The document discusses scaffold safety, including types of scaffolds, erecting and inspecting scaffolds, fall protection, and do's and don'ts of working on scaffolds. It provides information on supported scaffolds, suspended scaffolds, specialty scaffolds, tube and coupler scaffolds, mobile scaffolds, and inspecting job sites. Guidelines are presented on training, inspections, fall protection requirements, erecting scaffolds properly, guardrails and planking, climbing scaffolds, moving mobile scaffolds, and tying scaffolds to structures.
8 Lifting Operations with mobile crane Risk Assessment Templates
Crane checks on arrival to site
PRIOR TO USE
Access of crane to work areas
Siting and setting up of crane
Lifting of equipment and material
(Mobile crane Operator)
Crane supervision
Crane Maintenance
(revised 06-06-2018)
Every year people are killed or seriously injured by collapses and falling materials while working in excavations. They are at risk from:
Excavations collapsing and burying or injuring people working in them;
material falling from the sides into any excavation; and
people or plant falling into excavations.
8 Lifting Operations with mobile crane Risk Assessment Templates
Crane checks on arrival to site
PRIOR TO USE
Access of crane to work areas
Siting and setting up of crane
Lifting of equipment and material
(Mobile crane Operator)
Crane supervision
Crane Maintenance
(revised 06-06-2018)
Every year people are killed or seriously injured by collapses and falling materials while working in excavations. They are at risk from:
Excavations collapsing and burying or injuring people working in them;
material falling from the sides into any excavation; and
people or plant falling into excavations.
Definition
Type of scaffolding system
To familiarize with UAE Legal requirements with respect to Scaffolds
To enhance the skill of scaffold erection and inspection.
Safe Procedure for erection & dismantling
Practical on Scaffold Erection & dismantling
Procedure for Scaffold inspection
Brief description about the height work and brief description about hazards, equipment used for height work and best safety practices during performing a job in a site.
NEVER allow people to be below a suspended load at any time!
ONE TO ONE RULE:
All personnel should be two meter away from the load for every meter the load is above the floor
This presentation provides general information about the requirements of the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER):
What employers need to do to protect your employees
Also useful to employees and their representatives
More information : http://worlifts.co.uk/
16 Scaffolding (Temporary Works) Risk Assessment Templates
Access to work areas by personnel and plant.
Scaffold Material delivery to work area;
Scaffold design and erection standards
(Classified as Temporary Structure)
Scaffold erection
(Classified as Temporary Structure)
Dismantling of scaffold
Maintenance of Scaffold
Worker exposure to direct sun whist working on scaffold
(as applicable)
17 traffic operations working on live roads risk assessment templatesDwarika Bhushan Sharma
17 Traffic Op
erations - Working on live roads Risk Assessment Templates
• Road works
• Road delineation
• Diversions
• Closures
Vehicles and Equipment movements
(Truck and Hi-ab
Access to work areas within enclosed boundaries by personnel and plant.
Worker exposure to direct sun whist working on roads
(as applicable)
Lifting and rigging operations are some of the most hazardous activities we regularly undertake, day in day out. The consequences of something going wrong during a lifting or rigging operation can literally be fatal.
Many construction site mishaps are caused by struck-by or caught against hazards. These hazards result from using mobile machinery and equipment and vehicles onsite. The hazards can be controlled and risks minimized by taking a few simple precautions and training/remind all site workers on these hazards. Everyone needs to be visible and out of the blind spots. Perimeter protection and spotters help with reduce injury, property damage, and maintain continuity. Vehicle and equipment maintenance and inspection are also equally important.
Definition
Type of scaffolding system
To familiarize with UAE Legal requirements with respect to Scaffolds
To enhance the skill of scaffold erection and inspection.
Safe Procedure for erection & dismantling
Practical on Scaffold Erection & dismantling
Procedure for Scaffold inspection
Brief description about the height work and brief description about hazards, equipment used for height work and best safety practices during performing a job in a site.
NEVER allow people to be below a suspended load at any time!
ONE TO ONE RULE:
All personnel should be two meter away from the load for every meter the load is above the floor
This presentation provides general information about the requirements of the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER):
What employers need to do to protect your employees
Also useful to employees and their representatives
More information : http://worlifts.co.uk/
16 Scaffolding (Temporary Works) Risk Assessment Templates
Access to work areas by personnel and plant.
