A presentation on TPM and its goals, pillars, and other aspects have been explored as well as its relation to 5s, OEE these tools also have been shown. In the end, step by step implementation of TPM is also discussed.
A presentation on TPM and its objectives, goals, benefits, pillars and other aspects have been explored as well as its relation to 5s & visual. In the end, step by step implementation of TPM, losses & OEE, these tools also have been shown & discussed.
The presentation gives a brief explanation about the 8 pillar of TPM.It is medical science of machines.TPM focuses on maintenance as a necessary and vitally important part of the business. It is no longer regarded as a non-profit activity. The goal is to hold emergency and unscheduled maintenance to a minimum.
A presentation on TPM and its goals, pillars, and other aspects have been explored as well as its relation to 5s, OEE these tools also have been shown. In the end, step by step implementation of TPM is also discussed.
A presentation on TPM and its objectives, goals, benefits, pillars and other aspects have been explored as well as its relation to 5s & visual. In the end, step by step implementation of TPM, losses & OEE, these tools also have been shown & discussed.
The presentation gives a brief explanation about the 8 pillar of TPM.It is medical science of machines.TPM focuses on maintenance as a necessary and vitally important part of the business. It is no longer regarded as a non-profit activity. The goal is to hold emergency and unscheduled maintenance to a minimum.
TPM is for improving productivity by making processes more reliable and less wasteful. To achieve this objective, preventive and predictive maintenance is adopted. The objective of TPM is to maintain the plant or equipment in good condition.
My Home page is Japanese Gemba Kaizen Web
http://takuminotie.com/english/
Please Look and Like us on Facebook
Table of contents
1. TPM Concept
2. TPM Definition
3. TPM Philosophy
4. TPM Essence
5. Improvement lead to real benefits
6 .Case of small amount of work
7.TPM organization
8. TPM History
9.TQC&TPM
10. Step 12 of the TPM program
11.8 main pillars of TPM
12. Participation of all employees activities
13. TPM Promotion Organization
14. Case of TPM promotion organizations
15. TPM basic policy and Goal
16. Ask the machine
Total Productive Maintenance (TPM) for EVERTS 20Aug2018Timothy Wooi
This is a 2 day Course which is a company wide, team-based effort, to build quality into equipment, and to improve overall equipment effectiveness (OEE) towards Zero Breakdown.
It uses Total Quality Control and Total Employee Involvement approach, in maintaining the Equipment towards a “ready to use condition” using energy efficiently.
This course will guide you through to assess the activities of Autonomous Maintenance (AM) on your current Equipment and to plan the execution of your Maintenance Activities using a Visual Schedule.
TPM defines your Maintenance schedule and Goals..
TPM helps you plan and develop the optimal program for your facility, resulting in increased efficiencies and cost savings
This is a 2 days course on Total Productive Maintenance (TPM) that will guide you through to implement Autonomous Maintenance (AM) on your current Equipment and to plan the execution of your Preventive (PM) & Predictive Maintenance (PdM).TPM defines your Maintenance schedule and Goals. TPM helps you plan and develop the optimal program for your facility, resulting in increased efficiency and cost savings.
Day 2
TPM Implementation after (AM) & Maintenance
Workshop Activities
Review & extract Equipment PM to a ‘Do Dot’ Visual Master Plan & Visual TPM Board.
Attacking 6 big losses of Equipment
(PdM) with Engineering Kaizen to maximize
Equipment Utilization
Quality, Engineering & Maintenance Kaizen
Improvement Action Projects & Action Plans
TPM is for improving productivity by making processes more reliable and less wasteful. To achieve this objective, preventive and predictive maintenance is adopted. The objective of TPM is to maintain the plant or equipment in good condition.
My Home page is Japanese Gemba Kaizen Web
http://takuminotie.com/english/
Please Look and Like us on Facebook
Table of contents
1. TPM Concept
2. TPM Definition
3. TPM Philosophy
4. TPM Essence
5. Improvement lead to real benefits
6 .Case of small amount of work
7.TPM organization
8. TPM History
9.TQC&TPM
10. Step 12 of the TPM program
11.8 main pillars of TPM
12. Participation of all employees activities
13. TPM Promotion Organization
14. Case of TPM promotion organizations
15. TPM basic policy and Goal
16. Ask the machine
Total Productive Maintenance (TPM) for EVERTS 20Aug2018Timothy Wooi
This is a 2 day Course which is a company wide, team-based effort, to build quality into equipment, and to improve overall equipment effectiveness (OEE) towards Zero Breakdown.
