ORACLE | P6ACADEMY.COM
Shared by our members
Support Accreditation for Oracle Customers and Partners
Use your Study Guide along with the learning content to prepare for your exam.
– The content in this accreditation is fast-paced and targeted to experienced users actively
using My Oracle Support core functions on a regular basis (including logging service requests).
– We recommend you preview the series modules and study guide before you begin this
accreditation.
– This study guide provides links and information to help you get the most from your learning
experience, so please refer to it throughout your accreditation.
– Best Practice: Use the Comment/Sticky Note feature to add comments and questions to your
study guide for follow-up. Right-click anywhere on a page or use the Add Sticky Note icon on
the toolbar to create a note.
– Make sure the content and level of information is right for your current level of experience. If
any topic is new to you, take time to study it in more detail before continuing.
– Make the program work for you by pausing or replaying any video, looking up actions in My
Oracle Support, or asking questions in Community at any time. This is your accreditation
experience, and we want you to enjoy it.
Oracle Support Accreditation – Level 1 Study Guidep6academy
ORACLE | P6ACADEMY.COM
Shared from our members
A word from the program team
Thank you for deciding to include Oracle Support Accreditation as part of
your learning experience.
The content in this accreditation is fast-paced and targeted to experienced
users actively using My Oracle Support core functions on a regular basis.
Make sure the content and level of information is right for your current
level of experience. If any topic is new to you, take time to study it in more
detail before continuing.
Accreditation is self-paced. You can begin your accreditation at any time
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and laterp6academy
ORACLE | P6ACADEMY.COM
Webcast Slides
Administering Users, Access and Views in P6 EPPM
(Web) Release 8 and later
Mike Wilson
Technical Support Engineer
• New Web Administrative Features Setup
• Application Settings
• Enterprise Data
• Global Scheduled Services
• User Access (including adding new users)
• User Interface Views
• User Sessions
• Dashboards
• Prototype User
ORACLE P6ACADEMY.com
Shared by our members
Oracle Primavera
What’s New in Primavera Unifier 16.1
Ray McEntee - Director, Product Strategy
Krishna Madhuvarsu – Director, Product Strategy
April, 2016
Copyright Oracle
ORACLE | P6ACADEMY.COM
Introduction to P6 Analytics 2.0
Mark Haas
Senior Technical Support Engineer
Agenda
• General Overview
• Setup and Configuration
• Demonstration of Functionality
• New Features
WWW.P6ACADEMY.COM
Discover the Latest Release of Oracle’s Primavera P6 Enterprise Project Portfolio Management
Submitted by our members, all rights copyright Oracle.
ORACLE | P6ACADEMY.COM
Submitted and shared by our members
Agenda
• Introduction To Cloud Marketplace
• Oracle Cloud Marketplace for Cloud Partners
• Oracle Cloud Marketplace for Cloud Customers
• Partner Application Process
• Q&A
Oracle Support Accreditation – Level 1 Study Guidep6academy
ORACLE | P6ACADEMY.COM
Shared from our members
A word from the program team
Thank you for deciding to include Oracle Support Accreditation as part of
your learning experience.
The content in this accreditation is fast-paced and targeted to experienced
users actively using My Oracle Support core functions on a regular basis.
Make sure the content and level of information is right for your current
level of experience. If any topic is new to you, take time to study it in more
detail before continuing.
Accreditation is self-paced. You can begin your accreditation at any time
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and laterp6academy
ORACLE | P6ACADEMY.COM
Webcast Slides
Administering Users, Access and Views in P6 EPPM
(Web) Release 8 and later
Mike Wilson
Technical Support Engineer
• New Web Administrative Features Setup
• Application Settings
• Enterprise Data
• Global Scheduled Services
• User Access (including adding new users)
• User Interface Views
• User Sessions
• Dashboards
• Prototype User
ORACLE P6ACADEMY.com
Shared by our members
Oracle Primavera
What’s New in Primavera Unifier 16.1
Ray McEntee - Director, Product Strategy
Krishna Madhuvarsu – Director, Product Strategy
April, 2016
Copyright Oracle
ORACLE | P6ACADEMY.COM
Introduction to P6 Analytics 2.0
Mark Haas
Senior Technical Support Engineer
Agenda
• General Overview
• Setup and Configuration
• Demonstration of Functionality
• New Features
WWW.P6ACADEMY.COM
Discover the Latest Release of Oracle’s Primavera P6 Enterprise Project Portfolio Management
Submitted by our members, all rights copyright Oracle.
