Collaboration is coming
to the building industry.
It‟s a monumental shift
that promises speed
and efficiency.
www.SkyBIM.com
A shared building model which
digitally captures ALL project
information and makes it
available to the entire project
team throughout the lifecycle of
the building is widely seen as the
Next Big Thing in
design and construction.
www.SkyBIM.com
www.SkyBIM.com
Cloud based management and real-
            time costing
        of building projects
 Marek Brandstatter (South Africa)      Dave Willard (USA)
      marek@skybim.com               davewillard@comcast.net
Building Industry
  Challenges
Building Lifecycle Stages
    Projects generate massive arrays of information
 Real-world products
Construction methods
   Estimated Costs
        Actual Costs
   Manufacturer Info
         Warranties
Maintenance records
      Specifications
         Documents
              Photos
Radio Frequency IDs




                                                   Image courtesy of Autodesk Inc
Productivity in Construction
 Declining gradually for the past 40 years
 Lags other non-farm industries




                                                      Reasons…
                                                         Silo mentality

                                                         Fragmented responsibility

                                                         Poor coordination

                                                         Costly re-entry of duplicate data

                                                         Much info still reduced to paper
        US Construction Industry Productivity Index
Silo mentality
 Digital isolation
 Project data locked inside silos
                                     Silo Mentality
Traditional „Over the Wall‟ workflow
 Costly re-entry of duplicate data
 Much info still reduced to paper




                                      Image courtesy of Dave Willard, HNTB
Traditional Bill of Quantities is
an „Abstraction‟ of the BIM model
 BOQ has NO direct relationship to Building Information Model

                           Where are the
                         products/materials
                       located in the model?




                        SkyBIM knows…
What is SkyBIM?
What is SkyBIM?
 SkyBIM is a cloud-based platform to store ALL
 the information collected throughout the
 building‟s lifecycle to optimise the way
 buildings are designed, costed,
                                               Real-world products
 constructed, and managed.                   Construction methods
                                                 Estimated Costs
                                                    Actual Costs
                                                Manufacturer Info
                                                      Warranties
       SkyBIM is the Matrix for Buildings    Maintenance records
                                                   Specifications
                                                      Documents
                                                          Photos
                                              Radio Frequency IDs
SkyBIM is Unique…
 “SkyBIM provides a unique Cloud-based BIM
  platform that offers a live bi-directional
  exchange between real-world product data
  and BIM model elements.”
 “SkyBIM has what we consider the best
  common data platform by which all other
  phases of construction can build data upon.”
CAD versus BIM
CAD versus BIM
Computer Aided Design      Building Information Modeling
•   Primarily 2D            •   2D 3D 4D 5D 6D & beyond
•   Dumb graphics           •   Intelligent objects
•   Lines, arcs, circles    •   Walls, windows, floors, roofs
•   AutoCAD                 •   Revit
BIM as Lego
Think of BIM as intelligent Lego
 BIM elements are fully parametric
  Lego blocks
 Lego blocks are [PLACEHOLDERS]
  for real-world product data
 All Lego blocks must be accounted
  for - otherwise model is incomplete
All Lego blocks accounted for?
 Model is complete   (No blocks missing)
Imagine Lego blocks
• that can store „unlimited‟ building lifecycle data
 SkyBIM = Document Management System for Buildings
 BIM elements can be used as Smart Folders for “unlimited” data storage
                                                  Select the BIM element to access its associated:
                                                                              Real-world products
                                                                             Construction methods
                                                                                  Estimated Costs
                                                                                     Actual Costs
                                                                                Manufacturer Info
                                                                                      Warranties
                                                                             Maintenance records
                                                                                   Specifications
                                                                                      Documents
                                                                                           Photos
                                                                             Radio Frequency IDs
SkyBIM Account
SkyBIM Account contains…
   People                      Projects                     Products                Pricelists
    Administrator              Lightweight                 Lego blocks              Manufacturers
    Users                      Digital Doubles             Real- world recipes      Suppliers
    Permissions                                                                       Product catalogs
    Notifications                                                                     Databases