It uses Total Quality Control and Total Employee Involvement approach, in maintaining the Equipment towards a “ready to use condition” using energy efficiently.
This course will guide you through to assess the activities of Autonomous Maintenance (AM) on your current Equipment and to plan the execution of your Maintenance Activities using a Visual Schedule.
TPM defines your Maintenance schedule and Goals..
TPM helps you plan and develop the optimal program for your facility, resulting in increased efficiencies and cost savings
This is a 2 days course on Total Productive Maintenance (TPM) that will guide you through to implement Autonomous Maintenance (AM) on your current Equipment and to plan the execution of your Preventive (PM) & Predictive Maintenance (PdM).TPM defines your Maintenance schedule and Goals. TPM helps you plan and develop the optimal program for your facility, resulting in increased efficiency and cost savings.
Day 2
TPM Implementation after (AM) & Maintenance
Workshop Activities
Review & extract Equipment PM to a ‘Do Dot’ Visual Master Plan & Visual TPM Board.
Attacking 6 big losses of Equipment
(PdM) with Engineering Kaizen to maximize
Equipment Utilization
Quality, Engineering & Maintenance Kaizen
Improvement Action Projects & Action Plans
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...博行 門眞
My Home page is Japanese Gemba Kaizen Web
http://takuminotie.com/english/
Please Look and Like us on Facebook
Table of contents
1.What is the production efficiency?
2. 8 large loss to inhibit efficiency
3. Seven large loss of equipment
4. Sudden loss and chronic loss
5. Restoration
6. Cleaning is inspection
7. Equipment Ideal
8. Minaor defects
9. PM Analysis
10. maintenance skills
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...博行 門眞
My Home page is Japanese Gemba Kaizen Web
http://takuminotie.com/english/
Please Look and Like us on Facebook
Table of contents
1. Improvement of zero failure
2. Improvement of the setup
3. Improvement of cutting blade change loss
4. Improvement of start up
5. Improvement of Minor stoppage
6.Improvement of Speed losses
7.Improvement of Yield losses
8. Principle of improvement
TPM for lean manufacturing chp4 step of “jlshu hozen “activities博行 門眞
My Home page is Japanese Gemba Kaizen Web
http://takuminotie.com/english/
Please Look and Like us on Facebook
Table of contents
1. What is Jlshu-Hozen ?
2.Conservation activities of manufacturing departments
3.Conservation activities of maintenance department
4.Step method for the development of “Jishu-Hozen”
Step1: Initial-phase cleaning
Step2:Countermeasures for the source of problems
Step3: Establishment of tentative standards for“Jishu-Hozen”
Step4:General [overall] inspection
Step5: Autonomous inspection
Step6:Standardization
Step 7:Thorough implementation of autonomous
Kaizen events -what are they? Driving Performance ImprovementPhilip Lowe
Kaizen Events are a easy way to get started improving your business. With a focus on Action and implementation teams that are dedicated to solving a problem. Freeing up people from usual day to day responsibilities generates focus, dedication and enthusiasm that can be built upon every month to continually generate results. We have been involved in kaizen events that have generated benefits up to $20 Million for a weeks work! Usually 4 weeks is allowed to prepare for a Kaizen Event and 4 Weeks after the event to finalise any outstanding actions.
Quality of electronic products for the automotive博行 門眞
1.Why the Car need high level of quality ?
・Products related to human life
・PL(Product liability)
・Usage environment
・Repair and maintenance
2.Process control of automotive products
・Way of thinking
・Method
・Management of change point
Promoakce se staly povinnou složkou marketingu českých řetězců. Logio se na fenomén promoakcí soustředí již déle a nyní naše společnsot spočítala, jak to ve skutečnosti s těmi slevami je. Výsledek je pro řetězce velmi nepřízniví, na promoakci ztrácí až 80% svého zisku i zisku samotných výrobců a my těžko chápeme, proč v tom velké řetězce stále pokračují.
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementOSIsoft, LLC
The move from calendar-based maintenance to predictive maintenance is an ongoing process. But where should you begin? These ten easy steps can provide some guidance for getting started.
