Schedule Risk Analysis – What
Could Possibly Go Wrong?
Prepared by:
Ian Nicholson, P.Eng.
VP Solutions
Emerald Associates, Inc.
Lessons learned over many years of
Schedule Risk Analysis Exercises
Session ID#: 15431
Introduction
Session ID#: 15431
Presenter – Ian Nicholson, P.Eng.
VP Solutions, Emerald Associates
■ Oracle Primavera Risk Analysis trainer and consultant
■ Conducted many Schedule Risk Analysis in many industries
■ Started using Risk Analysis on cost estimates in construction
projects
■ Emerald is a Oracle Primavera Platinum Partner
▪ Specializing in Primavera
▪ One of two Oracle University Trainers for Risk Analysis in North
America
▪ We started working with Risk Analysis as the Canadian
Pertmaster reseller in 2001
Why Conduct Risk Analysis?
■ Helps projects teams and executives understand and
manage risks to a project
■ Gets project team discussing the challenges of the project
■ Keeps the project team focused on the right issues
▪ Near critical paths that can come and haunt you
■ Requirement of many company’s gate approval process
“Project Risk Assessment is shown to significantly reduce project cost
growth” - COAA Alberta Construction Report, 2009
The Minefield of Schedule Risk
Analysis
Session ID#: 15431
What are the common failures encountered
during Schedule Risk Analysis?
■ There are six areas that we need to careful with:
▪ Schedule construction issues
▪ Political Issues
▪ Risk Register/documentation issues
▪ Project specific issues
▪ Risk model issues
▪ Results interpretation issues
■ An mistake in any of them can lead to poor results
Building a schedule suitable for
Risk Analysis
Session ID#: 15431
Schedule construction issues
■ Is the schedule poor mechanically?
▪ Bad logic/open ends
▪ High Level/LOE schedules linked SS or FF only
▪ Constraints
■ Schedules that don’t reflect reality
▪ Where did the estimates come from?
— Is it Optimistic/Pessimistic
▪ Was the schedule benchmarked before the RA?
■ Too much detail/not enough detail conundrum
▪ When is the right level of detail?
▪ CLT and Correlation
Schedule construction issues
■ Schedule at different levels of development or from different
authors
▪ Do you need to develop a schedule specifically for the risk
analysis?
■ Variance between deterministic models in different systems
▪ P6 and RA both come from Oracle but they don’t schedule the
same way!
“A schedule is garbage in, garbage out. A Risk Analysis is garbage in, toxic
waste out!” – David Phillips
Political Issues in the Schedule
Risk Analysis Process
Session ID#: 15431
Political Issues
■ Project team may hide issues that are politically sensitive
■ Can’t alter the schedule – too late in the process to
incorporate the results
■ The results could kill the project!
■ Mitigation strategies are not realistic or attainable
■ External Influences not well mapped
▪ No details around permits/approvals
▪ Political Environment
▪ Project influencers
Interview Issues/Risk Register
Issues
Session ID#: 15431
Risk Register/Interview Issues
■ Does the existing register capture all the risks?
■ Agendas vs Information
■ One on One vs Group interviews
▪ Does the PM keep everyone quiet?
■ Three monkeys approach – no interviews, or blinders
■ Risk vs Opportunities
▪ Why do we call it Risk Analysis?
▪ Opportunity Analysis is just as important but often ignored
Risk Register/Interview Issues
■ Reviewer bias
▪ Who knows the project better than the project team?