                                                                Door Recipe




                                                                 Wall Recipe



  the 4 Ps
                                                                Room Recipe




*Project is just a collection of Products with Quantities
How SkyBIM works
How SkyBIM works
• Lightweight Digital Double                          („Mini-me‟)
   Revit models can be huge - sometimes over 800MB
   Approx 1/1000th of original size – 800Kb
   Digital Double perfectly synchronized
    (by Element ID)
   Revit elements and their
                                                                     Lightweight
    SkyBIM counterparts are                                         Digital Doubles
    linked
How SkyBIM works
• Plug-in real-world Product Recipes & Costs
  Attaching a product recipe in SkyBIM is the same as attaching it directly to the Revit model



                                                     Wall Recipe
                                    Door Recipe
How SkyBIM works
 • Example real-world WALL recipe




Revit wall is simply a
[PLACEHOLDER]
for real-world products
Real-world products
Construction methods
Estimated Costs
Actual Costs
Manufacturer Info
Warranties
Maintenance records
Specifications
Documents
Photos
Radio Frequency IDs

Remember SkyBIM can host „unlimited‟ information about the wall
How SkyBIM works
• Example real-world DOOR recipe
How SkyBIM works
• Projects learn from each other
• Cost quicker with each successive project
SkyBIM and DWF
SkyBIM and DWF
• Like PDFs – only much smarter
• Export 2D/3D DWFs to share




                      Detail

                                  Plan




    Section



                      Revit         3D
SkyBIM and DWFs
• DWF elements talk to SkyBIM (no need for Revit Model)
 1.   Select element in DWF file – for example, a wall in section
 2.   SkyBIM highlights the wall and its recipe in the cost report
SkyBIM is a sharable platform
• Other applications can communicate with SkyBIM
• Access product recipes
  from anywhere                Wall Recipe




                 Door Recipe
                                              Room Recipe




    Revit      DWF (2D)                                     Navisworks*
                                   DWF (3D)
SkyBIM in the Field
SkyBIM in the Field…
 Procurement, Material Tracking, Construction Status, Checklists




                                                                       Specify Project Status for each
                                                                         ingredient

                                                                          Back order
                                                                          In transit
     Tablet PC worker
                                                                          On site
                                                                          Percentage complete
                                                                          Installed
                                                                      (Use Checklists to flag any issues)


                                                                          Cost Reports
                                                                          Planned vs Actual
 Pick a door in plan,
   section, elevation or 3D    View SkyBIM recipe with ingredients
Implementing SkyBIM
Implementing SkyBIM
• As easy as




SkyBIM best practice
1. Set up your company‟s Revit library
2. Plug-in (Front load) SkyBIM product recipes
3. Audit model to ensure take-off accuracy
Implementing SkyBIM…
1. Set up your company‟s Revit library
  This is a standard Revit requirement
  Create Revit Lego blocks that your projects require
  Apply suitable naming conventions (use common sense, be descriptive)
  No need to over model
  Revit Lego blocks are simply [PLACEHOLDERS] for real-world products
Implementing SkyBIM…
 2. Plug-in (Front load) your product recipes
Estimators can have a huge
impact by Front Loading
product cost recipes into
Building Information Models



Any project that uses
Front Loaded Lego blocks
can be estimated real-time
Implementing SkyBIM…
3. Audit model to ensure take-off accuracy




All Lego blocks accounted for?

Are the measurements accurate?

     Model is trusted

Correct SkyBIM cost recipes attached?


