SlideShare a Scribd company logo
Lifting EquipmentsLifting Equipments
and Procedureand Procedure
15 January 2011.
Compiled by
Safety Trainees
PECL
2
2. Factories Act-Section 282. Factories Act-Section 28
(1):Hoists and Lifts(1):Hoists and Lifts
(a) In a factory hoists and lifts
should be of :
(i)-good mechanical construction
- sound material
- adequate strength
© SWL to be distinguishly marked and no load
greater than this be lifted or carried.
Sec 29. LIFTING MACHINES, CHAINS,
ROPES AND LIFTING TACKLES
3
4
The Factories Act, 1948
Sec:2(ca): Competent Person
Means:
A person or an institution recognised as such by
CIF for carrying out tests, examination and
inspections required to be done in a factory under
provisions of this Act regarding:
(i)qualifications and experience of person and
facilities available at his disposal;
(ii) qualifications and experience of persons
employed in such institution and facilities a/v
therein, with regard to conduct of such tests,
examinations and inspections, and more than
one person or institution can be recognised
as a competent person in relation to a factory.
5
The Factories Act,
1948
Sec:2(j): Machinery
Includes prime movers,
transmission machinery and
other appliances whereby power
is generated, transformed,
transmitted or applied.
Lifting Equipments:
 Hydra’s
 CRANES: limit switches
 Fork lifts
 Magnetic lift crane
 Mobile cranes: wheel ,crawler
 EOT
 Gantry
 Chain pully:spur gear,worm wheel
 Winch machine 6
Lifting tackle:
 Slings
 Ropes
 Shackles
 Swivel
 Rings
 Couplers
 Sockets, Eyebolts.
 Frames & spreaders
 Plate lifting clamps 7
Overview
 Terms & definitionsTerms & definitions
 Planning the liftPlanning the lift
 The liftThe lift
 Landing the loadLanding the load
 Do’s & Don’tsDo’s & Don’ts
 Case studyCase study
 Slinging methodsSlinging methods
 Safe slinging practiceSafe slinging practice
8
Terms & Definitions
 Competent person:
 A person who has acquired, through a
combination of qualifications, training or
experience, the knowledge and skill to
perform the task required.
 Grommet:
 Endless wire rope sling.
 MBL:
 Minimum breaking load of the lifting tackle.
 SWL:
 Safe working load.
9
Definitions
 Tag line:
 A rope of suitable strength, construction
and length attached with an appropriate
recognised bend or hitch to the load,
used to control the load during lifting or
positioning.
 Test certificate:
 A certificate issued by an authorized
person
10
11
SIMPLE CHAIN PULLEY
BLOCK
Planning the liftPlanning the lift
Planning the lifting operation is essential
Planning the lifting operation is essential
to ensure that the lift is carried out
to ensure that the lift is carried out
safely and efficiently
safely and efficiently
12
Planning the liftPlanning the lift
Absence of planning leads to
Short cuts, using unsafe procedure, equipment
&
It may cause
An ACCIDENT OR DELAY
13
Planning the liftPlanning the lift
 The following points must be
considered during planning:
 Where the load is to be picked up from
 Where the load is to be placed
 What areas to be passed over
 Any obstructions in the way
 How the load is to be slung
 How the slings are to be removed and
access to them
14
Planning the liftPlanning the lift
 For complex lifts, following points may have
to be considered:
 Special lifting accessories such as spreader
beams to ensure that the load is safely lifted and
without damage to the product (large
machineries, generators, etc.)
 Special connectors to connect special built in
connecting points. The operations may involve:
 Turning loads over or standing them upright
 Using more than one crane to lift a load.
15
The liftThe lift
 Are the slings undamaged and properly attached
to the load?
 Is the crane hoist rope vertical?
 Is the load free i.e not attached to any thing
else?
 Are the legs of multi legged sling equally
loaded?
 Are all spare all spare legs of the sling are
hooked up to the master link on the lifting hook?
After slinging but before lifting, the followingAfter slinging but before lifting, the following
must be consideredmust be considered
16
The liftThe lift
 Are all personnel clear of the load?
 Is the landing site prepared to take the
load?
 If required, is hand/tag lines attached to
the load?
After slinging but before lifting, the followingAfter slinging but before lifting, the following
must be consideredmust be considered
17
Check Before LiftingCheck Before Lifting
 Now lift the load a short distance above the
ground and check that:
 The load is balanced and stable.
 The legs of the slings are at correct angles.
 Any packing pieces used, are in place and
sound.
 The load itself is not stressed, especially when
lifting packing cases, timber etc, which can fail
under the loads applied due to lifting.
18
Landing the loadLanding the load
 Before landing the load check that:
 The landing area will take the weight of the load.
 There is sufficient space for the load.
 There are strips of timber or similar on which to
land the load such that the slings can be easily
removed by hand.
 The load should be landed gently to
ensure that it is not damaged and
that the crane does not receive any
shock loading.
19
Do’s & Don’tsDo’s & Don’ts
