Road Ahead for Integrated Projects:
Financial Analysis of Yamuna
Expressway
By
Neeraj Mehra and Shaman Singh
Objectives
• Understand the phases of the project
• Identify risks
• Financial calculations with own assumptions
• Analyze the results
• Suggestions
Past to Present
1997
• Conceptualized by Ms. Mayawati
2001
• Bidding Invited
2002
• Fresh Bids: Six Bidders
2003
• Concession Agreement between YEA and JAL
• Mayawati stepped down- Corruption Allegations
• Project Halted
2006
• Narayan Committee submitted report: In favor of grant of the project
Past to Present (Contd.)
2007
• Mayawati Comes Back to Power
• JIL Incorporated
• Project Construction Begins
2008
• Land Acquisition Issues- Mathura
2009
• Urgency Clause
• Extension of Construction Period
2010
• Land Acquisition Issues- Tappal
2012
• State Elections: Mayawati Lost; SP comes back in power
• Questions raised by new CM on the project
• Taj International Airport Project scrapped
• Ready for operation- No clarity on toll rates
Project Details
Length 165.537 Km
Right of Way 100m
Number of Lane 6 Lanes extendable to 8 lanes
Type of Pavement Rigid (Concrete)
Interchange/ Main Toll Plaza 6 / 5
Vehicular Underpasses / Minor
Bridges 70 / 41
Cart Track Underpasses / Crossing 76
Culverts 183
Project Parties
Traffic Study
• Origin Destination Survey
• Traffic Growth Rate Estimation:
Log e (P) = Ao + Ai Log e(EI)
Dependent variable : Number of registered vehicles
Independent variable: Net State Domestic Product (NSDP)
• Traffic Growth Rate = Growth Rate of NSDP *
Elasticity
• New Expressway Toll Rate Rules: Feb 2010
Risks
• Land Acquisition
• Environmental
• Construction
• Operating
• Demand Supply/Market
• Approvals
• Regulatory
Social Costs and Benefits
Social Costs
• Construction
• Maintenance
• Land
• Business on Original
Route
Social Benefits
•Fuel Savings
•Reduction in Pollution
•Time Savings
•Reduced Accidents
•Economic Development
•Tourism Boost
Financial Modeling
Main Assumptions
Risk Free Interest Rate: 6.47%
Tax Rate: 33.99%
Cost of Debt: 12.50%
Target D/V ratio: 0.6
Target E/V ratio: 0.4
Area per township (Acres): 1235
% of Total Area needed for utilities (Roads, Reserved, etc): 15%
Residential: 60%
Commercial: 20%
Institutional: 20%
Total Development Time (years): 15
Financial Modeling
Main Assumptions
OLD
Toll Growth Rate Assumption
Increment per 3 years: 12%
Toll Rate (Base)(Rs/Km)
Car 1.47
LCV 2.29
Bus 4.35
2A 3.17
3A 7.52
MAV 10.02
NEW (Proposed)
WPI Annual Proportion Increase:
6.30%
Escalation (Annual): 2.52%
Toll Rate (Base)(Rs/Km)
Car 0.8
LCV 1.3
Bus 2.75
2A 4.3
3A 4.3
MAV 5.25
Calculations
Cost of Equity
Risk Free Interest Rate
6.47%
Beta
1.217
Market Return
15.09%
Expected Return
(Equity)
16.961%
Target D/V ratio 0.6
Target E/V ratio 0.4
WACC Calculation
Weight of Debt 0.6
Weight of Equity 0.4
Cost of Debt
12.50%
Cost of Equity
16.96%
Tax Rate
33.99%
WACC
11.74%
NPV IRR Calculations:
Expressway and Real Estate
Expressway Valuation - Old
Rule
NPV 255.75
NPV Equity -4638.44
Project IRR 12.33%
Equity IRR 5.41%
Expressway Valuation - New