    Real-time costing
little bim BIG BIM
little bim versus BIG BIM
            little bim                            BIG BIM
          CAD on steroids                       BIM on steroids
              2D 3D                               4D 5D 6D
         Modelling expertise              Collaboration expertise (IPD)
        Model is incomplete                    Model is complete
          Silo Mentality                        Data sharing
   No real-world recipes & costs       Real-world recipes fully integrated
   Benefits internalised to company        Benefits entire ecosystem
Little change in how you do business      New business opportunities
       Internet is a reference                  Internet is pivotal
      Information throwaway              Data is an ever evolving asset
little bim



        BIG BIM
Integrated Project
  Delivery (IPD)
SkyBIM facilitates
Integrated Project Delivery

• IPD brings participants together early with
  incentives to maximise value for the owner
• Harness collective expertise & maximise efficiency
• Tight collaboration, seamless project team
• Decisions made on a “best for project” basis
Integrated Project Delivery
• Simultaneous access to Project information
  - Architect, Estimator, Contractor, Owner, Manufacturers
SkyBIM benefits entire team
    Architect                       Estimator                          Contractor                         Owner
   Front-load product             Front-load cost recipes           Front-load cost recipes           Improved project delivery
    specifications                                                                                        and coordination
                                 Perform automatic quantity          Perform automatic quantity
                                                                                                         Real-time access to
 Real-time access to               takeoffs                           takeoffs
                                                                                                          schedules and reports
    estimator‟s cost
    recipes/rates                  Begin estimating earlier          Estimate verification -           Receives "digital double" of
                                                                       crosscheck measurements            the project for Asset
   Dynamically monitor            Estimates are always                                                  Tracking & Management
    how design changes              consistent with the               Improved constructability
    impact project costs            design                                                               No information "throw away"
                                                                      Track progress of work
   Produce best-practice          Frees estimating team to           completed by referencing          Maintenance / warranty
    Revit Models that are           focus on higher value              intelligent digital drawings       records
    optimised for estimating        tasks                              (DWF files) - assists
    & construction purposes                                                                              Search and locate items in
                                                                       generation of monthly
                                                                                                          the building quickly
                                   Track progress of work             claims
   Leverage high-value             completed by referencing                                             Recall the paint color and
    BIM information to              intelligent digital drawings      Control systems tie in with        area of the feature wall in the
    quantity                        (DWF files) - assists              BIM model - material               executive conference room
    surveyor, contractor, own       progress valuations                tracking, installation
    er and other consultants                                           status, field notes, punch
                                                                       lists,
                                                                       QA/QV, construction trade
                                                                       coordination
The BIG BIM
business opportunity
HOK‟s BIM BAM BOOM savings
                                             HOK Chief Executive Officer
                                                 Patrick MacLeamy
                                            HOK is the largest U.S. based
                                            architecture-engineering firm
                                            Over 1,700 professional staff
                                        http://www.youtube.com/watch?v=5IgdcCemevI




                  Up to 30% saving                        Cost benefits over 50 years
 Benefit




             Building        Building                                Building
           Information       Assembly                        Operation & Optimisation
              Model           Model                                   Model




             1$                20$                                        60$
           Design            Build                                   Manage
                                         Time
SkyBIM = BIG BIM!
A shared building model is the Next Big Thing
in design & construction
SkyBIM projects are goldmines of valuable data
Manage virtual building in parallel with real one
Provide new on-going management services
Major competitive advantage in
procuring future work

 www.SkyBIM.com
The one who controls
the project information
will be at the center of
the building enterprise.

