Chapter 8
Resource Allocation
Allocating Resources to the Project
 Allocation of physical resources to one or multiple
projects.
 At any given time, the firm may have fixed level of
various resources like
- labor-hours of various types of professionals
- machine hours of various types of machinery
- hours of computing time
- specialized locations
 The project schedule should be adjusted to
smooth the use of the resources
Critical Path Method—Crashing a
Project
 Time and cost are interrelated
 The faster an activity is completed, the
more it costs
 Change the schedule and you change
the budget
 Thus many activities can be speeded up
by spending more money
What is Crashing / Crunching?
 To speed up, or expedite, a project
 Of course, the resources to do this must be
available
 Crunching a project changes the schedule for
all activities
 This will have an impact on schedules for all
the subcontractors
 Crunching a project often introduces
unanticipated problems
Direct Cost vs. Indirect Cost
 Direct cost increases if the activity
duration is to be reduced.
 The Indirect cost decreases if the activity
duration is to be reduced.
Activity Cost Slope
Time
Normal
-
Time
Crash
Cost
Normal
-
Cost
Crash

Slope
An Example of Two-Time CPM
Activity Slopes—Cost per Period for
Crashing
Negative slope: as the time required for a project or task is decreased,
the cost is increased.
Crashing the Project
When crashing a project, first task is to
develop a table or graph of the cost of a
project as a function of the project’s various
possible completion dates.
Crash selected activities, one at a time, to
decrease the project duration.
Crashing the Project
Two principles:
•Focus on the critical path(s) when trying to
shorten the duration of a project. (Crashing
a non-critical activity will not influence
project duration.)
•When shortening a project’s duration, select
the least expensive way to do it.
Crashing example
1
3
2
4 6
5
D [10,8]
10
•Direct Cost – Rs. 25,500
Indirect Cost – Rs. 200/day
Step 1
Path Normal Crashing A
by 2 day
ADG 21 19
AEH 37 35
BH 35 35
CFH 25 25
Step 2
Path Normal Crashing A
by 2 day
Crashing E, B
by 3 days
ADG 21 19 19
AEH 37 35 32
BH 35 35 32
CFH 25 25 25
Step 3
Path Normal Crashing
A by 2 day
Crashing
E, B by 3
days
Crashing H
by 2 days
ADG 21 19 19 19
AEH 37 35 32 30
BH 35 35 32 30
CFH 25 25 25 23
Crashing Table
2
5
3
6 7
1 4
A [9,6]
210
G [5,3]
180
H [2,1]
300
Question
•Direct Cost – Rs. 37,500
Indirect Cost – Rs. 250/day
Solution
Question 1:
Events Normal Crash
Activity Time
(days)
Cost
(Rs)
Time
(days)
Cost
(Rs)
1-2 3 360 2 400
2-3 6 1440 4 1620
2-4 9 2160 5 2380
2-5 7 1120 5 1600
3-4 8 400 4 800
4-5 5 1600 3 1770
5-6 3 480 2 760
Indirect cost: Rs100/day
Question 2:
Normal Crash
Activity Time
(days)
Cost
(Rs)
Time
(days)
Cost
(Rs)
Slope
1-2 8 100 6 200 50
1-3 4 150 2 350 100
2-4 2 50 1 90 40
2-5 10 100 5 400 60
3-4 5 100 1 200 25
4-5 3 80 1 100 10
Indirect cost: Rs. 70/day
Risks in Project Crashing
Various external and internal factors may lead project
manager to go for crashing, but it usually affects the
quality of work as the time taken (besides cost) is the
major issue on his mind:
 New resources aren't going to be familiar with the tasks
at hand, so they will probably be less productive than
current team members.
 Who will guide the new members up the learning curve?
Usually it will be the most productive members of the
team, who could themselves be working to get the task
finished more quickly.
 Being available does not equal being qualified. For
example, while outsourcing, one can't be sure that
workers are trained enough to deliver as per expected
standards.
Project Fast Tracking
 Fast tracking means that the activities that are
normally done in sequence are instead performed
partially in parallel. In other words, Fast tracking is
applied by re-scheduling various activities within the
project to be worked on simultaneously instead of
waiting for each piece to be completed separately.
 Fast-tracking always involves risk that could lead to
increased cost and some rework later.
 A good rule of thumb is that sequential activities can
sometimes be fast-tracked by up to 33%. In other
words, if you're fast-tracking, you can start the
second of two sequential activities when the first
activity is 66% complete.
The Resource Allocation
Problem
 As discussed, CPM/PERT ignore resource
utilization and availability
 Critical resources can’t be renewed or
inventoried.
 Schedules need to be evaluated in terms of
both time and resources (scarce ones)
 Time Limited vs. Resource Limited
Resource Loading
