What are subcritical and super critical?
Critical pressure of water is 220.64 bar = 3200.11 psi. Below that,
boilers are subcritical and above, supercritical.
Usually, the power rating of a super critical power plant will be more
than 400MW.
Less than that, those can be considered as sub critical and above that
it would be ultra super critical.
Comparison.
Sub critical power plant
• System with constant evaporation endpoint
• A typical example of this system is the drum-type
steam generator. Natural circulation is produced by
heating of the risers. The water/steam mixture
leaving the risers is separated into water & steam
in the drum. The steam flows into the super heater
and the water is returned to the evaporator inlet
through down comers.
• If the system is operated only with natural/assisted
circulation, the application range is limited to a
max drum pressure of approx. 190 bar.
• If a circulating pump is used (forced circulation),
this range can be extended somewhat fixing the
endpoint of evaporation in the drum also sets the
size of the heating surface in the evaporator &
superheater.
Super Critical power plant
• System with variable evaporation endpoint
• This type of boiler is drumless steam generator.
Evaporation takes place in a single pass. This
principle used in the BENSON/SULZER boiler, the
world's most frequently constructed steam
generator type. Flow through the evaporator is
induced by the feed pump. The system can
therefore be operated at any desired pressure i.e.
at either subcritical (Close to critical) or
supercritical pressure. The evaporation endpoint
can shift.
• The evaporator & super heater areas thus
automatically adjust to operational requirements.
Fig 1: Temperature vs Entropy
graph representing sub critical and
super critical cycles.
Vindhyachal Thermal Power Plant.
1. It is located in singrauli, Madhya Pradesh.
2. It is handled by NTPC.
3. Its rating is 4760MW, this is largest power station in India.
Mundra Thermal Power Plant.
1. It is of 4600MW capacity.
2. Located in kutch, Gujarat.
3. Handled by adani power ltd.
Chandrapur Super Thermal Power Plant
1. It is of capacity 3340MW.
2. It is situated in urjanpur, maharastra.
3. It is operated by Mahagenco(government of maharastra).
Sterlite Thermal Power Plant
1. It has a capacity of 2400MW.
2. It is located in jharsuguda, Odisha.
3. It is maintained sterlite energy a subsidiary unit of vadanta
resources.
Barh Super Power Plant
1. It is situated in patna, bihar.
2. It has a capacity of 1320MW.
3. It is one of the power plants with least power generating capacity.
Advantages of super critical power plants.
1. More thermal efficiency.
2. More flexible.
3. Here, the drum inside acts as a evaporation end point.
4. These automatically adjust to load fluctuations.
RAGHU ENGINEERING COLLEGE
(AUTONOMOUS)
DEPARTMENT OF EEE
Academic year: 2018-2019
II year II-semester
Power Systems-I Generation and Utilization
CASE STUDY
ON
VARIOUS BUSBAR ARRANGEMENTS.
BATCH-2
A.Snehitha-18985A0206
A.S.S.R.Murthy-18985A0207
A.Sai Sampath-18985A0208
B.Naga Venkatesh-18985A0209
B.Chaitanya-18985A0210
FACULTY:
V.Pramadha Rani.
Assosiate Professor.
4/19/2019 Power Systems-I 11
What is a busbar?
 An electrical bus bar can be defined as a conductor or groups of
conductors which collects electrical power from the incoming feeder
and distributes them to outgoing feeder.
 Busbars distribute electricity with greater ease and flexibility than
some other more permanent forms of installation and distribution.
 They are often metallic strips of copper, brass, or aluminum that
both ground and conduct electricity.
4/19/2019 Power Systems-I 12
Busbar Arrangements.
 The choice of particular arrangement depends upon viz., system
voltage, position of substation, system flexibility and cost.
 In addition, the following technical considerations must be borne in