 Ensure that only
authorized
slingers/signalers attach
or detach loads, or signal
the crane operator.
 Discuss operations with
the crane operator
(special operations).
 Ensure that the capacity
of the crane is sufficient.
 Seek expert advice when
using eye bolts, plate
clamp etc.
 Use tag line always
 Wrap tag line around
hand or body.
 Leave a suspended load
unattended.
 Pass loads over people.
 Ride or climb on
suspended loads.
 Stand or walk beneath
the loads.
 Use pipes to support
for landing the load
Always Never
20
21
SWL OF SLINGS
SAFE
WORKING
LOAD OF
SLING
INCLUDED
ANGLE θ
SAFE
WORKING
LOAD
WITH ANGLEθ
G = 10 TON at
90
90 10 TON
160 3.45 TON
140 6.80 TON
120 7.07 TON
60 12.25 TON
P = G / Cos 45
0 14.14 TON
SWL at angle
=P X Cosθ /2
SLING ANGLES AND SAFE WORKING
LOADS
90˚ angle at hook
corresponds
to 45˚ sling angle
22
SLING ANGLES AND SAFE WORKING LOADS
.
23
When L = S
Sling angle is 60˚
SLING ANGLES AND SAFE WORKING LOADS
Calculating SWL
H is the vertical
distance from the
saddle
of the hook to the top of
the load.
L is the distance
measured along the
sling from the saddle of
the hook to the
top of the load.
The ratio H/L will be
same as the ratio h/l
24
SLING ANGLES AND SAFE WORKING LOADS
Determining
capacity of 2-Leg
Bridle
Hitch
SWL
= SWL (of single
vertical hitch) X H/L
X 2
25
SLING ANGLES AND SAFE WORKING LOADS
When sling legs
are not of equal
length
use smallest H/L
ratio.
26
SLING ANGLES AND SAFE WORKING LOADS
Determining
capacity of 3-Leg
Bridle
Hitch
SWL
= SWL (of single
vertical hitch) X H/L
X 3
When sling legs are
not of equal length
use smallest H/L
ratio.
27
SLING ANGLES AND SAFE WORKING LOADS
Determining capacity
of 4-Leg Bridle
Hitch
Load may be carried by
only 3 legs while
the fourth merely
balances it. Therefore
the recommended SWL
is:
SWL
= SWL (of single
vertical hitch) X H/L X 3
When sling legs are not
of equal length
use smallest H/L ratio.
28
SLING ANGLES AND SAFE WORKING LOADS
Determining capacity
of Single Basket
Hitch
For Vertical legs (fig A):
SWL = SWL (of single
vertical hitch) X 2
For inclined legs (fig B):
SWL
= SWL (of single vertical
hitch) X H/L X 2
29
SLING ANGLES AND SAFE WORKING LOADS
Determining capacity
of Double Basket
Hitch with inclined
angles
SWL
= SWL (of single
vertical hitch) X H/L X 4
30
SLING ANGLES AND SAFE WORKING LOADS
Determining
capacity of Double
Wrap
Basket Hitch
Depending on the
configuration, SWLs
are the same for the
Single Basket Hitch
or the Double Basket
Hitch.
31
SLING ANGLES AND SAFE WORKING LOADS
Sling angles less than
45˚ (formed by the
choker) are not
recommended. If
they
must be used the
formula is:
SWL
= SWL (of single
vertical hitch) X H/L
X
A/B X 2
32
SLING ANGLES AND SAFE WORKING LOADS
Determining
capacity of Double
Wrap
Choker Hitch
Depending on the
configuration, SWLs
are the same for the
Single Choker Hitch
or the Double Choker
Hitch.
33
Endless or Grommet Sling in
Vertical Hitch
34
Endless Sling choker Hitch
Configuration
SLING ANGLES AND SAFE WORKING LOADS
Endless Sling in
Double Basket
Hitch
Configuration
35
Endless or Grommet Slings Standard Eye-to Eye slings
36
SLING ANGLES AND SAFE WORKING LOADS
37
Effect of sling angle on
Webbing
38
Twisted Eye Slings
39
What can happen, if, adequate
safety is not observed?
40
A case study 1
 The incident:
 In June 2003, a tragic incident
occurred at one of the oil and gas
development site in Algeria, resulting
in one fatality and two injuries.
 The incident occurred during the assembly
of an onshore drilling rig. A large section
of the rig was being lifted when a lifting
chain failed.
41
A case study 1
Actual measurement to
hook position was 9.43 m.
7.5 m to centre of crane
slew ring correct jib
head/hook position
Probably out of
alignment in this
direction (this would
transfer entire load to
one sling)
Chain being pulled into
angle would increase
tendency to jam and
prevent chain slipping
round to equalize
loading
Sketch of out-of-alignment load path
during lift, resulting in lifting chain
failure 42
A case study 1
 The causes, as established by an investing
team:
 Use of an underrated chain sling.
 Incorrect slinging and lifting techniques.
 The crane hook was positioned off-centre,
resulting in the load path being out of
alignment.
 Combined with a hinged load, this prevented the
sling from equalizing on all chain legs when
raised.
 Consequently, the entire load of 23.1 tonnes
was placed on one chain leg that had a breaking
load of 18.9 tonnes resulting in failure of chain
43
Case Study 2
 Job : erection of gantry crane beams
 Description of Accident:
 Two beams of 11.5m X 1.5m X 0.75m
weighing about 6 tones were lying on
concrete sleepers.
 Out of two beams one beam was lying on
sleeper in horizontal position.
 The other beam was in vertical position and
was to be positioned to make alignment with
the first beam.
44
45
Case Study 2
 Job : erection of gantry crane beams
 Description of Accident:
 Slings were placed around the vertical beam.
 Mr. XYZ went up the beam to adjust the sling.
 He adjusted the sling and stood in between the
two beams.
 In the meantime someone gave signal to lift the
beam.
 Crane operator lifted the beam by about 4 mm
up its position.
