This document summarizes rigging requirements under Washington state regulations WAC 296-155 Parts L and F-1. Part L covers rigging for cranes, requiring qualified riggers with documentation when workers are in the fall zone. Part F-1 covers rigging for material handling without cranes, requiring rigging be done by or under the supervision of a qualified rigger. Both parts require rigging equipment inspections by a qualified person and removal of defective equipment. Forklifts configured with hoists may fall under some crane requirements depending on their configuration and use.