www.SkyBIM.com
Thank you
  For more information contact

Marek Brandstatter (South Africa)
     marek@skybim.com


      Dave Willard (USA)
   davewillard@comcast.net

SkyBIM Cloud based management & real-time costing of BIM projects

  • 1.
    Collaboration is coming tothe building industry. It‟s a monumental shift that promises speed and efficiency. www.SkyBIM.com
  • 2.
    A shared buildingmodel which digitally captures ALL project information and makes it available to the entire project team throughout the lifecycle of the building is widely seen as the Next Big Thing in design and construction. www.SkyBIM.com
  • 3.
    www.SkyBIM.com Cloud based managementand real- time costing of building projects Marek Brandstatter (South Africa) Dave Willard (USA) marek@skybim.com davewillard@comcast.net
  • 4.
  • 5.
    Building Lifecycle Stages  Projects generate massive arrays of information Real-world products Construction methods Estimated Costs Actual Costs Manufacturer Info Warranties Maintenance records Specifications Documents Photos Radio Frequency IDs Image courtesy of Autodesk Inc
  • 6.
    Productivity in Construction Declining gradually for the past 40 years  Lags other non-farm industries Reasons…  Silo mentality  Fragmented responsibility  Poor coordination  Costly re-entry of duplicate data  Much info still reduced to paper US Construction Industry Productivity Index
  • 7.
    Silo mentality  Digitalisolation  Project data locked inside silos Silo Mentality
  • 8.
    Traditional „Over theWall‟ workflow  Costly re-entry of duplicate data  Much info still reduced to paper Image courtesy of Dave Willard, HNTB
  • 9.
    Traditional Bill ofQuantities is an „Abstraction‟ of the BIM model  BOQ has NO direct relationship to Building Information Model Where are the products/materials located in the model? SkyBIM knows…
  • 10.
  • 11.
    What is SkyBIM? SkyBIM is a cloud-based platform to store ALL the information collected throughout the building‟s lifecycle to optimise the way buildings are designed, costed,  Real-world products constructed, and managed.  Construction methods  Estimated Costs  Actual Costs  Manufacturer Info  Warranties SkyBIM is the Matrix for Buildings  Maintenance records  Specifications  Documents  Photos  Radio Frequency IDs
  • 12.
    SkyBIM is Unique… “SkyBIM provides a unique Cloud-based BIM platform that offers a live bi-directional exchange between real-world product data and BIM model elements.”  “SkyBIM has what we consider the best common data platform by which all other phases of construction can build data upon.”
  • 13.
  • 14.
    CAD versus BIM ComputerAided Design Building Information Modeling • Primarily 2D • 2D 3D 4D 5D 6D & beyond • Dumb graphics • Intelligent objects • Lines, arcs, circles • Walls, windows, floors, roofs • AutoCAD • Revit
  • 15.
  • 16.
    Think of BIMas intelligent Lego  BIM elements are fully parametric Lego blocks  Lego blocks are [PLACEHOLDERS] for real-world product data  All Lego blocks must be accounted for - otherwise model is incomplete
  • 17.
    All Lego blocksaccounted for?  Model is complete (No blocks missing)
  • 18.
    Imagine Lego blocks •that can store „unlimited‟ building lifecycle data  SkyBIM = Document Management System for Buildings  BIM elements can be used as Smart Folders for “unlimited” data storage Select the BIM element to access its associated: Real-world products Construction methods Estimated Costs Actual Costs Manufacturer Info Warranties Maintenance records Specifications Documents Photos Radio Frequency IDs
  • 19.
  • 20.
    SkyBIM Account contains… People Projects Products Pricelists  Administrator  Lightweight  Lego blocks  Manufacturers  Users  Digital Doubles  Real- world recipes  Suppliers  Permissions  Product catalogs  Notifications  Databases Door Recipe Wall Recipe the 4 Ps Room Recipe *Project is just a collection of Products with Quantities
  • 21.
  • 22.
    How SkyBIM works •Lightweight Digital Double („Mini-me‟)  Revit models can be huge - sometimes over 800MB  Approx 1/1000th of original size – 800Kb  Digital Double perfectly synchronized (by Element ID)  Revit elements and their Lightweight SkyBIM counterparts are Digital Doubles linked
  • 23.
    How SkyBIM works •Plug-in real-world Product Recipes & Costs  Attaching a product recipe in SkyBIM is the same as attaching it directly to the Revit model Wall Recipe Door Recipe
  • 24.
    How SkyBIM works • Example real-world WALL recipe Revit wall is simply a [PLACEHOLDER] for real-world products Real-world products Construction methods Estimated Costs Actual Costs Manufacturer Info Warranties Maintenance records Specifications Documents Photos Radio Frequency IDs Remember SkyBIM can host „unlimited‟ information about the wall
  • 25.
    How SkyBIM works •Example real-world DOOR recipe
  • 26.
    How SkyBIM works •Projects learn from each other • Cost quicker with each successive project
  • 27.
  • 28.
    SkyBIM and DWF •Like PDFs – only much smarter • Export 2D/3D DWFs to share Detail Plan Section Revit 3D
  • 29.
