What is BIM?                                                              How can construction/contractors
Building Information Modeling (BIM) is more than a new technology;
                                                                          take advantage of BIM?
it is an innovative approach to the entire design, construction, and
                                                                          While BIM was initially developed with a focus on the design world, it
maintenance process. Many of the agencies and organizations
                                                                          has quickly gained favor among contractors and construction managers.
involved in the building industry have their own definitions of BIM,
                                                                          Construction is a team sport, and BIM is dramatically reshaping the way
but they all have a similar feel to that of the National BIM Standard
                                                                          project teams work together to increase efficiency and enhance outcomes
definition:
                                                                          for all. This process is driving the most transformative evolution the
                                                                          construction industry has ever experienced. The use of BIM and 3D
BIM is a digital representation of physical and functional
                                                                          modeling facilitates the optimization of lean construction techniques
characteristics of a facility. As such, it serves as a shared knowledge
                                                                          and principles.
resource for information about a facility, forming a reliable basis
for decisions during its life-cycle; defined as existing from inception
                                                                          In a recent McGraw-Hill Construction BIM Report, 45% of users report
onward.
                                                                          they are utilizing BIM tools at moderate levels or higher. In 2009, 62% of
                                                                          BIM users will use it on more than 30% of their projects; and nearly half
How does BIM enhance the design process?                                  (45%) of all current adopters will advance to become heavy BIM users
                                                                          (using it on at least 60% of projects), up from 35%. Some of the benefits
During the project study and design phases, BIM allows you to             for contractors utilizing BIM include:
quickly create and review multiple design scenarios and easily convey
those options to the client while maintaining a single model. BIM          ssisting
                                                                           A             with scoping during bidding and purchasing.
offers many tools to create schematic massing models, as well as
detailed construction-ready models, without losing any of the design       oordinating
                                                                           C              construction sequencing
intent along the way.                                                      (even if just for two trades).

The current 2D design process relies on passing information from           dentifing
                                                                           I        collisions (e.g., identifying ductwork running into structural
the design team to the construction document team, creating new            members).
drawings at each phase. By having all project information contained
in a single, continuously updated database, it is easier to manage         isualizing
                                                                           V              what is to be built in a simulated environment.
data accuracy and integrate all project aspects during the design
phase. This leads to better specifications, estimations, schedules, and    aking
                                                                           M         fewer errors and corrections in the field.
compliance, as well as the ability to produce detailed 3D models and
simulate construction. Some additional items BIM will help with            igher
                                                                           H       reliability of expected field conditions, allowing opportunity to do
include:                                                                   more prefabrication of materials offsite, which is usually a higher quality
                                                                           at a lower cost.
 arlier
 E          and more accurate visualization of a design.
                                                                          Those contractors using BIM will almost universally tell you the number
 utomatic
 A              low-level corrections when changes are made to design.    of benefits they continue to discover seems endless. There are so many
                                                                          processes we think of in the context of a 2D-based mindset. As we shift to a
 ccurate
 A         and consistent generation of 2D drawings                       model-based process, contractors continue to find innovative uses for BIM.
  or 3D renderings at any stage of the design.

 arlier
 E          collaboration of multiple design disciplines.

Easier     checks against design intent.

Utilizing BIM on a project institutes a shift in the traditional
project workload. With BIM, much more work is done earlier in the
project. By shifting more work to the schematic design and design
development phases of a project, changes can be made with a smaller
impact on costs. Traditionally, more effort went into the construction
documents phase, where design changes are typically much more
expensive. The graph below indicates the preferred process versus
the typical process. BIM greatly increases the ability to follow the
preferred process.
We offer clients the option of construction management services. This integrated design/build
                                 approach fits perfectly with BIM technology. This software and production method will improve
                                 the exchange of building information throughout the building design and construction process.
                                 	        - es Hewitt, Retired Senior Vice President/Principal
                                           L




How do clients/owners benefit from BIM?
From the owner’s perspective, BIM offers the promise of a high- quality project, as well as
time and cost savings. The 3D models enable project owners to gain a better understanding,
early in the design process, of how their final project will look. Design issues can be
addressed early on with the prime consultant. If revisions are made, the database and model
are updated as necessary, and changes are automatically integrated throughout the process.
This should lead to fewer surprises, errors, and omissions. For owners doing multiple
similar projects, BIM offers the ability to communicate similarities and differences to the
design and construction teams. The result is consistency across all projects. In addition, if
the owner takes control of BIM when the project is completed, the owner benefits by having
more detailed models and schematics on hand for ongoing operation, maintenance, and
renovation of the project.