 Resource loading describes the amount
of resources an existing schedule
requires
 Gives an understanding of the demands
a project will make of a firm’s resources
Resource A
Resource B
Resource Leveling
 Approach to even out the peaks and
valleys of resource requirements so that
a fixed amount of resources can be
employed over time.
 Less hands-on management is required
 May be able to use just-in-time inventory
 Improves morale
 Fewer personnel problems
Resource Leveling Continued
 When an activity has slack, we can move that
activity to shift its resource usage
 May also be possible to alter the sequence of
activities to levelize resources
 Small projects can be levelized by hand
 Software can levelize resources for larger
projects
 Large projects with multiple resources are very
complex to levelize
Resource Leveling Steps
Create a project activity network diagram and
mention the duration of the activities
Calculate EOT( earliest occurrence time) for
all the events. This helps in calculation of float/
slack of activities
Develop a time-phased resource loading
diagram
Identify any resource conflicts and begin to
smooth the loading table using slacks
Resource Leveling Techniques
1. Shift the start date of an activity within its
slack time
2. Split the activity within its slack time
Resource Leveling Example:
Activity Duration Manpower Req.
1-2 6 8
1-3 10 4
1-4 6 9
2-3 10 7
2-4 4 6
3-5 6 17
4-5 6 6
Q: Reduce the peak manpower requirement and smoothen the period
to period resource requirement.
Solution
Question:
 A job requires the following resources:
Six crane operators have been recruited for the
job. How would you manage the job so as to
complete it at the earliest?
Constrained Resource Scheduling
Heuristic
Approach
An approach, such as a
rule of thumb, that yields
a good solution that may
or may not be optimal.
Optimization
Approach
An approach, such as
linear programming, that
yields the one best
solution.
Heuristic Methods
 The only feasible way on large projects
 While not optimal, the schedules are very
good
 Take the CPM/PERT schedule as a baseline
 They sequentially step through the schedule
trying to move resource requirements around
to levelize them
 Resources are moved around based on one or
more priority rules
Common Priority Rules
 As soon as possible
 As late as possible
 Shortest task first
 Most resources first
 Minimum slack first
 Most critical followers
 Most successors
 Arbitrary
Heuristic Methods Continued
 These are just the common ones
 There are many more
 The heuristic can either start at the
beginning and work forwards
 Or it can start at the end and work
backwards
Optimization Methods
 Finds the one best solution
 Uses either linear programming or
enumeration
 Not all projects can be optimized
 Approaches only work with small to
medium projects
Multi-Project Scheduling and
Resource Allocation
 Scheduling and resource allocation problems increase
with more than one project
 The greater the number of projects, the greater the
problems
 One way is to consider each project as part of a much
larger project
 However, different projects have different goals so
combining may not make sense
 Must also tell us if there are resources to tackle new
projects we are considering
Standards to Measure Schedule
Effectiveness
1. Schedule slippage
2. Resource utilization
3. In-process inventory
Schedule Slippage
 The time past a project’s due date when the
project is completed
 Slippage may cause penalties
 Different projects will have different penalties
 Expediting one project can cause others to slip
 Taking on a new project can cause existing
projects to slip
Resource Utilization
 The percentage of a resource that is
actually used
 We want a schedule that smoothes out
the dips and peaks of resource utilization
 This is especially true of labor, where
hiring and firing is expensive
In-Process Inventory
 This is the amount of work waiting to be
processed because there is a shortage
of some resource
 Similar to WIP in manufacturing
 The cost here is holding cost
Heuristic Techniques
 Multi-projects are too complex for
optimization approaches
 Many of the heuristics are extensions of
the ones used for one project
Additional Priority Rules
 Resource scheduling method
 Minimum late finish time
 Greatest resource demand
 Greatest resource utilization
 Most possible jobs

More Related Content

What's hot

Chapter-5-Scheduling-and-Resource-Allocation.ppt
Chapter-5-Scheduling-and-Resource-Allocation.pptChapter-5-Scheduling-and-Resource-Allocation.ppt
Chapter-5-Scheduling-and-Resource-Allocation.ppt
TecnicoItca
 