the mind while deciding an arrangement:
1) Simplicity is the keynote of a dependable system.
2) Maintenance should be possible without interruption of supply.
3) Alternative arrangements should be available in case of outage of
any apparatus.
4) The installation should be as economical as possible.
4/19/2019 Power Systems-I 13
Single Busbar
Arrangement.
 The arrangement is the
cheapest possible and simple
in construction.
 But, it suffers from two
major defects,
I. Maintenance without
interruption of supply is
not possible.
II. Extension of substation
without shutdown is not
possible.
4/19/2019 Power Systems-I 14
Fig A : Single Busbar Scheme.
Single Bus-bar
Arrangement with
Sectionalizer.
 It is used as an alternative for the
single bus-bar arrangement
because any breaker can be
taken for maintenance.
 Though it requires an extra
breaker, and the switching is
more complex.
 A fault in the bus may shut down
the whole system.
 Generally, used for 110kv
substations.
Fig B: Single busbar scheme
with sectionaliser.
4/19/2019 Power Systems-I 15
Comparison.
Single Bus-bar Scheme.
 It is simplest scheme with artless
protection system.
 Any fault on bus results in
disconnection of power. Any
maintenance on any breaker will lead
to disconnection of relevant breaker,
relevant line or whole system in some
cases.
Single Bus-bar with sectionalizer.
 Single breaker single busbar scheme is
slightly improved by dividing the bus
into two sections.
 This scheme is only effective if there
are two incoming lines and outgoing
lines are distributed evenly in each
section.
4/19/2019 Power Systems-I 16
Main and Transfer
Bus Scheme.
 It is more flexible because half
number of feeders are connected
on each bus.
 But, it needs an extra breaker
coupler circuit.
 Line breaker fault may result in
taking of all the circuits
connected to out of service and
also failure in the bus-bar results
in shutdown of complete system.
 Mostly used for substations of
66kv, 132kv and up to 220kv.
Fig C: Main and transfer bus-
bar scheme.4/19/2019 Power Systems-I 17
Double Bus-bar
Arrangement.
 It is more flexible as we can
connect feeders on either of
buses.
 This scheme is highly reliable as
any breaker can be taken for
maintenance whenever required.
 It is far more expensive when
compared to normal double bus-
bar scheme.
 Generally, used for high voltage
or EHV substations. Fig D: Double bus arrangement.
4/19/2019 Power Systems-I 18
Comparison.
Double Bus-bar Arrangement.
 In double bus system load can be
connected on either of the bus.
 The infeed and the load circuit can be
separated in two if needed from
operational considerations.
 Either bus can be taken out of
maintenance.
Main and Transfer Bus-bar System.
 This is alternative for double bus
scheme.
 It provides facility for breaker
maintenance but not bud
maintenance.
 Whenever maintenance is required the
circuit can be shifted to another bus
and controlled using bus coupler.
4/19/2019 Power Systems-I 19
One and Half
Breaker Scheme.
 More flexible in operation as all
the switching is done by
breakers.
 Selective tripping is possible.
 But any breaker can’t be
removed without interruption of
supply.
 Generally, used for substations
for 220kv to 440kv ratings.
Fig E: One and half breaker scheme.
4/19/2019 Power Systems-I 20
Ring/Mesh
Arrangement.
 Bus-bars gives more operational
flexibility.
 Any fault in the unit separates
the ring into two halves thereby
increasing the complexity of
reclosing and protection.
 Breaker failure during fault on
one circuit causes loss of
additional circuit because of
breaker failure.
 Mostly used for very high power
rating generating stations.
Fig F: Ring Bus-bar Arrangement.
4/19/2019 Power Systems-I 21
Single Bus-bar Scheme using Simulink.
4/19/2019 Power Systems-I 22
Double Bus-bar Scheme using Simulink.
4/19/2019 Power Systems-I 23