46
Case Study 2
 Job : erection of gantry crane beams
 Description of Accident:
 During that operation beam swayed
towards the first beam and Mr. XYZ was
caught between the two beams.
 On hearing the scream, crane driver
placed the beam back on its original
position.
47
Case Study 2
 Job : erection of gantry crane beams
 Description of Accident:
 Mr. XYZ got up and tried to get out of
two beams but he stumbled and fell
down on sleepers, got injury near left
eyebrow.
 He was taken to hospital, but was
declared as dead.
48
Case Study 2
49
Case Study 2 - Investigation
1. No hand rope (tag line) was used to avoid
swinging of the job.
2 Both the lifting rope used are having N no. of
kinks on it., naturally these kinks will have
tendency to swing the job.
3. No lifting hole or lugs were made to the beam
to rotate it.
4. Crane operator does not know who gave
him signal for lifting the job.
50
Learning from the incidents
Apart from lifting machine, it
is also necessary to take care
of lifting tackles and lifting
procedure
51
Safe Slinging Practice
52
Safe Slinging Practice
C.G.
Crane hook must
be on the CG
53
Safe Slinging Practice
This load is not stable. The hook is over
the CG, but the CG is above the lifting
hook.
This load is top heavy, and could
overturn while being lifted
54
Safe Slinging Practice
This load is stable
The hook is right over
the CG.
55
Safe Slinging Practice
The hook is not over
the centre of gravity
The load will shift until the
CG is under the hook.
This will make landing the load
very difficult, and could cause
major problems in crainage
Unstable
56
Safe Slinging Practice
1000
kg
1000
kg
1000
kg
1000
kg
45
90 90
45 30 30 1515
707
Kg
500
Kg
500
Kg
707
Kg
1000
Kg
1000
Kg
1932
Kg
1932
Kg
57
How to identify the correct
angle?
58
45
H
L
At 45 degrees, H = L
As the angle becomes
less than 45 degrees, H
will be less than L
Therefore ensure that
H is always = or > L
Safe Slinging Practice
Can carry
88% of
rated load
Can carry
100% of
rated load
Can carry
80% of
rated load
Can carry
70% of
rated load
Can carry
40% of
rated load
Balanced
load
¼” off
centre
1/2” off
centre
3/4” off
centre
Point
loading
Safety latches
omitted 59
Safe Slinging Practice
Softeners, padding or use of blocking..
60
Safe Slinging Practice
Tag line should be attached to the load swinging and to help it
landing in the right place.
61
Unsafe Slinging
Lift and lower the load
smoothly, do not jerk
62
Unsafe Slinging
63
Unsafe Slinging
64
Unsafe Slinging
65
Is it right method
to extend a chain
sling?
Unsafe Slinging
66
Sling storage
67
Hand SignalsHand Signals
 When should the crane operator
follow hand signals?
 A crane operator should always move
loads according to the established code
of signals, and use a signaler.
 Hand signals are preferred and
commonly used.
68
Hand SignalsHand Signals
 Who can give the hand signals?
 a person qualified to give crane signals
to the operator,
 there should be only one designated
signaler at a time,
 a crane operator should move loads only
on signals from one signaler,
69
Responsibility of the signaler
 The signaler must:
 be in clear view of the crane operator,
 have a clear view of the load and the
equipment,
 keep persons outside the crane's
operating area,
 never direct a load over a person.
70
Standard Hand Signals For
Controlling Overhead Cranes
With forearm
vertical, forefinger
pointing up, move
hand in small
horizontal circle
HOIST
71
Standard Hand Signals For
Controlling Overhead Cranes
With arm extended
downward,
forefinger pointing
down, move hand in
small horizontal
circle.
LOWER
72
Standard Hand Signals For
Controlling Overhead Cranes
Arm extended
forward, hand open
and slightly raised,
make pushing
motion in direction
of travel.
BRIDGE TRAVEL
73
Standard Hand Signals For
Controlling Overhead Cranes
TROLLEY TRAVEL.
Palm up, fingers
closed, thumb
pointing in direction
of motion, jerk hand
horizontally.
TROLLEY TRAVEL
74
Standard Hand Signals For
Controlling Overhead Cranes
Arm extended,
palm down, hold
position rigidly.
STOP
75
Standard Hand Signals For
Controlling Overhead Cranes
Use one hand to give
any motion signal
and place other
hand motionless in
front of hand giving
the motion signal.
(Hoist Slowly shown
as an example.)
MOVE SLOWLY
76
Standard Hand Signals For
Controlling Overhead Cranes
Crane operator
spreads both
hands apart –
palms up.
MAGNET DISCONNECTED
77
Finally, we must remember….
78
Objective Of Good SlingingObjective Of Good Slinging
 The sling and its method of use should
be suitable for the load.
 The method of attachment of the sling
to the load and the sling to the lifting
appliance should be secure.
 No part of the sling should be
overloaded either by the weight of the
load or by the method of slinging.
79
Objective Of Good SlingingObjective Of Good Slinging
 The slinging method should ensure
that the load is secure and that the
load will not fall from the sling.
 The load should be balanced and stable
and should not violently change its
attitude when lifted.
 The load must not be damaged by, or
cause damage to, the sling.
80
If we remember & achieve
this Objective…..
The probability of
accident will be
minimum
Sling storage
82
83