                                                                                                Are agencies or organizations
                                                                                                requiring the use of BIM?
                                                                                                In 2003, the Office of the Chief Architect (OCA)
                                                                                                of the U.S. General Services Administration
                                                                                                (GSA) Public Buildings Service spearheaded the
 BIM helps the contractors                                                                      National 3D-4D-BIM Program. To date, OCA
 to visualize a building before                                                                 has led a pilot program with over 30 projects
 and during construction                                                                        that incorporated a variety of BIM technologies
                                                                                                to address different programming, design, and
                                                                                                construction challenges faced by GSA capital
                                                                                                projects. In addition, OCA is assessing and
                                                                                                supporting BIM applications on over 40 ongoing
                                                                                                GSA projects across different regions. For all
                                                                                                major projects (prospectus-level) receiving
                                                                                                design funding in fiscal year 2007 and beyond,
                                                                                                a spatial program BIM will be the minimum
                                                                                                requirement.

                                                                                                Along with the GSA requiring BIM to be a
                                                                                                major part of the design process, several other
                                                                                                federal agencies and large companies are
                                                                                                requiring BIM as part of the design process.
                                                                                                Some examples include:

                                                                                                 .S. Army
                                                                                                 U            Corps of Engineers

                                                                                                 ational Aeronautics
                                                                                                 N                       and Space
                                                                                                 Administration

                                                                                                 aval
                                                                                                 N        Facilities Engineering Command

       Working with a 3D model increases coordination and collaboration                         U.S.   Coast Guard
       among disciplines, reduces conflicts among systems, and allows us to
       make design decisions faster and earlier in a project.                                    isconsin
                                                                                                 W            Department of Administration
       	 - dam Meeker, AIA, Senior Architect/Associate
           A
BIM necessarily provides the “ideal”… contractors, architects, engineers,
                                                   and suppliers who are communicating, on the same page, and working
                                                   toward the same goal. An excellent product for all!
                                                   	        -Charles Wesley, Construction Manager


                                                   How is FTCH utilizing BIM?
                                                   FTCH realizes that BIM is the future of design and construction. During the past 18
                                                   months, FTCH has invested heavily in software, hardware, and training to help bring
                                                   FTCH to the forefront of this new design and construction process.

                                                   As the use of BIM increases within the design and construction industry, it will lead to
                                                   a revolution in project delivery. Many are already referring to this revolution as leading
                                                   to the fully collaborative project team. The theory of full project collaboration generally
                                                   envisions the entire team–owner, architect, engineers, consultants, construction
                                                   manager, and specialty contractors–being involved from the project’s inception by
                                                   “sitting together at one table” in developing the project design. Essentially, the team
                                                   constructs the project virtually in 3D with the use of BIM. This full project collaboration
                                                   allows for increased speed of delivery, enhanced economics for the project, and true
                                                   lean construction—all at levels not yet experienced in our industry.

                                                   FTCH has the unique ability to realize the full potential of BIM because we have all
                                                   disciplines, including construction, under one roof. This integrated services approach
                                                   helps us utilize everything the model has to offer, from the preliminary design phase all
                                                   the way through construction. Over the past year, we have created models on several
                                                   types of projects, including:

                                                    niversity
                                                    U             facilities
                                                    otel
                                                    H        prototypes
                                                    ig-box
                                                    B          retail
                                                    unicipal
                                                    M             water treatment plants




FTCH has made the transition from
CAD to BIM a top priority. The firm views          Leveraging BIM (using Autodesk Revit specifically) will require some new

                                                                                                                                                 www.ftch.com
implementing BIM technology as a means of          thinking and should enhance communication and coordination between
achieving the next boost in productivity and       disciplines. With the help of our IT Department, Graphics Task Force, CAD
improved communication.                            Support Group, and new BIM Task Force our transition will be smooth and
	       - es Hewitt, Retired Senior
         L                                         deliberate – helping us deliver exceptional client service!
         Vice President, Principal                 	        - ohn Condie, P.E., Senior Vice President/Principal/
                                                             J
                                                             Senior Electrical Engineer