More Related Content

What's hot

A Report on Steam Turbine
A Report on Steam TurbineA Report on Steam Turbine
A Report on Steam Turbine
Rajput Chauhan
 
Vertical axis wind turbine
Vertical axis wind turbineVertical axis wind turbine
Vertical axis wind turbine
DavisLazarus
 
[PPT] on Steam Turbine
[PPT] on Steam Turbine[PPT] on Steam Turbine
[PPT] on Steam Turbine
Sumit Sharma
 
Steam turbine
Steam turbineSteam turbine
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plant
Md. Rimon Mia
 
super critical power plant
super critical power plantsuper critical power plant
super critical power plant
sridurga88
 
Centrifugal compressor
Centrifugal compressor Centrifugal compressor
Centrifugal compressor
Héctor Nguema Ondo
 
vertical axis wind turbine
vertical axis wind turbinevertical axis wind turbine
vertical axis wind turbine
iviral1992
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
SHIVAJI CHOUDHURY
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
Salil Vaidya
 
Energy, economic and environmental issues of power plants
Energy, economic and environmental issues of power plantsEnergy, economic and environmental issues of power plants
Energy, economic and environmental issues of power plants
Balamurugan Subburaj
 
POLLUTION CONTROL METHODS IN THERMAL POWER PLANTS
POLLUTION CONTROL METHODS IN THERMAL POWER PLANTSPOLLUTION CONTROL METHODS IN THERMAL POWER PLANTS
POLLUTION CONTROL METHODS IN THERMAL POWER PLANTS
Naveen Cena
 
Flywheel Energy Storage System
Flywheel Energy Storage SystemFlywheel Energy Storage System
Flywheel Energy Storage System
Seminar Links
 
Steam turbine and its types
Steam turbine and its typesSteam turbine and its types
Impulse and reaction steam turbines
Impulse and reaction steam turbinesImpulse and reaction steam turbines
Impulse and reaction steam turbines
Sushil Chapagain
 
Fixed and variable speed turbine
Fixed and variable speed turbineFixed and variable speed turbine
Fixed and variable speed turbine
SonuKumarBairwa
 
power plant engineering
power plant engineeringpower plant engineering
power plant engineering
Gulfaraz alam
 
Pump
PumpPump
Coal and Ash Handling
Coal and Ash HandlingCoal and Ash Handling
Coal and Ash Handling
Vanita Thakkar
 
Combined operation of power plants
Combined operation of power plantsCombined operation of power plants
Combined operation of power plants
Nishkam Dhiman
 

What's hot (20)

A Report on Steam Turbine
A Report on Steam TurbineA Report on Steam Turbine
A Report on Steam Turbine
 
Vertical axis wind turbine
Vertical axis wind turbineVertical axis wind turbine
Vertical axis wind turbine
 
[PPT] on Steam Turbine
[PPT] on Steam Turbine[PPT] on Steam Turbine
[PPT] on Steam Turbine
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plant
 
super critical power plant
super critical power plantsuper critical power plant
super critical power plant
 
Centrifugal compressor
Centrifugal compressor Centrifugal compressor
Centrifugal compressor
 
vertical axis wind turbine
vertical axis wind turbinevertical axis wind turbine
vertical axis wind turbine
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
 
Energy, economic and environmental issues of power plants
Energy, economic and environmental issues of power plantsEnergy, economic and environmental issues of power plants
Energy, economic and environmental issues of power plants
 
POLLUTION CONTROL METHODS IN THERMAL POWER PLANTS
POLLUTION CONTROL METHODS IN THERMAL POWER PLANTSPOLLUTION CONTROL METHODS IN THERMAL POWER PLANTS
POLLUTION CONTROL METHODS IN THERMAL POWER PLANTS
 
Flywheel Energy Storage System
Flywheel Energy Storage SystemFlywheel Energy Storage System
Flywheel Energy Storage System
 
Steam turbine and its types
Steam turbine and its typesSteam turbine and its types
Steam turbine and its types
 
Impulse and reaction steam turbines
Impulse and reaction steam turbinesImpulse and reaction steam turbines
Impulse and reaction steam turbines
 
Fixed and variable speed turbine
Fixed and variable speed turbineFixed and variable speed turbine
Fixed and variable speed turbine
 
power plant engineering
power plant engineeringpower plant engineering
power plant engineering
 
Pump
PumpPump
Pump
 
Coal and Ash Handling
Coal and Ash HandlingCoal and Ash Handling
Coal and Ash Handling
 
Combined operation of power plants
Combined operation of power plantsCombined operation of power plants
Combined operation of power plants
 

Similar to Sub Critical & Super Critical Power Plants in INDIA.

Various Bus-Bar Arrangements.
Various Bus-Bar Arrangements.Various Bus-Bar Arrangements.
Various Bus-Bar Arrangements.
SaiSampath16
 
BATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptx
BATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptxBATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptx
BATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptx
23mu08
 
C04832838
C04832838C04832838
C04832838
IOSR-JEN
 
IRJET- Review on Power Charging Unit using Rotary Leverage System
IRJET-  	  Review on Power Charging Unit using Rotary Leverage SystemIRJET-  	  Review on Power Charging Unit using Rotary Leverage System
IRJET- Review on Power Charging Unit using Rotary Leverage System
IRJET Journal
 