More Related Content

What's hot

Crane Safety & Rigging
Crane Safety & RiggingCrane Safety & Rigging
Crane Safety & Riggingfcarlson
 
Rigger signalman handbook
Rigger  signalman handbookRigger  signalman handbook
Rigger signalman handbook
nhivan
 
Lifting Operation.ppt
Lifting Operation.pptLifting Operation.ppt
Lifting Operation.ppt
ballabammoune1
 
presentation on mobile cranes
presentation on mobile cranespresentation on mobile cranes
presentation on mobile cranes
vipin balan
 
Below the hook
Below the hook Below the hook
Below the hook
BILL Bill Brown
 
Rigging Safety Training by ATP
Rigging Safety Training by ATPRigging Safety Training by ATP
Rigging Safety Training by ATP
Atlantic Training, LLC.
 
Rigging & slinging
Rigging & slingingRigging & slinging
Rigging & slinging
Faizal Muhaini
 
Lifting tools
Lifting toolsLifting tools
Lifting tools
List Supplier
 
Rigging & Slinging Training Course.pdf
Rigging & Slinging Training Course.pdfRigging & Slinging Training Course.pdf
Rigging & Slinging Training Course.pdf
ssuser92d367
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training PresentationFAIZ FAREED
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
VasudevaRajuDantulur1
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hight
Gaurav Singh Rajput
 
Toolbox Talk-Working at height
Toolbox Talk-Working at height Toolbox Talk-Working at height
Toolbox Talk-Working at height
Construction Technology
 
Rigging Presentation by Pipeweldrig
Rigging Presentation by PipeweldrigRigging Presentation by Pipeweldrig
Rigging Presentation by Pipeweldrig
Atlantic Training, LLC.
 
Lifting practices for engineers
Lifting practices for engineersLifting practices for engineers
Lifting practices for engineers
Salman Islam Shehzad
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awareness
edale07
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet
Phạm Thành
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
IrfanAwan25
 

What's hot (20)

Crane Safety & Rigging
Crane Safety & RiggingCrane Safety & Rigging
Crane Safety & Rigging
 
Basic Rigging
Basic RiggingBasic Rigging
Basic Rigging
 
Rigger signalman handbook
Rigger  signalman handbookRigger  signalman handbook
Rigger signalman handbook
 
Lifting Operation.ppt
Lifting Operation.pptLifting Operation.ppt
Lifting Operation.ppt
 
presentation on mobile cranes
presentation on mobile cranespresentation on mobile cranes
presentation on mobile cranes
 
Below the hook
Below the hook Below the hook
Below the hook
 
Rigging Safety Training by ATP
Rigging Safety Training by ATPRigging Safety Training by ATP
Rigging Safety Training by ATP
 
Rigging & slinging
Rigging & slingingRigging & slinging
Rigging & slinging
 
Lifting tools
Lifting toolsLifting tools
Lifting tools
 
Rigging & Slinging Training Course.pdf
Rigging & Slinging Training Course.pdfRigging & Slinging Training Course.pdf
Rigging & Slinging Training Course.pdf
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
 
Wrs rigging practice
Wrs rigging practiceWrs rigging practice
Wrs rigging practice
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hight
 
Toolbox Talk-Working at height
Toolbox Talk-Working at height Toolbox Talk-Working at height
Toolbox Talk-Working at height
 
Rigging Presentation by Pipeweldrig
Rigging Presentation by PipeweldrigRigging Presentation by Pipeweldrig
Rigging Presentation by Pipeweldrig
 
Lifting practices for engineers
Lifting practices for engineersLifting practices for engineers
Lifting practices for engineers
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awareness
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 