▪ Yet the team may be blind to the risks
▪ Reviewer needs to be a facilitator
■ Existing Risk register
▪ Is it valid?
▪ Does it contain schedule risks?
▪ Does it reflect schedule risk, cost risk, safety risk, reputation,
etc.
■ Mapping of the risks to the schedule
Project Specific Challenges
Session ID#: 15431
Challenges of fast track projects
■ Focus naturally falls on engineering, since that is where the
detail is
■ Not enough focus on Construction or C&SU even though that
is where the majority of the risk is
■ Engineering/Procurement use all the float
■ If you have separate E-P-C schedules, make sure that they
are linked and run the analysis one combined project if
possible.
Technology Risk
■ Scale up risk
■ New technology risks
■ New process risk
■ Non-project stakeholder risk
■ C&SU and production ramp up delays
■ Government incentive dates
Other project specific risks
■ TA’s
▪ Resource availability/congestion
▪ Tight timeframes
■ Pre-fab/Modularized Construction
▪ What happens when you don’t control inventory
▪ Road closures, load limits
■ Offshore
▪ Cost of on-boarding/off boarding
■ Pharmaceuticals
▪ Approval windows
■ Lump Sum or Design Build
▪ Are the contractors’ and owners’ risks the same?
Building the Risk Model
Session ID#: 15431
Risk Model Issues
■ Risk double dipping
■ Risk Events vs Uncertainty
▪ Risk Register
■ Advanced Modelling
▪ Probabilistic Branching/Links
▪ Task Existence
▪ Resource Risk
■ Low Probability/High Risk Events
▪ Only affect P90-P100, yet can be fatal
■ KISS
▪ Distribution shapes
Risk Model Issues
■ Levelling required
■ Trying to do schedule risk in a spreadsheet
■ Poor documentation
▪ All risks/uncertainties applied to the plan need to be
documented
▪ If the results are not as expected, it can be hard to track down
▪ Probabilistic Branching and Existence cannot be transferred
back to P6, so documentation is critical
▪ You may have to go back 6 months later and update the plan
■ Risk analysis is not completed regularly, only when a gate
review demands it
Risk Model Issues
■ Cost vs Schedule Risk
▪ Done separately
▪ Not combined at any point
▪ Yet are completely related
“On average, Alberta based projects experienced 19% project cost growth and
17% project schedule growth”
– COAA
Interpreting the Results
Session ID#: 15431
Results Interpretation Issues
■ The results should not be a surprise!
▪ 80% of the value comes before the analysis is run
■ Poor understanding of results
▪ Does it pass the “sniff test”?
■ What is really creating the results
▪ Not using the analysis tools effectively
■ Creating mitigation strategies
▪ Reduce the risk
▪ Mitigate the risk
▪ Transfer the risk
▪ Accept the risk
■ Poor results should be considered an opportunity
Summary
Session ID#: 15431
Summary
■ Risk analysis is a great tool, but the process is more
important than the software
■ Risk Analysis to be properly executed
▪ Needs repeatable process – see the PMI Risk Maturity Model
▪ Needs Management Buy-in
■ Don’t make it a check box on a form
■ Acknowledgement: Special thanks to David Phillips of Emerald Associates and John
Zhao of Statoil for their inputs and insights into this presentation
Questions?
iann@emerald-associates.com
Session ID#: 15431
Please complete the session
evaluation
We appreciate your feedback and insight
You may complete the session evaluation either
on paper or online via the mobile app