IRJET- Hybrid Power Generation by using Vertical Axis Wind Turbine and So...
IRJET-  	  Hybrid Power Generation by using Vertical Axis Wind Turbine and So...IRJET-  	  Hybrid Power Generation by using Vertical Axis Wind Turbine and So...
IRJET- Hybrid Power Generation by using Vertical Axis Wind Turbine and So...
IRJET Journal
 
Energy Management System in Electric Vehicle with PV Fed SRM System
Energy Management System in Electric Vehicle with PV Fed SRM SystemEnergy Management System in Electric Vehicle with PV Fed SRM System
Energy Management System in Electric Vehicle with PV Fed SRM System
IJMTST Journal
 
IRJET- Hybrid Smart Grid Connected Photovoltaic and Fuel System
IRJET- Hybrid Smart Grid Connected Photovoltaic and Fuel SystemIRJET- Hybrid Smart Grid Connected Photovoltaic and Fuel System
IRJET- Hybrid Smart Grid Connected Photovoltaic and Fuel System
IRJET Journal
 
IRJET- The Study of Various Control Techniques and Configurations for Grid Co...
IRJET- The Study of Various Control Techniques and Configurations for Grid Co...IRJET- The Study of Various Control Techniques and Configurations for Grid Co...
IRJET- The Study of Various Control Techniques and Configurations for Grid Co...
IRJET Journal
 
Power factor correction of 6.6 kv distribution line in lc11 rmhs department, ...
Power factor correction of 6.6 kv distribution line in lc11 rmhs department, ...Power factor correction of 6.6 kv distribution line in lc11 rmhs department, ...
Power factor correction of 6.6 kv distribution line in lc11 rmhs department, ...
eSAT Publishing House
 
IRJET- Dynamic Chargingof the Lead Acid Battery using the Programmable Interf...
IRJET- Dynamic Chargingof the Lead Acid Battery using the Programmable Interf...IRJET- Dynamic Chargingof the Lead Acid Battery using the Programmable Interf...
IRJET- Dynamic Chargingof the Lead Acid Battery using the Programmable Interf...
IRJET Journal
 
A different visions for uninterruptible load using hybrid solar-grid energy
A different visions for uninterruptible load using hybrid solar-grid energyA different visions for uninterruptible load using hybrid solar-grid energy
A different visions for uninterruptible load using hybrid solar-grid energy
International Journal of Power Electronics and Drive Systems
 
Design and Cost Evaluation of a Distribution Feeder Connected Solar System
Design and Cost Evaluation of a Distribution Feeder Connected Solar System Design and Cost Evaluation of a Distribution Feeder Connected Solar System
Design and Cost Evaluation of a Distribution Feeder Connected Solar System
ecij
 
SIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVE
SIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVESIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVE
SIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVE
Editor IJMTER
 
IRJET- Analysis and Implementation of Super Capacitors as a Storage Device in...
IRJET- Analysis and Implementation of Super Capacitors as a Storage Device in...IRJET- Analysis and Implementation of Super Capacitors as a Storage Device in...
IRJET- Analysis and Implementation of Super Capacitors as a Storage Device in...
IRJET Journal
 
IRJET - Review on Ideal Microgrid for Indian Farmers
IRJET - Review on Ideal Microgrid for Indian FarmersIRJET - Review on Ideal Microgrid for Indian Farmers
IRJET - Review on Ideal Microgrid for Indian Farmers
IRJET Journal
 
Base Load Plants and Peak Load Plant
Base Load Plants and Peak Load PlantBase Load Plants and Peak Load Plant
Base Load Plants and Peak Load Plant
Satish Taji
 
08529419.pdf
08529419.pdf08529419.pdf
08529419.pdf
RavipatiSrikanth1
 
H045045059
H045045059H045045059
H045045059
IJERA Editor
 
solar-ups_compress.pptx
solar-ups_compress.pptxsolar-ups_compress.pptx
solar-ups_compress.pptx
AkhilKanyal1
 
INTELLIGENT GRID INTERFACED SOLAR WATER PUMPING SYSTEM ppt.pptx
INTELLIGENT GRID INTERFACED SOLAR WATER PUMPING SYSTEM ppt.pptxINTELLIGENT GRID INTERFACED SOLAR WATER PUMPING SYSTEM ppt.pptx
INTELLIGENT GRID INTERFACED SOLAR WATER PUMPING SYSTEM ppt.pptx
ShriHarshMudhiraj
 

Similar to Sub Critical & Super Critical Power Plants in INDIA. (20)

Various Bus-Bar Arrangements.
Various Bus-Bar Arrangements.Various Bus-Bar Arrangements.
Various Bus-Bar Arrangements.
 
BATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptx
BATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptxBATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptx
BATCH 8 - PROJECT PHASE II - SECOND REVIEW.pptx
 
C04832838
C04832838C04832838
C04832838
 
IRJET- Review on Power Charging Unit using Rotary Leverage System
IRJET-  	  Review on Power Charging Unit using Rotary Leverage SystemIRJET-  	  Review on Power Charging Unit using Rotary Leverage System
IRJET- Review on Power Charging Unit using Rotary Leverage System
 
IRJET- Hybrid Power Generation by using Vertical Axis Wind Turbine and So...
IRJET-  	  Hybrid Power Generation by using Vertical Axis Wind Turbine and So...IRJET-  	  Hybrid Power Generation by using Vertical Axis Wind Turbine and So...
IRJET- Hybrid Power Generation by using Vertical Axis Wind Turbine and So...
 
Energy Management System in Electric Vehicle with PV Fed SRM System
Energy Management System in Electric Vehicle with PV Fed SRM SystemEnergy Management System in Electric Vehicle with PV Fed SRM System
Energy Management System in Electric Vehicle with PV Fed SRM System
 
IRJET- Hybrid Smart Grid Connected Photovoltaic and Fuel System
IRJET- Hybrid Smart Grid Connected Photovoltaic and Fuel SystemIRJET- Hybrid Smart Grid Connected Photovoltaic and Fuel System
IRJET- Hybrid Smart Grid Connected Photovoltaic and Fuel System
 
IRJET- The Study of Various Control Techniques and Configurations for Grid Co...
IRJET- The Study of Various Control Techniques and Configurations for Grid Co...IRJET- The Study of Various Control Techniques and Configurations for Grid Co...
IRJET- The Study of Various Control Techniques and Configurations for Grid Co...
 
Power factor correction of 6.6 kv distribution line in lc11 rmhs department, ...
Power factor correction of 6.6 kv distribution line in lc11 rmhs department, ...Power factor correction of 6.6 kv distribution line in lc11 rmhs department, ...
Power factor correction of 6.6 kv distribution line in lc11 rmhs department, ...
 
IRJET- Dynamic Chargingof the Lead Acid Battery using the Programmable Interf...
IRJET- Dynamic Chargingof the Lead Acid Battery using the Programmable Interf...IRJET- Dynamic Chargingof the Lead Acid Battery using the Programmable Interf...
IRJET- Dynamic Chargingof the Lead Acid Battery using the Programmable Interf...
 
A different visions for uninterruptible load using hybrid solar-grid energy
A different visions for uninterruptible load using hybrid solar-grid energyA different visions for uninterruptible load using hybrid solar-grid energy
A different visions for uninterruptible load using hybrid solar-grid energy
 
Design and Cost Evaluation of a Distribution Feeder Connected Solar System
Design and Cost Evaluation of a Distribution Feeder Connected Solar System Design and Cost Evaluation of a Distribution Feeder Connected Solar System
Design and Cost Evaluation of a Distribution Feeder Connected Solar System
 
SIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVE
SIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVESIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVE
SIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVE
 
IRJET- Analysis and Implementation of Super Capacitors as a Storage Device in...
IRJET- Analysis and Implementation of Super Capacitors as a Storage Device in...IRJET- Analysis and Implementation of Super Capacitors as a Storage Device in...
IRJET- Analysis and Implementation of Super Capacitors as a Storage Device in...
 
