SlideShare a Scribd company logo
SURVEY CAMP MANALI
2019
• Name : Ashfaq Manir
• Roll No. :7217806
• Sem. : 5th
• College: E.S.E.A.R
LIST OF PRACTICALS
RADIATION• 1.TO STUDYAND USEPLANE TABLESURVEYBY
AND INTERSECTION METHOD.
• 2.TO STUDYESSENTIALPARTSDUMPY LEVELAND REDUCTION OF
LEVEL.
• 3.TO MEASUREDIRECTANGLE ,DEPLECTIONANGLE
• AND MAGNETIC BEARING OF LINE BYUSING THEODOLITE.
• 4.TO TRAVERSEAN AREA,AND PLOTIT ON DRAWING SHEET.
• 5.TO MEASUREHORIZONTAL ANGLEATA POINT BYMETHOD OF
REITERATION.
•
PLANE TABLE SURVEYING
• AIM:- Tostudy and use the plane table survey by
radiation and intersection method.
• THEORY: Plane tabling is a graphical method of
surveying in which field book and plotting are done
• simultaneously. It is most suitable for filling in detail
about between the stations previously fixed by
• triangulation. It is particularly adopted on small scale
or medium scale marking in which detail is required
• for graphical survey.
•Accessories for plane table survey:
• 1)Drawing board-Made up of well-seasoned wood suchas teak
or pine and its size is 40x30cmto
• 75x60cm.It is mounted on midpoint after levelling about interior
axis.
• 2)Alidade- Alidade consistsof brass or metal or woodstraight
edge or ruler about 50cmlongline
• levelled edge. It is used for sighting the object to the located
point.
• 3)Trough compass- A trough compass or circular box compass
with magnetic needle at centre is used for
• measuring north direction on drawing sheet.
• 4)U-fork – Once the line of fork/plumb bob is attached and upper
arm is same what to indicate which
• point on table is vertically over the station point on ground.
• 5)Bubble Tube: There is a bubble in the tube when thebubble
comes exactly in the centre of the tube
• then indicates that the bubble corner is exactly horizontal to
ground.
PLANE TABLE
PLAIN ALIDADE
SPIRIT LEVEL
METHODS OF PLANE TABLE
SURVEYING:
• 1.Radiation: In this method point is located on plan by drawing a ray
from plane table stat. to the
• point and plotting to scale along the ray. The distance measured from
station to the point. This
• method is suitable for small area which can be commanded from a
single station.
• Procedure –
• 1)Select point Psuchthat all points to be located visible from it.
• 2)Set up the table at Cand after levelling it clamp theboard.
• 3)Using U-fork selected point Cis traversed to table.
• 4)Mark direction of magnetic meridian with the help of trough compass
right top corner of sheet.
• 5)Centring the alidade on Cand sight point. Pto Q, R,S,Tetc. and draw
rays on table along them
• 6)Measure distance CP,CQ,CR,CS,CT by chain or tape.
• 7) Taking suitable scale plot these distances on sheets
• Intersection method- In this method point is fixed on plan by the
intersection of rays drawn from
• the two instrument stations. The line joining these stations is called base line. It is
suitable when distances
• are very large and having observations between them.
• Procedure-
• 1)SELECTTWO POINTS LAND M IN A COMMANDING POSITION
• 2]THELINE JOINING THESTATION LAND M IS KNOWN AS BASELINE
• 3]MEASURE THEBASELINE LM
• 4]SETUP THETABLEAT THESTATION LAND MARK POINT l ON SHEETOVERL
• 5]ORIENT THEBOARD BYPLACING ALIDADE ALONG l m AND TURN THE BOARD
UNTIL THERANGING ROD AT BIS BISECTEDCLAMP THEBOARD
• 6]WITH ALIDADE TOUCHING POINT l DRAW RAYS 1,2,3OF INDEFINITE LENGTH
AS SHOWN IN FIG.
• 7]THETABLEIS THEN SHIFTEDTO STATION M ,ORIENT ITBY
BACKSIGHTING METHOD ON L
• 8]THROUGH m DRAW RAYS TOWARDS THEPOINT PREVIOUSLY SIGHTED
4,5AREDRAWN DETERMINETHEPOINTS ON INTERSECTIONa AND b
DUMPY LEVEL / AUTO LEVEL
• Aim:- Tostudy the essential parts of dumpy level &
reduction of levels.
• Apparatus:- Dumpy level, tripod stand, leveling staff
etc.
•Theory:-The dumpy level is a simple and compact
instrument; the telescope is rigidly fixed to its
• supports it can be rotated about its longitudinal axis.
Level tube is permanently placed so that axis lies in
• same vertical plane. A focusing screw near the eye
piece provided to get clear image of the object and to
• bisect cross hair.
•Bench mark: - It is point of known elevation. It is
used either as a starting point or as a check point before
• closing.
•Axis of telescope: - It is line joining the object,
optical centre of the glass to the centre of the eye piece.
•Line of collimation (Line of sight):-
It is line joining intersection of cross hair to the optical centre
of the
• glass.
PARTS OF DUMPY LEVEL:-
• 1. Tripod: - The tripod consists of three legs, lower ends of it fitted with steel
shoes.
• 2.Leveling head: - It consistsof two parallel triangular
plates to supports the foots screws.