Rule
NPV -1733.43
NPV Equity -5558.25
Project IRR 6.32%
Equity IRR N/A
Real Estate Valuation
Total NPV 14307.69
NPV Equity 7144.12
IRR 52.20%
Equity IRR 48.10%
NPV IRR Calculations:
Project
Project Valuation - New Rule
NPV 12339.92
NPV (Equity) 3359.88
Project IRR 34.74%
Equity IRR 26.49%
Project Valuation - Old Rule
NPV 14557.74
NPV (Equity) 4206.15
Project IRR 35.77%
Equity IRR 27.80%
Scenario Analysis
NPV Project (New) vs. Traffic
Scenario Analysis (Contd.)
NPV Equity (Old) vs. Traffic
Scenario Analysis (Contd.)
NPV Equity (New) vs. Real Estate Price Level
Scenario Analysis (Contd.)
Real Estate NPV vs. Real Estate Price Level
Sensitivity Analysis
Independent Variables
• For Interest rates: Historical Bank PLR in India has standard deviation of
1.28%
• For Property Prices: Historical Standard Deviation of Property Prices in
Noida is 18.33%
• For Traffic: 70% as downside and 110% as upside
Dependent Variables
2 cases: Old Tariff Scenario and Revised (Proposed) Tariff Scenario
• NPV
• NPV-Equity
• IRR
• IRR-Equity
• Number of Samples: 25,000
Percentiles Equity IRR-
new
NPV (Equity)-
new
NPV-
new
Project IRR-
new
Equity IRR-
old
NPV (Equity)-
old
NPV-old Project IRR-
old
0% 4.59% -4255.1 -76.17 11.97% 8.96% -3515.88 1702.9 15.02%
10% 20.28% 1119.6 8520.76 28.76% 21.94% 1898.33 10474.2
1
29.95%
20% 22.35% 1843.06 9723.98 30.80% 23.84% 2629.33 11711.7
9
31.90%
30% 23.88% 2388.19 10617.1
9
32.27% 25.24% 3170.26 12642.9
1
33.31%
40% 25.15% 2844.83 11423.5 33.46% 26.45% 3631.87 13458.8
2
34.47%
50% 26.29% 3264.5 12135.9
5
34.57% 27.53% 4053.85 14214.7
8
35.53%
60% 27.46% 3701.98 12864.8
1
35.70% 28.64% 4492.12 14958.2
1
36.63%
70% 28.67% 4153.51 13671.5
2
36.86% 29.80% 4945.66 15779.3
8
37.76%
80% 30.09% 4692.65 14603.1
3
38.24% 31.16% 5485.3 16773.3
2
39.10%
90% 31.98% 5418.73 15928.1
1
40.05% 32.98% 6213.4 18137.3
7
40.87%
100% 43.59% 10021.71 25915.3
8
50.26% 44.36% 10879.36 28820.9
2
50.87%
Sensitivity
Data
Assumptions Equity IRR-
new
NPV (Equity)-
new
NPV-
new
Project IRR-
new
Equity IRR-
old
NPV (Equity)-
old
NPV-old Project IRR-
old
Cost of Debt -0.21 -0.19 -0.34 -0.07 -0.21 -0.19 -0.4 -0.07
Real Estate 0.97 0.97 0.92 1 0.97 0.97 0.89 0.99
Traffic 0.03 0.05 0.06 0.03 0.06 0.09 0.12 0.05
Observations of Sensitivity Analysis
• Very low probability of the negative Project
NPV
• Under Old Tariff, Project NPV is always
positive.
• Negative Equity NPV is possible in both the
case, Old and Proposed New Tariff with very
low probability.
• In Terms of sensitivity: Real Estate>Cost of
Debt>Traffic
Conclusion
• Project conceived in 1997 (9th 5-year plan
period) got completed in 2012 (12th 5-year
plan period)
• Massive increase in the estimated cost of the
project
• Returns from real estate development
significantly outweigh the deficit from the
expressway
Food for thought!!
• Separate bids for real estate and expressway?
• Are roads viable without corresponding real
estate?
• Should toll be waived in lieu of high real estate
returns?
• Should government take back portion of land
given for townships?
Thank You

