPM Bedankbrief
2000 JIPM Bedankbrief2000 JIPM Bedankbrief
2000 JIPM Bedankbrief
 
Maintenance Scorecard
Maintenance ScorecardMaintenance Scorecard
Maintenance Scorecard
 
Manual%204%20 kobetsu kaizen
Manual%204%20 kobetsu kaizenManual%204%20 kobetsu kaizen
Manual%204%20 kobetsu kaizen
 
Maintenance Manager Balanced Scorecard
Maintenance Manager Balanced ScorecardMaintenance Manager Balanced Scorecard
Maintenance Manager Balanced Scorecard
 
Tpm presentation
Tpm presentationTpm presentation
Tpm presentation
 
Quality of electronic products for the automotive
Quality of electronic products for the automotiveQuality of electronic products for the automotive
Quality of electronic products for the automotive
 
Nesmyslné promoakce - Retail Summit 2016
Nesmyslné promoakce - Retail Summit 2016Nesmyslné promoakce - Retail Summit 2016
Nesmyslné promoakce - Retail Summit 2016
 
TPM CYCLE C
TPM CYCLE CTPM CYCLE C
TPM CYCLE C
 
TPM SUMMARY
TPM SUMMARYTPM SUMMARY
TPM SUMMARY
 
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementCondition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
 

Similar to TPM (en)

Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
Abdullah Saif
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
Jitesh Gaurav
 
Tpm assignment- roll no. 56 to 60
Tpm  assignment- roll no. 56 to 60Tpm  assignment- roll no. 56 to 60
Tpm assignment- roll no. 56 to 60
kalpeshvora4
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
EzraDhigo
 
Chapter 2. tpm
Chapter 2. tpmChapter 2. tpm
Chapter 2. tpm
Prof.Mayur Modi
 
05 Seminar Slide
05 Seminar Slide05 Seminar Slide
05 Seminar Slide
praful_m_n
 
Implementing total productive maintenance in manufacturing
Implementing total productive maintenance in manufacturingImplementing total productive maintenance in manufacturing
Implementing total productive maintenance in manufacturing
globalsevensteps
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity Maintenance
GohelYash1
 
Implementing total productive maintenance in manufacturing
Implementing total productive maintenance in manufacturingImplementing total productive maintenance in manufacturing
Implementing total productive maintenance in manufacturing
globalsevensteps
 
On concept of Total Productive Maintenance
On concept of Total Productive MaintenanceOn concept of Total Productive Maintenance
On concept of Total Productive Maintenance
Shree Bhargava and Associate
 
19BT02004.pptx
19BT02004.pptx19BT02004.pptx
19BT02004.pptx
DevenGohel1
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
Vikas Awasthi
 
Total Productive Maintenance - A Systematic Review
Total Productive Maintenance - A Systematic ReviewTotal Productive Maintenance - A Systematic Review
Total Productive Maintenance - A Systematic Review
ijsrd.com
 
tpm main.pptx
tpm main.pptxtpm main.pptx
tpm main.pptx
EzraDhigo
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
Ricky Smith CMRP, CMRT
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET Journal
 
Total Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Total Productive Maintenance: A Comprehensive Guide | Enterprise WiredTotal Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Total Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Enterprise Wired
 

Similar to TPM (en) (20)

Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 
Tpm assignment- roll no. 56 to 60
Tpm  assignment- roll no. 56 to 60Tpm  assignment- roll no. 56 to 60
Tpm assignment- roll no. 56 to 60
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
Chapter 2. tpm
Chapter 2. tpmChapter 2. tpm
Chapter 2. tpm
 
05 Seminar Slide
05 Seminar Slide05 Seminar Slide
05 Seminar Slide
 
Implementing total productive maintenance in manufacturing
Implementing total productive maintenance in manufacturingImplementing total productive maintenance in manufacturing
Implementing total productive maintenance in manufacturing
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity Maintenance
 
Implementing total productive maintenance in manufacturing
Implementing total productive maintenance in manufacturingImplementing total productive maintenance in manufacturing
Implementing total productive maintenance in manufacturing
 
On concept of Total Productive Maintenance
On concept of Total Productive MaintenanceOn concept of Total Productive Maintenance
On concept of Total Productive Maintenance
 