Scaffold Material delivery to work area;
Scaffold design and erection standards
(Classified as Temporary Structure)
Scaffold erection
(Classified as Temporary Structure)
Dismantling of scaffold
Maintenance of Scaffold
Worker exposure to direct sun whist working on scaffold
(as applicable)
17 traffic operations working on live roads risk assessment templatesDwarika Bhushan Sharma
17 Traffic Op
erations - Working on live roads Risk Assessment Templates
• Road works
• Road delineation
• Diversions
• Closures
Vehicles and Equipment movements
(Truck and Hi-ab
Access to work areas within enclosed boundaries by personnel and plant.
Worker exposure to direct sun whist working on roads
(as applicable)
Lifting and rigging operations are some of the most hazardous activities we regularly undertake, day in day out. The consequences of something going wrong during a lifting or rigging operation can literally be fatal.
Many construction site mishaps are caused by struck-by or caught against hazards. These hazards result from using mobile machinery and equipment and vehicles onsite. The hazards can be controlled and risks minimized by taking a few simple precautions and training/remind all site workers on these hazards. Everyone needs to be visible and out of the blind spots. Perimeter protection and spotters help with reduce injury, property damage, and maintain continuity. Vehicle and equipment maintenance and inspection are also equally important.
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
Memorandum Of Association Constitution of Company.pptseri bangash
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
2. USA (v. 2008) 2
Topics of DiscussionTopics of Discussion
• AwarenessAwareness
• Types of ScaffoldingTypes of Scaffolding
• Scaffolding BasicsScaffolding Basics
• Erecting ScaffoldsErecting Scaffolds
• Inspection ofInspection of
ScaffoldsScaffolds
• Do’s and Don’tsDo’s and Don’ts
Photo of Engelmann Gym scaffold (under construction, fall 2005)Photo of Engelmann Gym scaffold (under construction, fall 2005)
3. USA (v. 2008) 3
Anatomy of a FallAnatomy of a Fall
• Source:Source: Anatomy of a Fall diagram from AssociatedAnatomy of a Fall diagram from Associated
General Contractors of Wisconsin, 6General Contractors of Wisconsin, 6thth
Annual State RiskAnnual State Risk
Mgmt. Conference, Madison, 1998Mgmt. Conference, Madison, 1998
4. USA (v. 2008) 4
Scaffolding Accident/Injury StatisticsScaffolding Accident/Injury Statistics
• An estimated 2.3An estimated 2.3
million constructionmillion construction
workers, or 65% of theworkers, or 65% of the
construction industry,construction industry,
work on scaffoldswork on scaffolds
frequently.frequently.
• Protecting theseProtecting these
workers from scaffold-workers from scaffold-
related accidentsrelated accidents
would prevent 4,500would prevent 4,500
injuries and 50 deathsinjuries and 50 deaths
per year.per year.
2004 DOL Statistics
5. USA (v. 2008) 5
Fatalities in Construction (OSHA)Fatalities in Construction (OSHA)
Fall Protection (3 methods):
•Fall Prevention (e.g.,
guardrail system)
•Work Positioning, secures
you to a location, thus
preventing a fall
•Fall Arrest Systems,
consisting of a full body
harness, lanyard, and
anchorage
6. USA (v. 2008) 7
ScaffoldingScaffolding
– with wood poles andwith wood poles and
over 60 feet in heightover 60 feet in height
– frame scaffolds overframe scaffolds over
125 feet in height125 feet in height
– outrigger scaffolds plusoutrigger scaffolds plus
scaffold erectionsscaffold erections
– when intended loadswhen intended loads
exceed tube andexceed tube and
coupler scaffoldcoupler scaffold
standard ratingsstandard ratings
• A registered professional engineer must design andA registered professional engineer must design and
certify scaffolds:certify scaffolds:
8. USA (v. 2008) 9
Supported ScaffoldsSupported Scaffolds
• Ladder Jack
• Pump Jack
• Frame or
Fabricated
• Tube and
Coupler
• Mobile
• Specialty
• Pole
9. USA (v. 2008) 10
Manually PropelledManually Propelled
Mobile ScaffoldsMobile Scaffolds
11. USA (v. 2008) 12
Boatswain’s ChairBoatswain’s Chair
Seat slings must:
• Pass through four corner
holes in the seat,
• Cross on the underside of
the seat,
• Be rigged to prevent
slippage which could
cause the chair to be out-
of-level, and
• Be at least 5/8” diameter
fiber, synthetic, or other
first-grade manila rope of
equivalent criteria
(strength, slip resistance,
durability, etc.).
12. USA (v. 2008) 13
Specialty ScaffoldsSpecialty Scaffolds
• Plasterers‘
• Decorators', and other large-
area scaffolds;
• Bricklayers' square scaffolds;
• Horse scaffolds
• Outrigger scaffolds
• Step, platform, and trestle
ladder scaffolds
• Form and carpenter's bracket
scaffolds
• Window jack scaffolds;
• Crawling boards and chicken
ladders
• Roof bracket scaffolds.