More Related Content

What's hot

Continuous Risk Management
Continuous Risk ManagementContinuous Risk Management
Continuous Risk Management
Glen Alleman
 
Risk adjusted engineering management
Risk adjusted engineering managementRisk adjusted engineering management
Risk adjusted engineering management
Glen Alleman
 
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo
 
Integrating Risk With Earned Value
Integrating Risk With Earned ValueIntegrating Risk With Earned Value
Integrating Risk With Earned Value
Glen Alleman
 
What Does Done Look Like?
What Does Done Look Like?What Does Done Look Like?
What Does Done Look Like?
Glen Alleman
 
Concepts and best practices for the risk register in primavera risk analysis
Concepts and best practices for the risk register in primavera risk analysisConcepts and best practices for the risk register in primavera risk analysis
Concepts and best practices for the risk register in primavera risk analysisjisothomas
 
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
p6academy
 
Cure for Cost and Schedule Growth
Cure for Cost and Schedule GrowthCure for Cost and Schedule Growth
Cure for Cost and Schedule Growth
Glen Alleman
 
Pressman ch-25-risk-management
Pressman ch-25-risk-managementPressman ch-25-risk-management
Pressman ch-25-risk-management
zeeshanwrch
 
Pert master risk analysis tool
Pert master   risk analysis toolPert master   risk analysis tool
Pert master risk analysis tool
CADD Centre Software Solutions Private Limited
 
Establishing schedule margin using monte carlo simulation
Establishing schedule margin using monte carlo simulation Establishing schedule margin using monte carlo simulation
Establishing schedule margin using monte carlo simulation
Glen Alleman
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
Kathirvel Ayyaswamy
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
Dr. Anthony Vincent. B
 
What is risk?
What is risk?What is risk?
What is risk?
Glen Alleman
 
Managing Risk as Opportunity
Managing Risk as OpportunityManaging Risk as Opportunity
Managing Risk as Opportunity
Glen Alleman
 
Earned Value Management and Agile
Earned Value Management and AgileEarned Value Management and Agile
Earned Value Management and Agile
Glen Alleman
 
Essential views of the IPMR
Essential views of the IPMREssential views of the IPMR
Essential views of the IPMR
Glen Alleman
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
Russell Taylor BEng CEng FAPM FIET
 
Chapter 7 managing risk
Chapter 7   managing riskChapter 7   managing risk
Chapter 7 managing risk
Hammad Hashmi
 
From WBS to Integrated Master Schedule
From WBS to Integrated Master ScheduleFrom WBS to Integrated Master Schedule
From WBS to Integrated Master Schedule
Glen Alleman
 

What's hot (20)

Continuous Risk Management
Continuous Risk ManagementContinuous Risk Management
Continuous Risk Management
 
Risk adjusted engineering management
Risk adjusted engineering managementRisk adjusted engineering management
Risk adjusted engineering management
 
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
 
Integrating Risk With Earned Value
Integrating Risk With Earned ValueIntegrating Risk With Earned Value
Integrating Risk With Earned Value
 
What Does Done Look Like?
What Does Done Look Like?What Does Done Look Like?
What Does Done Look Like?
 
Concepts and best practices for the risk register in primavera risk analysis
Concepts and best practices for the risk register in primavera risk analysisConcepts and best practices for the risk register in primavera risk analysis
Concepts and best practices for the risk register in primavera risk analysis
 
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
 
Cure for Cost and Schedule Growth
Cure for Cost and Schedule GrowthCure for Cost and Schedule Growth
Cure for Cost and Schedule Growth
 
Pressman ch-25-risk-management
Pressman ch-25-risk-managementPressman ch-25-risk-management
Pressman ch-25-risk-management
 
Pert master risk analysis tool
Pert master   risk analysis toolPert master   risk analysis tool
Pert master risk analysis tool
 
Establishing schedule margin using monte carlo simulation
Establishing schedule margin using monte carlo simulation Establishing schedule margin using monte carlo simulation
Establishing schedule margin using monte carlo simulation
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
What is risk?
What is risk?What is risk?
What is risk?
 
Managing Risk as Opportunity
Managing Risk as OpportunityManaging Risk as Opportunity
Managing Risk as Opportunity
 
Earned Value Management and Agile
Earned Value Management and AgileEarned Value Management and Agile
Earned Value Management and Agile
 
Essential views of the IPMR
Essential views of the IPMREssential views of the IPMR
Essential views of the IPMR
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Chapter 7 managing risk
Chapter 7   managing riskChapter 7   managing risk
Chapter 7 managing risk
 
From WBS to Integrated Master Schedule
From WBS to Integrated Master ScheduleFrom WBS to Integrated Master Schedule
From WBS to Integrated Master Schedule
 

Similar to Schedule analysis what could possibly go wrong - Oracle Primavera Collaborate 14

Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...
Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...
Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...
Association for Project Management
 