More Related Content

What's hot

Expressway plan
Expressway planExpressway plan
Expressway plan
Abhishek Dixit
 
Airport engineering
Airport engineeringAirport engineering
Airport engineering
saibabu48
 
Airport engineering PART-1
Airport engineering PART-1 Airport engineering PART-1
Airport engineering PART-1
RAMPRASAD KUMAWAT
 
Factors influence site selection of an airport
Factors influence site selection of an airportFactors influence site selection of an airport
Factors influence site selection of an airport
MaddelaSiddhardha
 
Airport Layout
Airport LayoutAirport Layout
Airport Layout
Naveed Hussain
 
Dfc
DfcDfc
Road Construction
Road ConstructionRoad Construction
Road Construction
Danish Mohd
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
Karan Shah
 
Study on Crumb Rubber Modified Bitumen
Study on Crumb Rubber Modified BitumenStudy on Crumb Rubber Modified Bitumen
Study on Crumb Rubber Modified Bitumen
Kunal Bhadane
 
Parking
ParkingParking
Track Alignment of Railway Line | Civil TechMate
Track Alignment of Railway Line | Civil TechMateTrack Alignment of Railway Line | Civil TechMate
Track Alignment of Railway Line | Civil TechMate
Civil TechMate
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
Bhavik A Shah
 
HIGHWAY NETWORK SYSTEM
HIGHWAY NETWORK SYSTEMHIGHWAY NETWORK SYSTEM
HIGHWAY NETWORK SYSTEM
seminarppts
 
Chennai salem expressway highway case study
Chennai salem expressway highway case studyChennai salem expressway highway case study
Chennai salem expressway highway case study
blackstar uvan
 
Design elements of airport taxiway
Design elements of airport taxiwayDesign elements of airport taxiway
Design elements of airport taxiway
Asok999
 
Dynamic Traffic Modeling
Dynamic Traffic ModelingDynamic Traffic Modeling
Sleepers and Their types
Sleepers and Their typesSleepers and Their types
Sleepers and Their types
17CE67
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
RAMPRASAD KUMAWAT
 
Basic runway length
Basic runway lengthBasic runway length
Basic runway length
Gaurang Kakadiya
 

What's hot (20)

Expressway plan
Expressway planExpressway plan
Expressway plan
 
Airport engineering
Airport engineeringAirport engineering
Airport engineering
 
Airport engineering PART-1
Airport engineering PART-1 Airport engineering PART-1
Airport engineering PART-1
 
Factors influence site selection of an airport
Factors influence site selection of an airportFactors influence site selection of an airport
Factors influence site selection of an airport
 
Airport Layout
Airport LayoutAirport Layout
Airport Layout
 
Dfc
DfcDfc
Dfc
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
4 roadside hazard management
4 roadside hazard management4 roadside hazard management
4 roadside hazard management
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Study on Crumb Rubber Modified Bitumen
Study on Crumb Rubber Modified BitumenStudy on Crumb Rubber Modified Bitumen
Study on Crumb Rubber Modified Bitumen
 
Parking
ParkingParking
Parking
 
Track Alignment of Railway Line | Civil TechMate
Track Alignment of Railway Line | Civil TechMateTrack Alignment of Railway Line | Civil TechMate
Track Alignment of Railway Line | Civil TechMate
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
 
HIGHWAY NETWORK SYSTEM
HIGHWAY NETWORK SYSTEMHIGHWAY NETWORK SYSTEM
HIGHWAY NETWORK SYSTEM
 
Chennai salem expressway highway case study
Chennai salem expressway highway case studyChennai salem expressway highway case study
Chennai salem expressway highway case study
 
Design elements of airport taxiway
Design elements of airport taxiwayDesign elements of airport taxiway
Design elements of airport taxiway
 
Dynamic Traffic Modeling
Dynamic Traffic ModelingDynamic Traffic Modeling
Dynamic Traffic Modeling
 
Sleepers and Their types
Sleepers and Their typesSleepers and Their types
Sleepers and Their types
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
 
Basic runway length
Basic runway lengthBasic runway length
Basic runway length
 

Viewers also liked

Yamuna Expressway Case Study
Yamuna Expressway Case StudyYamuna Expressway Case Study
Yamuna Expressway Case Study
smart-i Electronics Systems Pvt Ltd.
 
Bot(build operate transfr)
Bot(build operate transfr)Bot(build operate transfr)
Bot(build operate transfr)
Kritika Garg
 
Everything You Need To Know About Investing In Yamuna Expressway - A CommonFl...
Everything You Need To Know About Investing In Yamuna Expressway - A CommonFl...Everything You Need To Know About Investing In Yamuna Expressway - A CommonFl...
Everything You Need To Know About Investing In Yamuna Expressway - A CommonFl...
CommonFloor.com
 
Gaur Yamuna City Call- 8010519519
Gaur Yamuna City Call- 8010519519Gaur Yamuna City Call- 8010519519
Gaur Yamuna City Call- 8010519519
Hansraj Singh M.D. Investor Aura
 
Coimbatore Bypass project
Coimbatore Bypass projectCoimbatore Bypass project
Coimbatore Bypass project
ARSHIYA KHAN
 