• 3. Foot Screws: - It is provided between trivet and tribatch, by turning the
screws the tribatch can be
• raised or lowered to bring bubble tube at the centre.
• 4.Telescope: - It consistof an object glass and eye piece on
opposite end, a diaphragm isfixed with
• the telescope just in front of eye piece.
• 5. Bubble tube: - Two bubble tubes one longitudinal and one cross bubble
provided right angles to
• each other. Thebubble isbrought to the centre with the
help of foot screws.
• 6. Compass: - A compass is provided just below the telescope for
taking magnetic bearing of a line
• required.
REDUCTION OF LEVEL
• H.I method:-
• The reduced level of the line of collimation is said to
be the height of the instrument. In this system height
• of the line of collimation is found out by adding back
side reading to the R.Lof bench mark on which BS
• is taken. Then RLof intermediate points and the
change point are obtained by subtracting the
respective
• staff reading from the height of instrument (HI). Tofind
new HI of change point BSis taken on last point
THEODOLITE SURVEYING
• Aim: - Tomeasure direct angle, deflection angle and
magnetic bearing of line by using theodolite
• Apparatus: - Transit theodolite, ranging rod, pegs etc.
• Direct Angle:
• The angle measured clockwise from preceding line to
the following line. They may vary 0°to 360°.
• Procedure:-
• - Set up the theodolite at O and level it accurately set
vernier A to 0°0΄0˝.Loosethe lower plate
• and take back sight on A.
• - Loose upper plate rotate telescope clockwise and
bisect Bexactly read both vernier.
• Plunge the telescope turns the
instrument about its outer axis and take
back sight on A the reading
• on vernier A will be same as in Step 1.
• - Loose the upper plate, turn the
telescope clockwise and again bisect B
exactly.
• - Read both verniers. The reading will be
twice the previous, <AOB will be obtain
by dividing the
• final reading by 2.
DEFLECTION ANGLE
• Deflection angle is the angle which the survey line
makes with the prolongation of preceding line.
• Procedure:-
• Set up the theodolite at Band level it accurately.
• - With both plates clamp the vernier A reading
0°0΄0˝take back sight on A. Plunge the telescope
• to direct the line of sight AB. Loosen the upper plate
and turn the telescope clockwise to take
• fore sight C.Read both verniers. The mean of two
verniers reading gives the approximate value
• of deflection at B&clamp upper clamp.
• -
• Loosen the lower clamp and turns the
telescope horizontally to back sight on A. The
vernier will
• read the same reading as in step 4and
telescope transited. Plunge the telescope and
unclamped
• the plates and again bisect C.Read both
verniers. Find the mean of final readings. Thus
the
• deflection angle is doubled and hence one half
of its average value given accurate value of
• deflection angle at B
MAGNETIC BEARING
• The angle which a line makes with the magnetic
meridian is called a magnetic bearing of a line.
• Procedure:-
• For measuring hearing through compass or tabular
compass is attached to theodolite.
• Set the vernier A to 0°0΄0˝of the horizontal circle after
setting theodolite over 0and level it.
• Loosen the lower clamp magnetic needle is then
realized to swing on pivot of compass. Rotate
• the instrument till needle roughly point to the north by
using lower tangent screw and correct
• direction of magnetic needle is obtain
• Loose the upper clamp and direct the telescope
towards A and bisect it exactly by using upper
• clamp and upper tangent screw. Read both verniers.
• - Change the face and repeat the process. The average
of two values gives correct bearing of line
• AB.
• :
TRAVERSING ANAREA
• AIM:- TO TRAVERSETHEGIVEN AREA,PLOTIT ON
DRAWING SHEET.
• INSTRUMENTS:- PLANETABLEWITHTRIPOD
,ALIDADE,TAPE,RANGING ROD ,COMPASS U FORK
WITH PLUMB BOB ,SPIRITLEVEL,DRAWING SHEET.
• THEORY:- IN SURVEYING TRAVERSEMEANS
DETERMING THELENGTHAND DIRECTION OF
CONSEQUTIVE LINE ,THELINEAR DISTANCEARE
MEASURED BYTAPE,RELATIVEDIRECTION OF LINEARE
MEASURED BYCOMPASS.THE INTEGRATED
MEASUREMENT PROVIDE DATAFOR DETERMINING
TWO DIMENSIONAL DATA,FOR DETERMINING
• LAND AREA.TRAVERSING CONSISTS OF
RECONNAISSANCE ,PICKING UP THEDETAILSAND
BOOKING FIELDNOTES TRAVERSEARECLASSIFIEDAS
OPEN OR CLOSE .
• PROCEDURE:- A,B,C,DAND EWEREGIVEN STATION
RECONNASSIANCE SURVEYWAS DONE AND TABLE
WAS SETUP ATA ,STATION POINT WAS TRANSFERRED
TO PAPERASA LAND POINTNG ATA AND SIGHTING B
RAY WAS DRAWN .THEDISTANCE WAS MEASURED
USING TAPEAND BMARKED ATSCALE,SHIFTTABLETO
BLEVELIT SIGHT A CONTINUE IT FOR OTHERS
.CLOSING RAY OF TRAVERSEIS GRAPHICALLY
ADJUSTED
•Thank you