                                                         engineers             ◆   scientists      ◆   architects          ◆   constructors



  Michigan                                                                                                    Ohio
  Grand Rapids	              Lansing	            Kalamazoo	                        Farmington Hills           Cincinnati
  ph. 616.575.3824	          ph. 517.882.0383	   ph. 269.375.3824	                 ph. 248.324.2090           ph. 513.469.2370

More Related Content

What's hot

Building Information Modeling - From Concept to Completion
Building Information Modeling - From Concept to CompletionBuilding Information Modeling - From Concept to Completion
Building Information Modeling - From Concept to Completion
Hitech CADD Services
 
BIM Introduction
BIM IntroductionBIM Introduction
BIM Introduction
Mohamed Mohsen Kamel
 
BIM Contract International Conference 2017
BIM Contract International Conference 2017BIM Contract International Conference 2017
BIM Contract International Conference 2017
Chun Keung Ng
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
fitsum yonas
 
iBIM and Knowledge Management
iBIM and Knowledge ManagementiBIM and Knowledge Management
iBIM and Knowledge Management
Be2camp Admin
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)
Ir. Abdul Aziz Abas
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
Dalbir Dugal
 
SkyBIM Cloud based management & real-time costing of BIM projects
SkyBIM Cloud based management & real-time costing of BIM projectsSkyBIM Cloud based management & real-time costing of BIM projects
SkyBIM Cloud based management & real-time costing of BIM projects
SkyBIM
 
Bringing together World of BIM and World of Products
Bringing together World of BIM and World of ProductsBringing together World of BIM and World of Products
Bringing together World of BIM and World of Products
SkyBIM
 
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
BIM in Project Management: Keynote Speech by Mr. Kevin POOLEBIM in Project Management: Keynote Speech by Mr. Kevin POOLE
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
The Hong Kong Institute of Building Information Modelling (HKIBIM)
 
A gentle introduction to BIM
A gentle introduction to BIMA gentle introduction to BIM
A gentle introduction to BIM
Rajan Filomeno Coelho
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
Cesare Caoduro
 
Building Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBuilding Information Modelling (BIM) in India
Building Information Modelling (BIM) in India
Be2camp Admin
 
Bim Facades.Final
Bim Facades.FinalBim Facades.Final
Bim Facades.Final
friscozephyr
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
Reshma Philip
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
Vulcan Smart Services
 
BIM Presentation
BIM PresentationBIM Presentation
BIM PresentationOmer Syed
 
How to save time and money on your BIM project with cloud collaboration
How to save time and money on your BIM project with cloud collaborationHow to save time and money on your BIM project with cloud collaboration
How to save time and money on your BIM project with cloud collaboration
Carrie Raynham
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction
Marc Goldman
 
SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping
SkyBIM - Accelerate Project Roll-out with Integrated BIM PrototypingSkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping
SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping
SkyBIM
 

What's hot (20)

Building Information Modeling - From Concept to Completion
Building Information Modeling - From Concept to CompletionBuilding Information Modeling - From Concept to Completion
Building Information Modeling - From Concept to Completion
 
BIM Introduction
BIM IntroductionBIM Introduction
BIM Introduction
 
BIM Contract International Conference 2017
BIM Contract International Conference 2017BIM Contract International Conference 2017
BIM Contract International Conference 2017
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
 
iBIM and Knowledge Management
iBIM and Knowledge ManagementiBIM and Knowledge Management
iBIM and Knowledge Management
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
 
SkyBIM Cloud based management & real-time costing of BIM projects
SkyBIM Cloud based management & real-time costing of BIM projectsSkyBIM Cloud based management & real-time costing of BIM projects
SkyBIM Cloud based management & real-time costing of BIM projects
 
Bringing together World of BIM and World of Products
Bringing together World of BIM and World of ProductsBringing together World of BIM and World of Products
Bringing together World of BIM and World of Products
 
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
BIM in Project Management: Keynote Speech by Mr. Kevin POOLEBIM in Project Management: Keynote Speech by Mr. Kevin POOLE
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
 