CASE STUDY ON DELHI GURGAON KM 24 TOLL PLAZA
CASE STUDY ON DELHI GURGAON KM 24 TOLL PLAZACASE STUDY ON DELHI GURGAON KM 24 TOLL PLAZA
CASE STUDY ON DELHI GURGAON KM 24 TOLL PLAZA
sanket singh
 
COST AND BENEFIT ANALYSIS OF FREE PUBLIC TRANSPORT IN PUNE
COST AND BENEFIT ANALYSIS OF FREE PUBLIC TRANSPORT IN PUNECOST AND BENEFIT ANALYSIS OF FREE PUBLIC TRANSPORT IN PUNE
COST AND BENEFIT ANALYSIS OF FREE PUBLIC TRANSPORT IN PUNEAmitesh Saha
 
Feasibility Report of Hyd Metro
Feasibility Report of Hyd MetroFeasibility Report of Hyd Metro
Feasibility Report of Hyd Metro
Raghavendra Rachamadugu
 
A STUDY ON THE FINANCIAL CRISIS FACED BY KERALA STATE ROAD TRANSPORT CORPORAT...
A STUDY ON THE FINANCIAL CRISIS FACED BY KERALA STATE ROAD TRANSPORT CORPORAT...A STUDY ON THE FINANCIAL CRISIS FACED BY KERALA STATE ROAD TRANSPORT CORPORAT...
A STUDY ON THE FINANCIAL CRISIS FACED BY KERALA STATE ROAD TRANSPORT CORPORAT...Aditya Vaishnav
 
Terminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportTerminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportAnkita Kolamkar
 
Indira Gandhi International Airport
Indira Gandhi International AirportIndira Gandhi International Airport
Indira Gandhi International Airport
Archana Kuppast
 
PPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro OnePPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro One
kopila
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
Yousuf Captain
 
Presentation On Bandra Worli Sealink
Presentation On Bandra Worli SealinkPresentation On Bandra Worli Sealink
Presentation On Bandra Worli Sealinkpriyank123
 
Commercial Real Estate Financial Analysis
Commercial Real Estate Financial AnalysisCommercial Real Estate Financial Analysis
Commercial Real Estate Financial Analysis
Ploutus Advisors
 
World Bank Ppt
World Bank PptWorld Bank Ppt
World Bank Ppt
milanmadhukar
 

Viewers also liked (18)

Yamuna Expressway Case Study
Yamuna Expressway Case StudyYamuna Expressway Case Study
Yamuna Expressway Case Study
 
Bot(build operate transfr)
Bot(build operate transfr)Bot(build operate transfr)
Bot(build operate transfr)
 
Everything You Need To Know About Investing In Yamuna Expressway - A CommonFl...
Everything You Need To Know About Investing In Yamuna Expressway - A CommonFl...Everything You Need To Know About Investing In Yamuna Expressway - A CommonFl...
Everything You Need To Know About Investing In Yamuna Expressway - A CommonFl...
 
Gaur Yamuna City Call- 8010519519
Gaur Yamuna City Call- 8010519519Gaur Yamuna City Call- 8010519519
Gaur Yamuna City Call- 8010519519
 
Coimbatore Bypass project
Coimbatore Bypass projectCoimbatore Bypass project
Coimbatore Bypass project
 
CASE STUDY ON DELHI GURGAON KM 24 TOLL PLAZA
CASE STUDY ON DELHI GURGAON KM 24 TOLL PLAZACASE STUDY ON DELHI GURGAON KM 24 TOLL PLAZA
CASE STUDY ON DELHI GURGAON KM 24 TOLL PLAZA
 
Ksrtc
KsrtcKsrtc
Ksrtc
 
MEGAPROJECT Case Study
MEGAPROJECT Case StudyMEGAPROJECT Case Study
MEGAPROJECT Case Study
 
COST AND BENEFIT ANALYSIS OF FREE PUBLIC TRANSPORT IN PUNE
COST AND BENEFIT ANALYSIS OF FREE PUBLIC TRANSPORT IN PUNECOST AND BENEFIT ANALYSIS OF FREE PUBLIC TRANSPORT IN PUNE
COST AND BENEFIT ANALYSIS OF FREE PUBLIC TRANSPORT IN PUNE
 
Feasibility Report of Hyd Metro
Feasibility Report of Hyd MetroFeasibility Report of Hyd Metro
Feasibility Report of Hyd Metro
 
A STUDY ON THE FINANCIAL CRISIS FACED BY KERALA STATE ROAD TRANSPORT CORPORAT...
A STUDY ON THE FINANCIAL CRISIS FACED BY KERALA STATE ROAD TRANSPORT CORPORAT...A STUDY ON THE FINANCIAL CRISIS FACED BY KERALA STATE ROAD TRANSPORT CORPORAT...
A STUDY ON THE FINANCIAL CRISIS FACED BY KERALA STATE ROAD TRANSPORT CORPORAT...
 
Terminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportTerminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International Airport
 
Indira Gandhi International Airport
Indira Gandhi International AirportIndira Gandhi International Airport
Indira Gandhi International Airport
 
PPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro OnePPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro One
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Presentation On Bandra Worli Sealink
Presentation On Bandra Worli SealinkPresentation On Bandra Worli Sealink
Presentation On Bandra Worli Sealink
 
Commercial Real Estate Financial Analysis
Commercial Real Estate Financial AnalysisCommercial Real Estate Financial Analysis
Commercial Real Estate Financial Analysis
 
World Bank Ppt
World Bank PptWorld Bank Ppt
World Bank Ppt
 

Similar to Road ahead for integrated projects: Yamuna Expressway

financialsnapshot
financialsnapshotfinancialsnapshot
financialsnapshotfinance14
 
Quarter 4 and Annual Results FY23 Logistics Industry
Quarter 4 and Annual Results FY23 Logistics IndustryQuarter 4 and Annual Results FY23 Logistics Industry
Quarter 4 and Annual Results FY23 Logistics Industry
Amicus Growth Advisors
 
CRISIL Automobile PPT
CRISIL Automobile PPTCRISIL Automobile PPT
CRISIL Automobile PPT
ssuser0bbaf7
 
Investor Relations book q3 2019
Investor Relations book q3 2019Investor Relations book q3 2019
Investor Relations book q3 2019
ahli bank
 
Effects of crashes on efficiency of the N3 toll route
Effects of crashes on efficiency of the N3 toll routeEffects of crashes on efficiency of the N3 toll route
Effects of crashes on efficiency of the N3 toll route
Tristan Wiggill
 
KPCL Showcase Presentation Dec 2020 04122020.pdf
KPCL Showcase Presentation Dec 2020  04122020.pdfKPCL Showcase Presentation Dec 2020  04122020.pdf
KPCL Showcase Presentation Dec 2020 04122020.pdf
RaviBhutani3
 
Institutional Presentation - May/17
Institutional Presentation - May/17Institutional Presentation - May/17
Institutional Presentation - May/17
Localiza
 
Revenues
RevenuesRevenues
Localiza institucional inglês
Localiza institucional   inglêsLocaliza institucional   inglês
Localiza institucional inglês
Localiza
 
Localiza completa 3 q10 eng (outubro-nova versão)
Localiza completa 3 q10 eng (outubro-nova versão)Localiza completa 3 q10 eng (outubro-nova versão)
Localiza completa 3 q10 eng (outubro-nova versão)Localiza
 
Automotive industry in india
Automotive industry in india Automotive industry in india
Automotive industry in india
Manish Lipcha
 
Banglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Banglalink (VEON) Ennovators 2.0 Winning Idea BrochureBanglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Banglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Md Asif Imrul
 
Am acma presentation_sweden_france
Am  acma presentation_sweden_franceAm  acma presentation_sweden_france
Am acma presentation_sweden_france
Wanderley Perna
 
Localiza completa 3 q11 eng (nova versao)
Localiza completa 3 q11 eng (nova versao)Localiza completa 3 q11 eng (nova versao)
Localiza completa 3 q11 eng (nova versao)Localiza
 
Nov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule UpdateNov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule Update
Adina Levin
 
AITPM Transport Demand Forecasting
AITPM Transport Demand ForecastingAITPM Transport Demand Forecasting
AITPM Transport Demand Forecasting
JumpingJaq
 
State Highway Performance
State Highway PerformanceState Highway Performance
Ir report h1 2019
Ir report h1 2019Ir report h1 2019
Ir report h1 2019
ahli bank
 
2019 MATC Fall Webinar Series - Mr. Daniel Murray
2019 MATC Fall Webinar Series - Mr. Daniel Murray2019 MATC Fall Webinar Series - Mr. Daniel Murray
2019 MATC Fall Webinar Series - Mr. Daniel Murray
Mid-America Transportation Center
 