    SkyBIM and DWFs •DWF elements talk to SkyBIM (no need for Revit Model) 1. Select element in DWF file – for example, a wall in section 2. SkyBIM highlights the wall and its recipe in the cost report
  • 30.
    SkyBIM is asharable platform • Other applications can communicate with SkyBIM • Access product recipes from anywhere Wall Recipe Door Recipe Room Recipe Revit DWF (2D) Navisworks* DWF (3D)
  • 31.
  • 32.
    SkyBIM in theField…  Procurement, Material Tracking, Construction Status, Checklists  Specify Project Status for each ingredient Back order In transit  Tablet PC worker On site Percentage complete Installed (Use Checklists to flag any issues) Cost Reports Planned vs Actual  Pick a door in plan, section, elevation or 3D  View SkyBIM recipe with ingredients
  • 33.
  • 34.
    Implementing SkyBIM • Aseasy as SkyBIM best practice 1. Set up your company‟s Revit library 2. Plug-in (Front load) SkyBIM product recipes 3. Audit model to ensure take-off accuracy
  • 35.
    Implementing SkyBIM… 1. Setup your company‟s Revit library  This is a standard Revit requirement  Create Revit Lego blocks that your projects require  Apply suitable naming conventions (use common sense, be descriptive)  No need to over model  Revit Lego blocks are simply [PLACEHOLDERS] for real-world products
  • 36.
    Implementing SkyBIM… 2.Plug-in (Front load) your product recipes Estimators can have a huge impact by Front Loading product cost recipes into Building Information Models Any project that uses Front Loaded Lego blocks can be estimated real-time
  • 37.
    Implementing SkyBIM… 3. Auditmodel to ensure take-off accuracy All Lego blocks accounted for? Are the measurements accurate? Model is trusted Correct SkyBIM cost recipes attached? Real-time costing
  • 38.
  • 39.
    little bim versusBIG BIM little bim BIG BIM CAD on steroids BIM on steroids 2D 3D 4D 5D 6D Modelling expertise Collaboration expertise (IPD) Model is incomplete Model is complete Silo Mentality Data sharing No real-world recipes & costs Real-world recipes fully integrated Benefits internalised to company Benefits entire ecosystem Little change in how you do business New business opportunities Internet is a reference Internet is pivotal Information throwaway Data is an ever evolving asset
  • 40.
    little bim BIG BIM
  • 41.
    Integrated Project Delivery (IPD)
  • 42.
    SkyBIM facilitates Integrated ProjectDelivery • IPD brings participants together early with incentives to maximise value for the owner • Harness collective expertise & maximise efficiency • Tight collaboration, seamless project team • Decisions made on a “best for project” basis
  • 43.
    Integrated Project Delivery •Simultaneous access to Project information - Architect, Estimator, Contractor, Owner, Manufacturers
  • 44.
    SkyBIM benefits entireteam Architect Estimator Contractor Owner  Front-load product  Front-load cost recipes  Front-load cost recipes  Improved project delivery specifications and coordination  Perform automatic quantity  Perform automatic quantity  Real-time access to  Real-time access to takeoffs takeoffs schedules and reports estimator‟s cost recipes/rates  Begin estimating earlier  Estimate verification -  Receives "digital double" of crosscheck measurements the project for Asset  Dynamically monitor  Estimates are always Tracking & Management how design changes consistent with the  Improved constructability impact project costs design  No information "throw away"  Track progress of work  Produce best-practice  Frees estimating team to completed by referencing  Maintenance / warranty Revit Models that are focus on higher value intelligent digital drawings records optimised for estimating tasks (DWF files) - assists & construction purposes  Search and locate items in generation of monthly the building quickly  Track progress of work claims  Leverage high-value completed by referencing  Recall the paint color and BIM information to intelligent digital drawings  Control systems tie in with area of the feature wall in the quantity (DWF files) - assists BIM model - material executive conference room surveyor, contractor, own progress valuations tracking, installation er and other consultants status, field notes, punch lists, QA/QV, construction trade coordination
  • 45.
  • 46.
    HOK‟s BIM BAMBOOM savings HOK Chief Executive Officer Patrick MacLeamy HOK is the largest U.S. based architecture-engineering firm Over 1,700 professional staff http://www.youtube.com/watch?v=5IgdcCemevI Up to 30% saving Cost benefits over 50 years Benefit Building Building Building Information Assembly Operation & Optimisation Model Model Model 1$ 20$ 60$ Design Build Manage Time
  • 47.
    SkyBIM = BIGBIM! A shared building model is the Next Big Thing in design & construction SkyBIM projects are goldmines of valuable data Manage virtual building in parallel with real one Provide new on-going management services Major competitive advantage in procuring future work www.SkyBIM.com
  • 48.
    The one whocontrols the project information will be at the center of the building enterprise. www.SkyBIM.com
  • 49.
    Thank you For more information contact Marek Brandstatter (South Africa) marek@skybim.com Dave Willard (USA) davewillard@comcast.net