ORACLE | P6ACADEMY.COM
Submitted and shared by our members
Agenda
• Introduction To Cloud Marketplace
• Oracle Cloud Marketplace for Cloud Partners
• Oracle Cloud Marketplace for Cloud Customers
• Partner Application Process
• Q&A
ORACLE P6ACADEMY.COM
Shared by our members
Primavera Prime Overview
Harish Bhagavatula
Director, Product Strategy
Primavera Global Business Unit
March, 2016
• 100% Cloud-based product.• Project and Portfolio Management service built on Oracle technology.• Integrated scope, cost and schedule.• Long range capital and resource planning.• Evaluate ideas and proposals that align with business strategic goals.• Tools to perform enterprise risk analysis in the cloud leveraging Monte Carlo simulations.
What is Primavera Prime?
• Prioritizing, planning, managing, and executing projects, programs, and portfolios on a global scale.• Support complex management process that requires the highest levels of performance.• To establish leadership in integrated Scope, Cost, Schedule, Resource and Risk Management.• Design and Process Automation platform.• Integrated data analysis and visualization platform.
ORACLE | P6ACADEMY.COM
Webcast Slides
• Client Administrative Features Moved to P6 Web
• Job Services Replaced By Scheduled Services
• Methodology Manager Replaced With Project
Templates (Single database for projects and templates)
• MS Project Link Removed
• New Risk Functionality moved from client to P6 Web
• P6 Analytics (Reporting)
• Business Process Management (BPM Workflow)
• Upgrade Information
• Home Window and Progress Reporter Removed
Primavera P6 Team Member - For Primavera Users on the Gop6academy
From Oracle Webcast Series for Primavera Team Member
Part 3: Primavera P6 Team Member - For Primavera Users on the Go
Enable team collaboration and easy collection of activity status while maintaining control of your schedule.
For more free articles visit: www.p6academy.com
Oracle | P6ACADEMY.COM
Sent to us from members
Primavera Analytics
Rich pre-built business analytics solution for
project centric organizations
Insights into current and historical project
portfolio performance
Analyze schedules, resources, and cost as well as
facilities and real estate information
Uncover trends, track performance, perform root
cause analysis, and forecast costs and cash flow
Drive efficiencies in your project processes by
making better decisions
Leverage the power of business analytics to gain visibility and insight into
Primavera P6 role utilization across all projects down to the daily level
Gain greater understanding into Primavera Unifier with our initial support
for Facilities and Real Estate Management
Expanded support for Primavera Unifier data, including more Business
Process data elements, cost-sheet columns, and cash flow curves
Enhanced user experience and visualizations
P6 Services: How to install, configure, tips and troubleshooting p6academy
ORACLE | WWW.P6ACADEMY.COM
P6 Services: How to install,
configure, tips and
troubleshooting
Ruben Reyes M, Pablo Oyarzo M
Agenda
Definition & Architecture
Working with P6 Services
Troubleshoot and Best Practices
Q&A
The latest Primavera Roadmap June 2015
The recognized standard for high-performance project management Primavera P6 Professional Project Management, handles large-scale, highly sophisticated and multifaceted projects. Organize projects of up to 100,000 activities with unlimited resources and an unlimited number of target plans.
ORACLE P6ACADEMY.COM
Shared by our members
Primavera Gateway
16 Release 1 – March 2016
John Pikovskiy
Director
Oracle
Primavera Product Strategy
Primavera Gateway
• Pre-packaged integration connections
for a variety of Primavera internal and
3rd Party applications
• Java application with no dependency
on third party middleware provides
extensible integration solution
• Combine financial management and
asset management information with
project, portfolio and resource
management
• Simple integration framework allows
customers and partners to quickly
develop and adopt Primavera
Gateway for integration
www.p6academy.com
You can learn what is new in this release by either viewing a User Productivity Kit (UPK) demo or by reading a PDF document. Please note that, at the moment, P6 EPPM and P6 Professional 17 are available only as cloud deployments.