IRJET - Review on Ideal Microgrid for Indian Farmers
IRJET - Review on Ideal Microgrid for Indian FarmersIRJET - Review on Ideal Microgrid for Indian Farmers
IRJET - Review on Ideal Microgrid for Indian Farmers
 
Base Load Plants and Peak Load Plant
Base Load Plants and Peak Load PlantBase Load Plants and Peak Load Plant
Base Load Plants and Peak Load Plant
 
08529419.pdf
08529419.pdf08529419.pdf
08529419.pdf
 
H045045059
H045045059H045045059
H045045059
 
solar-ups_compress.pptx
solar-ups_compress.pptxsolar-ups_compress.pptx
solar-ups_compress.pptx
 
INTELLIGENT GRID INTERFACED SOLAR WATER PUMPING SYSTEM ppt.pptx
INTELLIGENT GRID INTERFACED SOLAR WATER PUMPING SYSTEM ppt.pptxINTELLIGENT GRID INTERFACED SOLAR WATER PUMPING SYSTEM ppt.pptx
INTELLIGENT GRID INTERFACED SOLAR WATER PUMPING SYSTEM ppt.pptx
 

Recently uploaded

ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 

Recently uploaded (20)

ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 

Sub Critical & Super Critical Power Plants in INDIA.

  • 1. RAGHU ENGINEERING COLLEGE (AUTONOMOUS) DEPARTMENT OF EEE Academic year: 2018-2019 II year II-semester Power Systems-I Generation and Utilization CASE STUDY ON SUB CRITICAL AND SUPER CRITICAL POWER PLANTS IN INDIA. BATCH-2 A.Snehitha-18985A0206 A.S.S.R.Murthy-18985A0207 A.Sai Sampath-18985A0208 B.Naga Venkatesh-18985A0209 B.Chaitanya-18985A0210 FACULTY: V.Pramadha Rani. Assosiate Professor.
  • 2. What are subcritical and super critical? Critical pressure of water is 220.64 bar = 3200.11 psi. Below that, boilers are subcritical and above, supercritical. Usually, the power rating of a super critical power plant will be more than 400MW. Less than that, those can be considered as sub critical and above that it would be ultra super critical.
  • 3. Comparison. Sub critical power plant • System with constant evaporation endpoint • A typical example of this system is the drum-type steam generator. Natural circulation is produced by heating of the risers. The water/steam mixture leaving the risers is separated into water & steam in the drum. The steam flows into the super heater and the water is returned to the evaporator inlet through down comers. • If the system is operated only with natural/assisted circulation, the application range is limited to a max drum pressure of approx. 190 bar. • If a circulating pump is used (forced circulation), this range can be extended somewhat fixing the endpoint of evaporation in the drum also sets the size of the heating surface in the evaporator & superheater. Super Critical power plant • System with variable evaporation endpoint • This type of boiler is drumless steam generator. Evaporation takes place in a single pass. This principle used in the BENSON/SULZER boiler, the world's most frequently constructed steam generator type. Flow through the evaporator is induced by the feed pump. The system can therefore be operated at any desired pressure i.e. at either subcritical (Close to critical) or supercritical pressure. The evaporation endpoint can shift. • The evaporator & super heater areas thus automatically adjust to operational requirements.
  • 4. Fig 1: Temperature vs Entropy graph representing sub critical and super critical cycles.
  • 5. Vindhyachal Thermal Power Plant. 1. It is located in singrauli, Madhya Pradesh. 2. It is handled by NTPC. 3. Its rating is 4760MW, this is largest power station in India.
  • 6. Mundra Thermal Power Plant. 1. It is of 4600MW capacity. 2. Located in kutch, Gujarat. 3. Handled by adani power ltd.
  • 7. Chandrapur Super Thermal Power Plant 1. It is of capacity 3340MW. 2. It is situated in urjanpur, maharastra. 3. It is operated by Mahagenco(government of maharastra).
  • 8. Sterlite Thermal Power Plant 1. It has a capacity of 2400MW. 2. It is located in jharsuguda, Odisha. 3. It is maintained sterlite energy a subsidiary unit of vadanta resources.
  • 9. Barh Super Power Plant 1. It is situated in patna, bihar. 2. It has a capacity of 1320MW. 3. It is one of the power plants with least power generating capacity.
  • 10. Advantages of super critical power plants. 1. More thermal efficiency. 2. More flexible. 3. Here, the drum inside acts as a evaporation end point. 4. These automatically adjust to load fluctuations.
  • 11. RAGHU ENGINEERING COLLEGE (AUTONOMOUS) DEPARTMENT OF EEE Academic year: 2018-2019 II year II-semester Power Systems-I Generation and Utilization CASE STUDY ON VARIOUS BUSBAR ARRANGEMENTS. BATCH-2 A.Snehitha-18985A0206 A.S.S.R.Murthy-18985A0207 A.Sai Sampath-18985A0208 B.Naga Venkatesh-18985A0209 B.Chaitanya-18985A0210 FACULTY: V.Pramadha Rani. Assosiate Professor. 4/19/2019 Power Systems-I 11