Similar to Liftingproedure

Industrial safety of lifting & procedure
Industrial safety of lifting & procedureIndustrial safety of lifting & procedure
Industrial safety of lifting & procedurePavan Noel
 
Lifting & procedure
Lifting & procedureLifting & procedure
Lifting & procedure
Pavan Noel
 
safe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUESsafe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUES
EMERSON EDUARDO RODRIGUES
 
Quality Control Operator Training &.pptx
Quality Control Operator Training &.pptxQuality Control Operator Training &.pptx
Quality Control Operator Training &.pptx
AizazFarhat3
 
Truck crane training bill brown
Truck crane training bill brownTruck crane training bill brown
Truck crane training bill brown
Bill Brown
 
Crane Rigging Safety by HF & C
Crane Rigging Safety by HF & CCrane Rigging Safety by HF & C
Crane Rigging Safety by HF & C
Atlantic Training, LLC.
 
Cranes 2.ppt
Cranes 2.pptCranes 2.ppt
Cranes 2.ppt
GulfamShahzad11
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
AhmedAliKhan38
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
NeerajTiwari965955
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
GeneralCommunication1
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile CranesMihajlo Stupar
 
CDD2updated-Dimensions-allproducts.pdf
CDD2updated-Dimensions-allproducts.pdfCDD2updated-Dimensions-allproducts.pdf
CDD2updated-Dimensions-allproducts.pdf
Aravind560887
 
Chain Block Safety Operations and Parts Manual.pdf
Chain Block Safety Operations and Parts Manual.pdfChain Block Safety Operations and Parts Manual.pdf
Chain Block Safety Operations and Parts Manual.pdf
PABITRAPANDA15
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging Safety
NickHawkins19
 
Cranes and Derricks-2.PPT
Cranes and Derricks-2.PPTCranes and Derricks-2.PPT
Cranes and Derricks-2.PPT
HesamEsfandi
 
Failure analysis mtn526
Failure analysis mtn526Failure analysis mtn526
Failure analysis mtn526
Vaibhav 8791414391
 
MATERIAL.ppt
MATERIAL.pptMATERIAL.ppt
MATERIAL.ppt
dennisjuntak
 
Overhead Crane Operators by
Overhead  Crane Operators byOverhead  Crane Operators by
Overhead Crane Operators by
Atlantic Training, LLC.
 

Similar to Liftingproedure (20)

Industrial safety of lifting & procedure
Industrial safety of lifting & procedureIndustrial safety of lifting & procedure
Industrial safety of lifting & procedure
 
Lifting & procedure
Lifting & procedureLifting & procedure
Lifting & procedure
 
safe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUESsafe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUES
 
Quality Control Operator Training &.pptx
Quality Control Operator Training &.pptxQuality Control Operator Training &.pptx
Quality Control Operator Training &.pptx
 
Truck crane training bill brown
Truck crane training bill brownTruck crane training bill brown
Truck crane training bill brown
 
Crane Rigging Safety by HF & C
Crane Rigging Safety by HF & CCrane Rigging Safety by HF & C
Crane Rigging Safety by HF & C
 
Cranes 2.ppt
Cranes 2.pptCranes 2.ppt
Cranes 2.ppt
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
 
Loler
LolerLoler
Loler
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile Cranes
 
CDD2updated-Dimensions-allproducts.pdf
CDD2updated-Dimensions-allproducts.pdfCDD2updated-Dimensions-allproducts.pdf
CDD2updated-Dimensions-allproducts.pdf
 
Chain Block Safety Operations and Parts Manual.pdf
Chain Block Safety Operations and Parts Manual.pdfChain Block Safety Operations and Parts Manual.pdf
Chain Block Safety Operations and Parts Manual.pdf
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging Safety
 
Cranes and Derricks-2.PPT
Cranes and Derricks-2.PPTCranes and Derricks-2.PPT
Cranes and Derricks-2.PPT
 
Failure analysis mtn526
Failure analysis mtn526Failure analysis mtn526
Failure analysis mtn526
 
MATERIAL.ppt
MATERIAL.pptMATERIAL.ppt
MATERIAL.ppt
 
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
 
Overhead Crane Operators by
Overhead  Crane Operators byOverhead  Crane Operators by
Overhead Crane Operators by
 

Recently uploaded

Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 

Recently uploaded (20)

Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 

Liftingproedure

  • 1. Lifting EquipmentsLifting Equipments and Procedureand Procedure 15 January 2011. Compiled by Safety Trainees PECL
  • 2. 2 2. Factories Act-Section 282. Factories Act-Section 28 (1):Hoists and Lifts(1):Hoists and Lifts (a) In a factory hoists and lifts should be of : (i)-good mechanical construction - sound material - adequate strength © SWL to be distinguishly marked and no load greater than this be lifted or carried.
  • 3. Sec 29. LIFTING MACHINES, CHAINS, ROPES AND LIFTING TACKLES 3
  • 4. 4 The Factories Act, 1948 Sec:2(ca): Competent Person Means: A person or an institution recognised as such by CIF for carrying out tests, examination and inspections required to be done in a factory under provisions of this Act regarding: (i)qualifications and experience of person and facilities available at his disposal; (ii) qualifications and experience of persons employed in such institution and facilities a/v therein, with regard to conduct of such tests, examinations and inspections, and more than one person or institution can be recognised as a competent person in relation to a factory.
  • 5. 5 The Factories Act, 1948 Sec:2(j): Machinery Includes prime movers, transmission machinery and other appliances whereby power is generated, transformed, transmitted or applied.
  • 6. Lifting Equipments:  Hydra’s  CRANES: limit switches  Fork lifts  Magnetic lift crane  Mobile cranes: wheel ,crawler  EOT  Gantry  Chain pully:spur gear,worm wheel  Winch machine 6
  • 7. Lifting tackle:  Slings  Ropes  Shackles  Swivel  Rings  Couplers  Sockets, Eyebolts.  Frames & spreaders  Plate lifting clamps 7
  • 8. Overview  Terms & definitionsTerms & definitions  Planning the liftPlanning the lift  The liftThe lift  Landing the loadLanding the load  Do’s & Don’tsDo’s & Don’ts  Case studyCase study  Slinging methodsSlinging methods  Safe slinging practiceSafe slinging practice 8
  • 9. Terms & Definitions  Competent person:  A person who has acquired, through a combination of qualifications, training or experience, the knowledge and skill to perform the task required.  Grommet:  Endless wire rope sling.  MBL:  Minimum breaking load of the lifting tackle.  SWL:  Safe working load. 9
  • 10. Definitions  Tag line:  A rope of suitable strength, construction and length attached with an appropriate recognised bend or hitch to the load, used to control the load during lifting or positioning.  Test certificate:  A certificate issued by an authorized person 10
  • 12. Planning the liftPlanning the lift Planning the lifting operation is essential Planning the lifting operation is essential to ensure that the lift is carried out to ensure that the lift is carried out safely and efficiently safely and efficiently 12
  • 13. Planning the liftPlanning the lift Absence of planning leads to Short cuts, using unsafe procedure, equipment & It may cause An ACCIDENT OR DELAY 13
  • 14. Planning the liftPlanning the lift  The following points must be considered during planning:  Where the load is to be picked up from  Where the load is to be placed  What areas to be passed over  Any obstructions in the way  How the load is to be slung  How the slings are to be removed and access to them 14
  • 15. Planning the liftPlanning the lift  For complex lifts, following points may have to be considered:  Special lifting accessories such as spreader beams to ensure that the load is safely lifted and without damage to the product (large machineries, generators, etc.)  Special connectors to connect special built in connecting points. The operations may involve:  Turning loads over or standing them upright  Using more than one crane to lift a load. 15
  • 16. The liftThe lift  Are the slings undamaged and properly attached to the load?  Is the crane hoist rope vertical?  Is the load free i.e not attached to any thing else?  Are the legs of multi legged sling equally loaded?  Are all spare all spare legs of the sling are hooked up to the master link on the lifting hook? After slinging but before lifting, the followingAfter slinging but before lifting, the following must be consideredmust be considered 16
  • 17. The liftThe lift  Are all personnel clear of the load?  Is the landing site prepared to take the load?  If required, is hand/tag lines attached to the load? After slinging but before lifting, the followingAfter slinging but before lifting, the following must be consideredmust be considered 17
  • 18. Check Before LiftingCheck Before Lifting  Now lift the load a short distance above the ground and check that:  The load is balanced and stable.  The legs of the slings are at correct angles.  Any packing pieces used, are in place and sound.  The load itself is not stressed, especially when lifting packing cases, timber etc, which can fail under the loads applied due to lifting. 18
  • 19. Landing the loadLanding the load  Before landing the load check that:  The landing area will take the weight of the load.  There is sufficient space for the load.  There are strips of timber or similar on which to land the load such that the slings can be easily removed by hand.  The load should be landed gently to ensure that it is not damaged and that the crane does not receive any shock loading. 19