APM QSRA webinar; introduction for risk and planning professionals and decisi...
APM QSRA webinar; introduction for risk and planning professionals and decisi...APM QSRA webinar; introduction for risk and planning professionals and decisi...
APM QSRA webinar; introduction for risk and planning professionals and decisi...
Association for Project Management
 
Making P6 move in ready and adoption easy - Oracle Primavera P6 Collaborate 14
Making P6 move in ready and adoption easy - Oracle Primavera P6 Collaborate 14Making P6 move in ready and adoption easy - Oracle Primavera P6 Collaborate 14
Making P6 move in ready and adoption easy - Oracle Primavera P6 Collaborate 14
p6academy
 
B E Aerospace case study - Oracle Primavera P6 Collaborate 14
B E Aerospace case study - Oracle Primavera P6 Collaborate 14B E Aerospace case study - Oracle Primavera P6 Collaborate 14
B E Aerospace case study - Oracle Primavera P6 Collaborate 14
p6academy
 
Andy Abu Bakar - Risk Management: the human factor
Andy Abu Bakar - Risk Management: the human factorAndy Abu Bakar - Risk Management: the human factor
Andy Abu Bakar - Risk Management: the human factor
Association for Project Management
 
How primavera can help you in managing risks in project intensive industry ppt
How primavera can help you in managing risks in project intensive industry pptHow primavera can help you in managing risks in project intensive industry ppt
How primavera can help you in managing risks in project intensive industry pptp6academy
 
Presentation KCPMI 2016 PDD Days Portfolio Balance
Presentation   KCPMI 2016 PDD Days Portfolio BalancePresentation   KCPMI 2016 PDD Days Portfolio Balance
Presentation KCPMI 2016 PDD Days Portfolio Balance
Ron Montgomery
 
Managing What If Scenarios for Unconventional Oil & Gas
Managing What If Scenarios for Unconventional Oil & GasManaging What If Scenarios for Unconventional Oil & Gas
Managing What If Scenarios for Unconventional Oil & Gas
p6academy
 
If you dont know where you are going any road will do visioning for impleme...
If you dont know where you are going any road will do   visioning for impleme...If you dont know where you are going any road will do   visioning for impleme...
If you dont know where you are going any road will do visioning for impleme...p6academy
 
Probabilistic Schedule and Cost Analysis
Probabilistic Schedule and Cost AnalysisProbabilistic Schedule and Cost Analysis
Probabilistic Schedule and Cost Analysis
Glen Alleman
 
software project management risk control.pptx
software project management risk control.pptxsoftware project management risk control.pptx
software project management risk control.pptx
AgaChimdesa
 
12. Software Project Management.pptx
12. Software Project Management.pptx12. Software Project Management.pptx
12. Software Project Management.pptx
msohail37
 
Alexander Budzier APM RISK MANAGEMENT SIG CONFERENCE
 Alexander Budzier  APM RISK MANAGEMENT SIG CONFERENCE Alexander Budzier  APM RISK MANAGEMENT SIG CONFERENCE
Alexander Budzier APM RISK MANAGEMENT SIG CONFERENCE
Association for Project Management
 
Project Management in Information Technologies
Project Management in Information TechnologiesProject Management in Information Technologies
Project Management in Information Technologies
C.T.Co
 
Project management - Basics for all
Project management - Basics for allProject management - Basics for all
Project management - Basics for all
Surgyy Design
 
Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...
Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...
Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...
p6academy
 
The 5 Immutable principles of project management
The 5 Immutable principles of project managementThe 5 Immutable principles of project management
The 5 Immutable principles of project management
Glen Alleman
 
Project Planning & Work breakdown Structure.pptx
Project Planning & Work breakdown Structure.pptxProject Planning & Work breakdown Structure.pptx
Project Planning & Work breakdown Structure.pptx
ShwetaMahdole
 
Risk management concepts and learning
Risk management   concepts and learningRisk management   concepts and learning
Risk management concepts and learning
Vanita Ahuja
 
Planning can we do with out it?
Planning can we do with out it?Planning can we do with out it?
Planning can we do with out it?
Catherine Bendell
 

Similar to Schedule analysis what could possibly go wrong - Oracle Primavera Collaborate 14 (20)

Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...
Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...
Where do risks (threats and opportunities) arise from?, presented by Lynn Sta...
 