  • 12. What is a busbar?  An electrical bus bar can be defined as a conductor or groups of conductors which collects electrical power from the incoming feeder and distributes them to outgoing feeder.  Busbars distribute electricity with greater ease and flexibility than some other more permanent forms of installation and distribution.  They are often metallic strips of copper, brass, or aluminum that both ground and conduct electricity. 4/19/2019 Power Systems-I 12
  • 13. Busbar Arrangements.  The choice of particular arrangement depends upon viz., system voltage, position of substation, system flexibility and cost.  In addition, the following technical considerations must be borne in the mind while deciding an arrangement: 1) Simplicity is the keynote of a dependable system. 2) Maintenance should be possible without interruption of supply. 3) Alternative arrangements should be available in case of outage of any apparatus. 4) The installation should be as economical as possible. 4/19/2019 Power Systems-I 13
  • 14. Single Busbar Arrangement.  The arrangement is the cheapest possible and simple in construction.  But, it suffers from two major defects, I. Maintenance without interruption of supply is not possible. II. Extension of substation without shutdown is not possible. 4/19/2019 Power Systems-I 14 Fig A : Single Busbar Scheme.
  • 15. Single Bus-bar Arrangement with Sectionalizer.  It is used as an alternative for the single bus-bar arrangement because any breaker can be taken for maintenance.  Though it requires an extra breaker, and the switching is more complex.  A fault in the bus may shut down the whole system.  Generally, used for 110kv substations. Fig B: Single busbar scheme with sectionaliser. 4/19/2019 Power Systems-I 15
  • 16. Comparison. Single Bus-bar Scheme.  It is simplest scheme with artless protection system.  Any fault on bus results in disconnection of power. Any maintenance on any breaker will lead to disconnection of relevant breaker, relevant line or whole system in some cases. Single Bus-bar with sectionalizer.  Single breaker single busbar scheme is slightly improved by dividing the bus into two sections.  This scheme is only effective if there are two incoming lines and outgoing lines are distributed evenly in each section. 4/19/2019 Power Systems-I 16
  • 17. Main and Transfer Bus Scheme.  It is more flexible because half number of feeders are connected on each bus.  But, it needs an extra breaker coupler circuit.  Line breaker fault may result in taking of all the circuits connected to out of service and also failure in the bus-bar results in shutdown of complete system.  Mostly used for substations of 66kv, 132kv and up to 220kv. Fig C: Main and transfer bus- bar scheme.4/19/2019 Power Systems-I 17
  • 18. Double Bus-bar Arrangement.  It is more flexible as we can connect feeders on either of buses.  This scheme is highly reliable as any breaker can be taken for maintenance whenever required.  It is far more expensive when compared to normal double bus- bar scheme.  Generally, used for high voltage or EHV substations. Fig D: Double bus arrangement. 4/19/2019 Power Systems-I 18
  • 19. Comparison. Double Bus-bar Arrangement.  In double bus system load can be connected on either of the bus.  The infeed and the load circuit can be separated in two if needed from operational considerations.  Either bus can be taken out of maintenance. Main and Transfer Bus-bar System.  This is alternative for double bus scheme.  It provides facility for breaker maintenance but not bud maintenance.  Whenever maintenance is required the circuit can be shifted to another bus and controlled using bus coupler. 4/19/2019 Power Systems-I 19
  • 20. One and Half Breaker Scheme.  More flexible in operation as all the switching is done by breakers.  Selective tripping is possible.  But any breaker can’t be removed without interruption of supply.  Generally, used for substations for 220kv to 440kv ratings. Fig E: One and half breaker scheme. 4/19/2019 Power Systems-I 20
  • 21. Ring/Mesh Arrangement.  Bus-bars gives more operational flexibility.  Any fault in the unit separates the ring into two halves thereby increasing the complexity of reclosing and protection.  Breaker failure during fault on one circuit causes loss of additional circuit because of breaker failure.  Mostly used for very high power rating generating stations. Fig F: Ring Bus-bar Arrangement. 4/19/2019 Power Systems-I 21
  • 22. Single Bus-bar Scheme using Simulink. 4/19/2019 Power Systems-I 22