19BT02004.pptx
19BT02004.pptx19BT02004.pptx
19BT02004.pptx
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Total Productive Maintenance - A Systematic Review
Total Productive Maintenance - A Systematic ReviewTotal Productive Maintenance - A Systematic Review
Total Productive Maintenance - A Systematic Review
 
tpm main.pptx
tpm main.pptxtpm main.pptx
tpm main.pptx
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Total Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Total Productive Maintenance: A Comprehensive Guide | Enterprise WiredTotal Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Total Productive Maintenance: A Comprehensive Guide | Enterprise Wired
 

More from Federico フェデリコ Guidi

L’importanza dell’approccio Lean sui sistemi qualità delle organizzazioni
L’importanza dell’approccio Lean sui sistemi qualità delle organizzazioniL’importanza dell’approccio Lean sui sistemi qualità delle organizzazioni
L’importanza dell’approccio Lean sui sistemi qualità delle organizzazioni
Federico フェデリコ Guidi
 
Treecube - Progetto Favignana
Treecube - Progetto FavignanaTreecube - Progetto Favignana
Treecube - Progetto Favignana
Federico フェデリコ Guidi
 
.Master EAM7 - Il progetto "Eolo"
.Master EAM7 - Il progetto "Eolo".Master EAM7 - Il progetto "Eolo"
.Master EAM7 - Il progetto "Eolo"
Federico フェデリコ Guidi
 
Scheda tecnica della Windbooster 1.0
Scheda tecnica della Windbooster 1.0Scheda tecnica della Windbooster 1.0
Scheda tecnica della Windbooster 1.0
Federico フェデリコ Guidi
 
Environment Stress Cracking
Environment Stress CrackingEnvironment Stress Cracking
Environment Stress Cracking
Federico フェデリコ Guidi
 
Corso introduttivo avvolgitrici Atop TBW200
Corso introduttivo avvolgitrici Atop TBW200Corso introduttivo avvolgitrici Atop TBW200
Corso introduttivo avvolgitrici Atop TBW200
Federico フェデリコ Guidi
 
Calcolo della perdita di carico in una tubazione percorsa da gasolio.
Calcolo della perdita di carico in una tubazione percorsa da gasolio.Calcolo della perdita di carico in una tubazione percorsa da gasolio.
Calcolo della perdita di carico in una tubazione percorsa da gasolio.
Federico フェデリコ Guidi
 
The Windbooster project (en)
The Windbooster project (en)The Windbooster project (en)
The Windbooster project (en)
Federico フェデリコ Guidi
 
Windbooster system - brochure rev.2 (en)
Windbooster system - brochure rev.2 (en)Windbooster system - brochure rev.2 (en)
Windbooster system - brochure rev.2 (en)
Federico フェデリコ Guidi
 

More from Federico フェデリコ Guidi (9)

L’importanza dell’approccio Lean sui sistemi qualità delle organizzazioni
L’importanza dell’approccio Lean sui sistemi qualità delle organizzazioniL’importanza dell’approccio Lean sui sistemi qualità delle organizzazioni
L’importanza dell’approccio Lean sui sistemi qualità delle organizzazioni
 
Treecube - Progetto Favignana
Treecube - Progetto FavignanaTreecube - Progetto Favignana
Treecube - Progetto Favignana
 
.Master EAM7 - Il progetto "Eolo"
.Master EAM7 - Il progetto "Eolo".Master EAM7 - Il progetto "Eolo"
.Master EAM7 - Il progetto "Eolo"
 
Scheda tecnica della Windbooster 1.0
Scheda tecnica della Windbooster 1.0Scheda tecnica della Windbooster 1.0
Scheda tecnica della Windbooster 1.0
 
Environment Stress Cracking
Environment Stress CrackingEnvironment Stress Cracking
Environment Stress Cracking
 
Corso introduttivo avvolgitrici Atop TBW200
Corso introduttivo avvolgitrici Atop TBW200Corso introduttivo avvolgitrici Atop TBW200
Corso introduttivo avvolgitrici Atop TBW200
 
Calcolo della perdita di carico in una tubazione percorsa da gasolio.
Calcolo della perdita di carico in una tubazione percorsa da gasolio.Calcolo della perdita di carico in una tubazione percorsa da gasolio.
Calcolo della perdita di carico in una tubazione percorsa da gasolio.
 