Implementing total productive maintenance in manufacturingglobalsevensteps
Total Productive Maintenance is well known in its abbreviated form – TPM has origins from Japan. It is a well structured and scientific method refined with many iterations for getting best and sustainable results.
TPM is for improving productivity by making processes more reliable and less wasteful.
The objective of TPM is to maintain the plant or equipment in good condition.
To achieve this objective, preventive and predictive maintenance is required.
Total Productive Maintenance - A Systematic Reviewijsrd.com
TPM is an effective tool and a practical technique, which is aimed at maximizing the effectiveness of the facility by minimizing the downtime of machine, production losses and the material, production losses that occurs during the continuous production process. This also increase the working efficiency and productivity of the employee and a positive inclination is registered in the overall environment of a company. This paper presents the literature review of total productive maintenance which is a positive approach for solving the manufacturing problem, also gives the objective of TPM, a detail about a six big losses, 8 pillar of TPM also give the tool used for improvement, implementation stages, methodology for calculating the overall equipment efficiency and also give the direct and indirect benefits of TPM. The aim of this paper is to study the TPM concept and its implementation program which gives a successful improvement in overall equipment efficiency.
Much has been written about lean manufacturing and the lean enterprise—enough that nearly all readers are familiar with the concepts as well as the phrases themselves. But what about lean maintenance?
Is it merely a subset of lean manufacturing? Is it a natural fall-in-behind spinoff result of adopting lean manufacturing practices?
Much to the chagrin of many manufacturing companies, whose attempts at implementing lean practices have failed ignominiously, lean maintenance is neither a subset nor a spinoff of lean manufacturing. It is instead a prerequisite for success as a lean manufacturer. This article will explain why.
Total Productive Maintenance: A Comprehensive Guide | Enterprise WiredEnterprise Wired
Here are some pillars of Total Productive Maintenance: 1. Initial Setup (5S), 2. Planned Maintenance, 3. Autonomous Maintenance, 4. Quality Maintenance, 5. Early Management of Equipment Defects.
L’importanza dell’approccio Lean sui sistemi qualità delle organizzazioniFederico フェデリコ Guidi
La progressiva diffusione del concetto di azienda snella in molte realtà industriali italiane ha portato immediatamente alla contrapposizione “ideologica” fra “esperti”. Da un lato coloro che ritengono i Sistemi di Gestione per la Qualità, e le relative certificazioni ISO 9001, inutili, inefficaci ed incompatibili con l’approccio Lean. Ad essi si oppongono coloro che individuano nei SGQ l’unico strumento concreto e veramente efficace per incrementare la competitività delle imprese.
Esiste una terza via: mettere al centro dell’attenzione il valore per il cliente e non le singole viste parziali che ciascuna area o funzione aziendale ha del valore. In questo senso non esiste incompatibilità fra i due sistemi ma, al contrario, può esserci una fortissima integrazione: è l’approccio “Quality at the Source” con il quale si gettano le basi per una qualità autonoma e sostenibile.
L’obiettivo del Progetto Favignana è quello di installare un impianto per la produzione di energia elettrica da fonte eolica presso il distributore di carburante ENI situato sull’isola di Favignana.
Environment Stress Cracking (ESC) is one of the main causes of failure of injection moulded plastic components. Failure occurs as a result of the accelerated fracture of polymeric materials due to the combined action of environmental exposure and stress.
A low temperature condition combined with a particular constraint condition produces a critical tensile stress distribution that culminates in a slow crack growth: the material used for moulded plastic component is not suitable for a creep condition.
Calcolo della perdita di carico in una tubazione percorsa da gasolio.Federico フェデリコ Guidi
Calcolo delle perdite di carico legate al flusso di un fluido viscoso (gasolio) all'interno di una tubazione di geometria nota. Nella soluzione proposta la densità e la viscosità del fluido sono considerate funzioni della temperatura.
Windbooster is a vertical axis wind turbine fed by a conveyed stream designed to solve the drawbacks that limit the efficiency of traditional wind turbines with vertical axis. Windbooster is a wind turbine specially designed for “on-roof” installation.
What Exactly Is The Common Rail Direct Injection System & How Does It WorkMotor Cars International
Learn about Common Rail Direct Injection (CRDi) - the revolutionary technology that has made diesel engines more efficient. Explore its workings, advantages like enhanced fuel efficiency and increased power output, along with drawbacks such as complexity and higher initial cost. Compare CRDi with traditional diesel engines and discover why it's the preferred choice for modern engines.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Hyundai Motor Group
What’s the force behind Hyundai Motor Group's EV performance and quality?