APM QSRA webinar; introduction for risk and planning professionals and decisi...
APM QSRA webinar; introduction for risk and planning professionals and decisi...APM QSRA webinar; introduction for risk and planning professionals and decisi...
APM QSRA webinar; introduction for risk and planning professionals and decisi...
 
Making P6 move in ready and adoption easy - Oracle Primavera P6 Collaborate 14
Making P6 move in ready and adoption easy - Oracle Primavera P6 Collaborate 14Making P6 move in ready and adoption easy - Oracle Primavera P6 Collaborate 14
Making P6 move in ready and adoption easy - Oracle Primavera P6 Collaborate 14
 
B E Aerospace case study - Oracle Primavera P6 Collaborate 14
B E Aerospace case study - Oracle Primavera P6 Collaborate 14B E Aerospace case study - Oracle Primavera P6 Collaborate 14
B E Aerospace case study - Oracle Primavera P6 Collaborate 14
 
Andy Abu Bakar - Risk Management: the human factor
Andy Abu Bakar - Risk Management: the human factorAndy Abu Bakar - Risk Management: the human factor
Andy Abu Bakar - Risk Management: the human factor
 
How primavera can help you in managing risks in project intensive industry ppt
How primavera can help you in managing risks in project intensive industry pptHow primavera can help you in managing risks in project intensive industry ppt
How primavera can help you in managing risks in project intensive industry ppt
 
Presentation KCPMI 2016 PDD Days Portfolio Balance
Presentation   KCPMI 2016 PDD Days Portfolio BalancePresentation   KCPMI 2016 PDD Days Portfolio Balance
Presentation KCPMI 2016 PDD Days Portfolio Balance
 
Managing What If Scenarios for Unconventional Oil & Gas
Managing What If Scenarios for Unconventional Oil & GasManaging What If Scenarios for Unconventional Oil & Gas
Managing What If Scenarios for Unconventional Oil & Gas
 
If you dont know where you are going any road will do visioning for impleme...
If you dont know where you are going any road will do   visioning for impleme...If you dont know where you are going any road will do   visioning for impleme...
If you dont know where you are going any road will do visioning for impleme...
 
Probabilistic Schedule and Cost Analysis
Probabilistic Schedule and Cost AnalysisProbabilistic Schedule and Cost Analysis
Probabilistic Schedule and Cost Analysis
 
software project management risk control.pptx
software project management risk control.pptxsoftware project management risk control.pptx
software project management risk control.pptx
 
12. Software Project Management.pptx
12. Software Project Management.pptx12. Software Project Management.pptx
12. Software Project Management.pptx
 
Alexander Budzier APM RISK MANAGEMENT SIG CONFERENCE
 Alexander Budzier  APM RISK MANAGEMENT SIG CONFERENCE Alexander Budzier  APM RISK MANAGEMENT SIG CONFERENCE
Alexander Budzier APM RISK MANAGEMENT SIG CONFERENCE
 
Project Management in Information Technologies
Project Management in Information TechnologiesProject Management in Information Technologies
Project Management in Information Technologies
 
Project management - Basics for all
Project management - Basics for allProject management - Basics for all
Project management - Basics for all
 
Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...
Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...
Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...
 
The 5 Immutable principles of project management
The 5 Immutable principles of project managementThe 5 Immutable principles of project management
The 5 Immutable principles of project management
 
Project Planning & Work breakdown Structure.pptx
Project Planning & Work breakdown Structure.pptxProject Planning & Work breakdown Structure.pptx
Project Planning & Work breakdown Structure.pptx
 
Risk management concepts and learning
Risk management   concepts and learningRisk management   concepts and learning
Risk management concepts and learning
 
Planning can we do with out it?
Planning can we do with out it?Planning can we do with out it?
Planning can we do with out it?
 