Specialty Scaffolds are designed for a narrow and very specific
range of applications. Specialty Scaffolds Include:
13. USA (v. 2008) 14
Outrigger ScaffoldsOutrigger Scaffolds
Outrigger beams must
be:
Secured in place to
prevent movement,
and
Securely braced at
the fulcrum point to
prevent tipping.
14. USA (v. 2008) 15
Tube and CoupleTube and Couple
ScaffoldsScaffolds
• KlotscheKlotsche
natatorium HVACnatatorium HVAC
renovationrenovation
(Summer 2004)(Summer 2004)
15. USA (v. 2008) 16
Tube and Coupler ScaffoldsTube and Coupler Scaffolds
Light DutyLight Duty
• Not to exceed 25 pounds per
square foot
• 10 foot longitudinal post spacing
• 6 foot traverse post space
• 1 work level
– 8 additional planked levels
– 125 feet maximum height
• 2 work levels
– 4 additional planked levels
– 125 feet maximum height
• 3 work levels
– 0 additional planked levels
– 91 feet maximum height
Medium DutyMedium Duty
• Not to exceed 50 pounds per square
foot
• 8 foot longitudinal post spacing
• 6 foot traverse post space
• 1 work level
– 6 additional planked levels
– 125 feet maximum height
• 2 work levels
– 0 additional planked levels
– 78 feet maximum height
Heavy DutyHeavy Duty
• Not to exceed 75 pounds per square
foot
• 6’ 6” foot longitudinal post spacing
• 6 foot traverse post spacing
• 1 work level
– 6 additional planked levels
– 125 feet maximum height
16. USA (v. 2008) 17
BasicsBasics
• TrainingTraining — Employers must— Employers must
train each employee whotrain each employee who
works on a scaffold on theworks on a scaffold on the
procedures to control orprocedures to control or
minimize the hazards.minimize the hazards.
• InspectionsInspections — Before each— Before each
work shift and after anywork shift and after any
occurrence that could affectoccurrence that could affect
the structural integrity, athe structural integrity, a
competent person mustcompetent person must
inspect the scaffold andinspect the scaffold and
scaffold components forscaffold components for
visible defectsvisible defects..
17. USA (v. 2008) 18
BasicsBasics
• Fall protection (e.g.Fall protection (e.g.
guardrails) required at aguardrails) required at a
10 foot height above a10 foot height above a
lower level.lower level. [[
1926.451(g)(1)1926.451(g)(1)]]
• When erecting andWhen erecting and
dismantling supporteddismantling supported
scaffolds, a competentscaffolds, a competent
person must determineperson must determine
the feasibility of providingthe feasibility of providing
a safe means of accessa safe means of access
and fall protection forand fall protection for
these operationsthese operations
NOTE: guardrails recommended at
work platform heights greater than
4 feet
18. USA (v. 2008) 19
Personal Safety TipsPersonal Safety Tips
19. USA (v. 2008) 20
Personal Safety TipsPersonal Safety Tips
20. USA (v. 2008) 21
Inspect Prior to UseInspect Prior to Use
• All equipmentAll equipment
must bemust be
inspected to seeinspected to see
that it is in goodthat it is in good
condition andcondition and
serviceable.serviceable.
• Damaged orDamaged or
deteriorateddeteriorated
equipment mustequipment must
not be usednot be used
21. USA (v. 2008) 22
Erecting ScaffoldingErecting Scaffolding
• Erect plumb,Erect plumb,
square andsquare and
rigid with allrigid with all
bracebrace
connectionsconnections
securelysecurely
fastenedfastened
22. USA (v. 2008) 23
Tubular Welded-frame ScaffoldsTubular Welded-frame Scaffolds
• Be sure scaffold stays plumb and level as erection progressesBe sure scaffold stays plumb and level as erection progresses
• For mobile scaffolds, use a horizontal diagonal brace, forFor mobile scaffolds, use a horizontal diagonal brace, for
stability, at the base and every 21 feet in height.stability, at the base and every 21 feet in height.