What's hot (20)

Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPResource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSP
 
Extension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed IbarhimExtension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed Ibarhim
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Project control
Project controlProject control
Project control
 
Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project Control
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Fast Tracking a Project and Project Crashing.ppt
Fast Tracking a Project and Project Crashing.pptFast Tracking a Project and Project Crashing.ppt
Fast Tracking a Project and Project Crashing.ppt
 
Project cost management
Project cost management Project cost management
Project cost management
 
What is Manpower Planning Organizing Staffing Important objectives of staffin...
What is Manpower Planning Organizing Staffing Important objectives of staffin...What is Manpower Planning Organizing Staffing Important objectives of staffin...
What is Manpower Planning Organizing Staffing Important objectives of staffin...
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Delay Analysis and Concurrent Delay
Delay Analysis and Concurrent DelayDelay Analysis and Concurrent Delay
Delay Analysis and Concurrent Delay
 
Chapter-5-Scheduling-and-Resource-Allocation.ppt
Chapter-5-Scheduling-and-Resource-Allocation.pptChapter-5-Scheduling-and-Resource-Allocation.ppt
Chapter-5-Scheduling-and-Resource-Allocation.ppt
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
ppt for primevera
ppt for primeverappt for primevera
ppt for primevera
 
Controling productivity in construction projects
Controling productivity in construction projectsControling productivity in construction projects
Controling productivity in construction projects
 
Ch7 time cost
Ch7 time costCh7 time cost
Ch7 time cost
 
Resource allocation
Resource allocationResource allocation
Resource allocation
 
crashing of project
crashing of project crashing of project
crashing of project
 
Project Management - Critical path method
Project Management - Critical path methodProject Management - Critical path method
Project Management - Critical path method
 

Similar to Resource-Allocation.ppt

PMGT 510Principles of Project ManagementGroup Assign.docx
PMGT 510Principles of Project ManagementGroup Assign.docxPMGT 510Principles of Project ManagementGroup Assign.docx
PMGT 510Principles of Project ManagementGroup Assign.docx
stilliegeorgiana
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
 MBA 6951, Managing Complex Projects 1 Course Learning.docx MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docx
aryan532920
 
2.06 time management 1
2.06 time management 12.06 time management 1
2.06 time management 1
reddvise
 
Project TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docxProject TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docx
briancrawford30935
 
Scheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.pptScheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.ppt
TecnicoItca
 

Similar to Resource-Allocation.ppt (20)

ch09s.ppt
ch09s.pptch09s.ppt
ch09s.ppt
 
-PM-09-7.ppt
-PM-09-7.ppt-PM-09-7.ppt
-PM-09-7.ppt
 
Ch09 (1).pptx
Ch09 (1).pptxCh09 (1).pptx
Ch09 (1).pptx
 
PMGT 510Principles of Project ManagementGroup Assign.docx
PMGT 510Principles of Project ManagementGroup Assign.docxPMGT 510Principles of Project ManagementGroup Assign.docx
PMGT 510Principles of Project ManagementGroup Assign.docx
 
Allocating resources
Allocating resourcesAllocating resources
Allocating resources
 
Estimating time and cost resoures
Estimating time and cost resouresEstimating time and cost resoures
Estimating time and cost resoures
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
 MBA 6951, Managing Complex Projects 1 Course Learning.docx MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docx
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 
Pert Cpm Nis
Pert   Cpm NisPert   Cpm Nis
Pert Cpm Nis
 
PM Session 6
PM Session 6PM Session 6
PM Session 6
 
2.06 time management 1
2.06 time management 12.06 time management 1
2.06 time management 1
 
Time --updated 60b084af4f5af-
Time --updated 60b084af4f5af-Time --updated 60b084af4f5af-
Time --updated 60b084af4f5af-
 
CSRA Havranek Hostetter Palisade 2012
CSRA Havranek Hostetter Palisade 2012CSRA Havranek Hostetter Palisade 2012
CSRA Havranek Hostetter Palisade 2012
 
The Effective Management of Time
The Effective Management of TimeThe Effective Management of Time
The Effective Management of Time
 
Project TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docxProject TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docx
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
 
4) PTM & PCM .pptx
4) PTM & PCM .pptx4) PTM & PCM .pptx
4) PTM & PCM .pptx
 
Scheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.pptScheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.ppt
 
Project Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksProject Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & Tricks
 