Similar to Road ahead for integrated projects: Yamuna Expressway (20)

financialsnapshot
financialsnapshotfinancialsnapshot
financialsnapshot
 
Quarter 4 and Annual Results FY23 Logistics Industry
Quarter 4 and Annual Results FY23 Logistics IndustryQuarter 4 and Annual Results FY23 Logistics Industry
Quarter 4 and Annual Results FY23 Logistics Industry
 
CRISIL Automobile PPT
CRISIL Automobile PPTCRISIL Automobile PPT
CRISIL Automobile PPT
 
Investor Relations book q3 2019
Investor Relations book q3 2019Investor Relations book q3 2019
Investor Relations book q3 2019
 
Effects of crashes on efficiency of the N3 toll route
Effects of crashes on efficiency of the N3 toll routeEffects of crashes on efficiency of the N3 toll route
Effects of crashes on efficiency of the N3 toll route
 
KPCL Showcase Presentation Dec 2020 04122020.pdf
KPCL Showcase Presentation Dec 2020  04122020.pdfKPCL Showcase Presentation Dec 2020  04122020.pdf
KPCL Showcase Presentation Dec 2020 04122020.pdf
 
Institutional Presentation - May/17
Institutional Presentation - May/17Institutional Presentation - May/17
Institutional Presentation - May/17
 
Revenues
RevenuesRevenues
Revenues
 
Localiza institucional inglês
Localiza institucional   inglêsLocaliza institucional   inglês
Localiza institucional inglês
 
Localiza completa 3 q10 eng (outubro-nova versão)
Localiza completa 3 q10 eng (outubro-nova versão)Localiza completa 3 q10 eng (outubro-nova versão)
Localiza completa 3 q10 eng (outubro-nova versão)
 
Automotive industry in india
Automotive industry in india Automotive industry in india
Automotive industry in india
 
Banglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Banglalink (VEON) Ennovators 2.0 Winning Idea BrochureBanglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Banglalink (VEON) Ennovators 2.0 Winning Idea Brochure
 
Am acma presentation_sweden_france
Am  acma presentation_sweden_franceAm  acma presentation_sweden_france
Am acma presentation_sweden_france
 
Localiza completa 3 q11 eng (nova versao)
Localiza completa 3 q11 eng (nova versao)Localiza completa 3 q11 eng (nova versao)
Localiza completa 3 q11 eng (nova versao)
 
Nov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule UpdateNov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule Update
 
AITPM Transport Demand Forecasting
AITPM Transport Demand ForecastingAITPM Transport Demand Forecasting
AITPM Transport Demand Forecasting
 
State Highway Performance
State Highway PerformanceState Highway Performance
State Highway Performance
 
Ir report h1 2019
Ir report h1 2019Ir report h1 2019
Ir report h1 2019
 
Wealth Creation Study 2001-2006
Wealth Creation Study 2001-2006Wealth Creation Study 2001-2006
Wealth Creation Study 2001-2006
 
2019 MATC Fall Webinar Series - Mr. Daniel Murray
2019 MATC Fall Webinar Series - Mr. Daniel Murray2019 MATC Fall Webinar Series - Mr. Daniel Murray
2019 MATC Fall Webinar Series - Mr. Daniel Murray
 

More from Neeraj Mehra, CFA

Eli Lilly and Company, Inc. Case Analysis
Eli Lilly and Company, Inc. Case AnalysisEli Lilly and Company, Inc. Case Analysis
Eli Lilly and Company, Inc. Case Analysis
Neeraj Mehra, CFA
 
AJC Case Analysis
AJC Case AnalysisAJC Case Analysis
AJC Case Analysis
Neeraj Mehra, CFA
 
Airbus a3xx developing the worlds largest commercial jet Case Analysis
Airbus a3xx developing the worlds largest commercial jet Case AnalysisAirbus a3xx developing the worlds largest commercial jet Case Analysis
Airbus a3xx developing the worlds largest commercial jet Case Analysis
Neeraj Mehra, CFA
 
Kingfisher acquisition of air deccan
Kingfisher acquisition of air deccanKingfisher acquisition of air deccan
Kingfisher acquisition of air deccan
Neeraj Mehra, CFA
 
Assignment land market india
Assignment land market indiaAssignment land market india
Assignment land market india
Neeraj Mehra, CFA
 
Housing Sector In India
Housing Sector In IndiaHousing Sector In India
Housing Sector In India
Neeraj Mehra, CFA
 

More from Neeraj Mehra, CFA (6)

Eli Lilly and Company, Inc. Case Analysis
Eli Lilly and Company, Inc. Case AnalysisEli Lilly and Company, Inc. Case Analysis
Eli Lilly and Company, Inc. Case Analysis
 