OOW16 - Oracle E-Business Suite 12 Upgrade Experience for a 14 TB Oracle E-Bu...vasuballa
This session shares the experiences of a very successful upgrade of Oracle E-Business Suite 11.5.10 to Oracle E-Business Suite 12.2.4. Learn about the best practices from a planning, project management, and technical perspective. The session shares the do’s and don’ts for an upgrade, and covers best practices regarding the following:
• Decision matrix for upgrade vs. reimplementation
• Test scenario planning
• Project planning
• Cut-over planning and testing
• Simulations
• Optimizing time for upgrade
• Post go-live support
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]vasuballa
This session provides an overview of how the Oracle Quality Assurance team tests Oracle E-Business Suite. It covers the main areas that you should consider during functional testing, approaches for new feature and regression testing, how to reduce the test script generation and execution time, experiences on capturing and presenting metrics to showcase the ROI of the testing investment, leveraging automation for testing Oracle E-Business Suite applications, and more.
OOW16 - Oracle E-Business Suite Integration Best Practices [CON6709]vasuballa
Oracle is investing across applications and technologies to make the application integration experience easier for customers. Oracle E-Business Suite provides tools and technologies to address various application integration challenges and styles. Learn more about Oracle’s integration offering for cloud, data, event-driven, business-to-business, and process-centric integrations. In this session, you will get a better understanding of what Oracle integration technologies you can use and how, when, and where you can leverage them to connect end-to-end business processes across your enterprise, including the Oracle Applications portfolio in the cloud.
OOW15 - Standards-Based Desktop Integration in Oracle E-Business Suitevasuballa
This presentation covers the latest standards support in Oracle Web Applications Desktop Integrator and Oracle Report Manager. The presentation includes new features in Oracle E-Business Suite 12.2 and other proposed design changes that result in a vastly improved performance and spreadsheet experience. In addition, it offers information on how you can use Desktop Integration Framework to build your own custom desktop integrations between Oracle E-Business Suite and Microsoft Excel for enhanced end user productivity for mass upload/download of spreadsheet data.
ORACLE P6ACADEMY.COM
Shared by our members
Primavera Prime Overview
Harish Bhagavatula
Director, Product Strategy
Primavera Global Business Unit
March, 2016
• 100% Cloud-based product.• Project and Portfolio Management service built on Oracle technology.• Integrated scope, cost and schedule.• Long range capital and resource planning.• Evaluate ideas and proposals that align with business strategic goals.• Tools to perform enterprise risk analysis in the cloud leveraging Monte Carlo simulations.
What is Primavera Prime?
• Prioritizing, planning, managing, and executing projects, programs, and portfolios on a global scale.• Support complex management process that requires the highest levels of performance.• To establish leadership in integrated Scope, Cost, Schedule, Resource and Risk Management.• Design and Process Automation platform.• Integrated data analysis and visualization platform.
ORACLE | P6ACADEMY.COM
Webcast Slides
• Client Administrative Features Moved to P6 Web
• Job Services Replaced By Scheduled Services
• Methodology Manager Replaced With Project
Templates (Single database for projects and templates)
• MS Project Link Removed
• New Risk Functionality moved from client to P6 Web
• P6 Analytics (Reporting)
• Business Process Management (BPM Workflow)
• Upgrade Information
• Home Window and Progress Reporter Removed
Primavera P6 Team Member - For Primavera Users on the Gop6academy
From Oracle Webcast Series for Primavera Team Member
Part 3: Primavera P6 Team Member - For Primavera Users on the Go
Enable team collaboration and easy collection of activity status while maintaining control of your schedule.