Planning and scheduling Techniques.ppt
Planning and scheduling  Techniques.pptPlanning and scheduling  Techniques.ppt
Planning and scheduling Techniques.ppt
 

More from TecnicoItca

Tesis-de-gerencia-de-proyectos (1).pptx
Tesis-de-gerencia-de-proyectos (1).pptxTesis-de-gerencia-de-proyectos (1).pptx
Tesis-de-gerencia-de-proyectos (1).pptx
TecnicoItca
 
Gestion-Financiera-Semestre-2016-0-ppt.ppt
Gestion-Financiera-Semestre-2016-0-ppt.pptGestion-Financiera-Semestre-2016-0-ppt.ppt
Gestion-Financiera-Semestre-2016-0-ppt.ppt
TecnicoItca
 
Project-Progress-Presentation.pptx
Project-Progress-Presentation.pptxProject-Progress-Presentation.pptx
Project-Progress-Presentation.pptx
TecnicoItca
 
Telsys-Case-International-Management.ppt
Telsys-Case-International-Management.pptTelsys-Case-International-Management.ppt
Telsys-Case-International-Management.ppt
TecnicoItca
 
Project-Management-Introduction.ppt
Project-Management-Introduction.pptProject-Management-Introduction.ppt
Project-Management-Introduction.ppt
TecnicoItca
 
Lecture-8-Scheduling-Resources-and-Cost.pptx
Lecture-8-Scheduling-Resources-and-Cost.pptxLecture-8-Scheduling-Resources-and-Cost.pptx
Lecture-8-Scheduling-Resources-and-Cost.pptx
TecnicoItca
 
Clases-de-Bonos-matematica.ppt
Clases-de-Bonos-matematica.pptClases-de-Bonos-matematica.ppt
Clases-de-Bonos-matematica.ppt
TecnicoItca
 

More from TecnicoItca (20)

tipos-de-organizacion-empresarial.pdf
tipos-de-organizacion-empresarial.pdftipos-de-organizacion-empresarial.pdf
tipos-de-organizacion-empresarial.pdf
 
-Interes-Simple.ppt
-Interes-Simple.ppt-Interes-Simple.ppt
-Interes-Simple.ppt
 
Tesis-de-gerencia-de-proyectos (1).pptx
Tesis-de-gerencia-de-proyectos (1).pptxTesis-de-gerencia-de-proyectos (1).pptx
Tesis-de-gerencia-de-proyectos (1).pptx
 
Gestion-Financiera-Semestre-2016-0-ppt.ppt
Gestion-Financiera-Semestre-2016-0-ppt.pptGestion-Financiera-Semestre-2016-0-ppt.ppt
Gestion-Financiera-Semestre-2016-0-ppt.ppt
 
08-Project-Control-ppt.ppt
08-Project-Control-ppt.ppt08-Project-Control-ppt.ppt
08-Project-Control-ppt.ppt
 
Project-Progress-Presentation.pptx
Project-Progress-Presentation.pptxProject-Progress-Presentation.pptx
Project-Progress-Presentation.pptx
 
-Project-Management.ppt
-Project-Management.ppt-Project-Management.ppt
-Project-Management.ppt
 
Telsys-Case-International-Management.ppt
Telsys-Case-International-Management.pptTelsys-Case-International-Management.ppt
Telsys-Case-International-Management.ppt
 
Project-Management.pptx
Project-Management.pptxProject-Management.pptx
Project-Management.pptx
 
Project-Management.ppt
Project-Management.pptProject-Management.ppt
Project-Management.ppt
 
PROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxPROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptx
 
Project-Management-Introduction.ppt
Project-Management-Introduction.pptProject-Management-Introduction.ppt
Project-Management-Introduction.ppt
 
Project-Manager.ppt
Project-Manager.pptProject-Manager.ppt
Project-Manager.ppt
 
ch10s.ppt
ch10s.pptch10s.ppt
ch10s.ppt
 
Lecture-8-Scheduling-Resources-and-Cost.pptx
Lecture-8-Scheduling-Resources-and-Cost.pptxLecture-8-Scheduling-Resources-and-Cost.pptx
Lecture-8-Scheduling-Resources-and-Cost.pptx
 
Chapter-8-Post-Mid.ppt
Chapter-8-Post-Mid.pptChapter-8-Post-Mid.ppt
Chapter-8-Post-Mid.ppt
 