More from p6academy

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015
p6academy
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordably
p6academy
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1
p6academy
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2
p6academy
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2
p6academy
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1
p6academy
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1
p6academy
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1
p6academy
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1
p6academy
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
p6academy
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announced
p6academy
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1
p6academy
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overview
p6academy
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
p6academy
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientation
p6academy
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Proposition
p6academy
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition
p6academy
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)
p6academy
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guide
p6academy
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guide
p6academy
 

More from p6academy (20)

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordably
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announced
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overview
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientation
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Proposition
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guide
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guide
 

Recently uploaded

Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
Any kyc Account
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
SEOSMMEARTH
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
Top Forex Brokers Review
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 

Recently uploaded (20)

Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 

Schedule analysis what could possibly go wrong - Oracle Primavera Collaborate 14

  • 1. REMINDER Check in on the COLLABORATE mobile app Schedule Risk Analysis – What Could Possibly Go Wrong? Prepared by: Ian Nicholson, P.Eng. VP Solutions Emerald Associates, Inc. Lessons learned over many years of Schedule Risk Analysis Exercises Session ID#: 15431
  • 3. Presenter – Ian Nicholson, P.Eng. VP Solutions, Emerald Associates ■ Oracle Primavera Risk Analysis trainer and consultant ■ Conducted many Schedule Risk Analysis in many industries ■ Started using Risk Analysis on cost estimates in construction projects ■ Emerald is a Oracle Primavera Platinum Partner ▪ Specializing in Primavera ▪ One of two Oracle University Trainers for Risk Analysis in North America ▪ We started working with Risk Analysis as the Canadian Pertmaster reseller in 2001
  • 4. Why Conduct Risk Analysis? ■ Helps projects teams and executives understand and manage risks to a project ■ Gets project team discussing the challenges of the project ■ Keeps the project team focused on the right issues ▪ Near critical paths that can come and haunt you ■ Requirement of many company’s gate approval process “Project Risk Assessment is shown to significantly reduce project cost growth” - COAA Alberta Construction Report, 2009
  • 5. The Minefield of Schedule Risk Analysis Session ID#: 15431
  • 6. What are the common failures encountered during Schedule Risk Analysis? ■ There are six areas that we need to careful with: ▪ Schedule construction issues ▪ Political Issues ▪ Risk Register/documentation issues ▪ Project specific issues ▪ Risk model issues ▪ Results interpretation issues ■ An mistake in any of them can lead to poor results
  • 7. Building a schedule suitable for Risk Analysis Session ID#: 15431
  • 8. Schedule construction issues ■ Is the schedule poor mechanically? ▪ Bad logic/open ends ▪ High Level/LOE schedules linked SS or FF only ▪ Constraints ■ Schedules that don’t reflect reality ▪ Where did the estimates come from? — Is it Optimistic/Pessimistic ▪ Was the schedule benchmarked before the RA? ■ Too much detail/not enough detail conundrum ▪ When is the right level of detail? ▪ CLT and Correlation