AJC Case Analysis
AJC Case AnalysisAJC Case Analysis
AJC Case Analysis
 
Airbus a3xx developing the worlds largest commercial jet Case Analysis
Airbus a3xx developing the worlds largest commercial jet Case AnalysisAirbus a3xx developing the worlds largest commercial jet Case Analysis
Airbus a3xx developing the worlds largest commercial jet Case Analysis
 
Kingfisher acquisition of air deccan
Kingfisher acquisition of air deccanKingfisher acquisition of air deccan
Kingfisher acquisition of air deccan
 
Assignment land market india
Assignment land market indiaAssignment land market india
Assignment land market india
 
Housing Sector In India
Housing Sector In IndiaHousing Sector In India
Housing Sector In India
 

Recently uploaded

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
daothibichhang1
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Lviv Startup Club
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
narasimhamurthyh4
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 

Recently uploaded (20)

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 

Road ahead for integrated projects: Yamuna Expressway

  • 1. Road Ahead for Integrated Projects: Financial Analysis of Yamuna Expressway By Neeraj Mehra and Shaman Singh
  • 2. Objectives • Understand the phases of the project • Identify risks • Financial calculations with own assumptions • Analyze the results • Suggestions
  • 3. Past to Present 1997 • Conceptualized by Ms. Mayawati 2001 • Bidding Invited 2002 • Fresh Bids: Six Bidders 2003 • Concession Agreement between YEA and JAL • Mayawati stepped down- Corruption Allegations • Project Halted 2006 • Narayan Committee submitted report: In favor of grant of the project
  • 4. Past to Present (Contd.) 2007 • Mayawati Comes Back to Power • JIL Incorporated • Project Construction Begins 2008 • Land Acquisition Issues- Mathura 2009 • Urgency Clause • Extension of Construction Period 2010 • Land Acquisition Issues- Tappal 2012 • State Elections: Mayawati Lost; SP comes back in power • Questions raised by new CM on the project • Taj International Airport Project scrapped • Ready for operation- No clarity on toll rates
  • 5. Project Details Length 165.537 Km Right of Way 100m Number of Lane 6 Lanes extendable to 8 lanes Type of Pavement Rigid (Concrete) Interchange/ Main Toll Plaza 6 / 5 Vehicular Underpasses / Minor Bridges 70 / 41 Cart Track Underpasses / Crossing 76 Culverts 183
  • 6.
  • 8. Traffic Study • Origin Destination Survey • Traffic Growth Rate Estimation: Log e (P) = Ao + Ai Log e(EI) Dependent variable : Number of registered vehicles Independent variable: Net State Domestic Product (NSDP) • Traffic Growth Rate = Growth Rate of NSDP * Elasticity • New Expressway Toll Rate Rules: Feb 2010
  • 9. Risks • Land Acquisition • Environmental • Construction • Operating • Demand Supply/Market • Approvals • Regulatory
  • 10. Social Costs and Benefits Social Costs • Construction • Maintenance • Land • Business on Original Route Social Benefits •Fuel Savings •Reduction in Pollution •Time Savings •Reduced Accidents •Economic Development •Tourism Boost
  • 11. Financial Modeling Main Assumptions Risk Free Interest Rate: 6.47% Tax Rate: 33.99% Cost of Debt: 12.50% Target D/V ratio: 0.6 Target E/V ratio: 0.4 Area per township (Acres): 1235 % of Total Area needed for utilities (Roads, Reserved, etc): 15% Residential: 60% Commercial: 20% Institutional: 20% Total Development Time (years): 15
  • 12. Financial Modeling Main Assumptions OLD Toll Growth Rate Assumption Increment per 3 years: 12% Toll Rate (Base)(Rs/Km) Car 1.47 LCV 2.29 Bus 4.35 2A 3.17 3A 7.52 MAV 10.02 NEW (Proposed) WPI Annual Proportion Increase: 6.30% Escalation (Annual): 2.52% Toll Rate (Base)(Rs/Km) Car 0.8 LCV 1.3 Bus 2.75 2A 4.3 3A 4.3 MAV 5.25