A gentle introduction to BIM
A gentle introduction to BIMA gentle introduction to BIM
A gentle introduction to BIM
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
 
Building Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBuilding Information Modelling (BIM) in India
Building Information Modelling (BIM) in India
 
Bim Facades.Final
Bim Facades.FinalBim Facades.Final
Bim Facades.Final
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
BIM Presentation
BIM PresentationBIM Presentation
BIM Presentation
 
How to save time and money on your BIM project with cloud collaboration
How to save time and money on your BIM project with cloud collaborationHow to save time and money on your BIM project with cloud collaboration
How to save time and money on your BIM project with cloud collaboration
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction
 
SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping
SkyBIM - Accelerate Project Roll-out with Integrated BIM PrototypingSkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping
SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping
 

Similar to How BIM Enhances the Design Process

Hcse provide benefits of bim
Hcse provide benefits of bimHcse provide benefits of bim
Hcse provide benefits of bim
hcseonline
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction Projects
TawwabKhan4
 
BIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling ServicesBIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering LLC U.S.
 
Bim
BimBim
The top 3 benefits of bim in the construction industry
The top 3 benefits of bim in the construction industry The top 3 benefits of bim in the construction industry
The top 3 benefits of bim in the construction industry
Agon Coordination
 
5 Benefits of BIM Implementation
5 Benefits of BIM Implementation5 Benefits of BIM Implementation
5 Benefits of BIM Implementation
United-BIM
 
How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?
MarsBIM1
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7D
Yee Len Wan
 
Benefits of Scan to BIM Services in 2024
Benefits of Scan to BIM Services in 2024Benefits of Scan to BIM Services in 2024
Benefits of Scan to BIM Services in 2024
Chudasama Outsourcing | AutoCAD Drawing and Drafting Services
 
Facilities Management in BIM
Facilities Management in BIMFacilities Management in BIM
Facilities Management in BIM
Ahmed Towfeequllah Siddiqui
 
Bim White Paper 11 9 09
Bim White Paper 11 9 09Bim White Paper 11 9 09
Bim White Paper 11 9 09
rsalbin
 
Sc bim
Sc bimSc bim
Sc bim
Lam Yu
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in Construction
Veetil Digital Service
 
Scan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete GuideScan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete Guide
Chandresh Chudasama
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
karim ead
 
Building Information Model
Building Information ModelBuilding Information Model
Building Information Model
Manisha Shrivastava
 
BIM For Building Product Manufacturers and Distributors
BIM For Building Product Manufacturers and DistributorsBIM For Building Product Manufacturers and Distributors
BIM For Building Product Manufacturers and Distributors
Bevill & Associates
 
BIM For Building Product Manufacturers
BIM For Building Product ManufacturersBIM For Building Product Manufacturers
BIM For Building Product Manufacturers
guest3ce637
 
Group 14 presentation.pptx
Group 14 presentation.pptxGroup 14 presentation.pptx
Group 14 presentation.pptx
vaibhavchaudhary7017
 

Similar to How BIM Enhances the Design Process (20)

Hcse provide benefits of bim
Hcse provide benefits of bimHcse provide benefits of bim
Hcse provide benefits of bim
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction Projects
 
BIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling ServicesBIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling Services
 
Bim
BimBim
Bim
 
The top 3 benefits of bim in the construction industry
The top 3 benefits of bim in the construction industry The top 3 benefits of bim in the construction industry
The top 3 benefits of bim in the construction industry
 
5 Benefits of BIM Implementation
5 Benefits of BIM Implementation5 Benefits of BIM Implementation
5 Benefits of BIM Implementation
 
How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7D
 
Benefits of Scan to BIM Services in 2024
Benefits of Scan to BIM Services in 2024Benefits of Scan to BIM Services in 2024
Benefits of Scan to BIM Services in 2024
 
Facilities Management in BIM
Facilities Management in BIMFacilities Management in BIM
Facilities Management in BIM
 
Bim White Paper 11 9 09
Bim White Paper 11 9 09Bim White Paper 11 9 09
Bim White Paper 11 9 09
 
Sc bim
Sc bimSc bim
Sc bim
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in Construction
 