PM-Chapter8-1.pptx
PM-Chapter8-1.pptxPM-Chapter8-1.pptx
PM-Chapter8-1.pptx
 
Clases-de-Bonos-matematica.ppt
Clases-de-Bonos-matematica.pptClases-de-Bonos-matematica.ppt
Clases-de-Bonos-matematica.ppt
 
Valoracion-de-Bonos.pptx
Valoracion-de-Bonos.pptxValoracion-de-Bonos.pptx
Valoracion-de-Bonos.pptx
 
Bonos-Clase.ppt
Bonos-Clase.pptBonos-Clase.ppt
Bonos-Clase.ppt
 

Recently uploaded

Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
Kamal Acharya
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
Atif Razi
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
AbrahamGadissa
 

Recently uploaded (20)

KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 

Resource-Allocation.ppt

  • 2. Allocating Resources to the Project  Allocation of physical resources to one or multiple projects.  At any given time, the firm may have fixed level of various resources like - labor-hours of various types of professionals - machine hours of various types of machinery - hours of computing time - specialized locations  The project schedule should be adjusted to smooth the use of the resources
  • 3. Critical Path Method—Crashing a Project  Time and cost are interrelated  The faster an activity is completed, the more it costs  Change the schedule and you change the budget  Thus many activities can be speeded up by spending more money
  • 4. What is Crashing / Crunching?  To speed up, or expedite, a project  Of course, the resources to do this must be available  Crunching a project changes the schedule for all activities  This will have an impact on schedules for all the subcontractors  Crunching a project often introduces unanticipated problems
  • 5. Direct Cost vs. Indirect Cost  Direct cost increases if the activity duration is to be reduced.  The Indirect cost decreases if the activity duration is to be reduced.
  • 7. An Example of Two-Time CPM
  • 8. Activity Slopes—Cost per Period for Crashing Negative slope: as the time required for a project or task is decreased, the cost is increased.
  • 9. Crashing the Project When crashing a project, first task is to develop a table or graph of the cost of a project as a function of the project’s various possible completion dates. Crash selected activities, one at a time, to decrease the project duration.
  • 10. Crashing the Project Two principles: •Focus on the critical path(s) when trying to shorten the duration of a project. (Crashing a non-critical activity will not influence project duration.) •When shortening a project’s duration, select the least expensive way to do it.
  • 11. Crashing example 1 3 2 4 6 5 D [10,8] 10 •Direct Cost – Rs. 25,500 Indirect Cost – Rs. 200/day
  • 12. Step 1 Path Normal Crashing A by 2 day ADG 21 19 AEH 37 35 BH 35 35 CFH 25 25
  • 13. Step 2 Path Normal Crashing A by 2 day Crashing E, B by 3 days ADG 21 19 19 AEH 37 35 32 BH 35 35 32 CFH 25 25 25
  • 14. Step 3 Path Normal Crashing A by 2 day Crashing E, B by 3 days Crashing H by 2 days ADG 21 19 19 19 AEH 37 35 32 30 BH 35 35 32 30 CFH 25 25 25 23
  • 16. 2 5 3 6 7 1 4 A [9,6] 210 G [5,3] 180 H [2,1] 300 Question •Direct Cost – Rs. 37,500 Indirect Cost – Rs. 250/day
  • 18. Question 1: Events Normal Crash Activity Time (days) Cost (Rs) Time (days) Cost (Rs) 1-2 3 360 2 400 2-3 6 1440 4 1620 2-4 9 2160 5 2380 2-5 7 1120 5 1600 3-4 8 400 4 800 4-5 5 1600 3 1770 5-6 3 480 2 760 Indirect cost: Rs100/day
  • 19. Question 2: Normal Crash Activity Time (days) Cost (Rs) Time (days) Cost (Rs) Slope 1-2 8 100 6 200 50 1-3 4 150 2 350 100 2-4 2 50 1 90 40 2-5 10 100 5 400 60 3-4 5 100 1 200 25 4-5 3 80 1 100 10 Indirect cost: Rs. 70/day
  • 20. Risks in Project Crashing Various external and internal factors may lead project manager to go for crashing, but it usually affects the quality of work as the time taken (besides cost) is the major issue on his mind:  New resources aren't going to be familiar with the tasks at hand, so they will probably be less productive than current team members.  Who will guide the new members up the learning curve? Usually it will be the most productive members of the team, who could themselves be working to get the task finished more quickly.  Being available does not equal being qualified. For example, while outsourcing, one can't be sure that workers are trained enough to deliver as per expected standards.
  • 21. Project Fast Tracking  Fast tracking means that the activities that are normally done in sequence are instead performed partially in parallel. In other words, Fast tracking is applied by re-scheduling various activities within the project to be worked on simultaneously instead of waiting for each piece to be completed separately.  Fast-tracking always involves risk that could lead to increased cost and some rework later.  A good rule of thumb is that sequential activities can sometimes be fast-tracked by up to 33%. In other words, if you're fast-tracking, you can start the second of two sequential activities when the first activity is 66% complete.