For more free articles visit: www.p6academy.com
Oracle | P6ACADEMY.COM
Sent to us from members
Primavera Analytics
Rich pre-built business analytics solution for
project centric organizations
Insights into current and historical project
portfolio performance
Analyze schedules, resources, and cost as well as
facilities and real estate information
Uncover trends, track performance, perform root
cause analysis, and forecast costs and cash flow
Drive efficiencies in your project processes by
making better decisions
Leverage the power of business analytics to gain visibility and insight into
Primavera P6 role utilization across all projects down to the daily level
Gain greater understanding into Primavera Unifier with our initial support
for Facilities and Real Estate Management
Expanded support for Primavera Unifier data, including more Business
Process data elements, cost-sheet columns, and cash flow curves
Enhanced user experience and visualizations
P6 Services: How to install, configure, tips and troubleshooting p6academy
ORACLE | WWW.P6ACADEMY.COM
P6 Services: How to install,
configure, tips and
troubleshooting
Ruben Reyes M, Pablo Oyarzo M
Agenda
Definition & Architecture
Working with P6 Services
Troubleshoot and Best Practices
Q&A
The latest Primavera Roadmap June 2015
The recognized standard for high-performance project management Primavera P6 Professional Project Management, handles large-scale, highly sophisticated and multifaceted projects. Organize projects of up to 100,000 activities with unlimited resources and an unlimited number of target plans.
ORACLE P6ACADEMY.COM
Shared by our members
Primavera Gateway
16 Release 1 – March 2016
John Pikovskiy
Director
Oracle
Primavera Product Strategy
Primavera Gateway
• Pre-packaged integration connections
for a variety of Primavera internal and
3rd Party applications
• Java application with no dependency
on third party middleware provides
extensible integration solution
• Combine financial management and
asset management information with
project, portfolio and resource
management
• Simple integration framework allows
customers and partners to quickly
develop and adopt Primavera
Gateway for integration
www.p6academy.com
You can learn what is new in this release by either viewing a User Productivity Kit (UPK) demo or by reading a PDF document. Please note that, at the moment, P6 EPPM and P6 Professional 17 are available only as cloud deployments.
OOW16 - Oracle E-Business Suite 12 Upgrade Experience for a 14 TB Oracle E-Bu...vasuballa
This session shares the experiences of a very successful upgrade of Oracle E-Business Suite 11.5.10 to Oracle E-Business Suite 12.2.4. Learn about the best practices from a planning, project management, and technical perspective. The session shares the do’s and don’ts for an upgrade, and covers best practices regarding the following:
• Decision matrix for upgrade vs. reimplementation
• Test scenario planning
• Project planning
• Cut-over planning and testing
• Simulations
• Optimizing time for upgrade
• Post go-live support
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]vasuballa
This session provides an overview of how the Oracle Quality Assurance team tests Oracle E-Business Suite. It covers the main areas that you should consider during functional testing, approaches for new feature and regression testing, how to reduce the test script generation and execution time, experiences on capturing and presenting metrics to showcase the ROI of the testing investment, leveraging automation for testing Oracle E-Business Suite applications, and more.
OOW16 - Oracle E-Business Suite Integration Best Practices [CON6709]vasuballa
Oracle is investing across applications and technologies to make the application integration experience easier for customers. Oracle E-Business Suite provides tools and technologies to address various application integration challenges and styles. Learn more about Oracle’s integration offering for cloud, data, event-driven, business-to-business, and process-centric integrations. In this session, you will get a better understanding of what Oracle integration technologies you can use and how, when, and where you can leverage them to connect end-to-end business processes across your enterprise, including the Oracle Applications portfolio in the cloud.
OOW15 - Standards-Based Desktop Integration in Oracle E-Business Suitevasuballa
This presentation covers the latest standards support in Oracle Web Applications Desktop Integrator and Oracle Report Manager. The presentation includes new features in Oracle E-Business Suite 12.2 and other proposed design changes that result in a vastly improved performance and spreadsheet experience. In addition, it offers information on how you can use Desktop Integration Framework to build your own custom desktop integrations between Oracle E-Business Suite and Microsoft Excel for enhanced end user productivity for mass upload/download of spreadsheet data.
Dr. Fritsch Powder Shaping Technologies English CatalogueJens Huber
Product catalogue displaying an overview of the Technologies which Dr. Fritsch has to offer:
FAST Direct Hot-Pressing, Granulation, Mixing.
Main focus is on the manufacturing of friction materials, sputter targets, heat sinks and machines for R&D ( universities, etc.).