  • 13. Calculations Cost of Equity Risk Free Interest Rate 6.47% Beta 1.217 Market Return 15.09% Expected Return (Equity) 16.961% Target D/V ratio 0.6 Target E/V ratio 0.4 WACC Calculation Weight of Debt 0.6 Weight of Equity 0.4 Cost of Debt 12.50% Cost of Equity 16.96% Tax Rate 33.99% WACC 11.74%
  • 14. NPV IRR Calculations: Expressway and Real Estate Expressway Valuation - Old Rule NPV 255.75 NPV Equity -4638.44 Project IRR 12.33% Equity IRR 5.41% Expressway Valuation - New Rule NPV -1733.43 NPV Equity -5558.25 Project IRR 6.32% Equity IRR N/A Real Estate Valuation Total NPV 14307.69 NPV Equity 7144.12 IRR 52.20% Equity IRR 48.10%
  • 15. NPV IRR Calculations: Project Project Valuation - New Rule NPV 12339.92 NPV (Equity) 3359.88 Project IRR 34.74% Equity IRR 26.49% Project Valuation - Old Rule NPV 14557.74 NPV (Equity) 4206.15 Project IRR 35.77% Equity IRR 27.80%
  • 16. Scenario Analysis NPV Project (New) vs. Traffic
  • 17. Scenario Analysis (Contd.) NPV Equity (Old) vs. Traffic
  • 18. Scenario Analysis (Contd.) NPV Equity (New) vs. Real Estate Price Level
  • 19. Scenario Analysis (Contd.) Real Estate NPV vs. Real Estate Price Level
  • 20. Sensitivity Analysis Independent Variables • For Interest rates: Historical Bank PLR in India has standard deviation of 1.28% • For Property Prices: Historical Standard Deviation of Property Prices in Noida is 18.33% • For Traffic: 70% as downside and 110% as upside Dependent Variables 2 cases: Old Tariff Scenario and Revised (Proposed) Tariff Scenario • NPV • NPV-Equity • IRR • IRR-Equity • Number of Samples: 25,000
  • 21. Percentiles Equity IRR- new NPV (Equity)- new NPV- new Project IRR- new Equity IRR- old NPV (Equity)- old NPV-old Project IRR- old 0% 4.59% -4255.1 -76.17 11.97% 8.96% -3515.88 1702.9 15.02% 10% 20.28% 1119.6 8520.76 28.76% 21.94% 1898.33 10474.2 1 29.95% 20% 22.35% 1843.06 9723.98 30.80% 23.84% 2629.33 11711.7 9 31.90% 30% 23.88% 2388.19 10617.1 9 32.27% 25.24% 3170.26 12642.9 1 33.31% 40% 25.15% 2844.83 11423.5 33.46% 26.45% 3631.87 13458.8 2 34.47% 50% 26.29% 3264.5 12135.9 5 34.57% 27.53% 4053.85 14214.7 8 35.53% 60% 27.46% 3701.98 12864.8 1 35.70% 28.64% 4492.12 14958.2 1 36.63% 70% 28.67% 4153.51 13671.5 2 36.86% 29.80% 4945.66 15779.3 8 37.76% 80% 30.09% 4692.65 14603.1 3 38.24% 31.16% 5485.3 16773.3 2 39.10% 90% 31.98% 5418.73 15928.1 1 40.05% 32.98% 6213.4 18137.3 7 40.87% 100% 43.59% 10021.71 25915.3 8 50.26% 44.36% 10879.36 28820.9 2 50.87% Sensitivity Data Assumptions Equity IRR- new NPV (Equity)- new NPV- new Project IRR- new Equity IRR- old NPV (Equity)- old NPV-old Project IRR- old Cost of Debt -0.21 -0.19 -0.34 -0.07 -0.21 -0.19 -0.4 -0.07 Real Estate 0.97 0.97 0.92 1 0.97 0.97 0.89 0.99 Traffic 0.03 0.05 0.06 0.03 0.06 0.09 0.12 0.05
  • 22. Observations of Sensitivity Analysis • Very low probability of the negative Project NPV • Under Old Tariff, Project NPV is always positive. • Negative Equity NPV is possible in both the case, Old and Proposed New Tariff with very low probability. • In Terms of sensitivity: Real Estate>Cost of Debt>Traffic
  • 23. Conclusion • Project conceived in 1997 (9th 5-year plan period) got completed in 2012 (12th 5-year plan period) • Massive increase in the estimated cost of the project • Returns from real estate development significantly outweigh the deficit from the expressway
  • 24. Food for thought!! • Separate bids for real estate and expressway? • Are roads viable without corresponding real estate? • Should toll be waived in lieu of high real estate returns? • Should government take back portion of land given for townships?