23. USA (v. 2008) 24
• Cross membersCross members
must be lockedmust be locked
together with cottertogether with cotter
pins or equivalentpins or equivalent
• Safway scaffoldsSafway scaffolds
have “G” lockshave “G” locks
which open withwhich open with
slight pressure andslight pressure and
lock automaticallylock automatically
after guardrail slipsafter guardrail slips
into placeinto place
Tubular Welded-Frame ScaffoldsTubular Welded-Frame Scaffolds
24. USA (v. 2008) 25
• Each plank on a continuous run scaffold mustEach plank on a continuous run scaffold must
extend over its supports by at least 6” and overlapextend over its supports by at least 6” and overlap
each other by at least 12”each other by at least 12”
OverlapOverlap
25. USA (v. 2008) 26
• Guardrails and toeboards must be put on all open sidesGuardrails and toeboards must be put on all open sides
and ends of scaffolds 10’ or higherand ends of scaffolds 10’ or higher
• Screening required when materials are stacked higher thanScreening required when materials are stacked higher than
toeboardtoeboard
Guardrails and ToeboardsGuardrails and Toeboards
26. USA (v. 2008) 27
• Side and endSide and end
brackets arebrackets are
designed to supportdesigned to support
people ONLY.people ONLY.
• Brackets are not toBrackets are not to
be used on rollingbe used on rolling
towerstowers
• Brackets introduceBrackets introduce
overturning and/oroverturning and/or
uplift forces.uplift forces.
Side and End BracketsSide and End Brackets
27. USA (v. 2008) 28
• Do not storeDo not store
materials on side ormaterials on side or
end bracketend bracket
platformsplatforms
• Only store materialsOnly store materials
on scaffolds whichon scaffolds which
are for immediateare for immediate
useuse
• Do not overloadDo not overload
platforms withplatforms with
materials.materials.
Side and End BracketsSide and End Brackets
28. USA (v. 2008) 29
ClimbingClimbing
• Do not climb onDo not climb on
cross memberscross members
or railingsor railings
• Access laddersAccess ladders
must be used;must be used;
attachableattachable
ladders mustladders must
extend 3 feetextend 3 feet
above platformabove platform
29. USA (v. 2008) 30
Climb SafelyClimb Safely
• Face the rungsFace the rungs
• Use both handsUse both hands
• Do not carryDo not carry
materials whilematerials while
you climbyou climb
• Keep one handKeep one hand
firmly on frame orfirmly on frame or
ladder at all timesladder at all times
• Rungs and shoesRungs and shoes
should be clean toshould be clean to
avoid slippingavoid slipping
30. USA (v. 2008) 31
Mobile ScaffoldsMobile Scaffolds
• Height not to exceed 4* timesHeight not to exceed 4* times
the minimum base dimensionthe minimum base dimension
• (Example, if base is 6’ x 10’, the
maximum height is 24’)
• Planks must extend the fullPlanks must extend the full
length of the scaffoldlength of the scaffold
• Do not ride on a mobile rollingDo not ride on a mobile rolling
tower scaffold while it is beingtower scaffold while it is being
moved.moved.
• Guardrails and toeboardsGuardrails and toeboards
required on all sides whenrequired on all sides when
over 10 feetover 10 feet
* In California and some other states, height
must not exceed 3 times.
31. USA (v. 2008) 32
Mobile ScaffoldsMobile Scaffolds
• All tools or other objects whichAll tools or other objects which
could fall from the scaffoldcould fall from the scaffold
must be removed or securedmust be removed or secured
before moving the scaffoldbefore moving the scaffold
• At each new location, theAt each new location, the
scaffold shall be put on firmscaffold shall be put on firm
ground and kept plumbground and kept plumb
• Manual force used to move theManual force used to move the
scaffold must be applied asscaffold must be applied as
close to the base as possible,close to the base as possible,
but not more than 5 feet abovebut not more than 5 feet above
the supporting surface.the supporting surface.
32. USA (v. 2008) 33
• The load rating of theThe load rating of the
casters will limit the size,casters will limit the size,
configuration, and loadconfiguration, and load
capacity of the rollingcapacity of the rolling
tower. Casters must betower. Casters must be
rated 4 times therated 4 times the
maximum rated load ofmaximum rated load of
the scaffoldthe scaffold
• Caster and wheel stemCaster and wheel stem
shall be pinned, boltedshall be pinned, bolted
or otherwise secured inor otherwise secured in
scaffold legs orscaffold legs or
adjustment screws.adjustment screws.
Manually Propelled Mobile ScaffoldsManually Propelled Mobile Scaffolds
33. USA (v. 2008) 34
Manually Propelled Mobile ScaffoldsManually Propelled Mobile Scaffolds
• Lock allLock all
casterscasters
beforebefore
getting on agetting on a
rolling tower.rolling tower.