'Sustainable London Learning' (SLL) - first issue of the newsletter of London RCE (Regional Centre of Expertise) on ESD (Education for Sustainable Development), http://www.londonrce.kk5.org
Over the past year, more and more Java applications have benefited from gaining access to elastic, cloud-ready, data grids thanks to Infinispan, and from now on, Ruby apps running within TorqueBox get the same benefit as well thanks to the ability of TorqueBox to talk to Infinispan Hot Rod servers. In this talk, Galder will demo the integrations between TorqueBox, which is a Ruby application plattform, and Infinispan, which is a Java based data grid plattform, highlighting the benefits for TorqueBox administrators and Ruby developers, which include, amongst others, access to highly-scalable, low-latency data store that avoids single point of failure.
To maximize your Oracle investment and drive innovation, it's important to have a clear understanding of your business goals and how Oracle's technologies can help you achieve them. Start by identifying the Oracle products and services that are most relevant to your needs, and then work with a trusted partner or consultant to develop a comprehensive strategy for implementation and ongoing maintenance.
In this webinar on demand you'll learn how organizations leverage Oracle Cloud support strategies and increase focus on core business processes while boosting end-user satisfaction. We will show some strategies to help you improve response times, leverage the latest functionality, and lower your total cost of ownership. There will be an open Q&A at the end of our session.
Anastasiia Khait: Building Product Passion: Empowering Development Teams thro...Lviv Startup Club
Anastasiia Khait: Building Product Passion: Empowering Development Teams through "Know Your Product" Initiative (UA)
UA Online PMDay 2024 Spring
Website – www.pmday.org/online
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
Form I-9/E-Verify and Compliance & Managed Services for HCM Cloud
Presented by the Department of Homeland Security, ERP Risk Advisors, and Smart ERP Solutions
Part 2: Compliance With Managed Services for Human Capital Management (HCM)
In this webinar, discover how Compliance and Managed Services for Human Capital Management (HCM) Cloud can optimize and streamline your HR processes, saving time and resources and staying compliant. ERP Risk Advisors and SmartERP will showcase the benefits of utilizing managed services, focusing on automation, security, scalability, and compliance. Learn how managed services can enhance your HCM Cloud experience and allow HR professionals to focus on strategic initiatives while ensuring data privacy and regulatory compliance. There will be an open Q&A.
Some of the topics that will be presented:
What do we mean by Compliance through Managed Services?
Flexible Models for Managed Services as an extension of your Internal Team
Ensuring Oracle License Compliance and Reducing risk through Role Management
Demonstrate significant risks with the use of Seeded and Hybrid roles
Automated processes and their impact on HR efficiency
Compliance assurance and risk management through enabling and evaluating audit logs
This webinar will focus on content for HCM professionals that are utilizing HCM Cloud or are currently investigating moving to HCM Cloud.
Note: Both webinars are tailored to HR professionals, compliance officers, and managers. The aim is to offer valuable insights and practical tips for handling DHS Form I-9 compliance and leveraging Managed Services to optimize HCM Cloud operations and compliance.
Is Outsourcing eLearning Content Development Right For You - EI Design EI Design
If you are reading this article, you are probably evaluating outsourcing of eLearning content development or are looking at alternatives for your existing outsourcing approach. There are several compelling business reasons to outsource and there are certainly plenty of possible partners you can engage with. However, the evaluation and selection of the right partner is a tough job. Tougher still is to make the partnership work effectively and consistently once you sign up. So, how do you determine if outsourcing eLearning content development is right for you?
Ready for Fast Data: How Lightbend Enables Teams To Build Real-Time, Streamin...Lightbend
In this webinar with Mike Kelland, VP of Global Services at Lightbend, we will share some details of our specialized enablement strategy that allows teams of all sizes to successfully adopt Fast Data technologies and techniques. Based on over a decade of experience developing technologies that support real-time data streaming applications, Lightbend has the tools, expertise, and training courses you need to ramp up your team for Fast Data.
Apty's software adoption platform makes any web-based application easier to use and provides actionable insights to improve efficiency and reduce support costs.