More Related Content

What's hot

Compass surveying
Compass surveyingCompass surveying
Compass surveying
Marimuthu Kan
 
Compass surveying_Surveying, Civil Engineering
Compass surveying_Surveying, Civil EngineeringCompass surveying_Surveying, Civil Engineering
Compass surveying_Surveying, Civil Engineering
A Makwana
 
Elevation measurement_Surveying, Civil Engineering
Elevation measurement_Surveying, Civil EngineeringElevation measurement_Surveying, Civil Engineering
Elevation measurement_Surveying, Civil Engineering
A Makwana
 
levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouring
ANAND JIBHKATE
 
Theodolite traversing
Theodolite traversingTheodolite traversing
Theodolite traversing
Gaurang Prajapati
 
Plane table survey
Plane table surveyPlane table survey
Plane table survey
Kushal Patel
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
GAURAV. H .TANDON
 
Compass survey part 1
Compass survey part 1Compass survey part 1
Compass survey part 1
ArunRavi43
 
Levelling
LevellingLevelling
Levelling
srinivas cnu
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
Bhavik A Shah
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
Compass surveyingCompass surveying
Compass surveying
Salauddin Rubel
 
COMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYINGCOMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYING
Lavanya Singh
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURING
ANAND JIBHKATE
 
PLANE TABLE SURVEY
PLANE TABLE SURVEYPLANE TABLE SURVEY
PLANE TABLE SURVEY
KHUSHBU SHAH
 
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabusPrismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Warish Khan
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
GAURAV. H .TANDON
 
Angular measurement
Angular measurementAngular measurement
Angular measurement
KHUSHBU SHAH
 
Minor instruments in surveying
Minor instruments in surveyingMinor instruments in surveying
Minor instruments in surveying
Shikhar Malhotra
 
Unit 2
Unit 2Unit 2

What's hot (20)

Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Compass surveying_Surveying, Civil Engineering
Compass surveying_Surveying, Civil EngineeringCompass surveying_Surveying, Civil Engineering
Compass surveying_Surveying, Civil Engineering
 
Elevation measurement_Surveying, Civil Engineering
Elevation measurement_Surveying, Civil EngineeringElevation measurement_Surveying, Civil Engineering
Elevation measurement_Surveying, Civil Engineering
 
levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouring
 
Theodolite traversing
Theodolite traversingTheodolite traversing
Theodolite traversing
 