Editor's Notes

  • #7 A lot of people don’t know thishttp://www.aecbytes.com/viewpoint/2004/issue_4.htmlThe productivity of the construction industry, as measured by constant contract dollars of new construction work per hourly work hour, has gradually declined (with some modest exceptions) over the past 40 years at an average compound rate of -0.59%/year (see Figure 1). This is particularly alarming when compared to the increasing labor productivity in all non-farm industries, which have experienced an increasing productivity of 1.77%/year over the same time period. Over the past decade, this trend has slightly improved but the decline in construction labor productivity relative to the rest of the industry has continued.This is a serious problem which indicates that over the past 40 years, construction projects have required significantly more field work hours per dollar of contract. In other words, the construction industry seriously lags other industries in developing and applying labor saving ideas and in finding ways to substitute equipment for labor. While there are a number of construction tasks that have been made more productive through the use of labor saving equipment, it is clear that, looking at the whole industry, there is a significant productivity problem. Why is this the case and what can be done about it? First, let's review the productivity data shown in Figure 1. Despite the fact that there has been a significant adoption of new information technology (IT) by the construction industry over the past 35 years, these applications tend to run in a stand-alone mode that does not permit improved collaboration by the project team, e.g., each designer uses a separate CAD/CAE system, CPM is independent of cost control which is independent of project changes to the drawings and specs, etc. Thus, while computers now generate much information, they ultimately produce a paper output, which then must be manually reviewed so that relevant data can be entered into another program, e.g., CAD drawings are plotted so that estimators can use them for making a cost estimate. This fragmentation causes increased effort and time and has greatly reduced the ability of the project team to respond quickly and effectively to changes in scope, site conditions, delivery delays, etc. Thus, despite the widespread use of IT, it has not had a significant impact on overall performance.
  • #9 Underlying Needs - Solving The ProblemThe industry offers variety 3D BIM model viewers, the most popular coming from Autodesk & Microstation. The typical workflow for these products involves each team member to upload their latest BIM models. Afterwards one person is typically assigned the task of aggregating all of the BIM models into one for viewing by all of the team members (Arch, Struct, MEP, Contractors, Owers). The problem with this “Traditional Approach” is in the flow of information. As changes are made in the design, from any one of the disciplines, those changes must be relayed to all parties affected by those changes…thus the cycle of uploading the latest files, and the file aggregation begins all over again. In the background there’s quite a bit of “disconnected information” such as cost estimates, project schedules, etc. that become antiquated as soon as the design changes.
  • #13 Combining Common Data Platform with Data Driven Visualization - What Can We Accomplish?By driving visualization with data we can literally create 3D visuals that benefit many tasks throughout the lifecycle of the project. For example:4D scheduling5D Cost EstimationProcurement and Material TrackingConstruction StatusQA/QC Check lists and their statusPunch Listing statusAsset Management/FMControl Systems Monitoring
  • #19 SkyBIM stores all the information collected over building’s lifecycle – (not just for cost estimating)
