This document provides information on research design. It begins by defining research design and its key elements. Research design aims to combine relevance to the research purpose with economy in procedure. It indicates decisions regarding what, where, when, how much, and by what means for a research study.
The document then discusses the need for research design, which includes facilitating smooth research operations, minimizing bias and maximizing reliability of results, providing guidance to researchers, and preventing misleading conclusions without a design. Key features of a good research design are also outlined.
Finally, the document outlines different types of research design including exploratory, descriptive, diagnostic, experimental, laboratory experiments, and field experiments. The differences between exploratory and descriptive research designs