Maximized driving performance and quick charging time through high-density battery pack and fast charging technology and applicable to various vehicle types!
Discover more about Hyundai Motor Group’s EV platform ‘E-GMP’!
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
"Trans Failsafe Prog" on your BMW X5 indicates potential transmission issues requiring immediate action. This safety feature activates in response to abnormalities like low fluid levels, leaks, faulty sensors, electrical or mechanical failures, and overheating.
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
What Does the Active Steering Malfunction Warning Mean for Your BMWTanner Motors
Discover the reasons why your BMW’s Active Steering malfunction warning might come on. From electrical glitches to mechanical failures and software anomalies, addressing these promptly with professional inspection and maintenance ensures continued safety and performance on the road, maintaining the integrity of your driving experience.
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
1. MITSUBA F.N.E. Maintenance Department TPM / ODR T otal P roductive M aintenance O perator D riven R eliability ( focused on GF08 winding section )
2.
3. A common misunderstanding about TPM ! Total Productive Maintenance (TPM) provided the framework for policies, the structures, the tools, and the results for consistently reliable, low operating cost equipment and facilities during the evolution of the Toyota Production System (TPS). … TPM is the backbone of the TPS… This is where the misunderstanding begins for today’s corporate leaders: they see, they analyze, and adopt or adapt the TPS tools that they see when they see TPS in action. Unfortunately this tools are not the “system” which makes TPS working: what our western culture fails to see is the “TPS journey” from the old ways of doing business to the new and continuously improving ways, generating sustainable results.
4. TPM HOUSE PLANNED MAINTENANCE SYSTEM SKILL TRAINING PROGRAM QUALITY MAINTENANCE SYSTEM TPM IN OFFICE 5S S eiri (Sort out) - S eiton (Set in order) - S eiso (Shine) - S eiketsu (Standardize) - S hitsuke (Sustain) THE EIGHT PILLARS OF TPM “ KOBETSU - KAIZEN” SYSTEM “ JISHU - HOZEN” SYSTEM SAFETY, HYGIENE AND WORKING ENVIRONMENT
5. What is Operator Driven Reliability? PLANNED MAINTENANCE SYSTEM SKILL TRAINING PROGRAM 5S S eiri (Sort out) - S eiton (Set in order) - S eiso (Shine) - S eiketsu (Standardize) - S hitsuke (Sustain) THE FIVE PILLARS OF ODR “ KOBETSU - KAIZEN” SYSTEM “ JISHU - HOZEN” SYSTEM TPM is a slow culture change to get people to do the right things at the right time: the TPM journey must be covered using much attention and pursuing the goals in a systematic way (step by step). The first step of TPM is the ODR: the ODR is a new and innovative approach to the maintenance, used for example in SKF Industrie (Massa plant), to drive the maintenance operations toward the excellence!
6. 5S TPM starts with 5S. Problems cannot be clearly seen when the work place is unorganized. Cleaning and organizing the workplace helps the team to uncover problems. Making problems visible is the first step of improvement. SEIRI - Sort out : this means sorting and organizing the items as critical, important, frequently used items, useless, or items that are not need as of now. Unwanted items can be salvaged. Critical items should be kept for use nearby and items that are not be used in near future, should be stored in some place. For this step, the worth of the item should be decided based on utility and not cost. As a result of this step, the search time is reduced. SEITON - Set in order : the concept here is that "Each items has a place, and only one place". The items should be placed back after usage at the same place. To identify items easily, name plates and coloured tags has to be used. Vertical racks can be used for this purpose, and heavy items occupy the bottom position in the racks. SEISO - Shine the workplace : this involves cleaning the work place free of burrs, grease, oil, waste, scrap etc. No loosely hanging wires or oil leakage from machines. SEIKETSU - Standardize : employees has to discuss together and decide on standards for keeping the work place / Machines / pathways neat and clean. This standards are implemented for whole organization and are tested / Inspected randomly. SHITSUKE - Sustain : considering 5S as a way of life and bring about self-discipline among the employees of the organization. This includes wearing badges, following work procedures, punctuality, dedication to the organization etc.