Plane table survey
Plane table surveyPlane table survey
Plane table survey
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
 
Compass survey part 1
Compass survey part 1Compass survey part 1
Compass survey part 1
 
Levelling
LevellingLevelling
Levelling
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
COMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYINGCOMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYING
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURING
 
PLANE TABLE SURVEY
PLANE TABLE SURVEYPLANE TABLE SURVEY
PLANE TABLE SURVEY
 
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabusPrismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 
Angular measurement
Angular measurementAngular measurement
Angular measurement
 
Minor instruments in surveying
Minor instruments in surveyingMinor instruments in surveying
Minor instruments in surveying
 
Unit 2
Unit 2Unit 2
Unit 2
 

Similar to Survey Camp Manali ppt

Module 2,plane table surveying (kannur university)
Module 2,plane table surveying (kannur university)Module 2,plane table surveying (kannur university)
Module 2,plane table surveying (kannur university)
Vishnudev C
 
Plane_Table_Surveying.pptx
Plane_Table_Surveying.pptxPlane_Table_Surveying.pptx
Plane_Table_Surveying.pptx
AshutoshKumar536677
 
Levelling
LevellingLevelling
Levelling
KHUSHBU SHAH
 
planetablesurvey-131027094131-phpapp01.pdf
planetablesurvey-131027094131-phpapp01.pdfplanetablesurvey-131027094131-phpapp01.pdf
planetablesurvey-131027094131-phpapp01.pdf
ssuser23e4af
 
planetablesurvey-131027094131-phpapp01 (1).pdf
planetablesurvey-131027094131-phpapp01 (1).pdfplanetablesurvey-131027094131-phpapp01 (1).pdf
planetablesurvey-131027094131-phpapp01 (1).pdf
PotterheadKevin
 
planetablesurvey-131027094131-phpapp01.pdf
planetablesurvey-131027094131-phpapp01.pdfplanetablesurvey-131027094131-phpapp01.pdf
planetablesurvey-131027094131-phpapp01.pdf
RinsaFebin
 
Surveying Lab II Manual
Surveying Lab II ManualSurveying Lab II Manual
Surveying Lab II Manual
Malla Reddy University
 
3_ORDINARY SPIRIT LEVELLING.pptx
3_ORDINARY SPIRIT LEVELLING.pptx3_ORDINARY SPIRIT LEVELLING.pptx
3_ORDINARY SPIRIT LEVELLING.pptx
Martin Murimi
 
Levelling
LevellingLevelling
Levelling
Nirant Patel
 
PLANE TABLE SURVEYING
PLANE TABLE SURVEYINGPLANE TABLE SURVEYING
PLANE TABLE SURVEYING
khushi ahir
 
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
sharmajivijay99
 
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
sharmajivijay99
 
Theodolite_surveying.ppt
Theodolite_surveying.pptTheodolite_surveying.ppt
Theodolite_surveying.ppt
sivaganesan23
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
Muhammad Zubair
 
Theodolite and Its Uses
Theodolite and Its UsesTheodolite and Its Uses
Theodolite and Its Uses
AmitKumar8151
 
Plane table survey_Surveying, Civil Engineering
Plane table survey_Surveying, Civil EngineeringPlane table survey_Surveying, Civil Engineering
Plane table survey_Surveying, Civil Engineering
A Makwana
 
plane Table surveing.pptx
plane Table surveing.pptxplane Table surveing.pptx
plane Table surveing.pptx
raziaramzan1
 
Surveying & prismatic compass survey
Surveying & prismatic compass surveySurveying & prismatic compass survey
Surveying & prismatic compass survey
Suman Das
 
Week1 introductiontobasicsurveying
Week1 introductiontobasicsurveyingWeek1 introductiontobasicsurveying
Week1 introductiontobasicsurveying
Jackie Arul
 
Compasssurveyin
CompasssurveyinCompasssurveyin
Compasssurveyin
yash patel
 

Similar to Survey Camp Manali ppt (20)

Module 2,plane table surveying (kannur university)
Module 2,plane table surveying (kannur university)Module 2,plane table surveying (kannur university)
Module 2,plane table surveying (kannur university)
 