Scan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete GuideScan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete Guide
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
 
Building Information Model
Building Information ModelBuilding Information Model
Building Information Model
 
BIM For Building Product Manufacturers and Distributors
BIM For Building Product Manufacturers and DistributorsBIM For Building Product Manufacturers and Distributors
BIM For Building Product Manufacturers and Distributors
 
BIM For Building Product Manufacturers
BIM For Building Product ManufacturersBIM For Building Product Manufacturers
BIM For Building Product Manufacturers
 
Group 14 presentation.pptx
Group 14 presentation.pptxGroup 14 presentation.pptx
Group 14 presentation.pptx
 

More from Fishbeck, Thompson, Carr & Huber, Inc.

Commercial and Retail - Where Life Happens
Commercial and Retail - Where Life HappensCommercial and Retail - Where Life Happens
Commercial and Retail - Where Life Happens
Fishbeck, Thompson, Carr & Huber, Inc.
 
Your Career at FTCH
Your Career at FTCHYour Career at FTCH
Systems Commissioning CX - Efficient Systems Work Together
Systems Commissioning CX - Efficient Systems Work TogetherSystems Commissioning CX - Efficient Systems Work Together
Systems Commissioning CX - Efficient Systems Work Together
Fishbeck, Thompson, Carr & Huber, Inc.
 
Existing Building Commissioning
Existing Building CommissioningExisting Building Commissioning
Existing Building Commissioning
Fishbeck, Thompson, Carr & Huber, Inc.
 
FTCH Firm Overview
FTCH Firm Overview FTCH Firm Overview
Shining Light on Photovoltaics
Shining Light on PhotovoltaicsShining Light on Photovoltaics
Shining Light on Photovoltaics
Fishbeck, Thompson, Carr & Huber, Inc.
 
Energy Management
Energy ManagementEnergy Management
Laser Scanning: The Future Trend
Laser Scanning: The Future TrendLaser Scanning: The Future Trend
Laser Scanning: The Future Trend
Fishbeck, Thompson, Carr & Huber, Inc.
 
Woodward 5 Community Sustainability Collaboration
Woodward 5 Community Sustainability CollaborationWoodward 5 Community Sustainability Collaboration
Woodward 5 Community Sustainability Collaboration
Fishbeck, Thompson, Carr & Huber, Inc.
 
City of Rochester, Main Street Makeover
City of Rochester, Main Street MakeoverCity of Rochester, Main Street Makeover
City of Rochester, Main Street Makeover
Fishbeck, Thompson, Carr & Huber, Inc.
 
Integrated Solutions
Integrated SolutionsIntegrated Solutions
One Source Solutions
One Source SolutionsOne Source Solutions

More from Fishbeck, Thompson, Carr & Huber, Inc. (13)

Commercial and Retail - Where Life Happens
Commercial and Retail - Where Life HappensCommercial and Retail - Where Life Happens
Commercial and Retail - Where Life Happens
 
Your Career at FTCH
Your Career at FTCHYour Career at FTCH
Your Career at FTCH
 
Systems Commissioning CX - Efficient Systems Work Together
Systems Commissioning CX - Efficient Systems Work TogetherSystems Commissioning CX - Efficient Systems Work Together
Systems Commissioning CX - Efficient Systems Work Together
 
Existing Building Commissioning
Existing Building CommissioningExisting Building Commissioning
Existing Building Commissioning
 
FTCH Firm Overview
FTCH Firm Overview FTCH Firm Overview
FTCH Firm Overview
 
Shining Light on Photovoltaics
Shining Light on PhotovoltaicsShining Light on Photovoltaics
Shining Light on Photovoltaics
 
Energy Management
Energy ManagementEnergy Management
Energy Management
 
Infrastructure Week Q&A with FTCH Experts
Infrastructure Week Q&A with FTCH ExpertsInfrastructure Week Q&A with FTCH Experts
Infrastructure Week Q&A with FTCH Experts
 
Laser Scanning: The Future Trend
Laser Scanning: The Future TrendLaser Scanning: The Future Trend
Laser Scanning: The Future Trend
 
Woodward 5 Community Sustainability Collaboration
Woodward 5 Community Sustainability CollaborationWoodward 5 Community Sustainability Collaboration
Woodward 5 Community Sustainability Collaboration
 