ORACLE | P6ACADEMY.COM
Shared by our members | Copyright Oracle Corp
Discover the Latest Release of Oracle’s
Primavera P6 Enterprise Project
Portfolio Management
Karen Pilla
Director, Product Strategy
Oracle’s Primavera Product Strategy
March 2016
Program Agenda
4
Usability and Adoption
Team Member
Primavera P6 Professional
Industry Highlights
ORACLE | P6ACADEMY.COM
Source: User Submitted
Primavera Unifier provides a best-in-class cloud-based solution for managing capital projects and facilities of any size in every vertical market. Join us for this live webcast with Q&A to learn about enhancements in the 16.1 version, including:
iOS Mobile Application
Unifier Gateway Provider supporting Business Processes
Pushing changes from PM Book Templates
Support for reports created within BI Publisher
Space Manager support within Primavera Analytics
Usability enhancements
Business process enhancementsPrimavera Unifier provides a best-in-class cloud-based solution for managing capital projects and facilities of any size in every vertical market. Join us for this live webcast with Q&A to learn about enhancements in the 16.1 version, including:
iOS Mobile Application
Unifier Gateway Provider supporting Business Processes
Pushing changes from PM Book Templates
Support for reports created within BI Publisher
Space Manager support within Primavera Analytics
Usability enhancements
Business process enhancements
Oracle Primavera P6 R8 Release Value Propositionp6academy
ORACLE | P6ACADEMY.COM
Shared by our members
This document provides an overview of features and enhancements included in
Oracle’s Primavera P6 Enterprise Project Portfolio Management Release 8. It is
intended solely to help you assess the business benefits of upgrading to
Primavera P6 Enterprise Project Portfolio Management R8.
Copyright Oracle
Oracle Primavera P6 v7 Release Value Proposition p6academy
ORACLE | P6ACADEMY.COM
Shared by our members
This document provides an overview of features and enhancements included in
Oracle Primavera P6 Enterprise Project Portfolio Management (EPPM) v7. It is
intended solely to help you assess the business benefits of upgrading to P6
EPPM v7 and to plan your I.T. projects.
This document provides an overview of the value proposition that is associated with the new
features and enhancements that are planned for Oracle Primavera P6 v7. This document will
help you assess the business benefits of Oracle Primavera P6 v7 and plan your information
technology investments.
This document describes new or changed functionality only. Existing functionality from prior
releases is not described.
Our goal is to ensure that you leverage technologyto its fullest to increase the efficiency and
effectiveness of your operations. Please note that the final release may not have every feature
that is discussed in this document, and a specific feature may become a part of a different
application or have a product name that is different from those cited in this document.
This preface discusses:
ORACLE | P6ACADEMY.COM
Shared by our members
This Release Content Document (RCD) describes product features that are planned for
release 8 of Oracle Primavera P6 Enterprise Project Portfolio Management. This
document describes new or changed functionality only. Existing functionality from prior
releases is not described. This document is intended solely to help you assess the new
or changed capabilities and business benefits of release 8
Release 8 is the next major release of the Oracle Primavera P6 solution. This release
delivers significant advances in functionality and will help companies deliver more
projects on schedule and within scope, while reducing the overall cost of projects,
project management processes, and systems.
ORACLE | WWW.P6ACADEMY.COM
Primavera P6 Enterprise Project Portfolio Management 8
Essentials (1Z0-567) Exam Study Guide
Margy Girdzius
Director, Partner Enablement
WWA&C
Objective
• Help you prepare to take the Primavera P6 Enterprise Project
Portfolio Management 8 Essentials (1Z0-567) exam by providing
pointers to resources that you can use in your preparation.
Targeted Audience
• Implementation Consultants
• Technical Consultants
• Pre Sales Consultants
• Strong foundation and expertise in implementing
Primavera P6 EPPM
• Up-to-date training and field experience are recommended
ORACLE | WWW.P6ACADEMY.COM
Reporting Basics of Project Management
Scot Fortna
Technical Support Engineer
Sean Rabenold
Technical Support Engineer
In today’s presentation, we will cover the following:
• Client Reporting
• Pre P6 R8.x Web Reporting
• P6 R8.x Web Reporting with BI Publisher
• Demonstration of Reporting with BI Publisher
Primavera P6 R7 vs R15.1 Functionality Matrixp6academy
ORACLE | WWW.P6ACADEMY.COM
This document provides an outline of functionality for the different P6 Enterprise Project Portfolio Management components, including Web Access, and P6 Professional. It compares functionality available in P6r7 to P6r15.1.
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Memorandum Of Association Constitution of Company.pptseri bangash
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.