Plane_Table_Surveying.pptx
Plane_Table_Surveying.pptxPlane_Table_Surveying.pptx
Plane_Table_Surveying.pptx
 
Levelling
LevellingLevelling
Levelling
 
planetablesurvey-131027094131-phpapp01.pdf
planetablesurvey-131027094131-phpapp01.pdfplanetablesurvey-131027094131-phpapp01.pdf
planetablesurvey-131027094131-phpapp01.pdf
 
planetablesurvey-131027094131-phpapp01 (1).pdf
planetablesurvey-131027094131-phpapp01 (1).pdfplanetablesurvey-131027094131-phpapp01 (1).pdf
planetablesurvey-131027094131-phpapp01 (1).pdf
 
planetablesurvey-131027094131-phpapp01.pdf
planetablesurvey-131027094131-phpapp01.pdfplanetablesurvey-131027094131-phpapp01.pdf
planetablesurvey-131027094131-phpapp01.pdf
 
Surveying Lab II Manual
Surveying Lab II ManualSurveying Lab II Manual
Surveying Lab II Manual
 
3_ORDINARY SPIRIT LEVELLING.pptx
3_ORDINARY SPIRIT LEVELLING.pptx3_ORDINARY SPIRIT LEVELLING.pptx
3_ORDINARY SPIRIT LEVELLING.pptx
 
Levelling
LevellingLevelling
Levelling
 
PLANE TABLE SURVEYING
PLANE TABLE SURVEYINGPLANE TABLE SURVEYING
PLANE TABLE SURVEYING
 
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
 
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
 
Theodolite_surveying.ppt
Theodolite_surveying.pptTheodolite_surveying.ppt
Theodolite_surveying.ppt
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
Theodolite and Its Uses
Theodolite and Its UsesTheodolite and Its Uses
Theodolite and Its Uses
 
Plane table survey_Surveying, Civil Engineering
Plane table survey_Surveying, Civil EngineeringPlane table survey_Surveying, Civil Engineering
Plane table survey_Surveying, Civil Engineering
 
plane Table surveing.pptx
plane Table surveing.pptxplane Table surveing.pptx
plane Table surveing.pptx
 
Surveying & prismatic compass survey
Surveying & prismatic compass surveySurveying & prismatic compass survey
Surveying & prismatic compass survey
 
Week1 introductiontobasicsurveying
Week1 introductiontobasicsurveyingWeek1 introductiontobasicsurveying
Week1 introductiontobasicsurveying
 
Compasssurveyin
CompasssurveyinCompasssurveyin
Compasssurveyin
 

Recently uploaded

Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
CE19KaushlendraKumar
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
snaprevwdev
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
um7474492
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
wafawafa52
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 

Recently uploaded (20)

Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 

Survey Camp Manali ppt

  • 1. SURVEY CAMP MANALI 2019 • Name : Ashfaq Manir • Roll No. :7217806 • Sem. : 5th • College: E.S.E.A.R
  • 2. LIST OF PRACTICALS RADIATION• 1.TO STUDYAND USEPLANE TABLESURVEYBY AND INTERSECTION METHOD. • 2.TO STUDYESSENTIALPARTSDUMPY LEVELAND REDUCTION OF LEVEL. • 3.TO MEASUREDIRECTANGLE ,DEPLECTIONANGLE • AND MAGNETIC BEARING OF LINE BYUSING THEODOLITE. • 4.TO TRAVERSEAN AREA,AND PLOTIT ON DRAWING SHEET. • 5.TO MEASUREHORIZONTAL ANGLEATA POINT BYMETHOD OF REITERATION. •
  • 3. PLANE TABLE SURVEYING • AIM:- Tostudy and use the plane table survey by radiation and intersection method. • THEORY: Plane tabling is a graphical method of surveying in which field book and plotting are done • simultaneously. It is most suitable for filling in detail about between the stations previously fixed by • triangulation. It is particularly adopted on small scale or medium scale marking in which detail is required • for graphical survey.
  • 4. •Accessories for plane table survey: • 1)Drawing board-Made up of well-seasoned wood suchas teak or pine and its size is 40x30cmto • 75x60cm.It is mounted on midpoint after levelling about interior axis. • 2)Alidade- Alidade consistsof brass or metal or woodstraight edge or ruler about 50cmlongline • levelled edge. It is used for sighting the object to the located point. • 3)Trough compass- A trough compass or circular box compass with magnetic needle at centre is used for • measuring north direction on drawing sheet. • 4)U-fork – Once the line of fork/plumb bob is attached and upper arm is same what to indicate which • point on table is vertically over the station point on ground. • 5)Bubble Tube: There is a bubble in the tube when thebubble comes exactly in the centre of the tube • then indicates that the bubble corner is exactly horizontal to ground.
  • 8. METHODS OF PLANE TABLE SURVEYING: • 1.Radiation: In this method point is located on plan by drawing a ray from plane table stat. to the • point and plotting to scale along the ray. The distance measured from station to the point. This • method is suitable for small area which can be commanded from a single station. • Procedure – • 1)Select point Psuchthat all points to be located visible from it. • 2)Set up the table at Cand after levelling it clamp theboard. • 3)Using U-fork selected point Cis traversed to table. • 4)Mark direction of magnetic meridian with the help of trough compass right top corner of sheet. • 5)Centring the alidade on Cand sight point. Pto Q, R,S,Tetc. and draw rays on table along them • 6)Measure distance CP,CQ,CR,CS,CT by chain or tape. • 7) Taking suitable scale plot these distances on sheets
  • 9.
  • 10. • Intersection method- In this method point is fixed on plan by the intersection of rays drawn from • the two instrument stations. The line joining these stations is called base line. It is suitable when distances • are very large and having observations between them. • Procedure- • 1)SELECTTWO POINTS LAND M IN A COMMANDING POSITION • 2]THELINE JOINING THESTATION LAND M IS KNOWN AS BASELINE • 3]MEASURE THEBASELINE LM • 4]SETUP THETABLEAT THESTATION LAND MARK POINT l ON SHEETOVERL • 5]ORIENT THEBOARD BYPLACING ALIDADE ALONG l m AND TURN THE BOARD UNTIL THERANGING ROD AT BIS BISECTEDCLAMP THEBOARD • 6]WITH ALIDADE TOUCHING POINT l DRAW RAYS 1,2,3OF INDEFINITE LENGTH AS SHOWN IN FIG. • 7]THETABLEIS THEN SHIFTEDTO STATION M ,ORIENT ITBY BACKSIGHTING METHOD ON L • 8]THROUGH m DRAW RAYS TOWARDS THEPOINT PREVIOUSLY SIGHTED 4,5AREDRAWN DETERMINETHEPOINTS ON INTERSECTIONa AND b
  • 11.
  • 12. DUMPY LEVEL / AUTO LEVEL • Aim:- Tostudy the essential parts of dumpy level & reduction of levels. • Apparatus:- Dumpy level, tripod stand, leveling staff etc. •Theory:-The dumpy level is a simple and compact instrument; the telescope is rigidly fixed to its • supports it can be rotated about its longitudinal axis. Level tube is permanently placed so that axis lies in • same vertical plane. A focusing screw near the eye piece provided to get clear image of the object and to • bisect cross hair.
  • 13. •Bench mark: - It is point of known elevation. It is used either as a starting point or as a check point before • closing. •Axis of telescope: - It is line joining the object, optical centre of the glass to the centre of the eye piece. •Line of collimation (Line of sight):- It is line joining intersection of cross hair to the optical centre of the • glass.