  • 22. The Resource Allocation Problem  As discussed, CPM/PERT ignore resource utilization and availability  Critical resources can’t be renewed or inventoried.  Schedules need to be evaluated in terms of both time and resources (scarce ones)  Time Limited vs. Resource Limited
  • 23. Resource Loading  Resource loading describes the amount of resources an existing schedule requires  Gives an understanding of the demands a project will make of a firm’s resources
  • 26. Resource Leveling  Approach to even out the peaks and valleys of resource requirements so that a fixed amount of resources can be employed over time.  Less hands-on management is required  May be able to use just-in-time inventory  Improves morale  Fewer personnel problems
  • 27. Resource Leveling Continued  When an activity has slack, we can move that activity to shift its resource usage  May also be possible to alter the sequence of activities to levelize resources  Small projects can be levelized by hand  Software can levelize resources for larger projects  Large projects with multiple resources are very complex to levelize
  • 28. Resource Leveling Steps Create a project activity network diagram and mention the duration of the activities Calculate EOT( earliest occurrence time) for all the events. This helps in calculation of float/ slack of activities Develop a time-phased resource loading diagram Identify any resource conflicts and begin to smooth the loading table using slacks
  • 29. Resource Leveling Techniques 1. Shift the start date of an activity within its slack time 2. Split the activity within its slack time
  • 30. Resource Leveling Example: Activity Duration Manpower Req. 1-2 6 8 1-3 10 4 1-4 6 9 2-3 10 7 2-4 4 6 3-5 6 17 4-5 6 6 Q: Reduce the peak manpower requirement and smoothen the period to period resource requirement.
  • 32. Question:  A job requires the following resources: Six crane operators have been recruited for the job. How would you manage the job so as to complete it at the earliest?
  • 33. Constrained Resource Scheduling Heuristic Approach An approach, such as a rule of thumb, that yields a good solution that may or may not be optimal. Optimization Approach An approach, such as linear programming, that yields the one best solution.
  • 34. Heuristic Methods  The only feasible way on large projects  While not optimal, the schedules are very good  Take the CPM/PERT schedule as a baseline  They sequentially step through the schedule trying to move resource requirements around to levelize them  Resources are moved around based on one or more priority rules
  • 35. Common Priority Rules  As soon as possible  As late as possible  Shortest task first  Most resources first  Minimum slack first  Most critical followers  Most successors  Arbitrary
  • 36. Heuristic Methods Continued  These are just the common ones  There are many more  The heuristic can either start at the beginning and work forwards  Or it can start at the end and work backwards
  • 37. Optimization Methods  Finds the one best solution  Uses either linear programming or enumeration  Not all projects can be optimized  Approaches only work with small to medium projects
  • 38. Multi-Project Scheduling and Resource Allocation  Scheduling and resource allocation problems increase with more than one project  The greater the number of projects, the greater the problems  One way is to consider each project as part of a much larger project  However, different projects have different goals so combining may not make sense  Must also tell us if there are resources to tackle new projects we are considering
  • 39. Standards to Measure Schedule Effectiveness 1. Schedule slippage 2. Resource utilization 3. In-process inventory
  • 40. Schedule Slippage  The time past a project’s due date when the project is completed  Slippage may cause penalties  Different projects will have different penalties  Expediting one project can cause others to slip  Taking on a new project can cause existing projects to slip
  • 41. Resource Utilization  The percentage of a resource that is actually used  We want a schedule that smoothes out the dips and peaks of resource utilization  This is especially true of labor, where hiring and firing is expensive
  • 42. In-Process Inventory  This is the amount of work waiting to be processed because there is a shortage of some resource  Similar to WIP in manufacturing  The cost here is holding cost
  • 43. Heuristic Techniques  Multi-projects are too complex for optimization approaches  Many of the heuristics are extensions of the ones used for one project
  • 44. Additional Priority Rules  Resource scheduling method  Minimum late finish time  Greatest resource demand  Greatest resource utilization  Most possible jobs