  • 9. Schedule construction issues ■ Schedule at different levels of development or from different authors ▪ Do you need to develop a schedule specifically for the risk analysis? ■ Variance between deterministic models in different systems ▪ P6 and RA both come from Oracle but they don’t schedule the same way! “A schedule is garbage in, garbage out. A Risk Analysis is garbage in, toxic waste out!” – David Phillips
  • 10. Political Issues in the Schedule Risk Analysis Process Session ID#: 15431
  • 11. Political Issues ■ Project team may hide issues that are politically sensitive ■ Can’t alter the schedule – too late in the process to incorporate the results ■ The results could kill the project! ■ Mitigation strategies are not realistic or attainable ■ External Influences not well mapped ▪ No details around permits/approvals ▪ Political Environment ▪ Project influencers
  • 13. Risk Register/Interview Issues ■ Does the existing register capture all the risks? ■ Agendas vs Information ■ One on One vs Group interviews ▪ Does the PM keep everyone quiet? ■ Three monkeys approach – no interviews, or blinders ■ Risk vs Opportunities ▪ Why do we call it Risk Analysis? ▪ Opportunity Analysis is just as important but often ignored
  • 14. Risk Register/Interview Issues ■ Reviewer bias ▪ Who knows the project better than the project team? ▪ Yet the team may be blind to the risks ▪ Reviewer needs to be a facilitator ■ Existing Risk register ▪ Is it valid? ▪ Does it contain schedule risks? ▪ Does it reflect schedule risk, cost risk, safety risk, reputation, etc. ■ Mapping of the risks to the schedule
  • 16. Challenges of fast track projects ■ Focus naturally falls on engineering, since that is where the detail is ■ Not enough focus on Construction or C&SU even though that is where the majority of the risk is ■ Engineering/Procurement use all the float ■ If you have separate E-P-C schedules, make sure that they are linked and run the analysis one combined project if possible.
  • 17. Technology Risk ■ Scale up risk ■ New technology risks ■ New process risk ■ Non-project stakeholder risk ■ C&SU and production ramp up delays ■ Government incentive dates
  • 18. Other project specific risks ■ TA’s ▪ Resource availability/congestion ▪ Tight timeframes ■ Pre-fab/Modularized Construction ▪ What happens when you don’t control inventory ▪ Road closures, load limits ■ Offshore ▪ Cost of on-boarding/off boarding ■ Pharmaceuticals ▪ Approval windows ■ Lump Sum or Design Build ▪ Are the contractors’ and owners’ risks the same?
  • 19. Building the Risk Model Session ID#: 15431
  • 20. Risk Model Issues ■ Risk double dipping ■ Risk Events vs Uncertainty ▪ Risk Register ■ Advanced Modelling ▪ Probabilistic Branching/Links ▪ Task Existence ▪ Resource Risk ■ Low Probability/High Risk Events ▪ Only affect P90-P100, yet can be fatal ■ KISS ▪ Distribution shapes
  • 21. Risk Model Issues ■ Levelling required ■ Trying to do schedule risk in a spreadsheet ■ Poor documentation ▪ All risks/uncertainties applied to the plan need to be documented ▪ If the results are not as expected, it can be hard to track down ▪ Probabilistic Branching and Existence cannot be transferred back to P6, so documentation is critical ▪ You may have to go back 6 months later and update the plan ■ Risk analysis is not completed regularly, only when a gate review demands it
  • 22. Risk Model Issues ■ Cost vs Schedule Risk ▪ Done separately ▪ Not combined at any point ▪ Yet are completely related “On average, Alberta based projects experienced 19% project cost growth and 17% project schedule growth” – COAA
  • 24. Results Interpretation Issues ■ The results should not be a surprise! ▪ 80% of the value comes before the analysis is run ■ Poor understanding of results ▪ Does it pass the “sniff test”? ■ What is really creating the results ▪ Not using the analysis tools effectively ■ Creating mitigation strategies ▪ Reduce the risk ▪ Mitigate the risk ▪ Transfer the risk ▪ Accept the risk ■ Poor results should be considered an opportunity
  • 26. Summary ■ Risk analysis is a great tool, but the process is more important than the software ■ Risk Analysis to be properly executed ▪ Needs repeatable process – see the PMI Risk Maturity Model ▪ Needs Management Buy-in ■ Don’t make it a check box on a form ■ Acknowledgement: Special thanks to David Phillips of Emerald Associates and John Zhao of Statoil for their inputs and insights into this presentation
  • 28. Please complete the session evaluation We appreciate your feedback and insight You may complete the session evaluation either on paper or online via the mobile app