  • 14. PARTS OF DUMPY LEVEL:- • 1. Tripod: - The tripod consists of three legs, lower ends of it fitted with steel shoes. • 2.Leveling head: - It consistsof two parallel triangular plates to supports the foots screws. • 3. Foot Screws: - It is provided between trivet and tribatch, by turning the screws the tribatch can be • raised or lowered to bring bubble tube at the centre. • 4.Telescope: - It consistof an object glass and eye piece on opposite end, a diaphragm isfixed with • the telescope just in front of eye piece. • 5. Bubble tube: - Two bubble tubes one longitudinal and one cross bubble provided right angles to • each other. Thebubble isbrought to the centre with the help of foot screws. • 6. Compass: - A compass is provided just below the telescope for taking magnetic bearing of a line • required.
  • 15. REDUCTION OF LEVEL • H.I method:- • The reduced level of the line of collimation is said to be the height of the instrument. In this system height • of the line of collimation is found out by adding back side reading to the R.Lof bench mark on which BS • is taken. Then RLof intermediate points and the change point are obtained by subtracting the respective • staff reading from the height of instrument (HI). Tofind new HI of change point BSis taken on last point
  • 16. THEODOLITE SURVEYING • Aim: - Tomeasure direct angle, deflection angle and magnetic bearing of line by using theodolite • Apparatus: - Transit theodolite, ranging rod, pegs etc. • Direct Angle: • The angle measured clockwise from preceding line to the following line. They may vary 0°to 360°. • Procedure:- • - Set up the theodolite at O and level it accurately set vernier A to 0°0΄0˝.Loosethe lower plate • and take back sight on A. • - Loose upper plate rotate telescope clockwise and bisect Bexactly read both vernier.
  • 17. • Plunge the telescope turns the instrument about its outer axis and take back sight on A the reading • on vernier A will be same as in Step 1. • - Loose the upper plate, turn the telescope clockwise and again bisect B exactly. • - Read both verniers. The reading will be twice the previous, <AOB will be obtain by dividing the • final reading by 2.
  • 18.
  • 19. DEFLECTION ANGLE • Deflection angle is the angle which the survey line makes with the prolongation of preceding line. • Procedure:- • Set up the theodolite at Band level it accurately. • - With both plates clamp the vernier A reading 0°0΄0˝take back sight on A. Plunge the telescope • to direct the line of sight AB. Loosen the upper plate and turn the telescope clockwise to take • fore sight C.Read both verniers. The mean of two verniers reading gives the approximate value • of deflection at B&clamp upper clamp. • -
  • 20. • Loosen the lower clamp and turns the telescope horizontally to back sight on A. The vernier will • read the same reading as in step 4and telescope transited. Plunge the telescope and unclamped • the plates and again bisect C.Read both verniers. Find the mean of final readings. Thus the • deflection angle is doubled and hence one half of its average value given accurate value of • deflection angle at B
  • 21.
  • 22. MAGNETIC BEARING • The angle which a line makes with the magnetic meridian is called a magnetic bearing of a line. • Procedure:- • For measuring hearing through compass or tabular compass is attached to theodolite. • Set the vernier A to 0°0΄0˝of the horizontal circle after setting theodolite over 0and level it. • Loosen the lower clamp magnetic needle is then realized to swing on pivot of compass. Rotate • the instrument till needle roughly point to the north by using lower tangent screw and correct • direction of magnetic needle is obtain
  • 23. • Loose the upper clamp and direct the telescope towards A and bisect it exactly by using upper • clamp and upper tangent screw. Read both verniers. • - Change the face and repeat the process. The average of two values gives correct bearing of line • AB. • :
  • 24. TRAVERSING ANAREA • AIM:- TO TRAVERSETHEGIVEN AREA,PLOTIT ON DRAWING SHEET. • INSTRUMENTS:- PLANETABLEWITHTRIPOD ,ALIDADE,TAPE,RANGING ROD ,COMPASS U FORK WITH PLUMB BOB ,SPIRITLEVEL,DRAWING SHEET. • THEORY:- IN SURVEYING TRAVERSEMEANS DETERMING THELENGTHAND DIRECTION OF CONSEQUTIVE LINE ,THELINEAR DISTANCEARE MEASURED BYTAPE,RELATIVEDIRECTION OF LINEARE MEASURED BYCOMPASS.THE INTEGRATED MEASUREMENT PROVIDE DATAFOR DETERMINING TWO DIMENSIONAL DATA,FOR DETERMINING
  • 25. • LAND AREA.TRAVERSING CONSISTS OF RECONNAISSANCE ,PICKING UP THEDETAILSAND BOOKING FIELDNOTES TRAVERSEARECLASSIFIEDAS OPEN OR CLOSE . • PROCEDURE:- A,B,C,DAND EWEREGIVEN STATION RECONNASSIANCE SURVEYWAS DONE AND TABLE WAS SETUP ATA ,STATION POINT WAS TRANSFERRED TO PAPERASA LAND POINTNG ATA AND SIGHTING B RAY WAS DRAWN .THEDISTANCE WAS MEASURED USING TAPEAND BMARKED ATSCALE,SHIFTTABLETO BLEVELIT SIGHT A CONTINUE IT FOR OTHERS .CLOSING RAY OF TRAVERSEIS GRAPHICALLY ADJUSTED