The Windbooster project (en)
The Windbooster project (en)The Windbooster project (en)
The Windbooster project (en)
 
Windbooster system - brochure rev.2 (en)
Windbooster system - brochure rev.2 (en)Windbooster system - brochure rev.2 (en)
Windbooster system - brochure rev.2 (en)
 

Recently uploaded

What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
Motor Cars International
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
jennifermiller8137
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Hyundai Motor Group
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Masters European & Gapanese Auto Repair
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Vic Auto Collision & Repair
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
psavhef
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
Antique Plastic Traders
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
Excavator
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
kshamashah95
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
European Service Center
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
Autohaus Service and Sales
 
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
amvovau
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
coc7987515756
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
Excavator
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
Dart Auto
 
What Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMWWhat Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMW
Tanner Motors
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
Bertini's German Motors
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Precious Mvulane CA (SA),RA
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
4thzenzstar
 

Recently uploaded (19)

What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
 
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
 
What Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMWWhat Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMW
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
 

TPM (en)

  • 1. MITSUBA F.N.E. Maintenance Department TPM / ODR T otal P roductive M aintenance O perator D riven R eliability ( focused on GF08 winding section )
  • 2.
  • 3. A common misunderstanding about TPM ! Total Productive Maintenance (TPM) provided the framework for policies, the structures, the tools, and the results for consistently reliable, low operating cost equipment and facilities during the evolution of the Toyota Production System (TPS). … TPM is the backbone of the TPS… This is where the misunderstanding begins for today’s corporate leaders: they see, they analyze, and adopt or adapt the TPS tools that they see when they see TPS in action. Unfortunately this tools are not the “system” which makes TPS working: what our western culture fails to see is the “TPS journey” from the old ways of doing business to the new and continuously improving ways, generating sustainable results.
  • 4. TPM HOUSE PLANNED MAINTENANCE SYSTEM SKILL TRAINING PROGRAM QUALITY MAINTENANCE SYSTEM TPM IN OFFICE 5S S eiri (Sort out) - S eiton (Set in order) - S eiso (Shine) - S eiketsu (Standardize) - S hitsuke (Sustain) THE EIGHT PILLARS OF TPM “ KOBETSU - KAIZEN” SYSTEM “ JISHU - HOZEN” SYSTEM SAFETY, HYGIENE AND WORKING ENVIRONMENT
  • 5. What is Operator Driven Reliability? PLANNED MAINTENANCE SYSTEM SKILL TRAINING PROGRAM 5S S eiri (Sort out) - S eiton (Set in order) - S eiso (Shine) - S eiketsu (Standardize) - S hitsuke (Sustain) THE FIVE PILLARS OF ODR “ KOBETSU - KAIZEN” SYSTEM “ JISHU - HOZEN” SYSTEM TPM is a slow culture change to get people to do the right things at the right time: the TPM journey must be covered using much attention and pursuing the goals in a systematic way (step by step). The first step of TPM is the ODR: the ODR is a new and innovative approach to the maintenance, used for example in SKF Industrie (Massa plant), to drive the maintenance operations toward the excellence!
  • 6. 5S TPM starts with 5S. Problems cannot be clearly seen when the work place is unorganized. Cleaning and organizing the workplace helps the team to uncover problems. Making problems visible is the first step of improvement. SEIRI - Sort out : this means sorting and organizing the items as critical, important, frequently used items, useless, or items that are not need as of now. Unwanted items can be salvaged. Critical items should be kept for use nearby and items that are not be used in near future, should be stored in some place. For this step, the worth of the item should be decided based on utility and not cost. As a result of this step, the search time is reduced. SEITON - Set in order : the concept here is that "Each items has a place, and only one place". The items should be placed back after usage at the same place. To identify items easily, name plates and coloured tags has to be used. Vertical racks can be used for this purpose, and heavy items occupy the bottom position in the racks. SEISO - Shine the workplace : this involves cleaning the work place free of burrs, grease, oil, waste, scrap etc. No loosely hanging wires or oil leakage from machines. SEIKETSU - Standardize : employees has to discuss together and decide on standards for keeping the work place / Machines / pathways neat and clean. This standards are implemented for whole organization and are tested / Inspected randomly. SHITSUKE - Sustain : considering 5S as a way of life and bring about self-discipline among the employees of the organization. This includes wearing badges, following work procedures, punctuality, dedication to the organization etc.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 13. SAFETY, HYGIENE AND WORKING ENVIRONMENT