  • #24 What is unique about SkyBIM is that all the "real-time" BIM data is securely hosted in the cloud, allowing anywhere, anytime collaboration. For example, here is a live fully-editable link (http://bit.ly/ex6iah) to an interior wall in an sample SkyBIM estimate, that allows you to:Edit a product's costsEdit and manage a product's assemblyInvite 'suppliers' to provide pricingAssign a long description to the productAssign a labor crew to a productFind products in SkyBIM to add as ingredients to the product's assemblyFind Craftsman products in SkyBIM to add as ingredients to the product's assemblyView products that have been bookmarkedModify a product's classificationsAssign a manufacturer to a productView the product's Revit based specificationsInvite people to collaborate in the editing of this productRoom Assemblyhttp://bit.ly/swhyxRhttp://bit.ly/uKPtjUWall Assemblyhttp://bit.ly/ueJuXzhttp://bit.ly/tqsYQVEquipment Assemblyhttp://bit.ly/swFdOchttp://bit.ly/vPbSD2Door Assemblyhttp://bit.ly/w3FyIThttp://bit.ly/tRJsyp
  • #31 SkyBIMelements, anywhere to view or edit their SkyBIM product recipes
  • #33 Combining Common Data Platform with Data Driven Visualization - What Can We Accomplish?By driving visualization with data we can literally create 3D visuals that benefit many tasks throughout the lifecycle of the project. For example:4D scheduling5D Cost EstimationProcurement and Material TrackingConstruction StatusQA/QC Check lists and their statusPunch Listing statusAsset Management/FMControl Systems Monitoring
  • #43 http://en.wikipedia.org/wiki/Integrated_Project_Deliveryhttp://www.bdcnetwork.com/article/449683-BIM_research_New_IPD_document_quantifies_savings_shows_obstacles-full.phpThe inspiring vision of IPD is that of a seamless project team, not portioned by economic self interest of contractual silos of responsibility, but a collection of companies with a mutual responsibility to help one another meet an owner’s goals. To support that vision, AEs, CMs, (architects/engineers, construction managers) and their lawyers are crafting management processes and contract terms intended to align the interests of the key project team with the project mission, increase efficiency, reduce waste, and make better buildings.”The main crux of IPD is around the idea of assembling all parties involved on a project as early as possible—ideally during schematic design—to provide a collective expertise to the development of a project before anything is designed. To incentivize parties, shared risk/shared reward contracts are established upfront with an understanding that all parties are working together for the good of the project.DEFINITIONIntegrated Project Delivery (IPD) is a project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to reduce waste and optimize efficiency through all phases of design, fabrication and construction.Integrated Project Delivery principles can be applied to a variety of contractual arrangements and Integrated Project Delivery teams will usually include members well beyond the basic triad of owner, architect, and contractor. At a minimum, though, an Integrated Project includes tight collaboration between the owner, the architect, and the general contractor ultimately responsible for construction of the project, from early design through project handover.OVERVIEWIntegrated Project Delivery uses business structures, practices, and processes to collaboratively use the talents and insights of all participants in the design, construction and fabrication process. Beginning when the project is first conceptualized, the integrated process continues throughout the full life cycle of the facilities.Integrated Project Delivery encourages early contribution of knowledge and experience and requires proactive involvement of key participants. Responsibility is placed on the most able person with decisions being made on a “best for project” basis. Although it is possible to achieve Integrated Project Delivery without Building Information Modeling, it is the opinion and recommendation of this study that Building Information Modeling is essential to efficiently achieve the collaboration required for Integrated Project Delivery.
  • #47 HOK Chief Executive Officer Patrick MacLeamy