City of Rochester, Main Street Makeover
City of Rochester, Main Street MakeoverCity of Rochester, Main Street Makeover
City of Rochester, Main Street Makeover
 
Integrated Solutions
Integrated SolutionsIntegrated Solutions
Integrated Solutions
 
One Source Solutions
One Source SolutionsOne Source Solutions
One Source Solutions
 

Recently uploaded

Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
9a93xvy
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
7sd8fier
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
garcese
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
jyz59f4j
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
ameli25062005
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
taqyed
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
h7j5io0
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
Alan Dix
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
fabianavillanib
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
ameli25062005
 
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
h7j5io0
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
ResDraft
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
AlecAnidul
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
Mansi Shah
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
PlanitIsrael
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
Exploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdfExploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdf
fastfixgaragedoor
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
h7j5io0
 

Recently uploaded (20)

Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
 
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
Exploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdfExploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdf
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
 

How BIM Enhances the Design Process

  • 1. Why BIM? Building Information Modeling www.ftch.com engineers scientists architects constructors fishbeck, thompson, carr & huber, inc.
  • 2. What is BIM? How can construction/contractors Building Information Modeling (BIM) is more than a new technology; take advantage of BIM? it is an innovative approach to the entire design, construction, and While BIM was initially developed with a focus on the design world, it maintenance process. Many of the agencies and organizations has quickly gained favor among contractors and construction managers. involved in the building industry have their own definitions of BIM, Construction is a team sport, and BIM is dramatically reshaping the way but they all have a similar feel to that of the National BIM Standard project teams work together to increase efficiency and enhance outcomes definition: for all. This process is driving the most transformative evolution the construction industry has ever experienced. The use of BIM and 3D BIM is a digital representation of physical and functional modeling facilitates the optimization of lean construction techniques characteristics of a facility. As such, it serves as a shared knowledge and principles. resource for information about a facility, forming a reliable basis for decisions during its life-cycle; defined as existing from inception In a recent McGraw-Hill Construction BIM Report, 45% of users report onward. they are utilizing BIM tools at moderate levels or higher. In 2009, 62% of BIM users will use it on more than 30% of their projects; and nearly half How does BIM enhance the design process? (45%) of all current adopters will advance to become heavy BIM users (using it on at least 60% of projects), up from 35%. Some of the benefits During the project study and design phases, BIM allows you to for contractors utilizing BIM include: quickly create and review multiple design scenarios and easily convey those options to the client while maintaining a single model. BIM  ssisting A with scoping during bidding and purchasing. offers many tools to create schematic massing models, as well as detailed construction-ready models, without losing any of the design  oordinating C construction sequencing intent along the way. (even if just for two trades). The current 2D design process relies on passing information from  dentifing I collisions (e.g., identifying ductwork running into structural the design team to the construction document team, creating new members). drawings at each phase. By having all project information contained in a single, continuously updated database, it is easier to manage  isualizing V what is to be built in a simulated environment. data accuracy and integrate all project aspects during the design phase. This leads to better specifications, estimations, schedules, and  aking M fewer errors and corrections in the field. compliance, as well as the ability to produce detailed 3D models and simulate construction. Some additional items BIM will help with  igher H reliability of expected field conditions, allowing opportunity to do include: more prefabrication of materials offsite, which is usually a higher quality at a lower cost.  arlier E and more accurate visualization of a design. Those contractors using BIM will almost universally tell you the number  utomatic A low-level corrections when changes are made to design. of benefits they continue to discover seems endless. There are so many processes we think of in the context of a 2D-based mindset. As we shift to a  ccurate A and consistent generation of 2D drawings model-based process, contractors continue to find innovative uses for BIM. or 3D renderings at any stage of the design.  arlier E collaboration of multiple design disciplines. Easier checks against design intent. Utilizing BIM on a project institutes a shift in the traditional project workload. With BIM, much more work is done earlier in the project. By shifting more work to the schematic design and design development phases of a project, changes can be made with a smaller impact on costs. Traditionally, more effort went into the construction documents phase, where design changes are typically much more expensive. The graph below indicates the preferred process versus the typical process. BIM greatly increases the ability to follow the preferred process.