  • 20. Do’s & Don’tsDo’s & Don’ts  Ensure that only authorized slingers/signalers attach or detach loads, or signal the crane operator.  Discuss operations with the crane operator (special operations).  Ensure that the capacity of the crane is sufficient.  Seek expert advice when using eye bolts, plate clamp etc.  Use tag line always  Wrap tag line around hand or body.  Leave a suspended load unattended.  Pass loads over people.  Ride or climb on suspended loads.  Stand or walk beneath the loads.  Use pipes to support for landing the load Always Never 20
  • 21. 21 SWL OF SLINGS SAFE WORKING LOAD OF SLING INCLUDED ANGLE θ SAFE WORKING LOAD WITH ANGLEθ G = 10 TON at 90 90 10 TON 160 3.45 TON 140 6.80 TON 120 7.07 TON 60 12.25 TON P = G / Cos 45 0 14.14 TON SWL at angle =P X Cosθ /2
  • 22. SLING ANGLES AND SAFE WORKING LOADS 90˚ angle at hook corresponds to 45˚ sling angle 22
  • 23. SLING ANGLES AND SAFE WORKING LOADS . 23 When L = S Sling angle is 60˚
  • 24. SLING ANGLES AND SAFE WORKING LOADS Calculating SWL H is the vertical distance from the saddle of the hook to the top of the load. L is the distance measured along the sling from the saddle of the hook to the top of the load. The ratio H/L will be same as the ratio h/l 24
  • 25. SLING ANGLES AND SAFE WORKING LOADS Determining capacity of 2-Leg Bridle Hitch SWL = SWL (of single vertical hitch) X H/L X 2 25
  • 26. SLING ANGLES AND SAFE WORKING LOADS When sling legs are not of equal length use smallest H/L ratio. 26
  • 27. SLING ANGLES AND SAFE WORKING LOADS Determining capacity of 3-Leg Bridle Hitch SWL = SWL (of single vertical hitch) X H/L X 3 When sling legs are not of equal length use smallest H/L ratio. 27
  • 28. SLING ANGLES AND SAFE WORKING LOADS Determining capacity of 4-Leg Bridle Hitch Load may be carried by only 3 legs while the fourth merely balances it. Therefore the recommended SWL is: SWL = SWL (of single vertical hitch) X H/L X 3 When sling legs are not of equal length use smallest H/L ratio. 28
  • 29. SLING ANGLES AND SAFE WORKING LOADS Determining capacity of Single Basket Hitch For Vertical legs (fig A): SWL = SWL (of single vertical hitch) X 2 For inclined legs (fig B): SWL = SWL (of single vertical hitch) X H/L X 2 29
  • 30. SLING ANGLES AND SAFE WORKING LOADS Determining capacity of Double Basket Hitch with inclined angles SWL = SWL (of single vertical hitch) X H/L X 4 30
  • 31. SLING ANGLES AND SAFE WORKING LOADS Determining capacity of Double Wrap Basket Hitch Depending on the configuration, SWLs are the same for the Single Basket Hitch or the Double Basket Hitch. 31
  • 32. SLING ANGLES AND SAFE WORKING LOADS Sling angles less than 45˚ (formed by the choker) are not recommended. If they must be used the formula is: SWL = SWL (of single vertical hitch) X H/L X A/B X 2 32
  • 33. SLING ANGLES AND SAFE WORKING LOADS Determining capacity of Double Wrap Choker Hitch Depending on the configuration, SWLs are the same for the Single Choker Hitch or the Double Choker Hitch. 33
  • 34. Endless or Grommet Sling in Vertical Hitch 34 Endless Sling choker Hitch Configuration
  • 35. SLING ANGLES AND SAFE WORKING LOADS Endless Sling in Double Basket Hitch Configuration 35
  • 36. Endless or Grommet Slings Standard Eye-to Eye slings 36
  • 37. SLING ANGLES AND SAFE WORKING LOADS 37
  • 38. Effect of sling angle on Webbing 38
  • 40. What can happen, if, adequate safety is not observed? 40
  • 41. A case study 1  The incident:  In June 2003, a tragic incident occurred at one of the oil and gas development site in Algeria, resulting in one fatality and two injuries.  The incident occurred during the assembly of an onshore drilling rig. A large section of the rig was being lifted when a lifting chain failed. 41
  • 42. A case study 1 Actual measurement to hook position was 9.43 m. 7.5 m to centre of crane slew ring correct jib head/hook position Probably out of alignment in this direction (this would transfer entire load to one sling) Chain being pulled into angle would increase tendency to jam and prevent chain slipping round to equalize loading Sketch of out-of-alignment load path during lift, resulting in lifting chain failure 42
  • 43. A case study 1  The causes, as established by an investing team:  Use of an underrated chain sling.  Incorrect slinging and lifting techniques.  The crane hook was positioned off-centre, resulting in the load path being out of alignment.  Combined with a hinged load, this prevented the sling from equalizing on all chain legs when raised.  Consequently, the entire load of 23.1 tonnes was placed on one chain leg that had a breaking load of 18.9 tonnes resulting in failure of chain 43
  • 44. Case Study 2  Job : erection of gantry crane beams  Description of Accident:  Two beams of 11.5m X 1.5m X 0.75m weighing about 6 tones were lying on concrete sleepers.  Out of two beams one beam was lying on sleeper in horizontal position.  The other beam was in vertical position and was to be positioned to make alignment with the first beam. 44
  • 45. 45
  • 46. Case Study 2  Job : erection of gantry crane beams  Description of Accident:  Slings were placed around the vertical beam.  Mr. XYZ went up the beam to adjust the sling.  He adjusted the sling and stood in between the two beams.  In the meantime someone gave signal to lift the beam.  Crane operator lifted the beam by about 4 mm up its position. 46