• Casters shallCasters shall
remainremain
locked whilelocked while
in usein use
34. USA (v. 2008) 35
Upright Narrow ScaffoldUpright Narrow Scaffold
• Per instructions of the
UpRight Narrow
Scaffold, the platform
height must not exceed
3 times the smaller
base dimension unless
scaffold is tied to the
structure
35. USA (v. 2008) 36
Upright Narrow Scaffold: read the labelsUpright Narrow Scaffold: read the labels
36. USA (v. 2008) 37
Upright Narrow ScaffoldUpright Narrow Scaffold
37. USA (v. 2008) 38
Inspect Job SiteInspect Job Site
• Inspect job site toInspect job site to
determine grounddetermine ground
conditions, strengthconditions, strength
of supportingof supporting
structure, proximitystructure, proximity
to electric lines &to electric lines &
overheadoverhead
obstructionsobstructions
• Compensate forCompensate for
uneven ground byuneven ground by
using screw jacks &using screw jacks &
base platesbase plates
• Do not use unstable objects suchDo not use unstable objects such
as blocks, loose bricks andas blocks, loose bricks and
similarsimilar objectsobjects
38. USA (v. 2008) 39
Ties, Guys, BracingTies, Guys, Bracing
• Scaffolds must beScaffolds must be
secured to thesecured to the
structure when thestructure when the
height exceeds 4 timesheight exceeds 4 times
the minimum basethe minimum base
widthwidth
– every 30 horizontal feetevery 30 horizontal feet
– every 20 feet or lessevery 20 feet or less
(for scaffolds less than(for scaffolds less than
3 feet wide) or 263 feet wide) or 26
vertical feet or less (forvertical feet or less (for
>3 feet wide)>3 feet wide)
– Outriggers, if used,Outriggers, if used,
must be installed onmust be installed on
both sidesboth sides
39. USA (v. 2008) 40
ClearancesClearances
• Any work where theAny work where the
tube could come intotube could come into
contact with the linecontact with the line
would need to be 6would need to be 6
meters plus themeters plus the
““Danger Zone”Danger Zone”
distance relative todistance relative to
the voltage andthe voltage and
nature of insulation innature of insulation in
order that theorder that the
scaffold tube cannotscaffold tube cannot
enter the “enter the “DangerDanger
Zone”Zone”
40. USA (v. 2008) 41
ClearancesClearances
Minimum Clearances From Electrical Lines
Insulated Lines
Less than 300 volts 3 feet
300 volts to 50 kv 10 feet
More than 50 kv 10 feet plus 4” for each
additional kv
Uninsulated Lines
Up to 50 kv 10 feet
More than 50 kv 10 feet plus 4” for each
additional kv
41. USA (v. 2008) 42
Peronsal Protective EquipmentPeronsal Protective Equipment
• What types of PPE should you use whenWhat types of PPE should you use when
working on or near a scaffold?working on or near a scaffold?
1.1.
2.2.
3.3.
42. USA (v. 2008) 43
What’s Wrong in This Picture?What’s Wrong in This Picture?
43. USA (v. 2008) 44
What’s Wrong in This Picture?What’s Wrong in This Picture?
44. USA (v. 2008) 45
• The concrete blocks are
stacked six high, there
are no base plates on
some legs, scaffold legs
are bearing on unstable
objects, and there is
improper/inadequate
bracing.
What’s Wrong in ThisWhat’s Wrong in This
Picture?Picture?
Photo & Text -- OSHA
45. USA (v. 2008) 46
• This is a shore, or lean-to
scaffold, and it is not
permitted to be used per
OSHA or ANSI.
• In this photo, workers
have a shore scaffold on
top of another shore
scaffold.
• Access is unsafe both
from above and below.
• The only thing holding
this scaffold up is the
DUMPSTER!
What’s Wrong in ThisWhat’s Wrong in This
Picture?Picture?
Photo & Text -- OSHA
46. USA (v. 2008) 47
What’s Wrong in This Picture?What’s Wrong in This Picture?
47. USA (v. 2008) 48
What’s Wrong in This Picture?What’s Wrong in This Picture?
48. USA (v. 2008) 49
What’s Wrong in This Picture?What’s Wrong in This Picture?
• The planks are not
cleated or
otherwise secured
against
displacement,
• There are no
guardrails, and
• There is greater
than a 14-inch gap
between the
building and the
scaffold platform.
49. USA (v. 2008) 50
• Where laddersWhere ladders
end, plasterersend, plasterers
clamber ontoclamber onto
bundles of sticksbundles of sticks
that stud thethat stud the
Great Mosque.Great Mosque.
These serve asThese serve as
scaffolding --ascaffolding --a
grid ofgrid of
permanentpermanent
perches.perches.
• Photograph by SarahPhotograph by Sarah
Leen, NationalLeen, National
Geographic, June 2001Geographic, June 2001
Editor's Notes
Clearance from 1000 volts live insulated power line would be 0.5m + 6.0m = 6.5 m