  • 3. We offer clients the option of construction management services. This integrated design/build approach fits perfectly with BIM technology. This software and production method will improve the exchange of building information throughout the building design and construction process. - es Hewitt, Retired Senior Vice President/Principal L How do clients/owners benefit from BIM? From the owner’s perspective, BIM offers the promise of a high- quality project, as well as time and cost savings. The 3D models enable project owners to gain a better understanding, early in the design process, of how their final project will look. Design issues can be addressed early on with the prime consultant. If revisions are made, the database and model are updated as necessary, and changes are automatically integrated throughout the process. This should lead to fewer surprises, errors, and omissions. For owners doing multiple similar projects, BIM offers the ability to communicate similarities and differences to the design and construction teams. The result is consistency across all projects. In addition, if the owner takes control of BIM when the project is completed, the owner benefits by having more detailed models and schematics on hand for ongoing operation, maintenance, and renovation of the project. Are agencies or organizations requiring the use of BIM? In 2003, the Office of the Chief Architect (OCA) of the U.S. General Services Administration (GSA) Public Buildings Service spearheaded the BIM helps the contractors National 3D-4D-BIM Program. To date, OCA to visualize a building before has led a pilot program with over 30 projects and during construction that incorporated a variety of BIM technologies to address different programming, design, and construction challenges faced by GSA capital projects. In addition, OCA is assessing and supporting BIM applications on over 40 ongoing GSA projects across different regions. For all major projects (prospectus-level) receiving design funding in fiscal year 2007 and beyond, a spatial program BIM will be the minimum requirement. Along with the GSA requiring BIM to be a major part of the design process, several other federal agencies and large companies are requiring BIM as part of the design process. Some examples include:  .S. Army U Corps of Engineers  ational Aeronautics N and Space Administration  aval N Facilities Engineering Command Working with a 3D model increases coordination and collaboration U.S. Coast Guard among disciplines, reduces conflicts among systems, and allows us to make design decisions faster and earlier in a project.  isconsin W Department of Administration - dam Meeker, AIA, Senior Architect/Associate A
  • 4. BIM necessarily provides the “ideal”… contractors, architects, engineers, and suppliers who are communicating, on the same page, and working toward the same goal. An excellent product for all! -Charles Wesley, Construction Manager How is FTCH utilizing BIM? FTCH realizes that BIM is the future of design and construction. During the past 18 months, FTCH has invested heavily in software, hardware, and training to help bring FTCH to the forefront of this new design and construction process. As the use of BIM increases within the design and construction industry, it will lead to a revolution in project delivery. Many are already referring to this revolution as leading to the fully collaborative project team. The theory of full project collaboration generally envisions the entire team–owner, architect, engineers, consultants, construction manager, and specialty contractors–being involved from the project’s inception by “sitting together at one table” in developing the project design. Essentially, the team constructs the project virtually in 3D with the use of BIM. This full project collaboration allows for increased speed of delivery, enhanced economics for the project, and true lean construction—all at levels not yet experienced in our industry. FTCH has the unique ability to realize the full potential of BIM because we have all disciplines, including construction, under one roof. This integrated services approach helps us utilize everything the model has to offer, from the preliminary design phase all the way through construction. Over the past year, we have created models on several types of projects, including:  niversity U facilities  otel H prototypes  ig-box B retail  unicipal M water treatment plants FTCH has made the transition from CAD to BIM a top priority. The firm views Leveraging BIM (using Autodesk Revit specifically) will require some new www.ftch.com implementing BIM technology as a means of thinking and should enhance communication and coordination between achieving the next boost in productivity and disciplines. With the help of our IT Department, Graphics Task Force, CAD improved communication. Support Group, and new BIM Task Force our transition will be smooth and - es Hewitt, Retired Senior L deliberate – helping us deliver exceptional client service! Vice President, Principal - ohn Condie, P.E., Senior Vice President/Principal/ J Senior Electrical Engineer engineers ◆ scientists ◆ architects ◆ constructors Michigan Ohio Grand Rapids Lansing Kalamazoo Farmington Hills Cincinnati ph. 616.575.3824 ph. 517.882.0383 ph. 269.375.3824 ph. 248.324.2090 ph. 513.469.2370