14. LOSS STRUCTURE IN PRODUCTION ACTIVITIES Operating worker-hours Operating hours Loading worker-hours Loading hours Actual working worker-hours Utilization hours Effective working worker-hours Net utilization hours Value-added worker-hours Value-added hours Human Equipment Management Losses Motion Losses Line Organization Losses Losses resulting from failure to automate Measuring and adjustment losses Shut Down Losses Failure Losses Setup and Adjustment Losses Start-Up Losses The losses which decrease the human work efficiency The losses which decrease the equipment efficiency Other Stoppage Losses Speed Losses Typical Equipment Losses Defect/Rework Losses Minor stoppage/Idling Losses
15.
16. HOW MUCH DOES AN OEE IMPROVEMENT COST? Measurement of actual level of defects and breakdowns. Modelling the plant behaviour and validate the simulation model. Determination of current OEE. INTERNAL SPEC. Evaluation of possible single or combined equipments interventions. Determination of Percentage of OEE Improvements for intervention (%OEEI) Evaluation of Equipments Improvements Costs (EIC) Determination of the Cost Percentage Improvement index for interventions. DESIGN A PLANT MAINTENANCE PROGRAM. OEE = A ·PR·QR CPI = EIC/(%OEEI)
17.
18. Why should Mitsuba start the TPM application? IMPROVE QUALITY COST DECREASES PRODUCTIVITY IMPROVES CAPTURE THE MARKET STAY IN BUSINESS PROVIDE JOBS AND MORE JOBS Cost decreases because of less rework, fewer mistakes, fewer delays, snags, better use of machine-time and materials. Capture the market with better quality and lower price. Deming Chain Reaction
24. PM ANALYSIS ( visible defect ) PM P henomena P hysical After the winding process, wire insulator has been damaged! Wire guide tools damage the wire insulator. M echanism Wire guide tools touch the wire insulator during the process. M achine Hardware Software M aterial Wire insulator is too fragile. Wrong position of wire guide tools. Wrong dimension of layering. Wire Tightener does not work properly. M ethod Wrong transition between two poles. CHECK
25. PM ANALYSIS ( not visible defect ) PM P henomena P hysical Stator Assy fails the tests at the ending of production line! M echanism Wire guide tools touch the wire insulator during the process. M achine Hardware Software M aterial Wrong height of coil core unit. Wrong position of wire guide tools. Wrong dimension of layering. Wire Tightener does not work properly. M ethod A too high load on the wire during the winding process produces a high stress into the insulator Wire insulator is too fragile. Wrong design of coil bobbin. Resistance CHECK Inductance Wire insulator has been damaged during the winding process and it makes a short-circuit.
26. WHY-WHY ANALYSIS Kaizen Idea and schedule… … … … Why 2 Why 1 Due to/Action Why did you take above action? □ In case of spare-part no replacement. Describe Countermeasure: □ In case of spare-part replacement. What your final action? Breakdown, physical phenomenon: (6) □ Poor Skill (5) □ Weak Design (4) □ Deterioration (3) □ Material □ Coil Bobbin □ Coil Core Unit □ Wire (2) □ Poor Condition □ Basic □ Operating (1) □ Winding Machine □ Hardware □ Software E&T SKILL DESIGN PM JH Root cause is one of the following 5 items.
27. WHY-WHY PROCESS ANALYSIS NEW TEST Worker must not spend time for “NG” pieces. Why 2 Add facilities to test the coil core assy. Worker has to test the coil core assy. Why 1 Due to/Action Why did you take above action? □ In case of spare-part no replacement. Describe Countermeasure: first of all, the countermeasure avoids that a “NG” piece could be used in the downstream operations, as the resin treatment and the lead wire assembly ( it decreases the waste ); beside this, at this point of the process flow it is possible to rework the coil core assy. □ In case of spare-part replacement. What your final action? Add facilities to test the coil core assy. Phenomenon: Worker can not test the coil core assy before the resin treatment and the lead wire assembly! (6) □ Poor Skill (5) □ Weak Design (4) □ Deterioration (3) □ Material □ Coil Bobbin □ Coil Core Unit □ Wire ▣ (2) ▣ Poor Condition □ Basic ▣ Operating (1) □ Winding Machine □ Hardware □ Software E&T SKILL DESIGN PM JH Root cause is one of the following 5 items.