  • 14. LOSS STRUCTURE IN PRODUCTION ACTIVITIES Operating worker-hours Operating hours Loading worker-hours Loading hours Actual working worker-hours Utilization hours Effective working worker-hours Net utilization hours Value-added worker-hours Value-added hours Human Equipment Management Losses Motion Losses Line Organization Losses Losses resulting from failure to automate Measuring and adjustment losses Shut Down Losses Failure Losses Setup and Adjustment Losses Start-Up Losses The losses which decrease the human work efficiency The losses which decrease the equipment efficiency Other Stoppage Losses Speed Losses Typical Equipment Losses Defect/Rework Losses Minor stoppage/Idling Losses
  • 15.
  • 16. HOW MUCH DOES AN OEE IMPROVEMENT COST? Measurement of actual level of defects and breakdowns. Modelling the plant behaviour and validate the simulation model. Determination of current OEE. INTERNAL SPEC. Evaluation of possible single or combined equipments interventions. Determination of Percentage of OEE Improvements for intervention (%OEEI) Evaluation of Equipments Improvements Costs (EIC) Determination of the Cost Percentage Improvement index for interventions. DESIGN A PLANT MAINTENANCE PROGRAM. OEE = A ·PR·QR CPI = EIC/(%OEEI)
  • 17.
  • 18. Why should Mitsuba start the TPM application? IMPROVE QUALITY COST DECREASES PRODUCTIVITY IMPROVES CAPTURE THE MARKET STAY IN BUSINESS PROVIDE JOBS AND MORE JOBS Cost decreases because of less rework, fewer mistakes, fewer delays, snags, better use of machine-time and materials. Capture the market with better quality and lower price. Deming Chain Reaction
  • 19. Where should Mitsuba start the TPM application?
  • 20. COIL CORE ASSY FLOW PROCESS WINDING MACHINE COIL CORE UNIT WIRE COIL BOBBIN COIL CORE ASSY
  • 23. WINDING MACHINE STRUCTURE Winding Machine Equipment Software Equipment Hardware Equipment NC Axis Wire Guide Wire Tightener Flyer Wire Guide Tools Brake Program
  • 24. PM ANALYSIS ( visible defect ) PM P henomena P hysical After the winding process, wire insulator has been damaged! Wire guide tools damage the wire insulator. M echanism Wire guide tools touch the wire insulator during the process. M achine Hardware Software M aterial Wire insulator is too fragile. Wrong position of wire guide tools. Wrong dimension of layering. Wire Tightener does not work properly. M ethod Wrong transition between two poles. CHECK
  • 25. PM ANALYSIS ( not visible defect ) PM P henomena P hysical Stator Assy fails the tests at the ending of production line! M echanism Wire guide tools touch the wire insulator during the process. M achine Hardware Software M aterial Wrong height of coil core unit. Wrong position of wire guide tools. Wrong dimension of layering. Wire Tightener does not work properly. M ethod A too high load on the wire during the winding process produces a high stress into the insulator Wire insulator is too fragile. Wrong design of coil bobbin. Resistance CHECK Inductance Wire insulator has been damaged during the winding process and it makes a short-circuit.
  • 26. WHY-WHY ANALYSIS Kaizen Idea and schedule… … … … Why 2 Why 1 Due to/Action Why did you take above action? □ In case of spare-part no replacement. Describe Countermeasure: □ In case of spare-part replacement. What your final action? Breakdown, physical phenomenon: (6) □ Poor Skill (5) □ Weak Design (4) □ Deterioration (3) □ Material □ Coil Bobbin □ Coil Core Unit □ Wire (2) □ Poor Condition □ Basic □ Operating (1) □ Winding Machine □ Hardware □ Software E&T SKILL DESIGN PM JH Root cause is one of the following 5 items.
  • 27. WHY-WHY PROCESS ANALYSIS NEW TEST Worker must not spend time for “NG” pieces. Why 2 Add facilities to test the coil core assy. Worker has to test the coil core assy. Why 1 Due to/Action Why did you take above action? □ In case of spare-part no replacement. Describe Countermeasure: first of all, the countermeasure avoids that a “NG” piece could be used in the downstream operations, as the resin treatment and the lead wire assembly ( it decreases the waste ); beside this, at this point of the process flow it is possible to rework the coil core assy. □ In case of spare-part replacement. What your final action? Add facilities to test the coil core assy. Phenomenon: Worker can not test the coil core assy before the resin treatment and the lead wire assembly! (6) □ Poor Skill (5) □ Weak Design (4) □ Deterioration (3) □ Material □ Coil Bobbin □ Coil Core Unit □ Wire ▣ (2) ▣ Poor Condition □ Basic ▣ Operating (1) □ Winding Machine □ Hardware □ Software E&T SKILL DESIGN PM JH Root cause is one of the following 5 items.