  • 47. Case Study 2  Job : erection of gantry crane beams  Description of Accident:  During that operation beam swayed towards the first beam and Mr. XYZ was caught between the two beams.  On hearing the scream, crane driver placed the beam back on its original position. 47
  • 48. Case Study 2  Job : erection of gantry crane beams  Description of Accident:  Mr. XYZ got up and tried to get out of two beams but he stumbled and fell down on sleepers, got injury near left eyebrow.  He was taken to hospital, but was declared as dead. 48
  • 50. Case Study 2 - Investigation 1. No hand rope (tag line) was used to avoid swinging of the job. 2 Both the lifting rope used are having N no. of kinks on it., naturally these kinks will have tendency to swing the job. 3. No lifting hole or lugs were made to the beam to rotate it. 4. Crane operator does not know who gave him signal for lifting the job. 50
  • 51. Learning from the incidents Apart from lifting machine, it is also necessary to take care of lifting tackles and lifting procedure 51
  • 53. Safe Slinging Practice C.G. Crane hook must be on the CG 53
  • 54. Safe Slinging Practice This load is not stable. The hook is over the CG, but the CG is above the lifting hook. This load is top heavy, and could overturn while being lifted 54
  • 55. Safe Slinging Practice This load is stable The hook is right over the CG. 55
  • 56. Safe Slinging Practice The hook is not over the centre of gravity The load will shift until the CG is under the hook. This will make landing the load very difficult, and could cause major problems in crainage Unstable 56
  • 57. Safe Slinging Practice 1000 kg 1000 kg 1000 kg 1000 kg 45 90 90 45 30 30 1515 707 Kg 500 Kg 500 Kg 707 Kg 1000 Kg 1000 Kg 1932 Kg 1932 Kg 57
  • 58. How to identify the correct angle? 58 45 H L At 45 degrees, H = L As the angle becomes less than 45 degrees, H will be less than L Therefore ensure that H is always = or > L
  • 59. Safe Slinging Practice Can carry 88% of rated load Can carry 100% of rated load Can carry 80% of rated load Can carry 70% of rated load Can carry 40% of rated load Balanced load ¼” off centre 1/2” off centre 3/4” off centre Point loading Safety latches omitted 59
  • 60. Safe Slinging Practice Softeners, padding or use of blocking.. 60
  • 61. Safe Slinging Practice Tag line should be attached to the load swinging and to help it landing in the right place. 61
  • 62. Unsafe Slinging Lift and lower the load smoothly, do not jerk 62
  • 65. Unsafe Slinging 65 Is it right method to extend a chain sling?
  • 68. Hand SignalsHand Signals  When should the crane operator follow hand signals?  A crane operator should always move loads according to the established code of signals, and use a signaler.  Hand signals are preferred and commonly used. 68
  • 69. Hand SignalsHand Signals  Who can give the hand signals?  a person qualified to give crane signals to the operator,  there should be only one designated signaler at a time,  a crane operator should move loads only on signals from one signaler, 69
  • 70. Responsibility of the signaler  The signaler must:  be in clear view of the crane operator,  have a clear view of the load and the equipment,  keep persons outside the crane's operating area,  never direct a load over a person. 70
  • 71. Standard Hand Signals For Controlling Overhead Cranes With forearm vertical, forefinger pointing up, move hand in small horizontal circle HOIST 71
  • 72. Standard Hand Signals For Controlling Overhead Cranes With arm extended downward, forefinger pointing down, move hand in small horizontal circle. LOWER 72
  • 73. Standard Hand Signals For Controlling Overhead Cranes Arm extended forward, hand open and slightly raised, make pushing motion in direction of travel. BRIDGE TRAVEL 73
  • 74. Standard Hand Signals For Controlling Overhead Cranes TROLLEY TRAVEL. Palm up, fingers closed, thumb pointing in direction of motion, jerk hand horizontally. TROLLEY TRAVEL 74
  • 75. Standard Hand Signals For Controlling Overhead Cranes Arm extended, palm down, hold position rigidly. STOP 75
  • 76. Standard Hand Signals For Controlling Overhead Cranes Use one hand to give any motion signal and place other hand motionless in front of hand giving the motion signal. (Hoist Slowly shown as an example.) MOVE SLOWLY 76
  • 77. Standard Hand Signals For Controlling Overhead Cranes Crane operator spreads both hands apart – palms up. MAGNET DISCONNECTED 77
  • 78. Finally, we must remember…. 78
  • 79. Objective Of Good SlingingObjective Of Good Slinging  The sling and its method of use should be suitable for the load.  The method of attachment of the sling to the load and the sling to the lifting appliance should be secure.  No part of the sling should be overloaded either by the weight of the load or by the method of slinging. 79
  • 80. Objective Of Good SlingingObjective Of Good Slinging  The slinging method should ensure that the load is secure and that the load will not fall from the sling.  The load should be balanced and stable and should not violently change its attitude when lifted.  The load must not be damaged by, or cause damage to, the sling. 80
  • 81. If we remember & achieve this Objective….. The probability of accident will be minimum
  • 83. 83